1 COMPREHENSIVE PBN PROGRAMMED ACTION PLAN No. Occurance Start Complete Owner Remarks 1 PRE-PLANNING PHASE 1.1 Nomination of the State Focal Point of Contact. Once State 1.2 Once State 1.2.1 Define the goals and objectives of Project. Recurring 1.2.2 Define the Terms of Reference for the Project Manager and Team. Recurring 1.2.3 Recurring 1.2.4 Recurring 1.2.4.1 Once 1.2.4.2 Once 1.2.4.3 Establish implementation target date for PBN Terminal implementation. Once 1.2.4.4 Establish implementation target date for PBN Approaches implementation. Once Approaches 1.2.5 Once Note: This sample Action Plan can be considered as a starting point to assist in establishing a PBN program. It should be adapted as needed to the specific circumstances of a project. The steps are not always conducted in strict sequence, and certain steps may be conducted on a recurring basis as organization of the program progresses. The steps and the sequence in which they are performed in the project should be evaluated by the organizers on the basis of their experience and judgment. Some of the steps are also included in the domain-specific sample action plans. Use of the sample action plan does not ensure full ICAO compliance nor is it intended to supersede or replace state requirements. PBN sample action plans can supplement a robust State safety plan, but not replace state safety plan Area of Operation Not Applicable Appointment of a State PBN Project Manager (preferably the State Focal Point of Contact) and Team as required. Not Applicable Not Applicable State, Regulator, ANSP, Air Operators & Project Team Not Applicable State, Regulator, ANSP, Air Operators & Project Team Coordinate planning and implementation needs with Air Navigation Service Providers, Regulators, Users, aircraft operators and military authorities Not Applicable State, Regulator, ANSP, Air Operators & Project Team Establish implementation target dates per each specific PBN implementation. Oceanic & Remote, Continental En-route, Terminal Operations & Approaches State, Regulator, ANSP, Air Operators & Project Team Establish implementation target date for Oceanic and Remote PBN implementation (if required). Oceanic & Remote State, Regulator, ANSP, Air Operators & Project Team Establish implementation target date for Continental En-route PBN implementation (if required). Continental En-route State, Regulator, ANSP, Air Operators & Project Team Terminal Operations State, Regulator, ANSP, Air Operators & Project Team State, Regulator, ANSP, Air Operators & Project Team Establish protocols for the sharing of resources and experiences between state stakeholders and intra-regionally. Not Applicable State, Regulator, ANSP, Air Operators & Project Team A B C D E F G J 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Sample Comprehensive PBN Model Action Plan

Embed Size (px)

Citation preview

Page 1: Sample Comprehensive PBN Model Action Plan

1

COMPREHENSIVE PBN PROGRAMMED ACTION PLAN

No. Occurance Start Complete Owner Remarks

1 PRE-PLANNING PHASE1.1 Nomination of the State Focal Point of Contact. Once State

1.2 Once State

1.2.1 Define the goals and objectives of Project. Recurring

1.2.2 Define the Terms of Reference for the Project Manager and Team. Recurring

1.2.3 Recurring

1.2.4 Recurring

1.2.4.1 Once

1.2.4.2 Once

1.2.4.3 Establish implementation target date for PBN Terminal implementation. Once

1.2.4.4 Once Approaches

1.2.5 Once

Note: This sample Action Plan can be considered as a starting point to assist in establishing a PBN program. It should be adapted as needed to the specific circumstances of a project. The steps are not always conducted in strict sequence, and certain steps may be conducted on a recurring basis as organization of the program progresses. The steps and the sequence in which they are performed in the project should be evaluated by the organizers on the basis of their experience and judgment. Some of the steps are also included in the domain-specific sample action plans.Use of the sample action plan does not ensure full ICAO compliance nor is it intended to supersede or replace state requirements.PBN sample action plans can supplement a robust State safety plan, but not replace state safety plan

Area of Operation

Not Applicable

Appointment of a State PBN Project Manager (preferably the State Focal Point of Contact) and Team as required.

Not Applicable

Not Applicable

State, Regulator, ANSP, Air Operators & Project Team

Not Applicable

State, Regulator, ANSP, Air Operators & Project Team

Coordinate planning and implementation needs with Air Navigation Service Providers, Regulators, Users, aircraft operators and military authorities

Not Applicable

State, Regulator, ANSP, Air Operators & Project Team

Establish implementation target dates per each specific PBN implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

State, Regulator, ANSP, Air Operators & Project Team

Establish implementation target date for Oceanic and Remote PBN implementation (if required).

Oceanic & Remote

State, Regulator, ANSP, Air Operators & Project Team

Establish implementation target date for Continental En-route PBN implementation (if required).

Continental En-route

State, Regulator, ANSP, Air Operators & Project Team

Terminal Operations

State, Regulator, ANSP, Air Operators & Project Team

Establish implementation target date for PBN Approaches implementation.

State, Regulator, ANSP, Air Operators & Project Team

Establish protocols for the sharing of resources and experiences between state stakeholders and intra-regionally.

Not Applicable

State, Regulator, ANSP, Air Operators & Project Team

A B C D E F G J

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Page 2: Sample Comprehensive PBN Model Action Plan

2

No. Occurance Start Complete Owner RemarksArea of Operation

1.2.6 Once

1.2.7 Establish a project site (if required). Once

1.2.7.1 Establish the documentation format of PBN Implementation Website Once

1.3 Recurring

1.3.1 State WGS-84 implementation status. Recurring

1.3.2 Recurring

1.3.3 Recurring

1.3.4 Air Operator equipage and PBN approval status. Recurring

1.3.5 ANSP CNS-ATM status. Recurring

1.3.5.1 Recurring

1.3.5.2 Evaluate any existing PBN implementation in the CNS Systems. Recurring

Establish protocols for the attendance of Regional PBN Task Force Meetings

Not Applicable

State, Regulator, ANSP, Air Operators & Project Team

Not Applicable

Project Team

Not Applicable

Project Team

Conduct Process 1, Determine Requirements as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 2, including the following Gap Analyses:

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 2

Terminal Operations & Approaches

Project Team, Regulator & ANSP

State Electronic Terrain and Obstacle Data (eTOD) implementation status.

Terminal Operations & Approaches

Project Team, Regulator & ANSP

State implementation status of PBN components (means what? - evelaute any exisitng RNAV or RNOP route or procedure?)

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Evaluate the PBN implementation in the ATC Automated Systems, including Amendment 1 to the PANS/ATM (flight plan provisions).

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

A B C D E F G J

3

16

17

18

19

20

21

22

23

24

25

26

Page 3: Sample Comprehensive PBN Model Action Plan

3

No. Occurance Start Complete Owner RemarksArea of Operation

1.3.5.3 Evaluate any existing PBN implementation in the ATM Systems. Recurring

1.3.6 Recurring

1.3.7 Recurring

1.3.8 Develop appropriate State Airspace Concepts. Recurring

1.3.8.1 Recurring

1.3.8.2 Recurring

1.3.8.3 Analyse air traffic data to obtain airspace/airport traffic flows. Recurring

1.3.8.3 Recurring

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

State Training level status including pilots, ATCs, Flight Procedure Designers, etc.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Evaluate State Flight Procedure Design status including competencies, capacities, tools and data.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Establish and prioritise Strategic Objectives (Safety, Capacity, Environment, etc)

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Analyse aircraft fleet navigation capacity operating in the Airport/Airspace.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Analyse communication, ground navigation (VOR, DME) and surveillance for PBN navigation specification compliance and reversionary mode capabilities. Notice needs to be taken of mixed mode operations.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

A B C D E F G J

3

27

28

29

30

31

32

33

34

Page 4: Sample Comprehensive PBN Model Action Plan

4

No. Occurance Start Complete Owner RemarksArea of Operation

2 PLANNING PHASE

2.1 Formulate a State PBN Implementation Plan/Roadmap. Once

2.1.1 Ensure harmonization within region. Recurring

2.1.2 Recurring

2.1.3 Establish/identify airspace categorization for en-route and areas Recurring

2.1.4 Identify transition areas and transition procedures. Recurring

2.1.5 Identify the restructuring of airspace as appropriate, if required. Recurring

2.2

2.2.1 Develop Corrective Action Plans for Gap Analyses. Recurring

2.2.1.1 Develop Corrective Action Plans for WGS-84 implementation. Recurring

2.2.1.2 Develop Corrective Action Plans for eTOD implementation. Recurring

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote; Continental En-route

Project Team

Devise methodologies for incorporating the effects of projected traffic growth and system changes on occupancy & collision risk in the future environment.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Formulate State PBN Implementation Action Plan including:

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Terminal Operations & Approaches

Project Team, Regulator & ANSP

Terminal Operations & Approaches

Project Team, Regulator & ANSP

A B C D E F G J

3

35

36

37

38

39

40

41

42

43

44

45

Page 5: Sample Comprehensive PBN Model Action Plan

5

No. Occurance Start Complete Owner RemarksArea of Operation

2.2.1.3 Recurring

2.2.1.4 Recurring

2.2.1.5 Develop Corrective Action Plans for CNS Systems implementation. Recurring

2.2.1.6 Develop Corrective Action Plans for ATM Systems implementation. Recurring

2.2.2 Recurring

2.2.3 Develop PBN Performance Measurement Plan. Recurring

2.2.3.1 Recurring

2.2.4 Develop Safety Assessment Plan. Recurring

Develop Corrective Action Plans for Air Operator equipage and approval implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Develop Corrective Action Plans for ATC Automated Systems implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Develop Timeline for Implementation per each specific PBN Implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Prepare Performance Measurement Plan, including gas emission, safety, efficiency and cost benefits.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

A B C D E F G J

3

46

47

48

49

50

51

52

53

Page 6: Sample Comprehensive PBN Model Action Plan

6

No. Occurance Start Complete Owner RemarksArea of Operation

2.2.4.1 Recurring

2.2.4.2 Prepare a data collection programme for airspace safety assessment. Recurring

2.2.5 Recurring

2.2.6 Recurring

2.2.7 Recurring

2.2.8 Recurring

2.3 Conduct a Cost-Benefit Analyses per each specific PBN Implementation. Recurring

2.4 Recurring

Determine which methodology shall be used to evaluate procedure safety, depending on the navigation specification. Consider Airspace Modelling, ATC simulations (fast time and/or real time), Live Trials, etc.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Development of Legislation and Regulation Amendment Plan including scope of amendments required, publication alternatives, approval processes and timelines (if required).

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, State & Regulator

Development of Standards and Procedures Plan including ATS, Air Operator, airworthiness and certification processes.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Develop a PBN Training Needs Plan addressing ATS, Air Operator, airworthiness and certification requirements.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Develop a Progress Reporting Plan including reports to ICAO regional office, state representatives, and all stakeholders as required.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Conduct Process 2, Identifying an ICAO Specification for Implementation as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 3 for each specific PBN implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 3

A B C D E F G J

3

54

55

56

57

58

59

60

61

Page 7: Sample Comprehensive PBN Model Action Plan

7

No. Occurance Start Complete Owner RemarksArea of Operation

3 IMPLEMENTATION PHASE

3.1 Execute Corrective Action Plans for Gap Analyses. Recurring

3.1.1 Execute Corrective Action Plans for WGS-84 implementation. Recurring

3.1.2 Execute Corrective Action Plans for eTOD implementation. Recurring

3.1.3 Recurring

3.1.4 Recurring

3.1.5 Execute Corrective Action Plans for CNS Systems implementation. Recurring

3.1.6 Execute Corrective Action Plans for ATM Systems implementation. Recurring

3.2 Execute State PBN Implementation Plan including: Recurring

3.2.2 Recurring

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Terminal Operations & Approaches

Project Team, Regulator & ANSP

Terminal Operations & Approaches

Project Team, Regulator & ANSP

Execute Corrective Action Plans for Air Operator equipage and approval implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Execute Corrective Action Plans for ATC Automated Systems implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Conduct Process 3, Planning and Implementation as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 4 for each specific PBN Implementation (i.e. Oceanic and Remote, Continental En-route, Arrivals and Departures, and Approaches).

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

A B C D E F G J

3

62

63

64

65

66

67

68

69

70

71

Page 8: Sample Comprehensive PBN Model Action Plan

8

No. Occurance Start Complete Owner RemarksArea of Operation

3.2.2.1 Recurring

3.2.2.2 Recurring

3.2.2.3 Recurring Approaches

3.3 Execute PBN Performance Measurement Plan. Recurring

3.3.1 Execute Performance Measurement Plan for gas emissions. Recurring

3.3.2 Execute Performance Measurement Plan for safety. Recurring

3.3.3 Execute Performance Measurement Plan for efficiencies. Recurring

3.3.4 Execute Performance Measurement Plan for cost benefits. Recurring

3.3.5 Undertake harmonisation of procedures with adjacent states. Recurring

3.4 Recurring

Optimise the airspace structure, by reorganising the network or implementing new routes based on the strategic objectives of the airspace concept.

Oceanic & Remote; Continental En-route

Project Team, Regulator, ANSP & Air Operators

Optimise the airspace structure, by implementing new SIDs and STARs, based on the strategic objectives of the airspace concept.

Terminal Operations

Project Team, Regulator, ANSP & Air Operators

Design Instrument Approach Procedures (RNP APCH/APV Baro-VNAV or RNP AR), based on the strategic objectives of the airspace concept.

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote; Continental En-route

Project Team, Regulator & ANSP

Execute Safety Plan as per each specific PBN implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

A B C D E F G J

3

72

73

74

75

76

77

78

79

80

81

Page 9: Sample Comprehensive PBN Model Action Plan

9

No. Occurance Start Complete Owner RemarksArea of Operation

3.4.1 Prepare preliminary procedure (s) safety assessment. Recurring

3.4.2 Prepare final procedure (s) safety assessment. Recurring

3.5 Execute Legislation and Regulation Amendment Plan (if required). Recurring

3.5.1 Develop and publish regulations for PBN and GNSS use. Recurring

3.5.2 Develop and publish AIC notifying PBN implementation planning. Recurring

3.5.3 Publish AIP Supplement including applicable standards and procedures. Recurring

3.6 Execute Standards and Procedures Plan. Recurring

3.6.1 Develop, harmonise and obtain approval for ATS operational procedures. Recurring

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, State & Regulator

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, State & Regulator

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team & Regulator

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team & Regulator

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

A B C D E F G J

3

82

83

84

85

86

87

88

89

Page 10: Sample Comprehensive PBN Model Action Plan

10

No. Occurance Start Complete Owner RemarksArea of Operation

3.6.2 Review and update the Procedural Manuals of the ATS units involved. Recurring

3.6.3 Update Letters of Agreement between ATS units, if necessary. Recurring

3.6.4 Recurring

3.6.5 Develop and publish procedures for the suspension of PBN. Recurring

3.6.6 Recurring

3.6.7 Develop and publish standards for the charting of PBN. Recurring

3.6.8 Recurring

3.6.9 Develop and publish pilot certification requirements. Recurring

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Develop and publish procedures to accommodate non-approved RNAV/RNP aircraft, when applicable.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Develop and publish procedures for aircraft found to be non-compliant through monitoring.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Develop and publish weather and contingency procedures for applicability under PBN if required.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

A B C D E F G J

3

90

91

92

93

94

95

96

97

Page 11: Sample Comprehensive PBN Model Action Plan

11

No. Occurance Start Complete Owner RemarksArea of Operation

3.6.10 Develop and publish Air Operator approval requirements. Recurring

3.6.11 Develop and publish airworthiness approval requirements. Recurring

3.6.12 Develop and publish aircraft certification approval requirements. Recurring

3.7 Execute Training Needs Plan. Recurring

3.7.1 Recurring

3.7.2 Recurring

3.7.3 Recurring

3.7.4 Recurring

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Hold seminars for stakeholders indicating the plans and the operational and financial benefits expected.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Develop and implement a training programme and documentation for operators (pilots, dispatchers and maintenance).

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

Develop and implement a training programme and documentation for Air Traffic Controllers and AIS Operators.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & ANSP

Develop and implement training programme and documentation for regulators (aviation safety inspectors).

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team & Regulator

A B C D E F G J

3

98

99

100

101

102

103

104

105

Page 12: Sample Comprehensive PBN Model Action Plan

12

No. Occurance Start Complete Owner RemarksArea of Operation

3.8 Recurring Regulator

3.8.1 Recurring

3.8.2 Recurring Regulator

3.8.3 Recurring

3.8.4 Verify operations with a continuing monitoring programme. Recurring

3.9 Recurring

3.9.1 Evaluate operational documentation availability (ATS, OPS/AIR). Recurring

3.9.2 Recurring

Execute ATS, Aircraft and Air Operators Approvals for each type of procedure and navigation specification.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Analyse ATS, aircraft and Air Operator approval requirements, i.e. approval requirements for the navigation specifications to be implemented, as contained in the ICAO PBN Manual.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Approval of ATS, aircraft and Air Operators for each type of procedure and navigation specification.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Establish and keep updated a record of approved ATS, aircraft and Air Operators.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Decision for implementation per each specific PBN implementation (i.e. Oceanic and Remote, Continental En-route, Arrivals and Departures, and Approaches).

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Evaluate the percentage of approved aircraft and operations (mixed equipage concerns).

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator & Air Operators

A B C D E F G J

3

106

107

108

109

110

111

112

113

Page 13: Sample Comprehensive PBN Model Action Plan

13

No. Occurance Start Complete Owner RemarksArea of Operation

3.9.3 Review safety assessment results. Recurring

3.10 Execute Progress Reporting Plan. Recurring

3.10.1 Recurring

3.10.2 Recurring

3.10.3 Report planning and implementation progress to stakeholders. Recurring

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team, Regulator, ANSP & Air Operators

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Report planning and implementation progress to the corresponding Regional Office including lessons learnt.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Report planning and implementation progress to the state representative.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

A B C D E F G J

3

114

115

116

117

118

Page 14: Sample Comprehensive PBN Model Action Plan

14

No. Occurance Start Complete Owner RemarksArea of Operation

4 POST-IMPLEMENTATION PHASE

4.1 System Performance Monitoring. Recurring

4.1.1 Recurring

4.1.2 Recurring

4.1.3 Recurring

4.1.4 Recurring

Occurrence OnceRecurring

Area of Operations

Approaches

Owner StateRegulatorANSP

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Develop post-implementation monitoring programme per each specific PBN implementation including safety, efficiency and environmental issues.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Execute post-implementation operations monitoring programme per each specific PBN implementation.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Perform periodically, other data collections (e.g. ASE stability) in order to ensure that the parameter values used remain current.

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Project Team

Perform periodical assessments of harmonisation with neighbouring states.

Oceanic and Remote & Continental En-route

Project Team

Oceanic & Remote, Continental En-route, Terminal Operations & Approaches

Oceanic & Remote; Continental En-route

Terminal Operations & ApproachesOceanic & RemoteContinental En-routeTerminal Operations

A B C D E F G J

3

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

B121
Administrator: Link to PBN Manual. Are you achieving your Strategic Objectives
Page 15: Sample Comprehensive PBN Model Action Plan

15

No. Occurance Start Complete Owner RemarksArea of Operation

Air Operator

Project Team

A B C D E F G J

3

144

145