COMPREHENSIVE PBN PROGRAMMED ACTION PLAN
No. Occurance Start Complete Owner Remarks
1 PRE-PLANNING PHASE1.1 Nomination of the State Focal Point of Contact. Once State
1.2 Once State
1.2.1 Define the goals and objectives of Project. Recurring
1.2.2 Define the Terms of Reference for the Project Manager and Team. Recurring
1.2.3 Recurring
1.2.4 Recurring
1.2.4.1 Once
1.2.4.2 Once
1.2.4.3 Establish implementation target date for PBN Terminal implementation. Once
1.2.4.4 Once Approaches
1.2.5 Once
Note: This sample Action Plan can be considered as a starting point to assist in establishing a PBN program. It should be adapted as needed to the specific circumstances of a project. The steps are not always conducted in strict sequence, and certain steps may be conducted on a recurring basis as organization of the program progresses. The steps and the sequence in which they are performed in the project should be evaluated by the organizers on the basis of their experience and judgment. Some of the steps are also included in the domain-specific sample action plans.Use of the sample action plan does not ensure full ICAO compliance nor is it intended to supersede or replace state requirements.PBN sample action plans can supplement a robust State safety plan, but not replace state safety plan
Area of Operation
Not Applicable
Appointment of a State PBN Project Manager (preferably the State Focal Point of Contact) and Team as required.
Not Applicable
Not Applicable
State, Regulator, ANSP, Air Operators & Project Team
Not Applicable
State, Regulator, ANSP, Air Operators & Project Team
Coordinate planning and implementation needs with Air Navigation Service Providers, Regulators, Users, aircraft operators and military authorities
Not Applicable
State, Regulator, ANSP, Air Operators & Project Team
Establish implementation target dates per each specific PBN implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
State, Regulator, ANSP, Air Operators & Project Team
Establish implementation target date for Oceanic and Remote PBN implementation (if required).
Oceanic & Remote
State, Regulator, ANSP, Air Operators & Project Team
Establish implementation target date for Continental En-route PBN implementation (if required).
Continental En-route
State, Regulator, ANSP, Air Operators & Project Team
Terminal Operations
State, Regulator, ANSP, Air Operators & Project Team
Establish implementation target date for PBN Approaches implementation.
State, Regulator, ANSP, Air Operators & Project Team
Establish protocols for the sharing of resources and experiences between state stakeholders and intra-regionally.
Not Applicable
State, Regulator, ANSP, Air Operators & Project Team
A B C D E F G J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2
No. Occurance Start Complete Owner RemarksArea of Operation
1.2.6 Once
1.2.7 Establish a project site (if required). Once
1.2.7.1 Establish the documentation format of PBN Implementation Website Once
1.3 Recurring
1.3.1 State WGS-84 implementation status. Recurring
1.3.2 Recurring
1.3.3 Recurring
1.3.4 Air Operator equipage and PBN approval status. Recurring
1.3.5 ANSP CNS-ATM status. Recurring
1.3.5.1 Recurring
1.3.5.2 Evaluate any existing PBN implementation in the CNS Systems. Recurring
Establish protocols for the attendance of Regional PBN Task Force Meetings
Not Applicable
State, Regulator, ANSP, Air Operators & Project Team
Not Applicable
Project Team
Not Applicable
Project Team
Conduct Process 1, Determine Requirements as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 2, including the following Gap Analyses:
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 2
Terminal Operations & Approaches
Project Team, Regulator & ANSP
State Electronic Terrain and Obstacle Data (eTOD) implementation status.
Terminal Operations & Approaches
Project Team, Regulator & ANSP
State implementation status of PBN components (means what? - evelaute any exisitng RNAV or RNOP route or procedure?)
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Evaluate the PBN implementation in the ATC Automated Systems, including Amendment 1 to the PANS/ATM (flight plan provisions).
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
A B C D E F G J
3
16
17
18
19
20
21
22
23
24
25
26
3
No. Occurance Start Complete Owner RemarksArea of Operation
1.3.5.3 Evaluate any existing PBN implementation in the ATM Systems. Recurring
1.3.6 Recurring
1.3.7 Recurring
1.3.8 Develop appropriate State Airspace Concepts. Recurring
1.3.8.1 Recurring
1.3.8.2 Recurring
1.3.8.3 Analyse air traffic data to obtain airspace/airport traffic flows. Recurring
1.3.8.3 Recurring
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
State Training level status including pilots, ATCs, Flight Procedure Designers, etc.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Evaluate State Flight Procedure Design status including competencies, capacities, tools and data.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Establish and prioritise Strategic Objectives (Safety, Capacity, Environment, etc)
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Analyse aircraft fleet navigation capacity operating in the Airport/Airspace.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Analyse communication, ground navigation (VOR, DME) and surveillance for PBN navigation specification compliance and reversionary mode capabilities. Notice needs to be taken of mixed mode operations.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
A B C D E F G J
3
27
28
29
30
31
32
33
34
4
No. Occurance Start Complete Owner RemarksArea of Operation
2 PLANNING PHASE
2.1 Formulate a State PBN Implementation Plan/Roadmap. Once
2.1.1 Ensure harmonization within region. Recurring
2.1.2 Recurring
2.1.3 Establish/identify airspace categorization for en-route and areas Recurring
2.1.4 Identify transition areas and transition procedures. Recurring
2.1.5 Identify the restructuring of airspace as appropriate, if required. Recurring
2.2
2.2.1 Develop Corrective Action Plans for Gap Analyses. Recurring
2.2.1.1 Develop Corrective Action Plans for WGS-84 implementation. Recurring
2.2.1.2 Develop Corrective Action Plans for eTOD implementation. Recurring
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote; Continental En-route
Project Team
Devise methodologies for incorporating the effects of projected traffic growth and system changes on occupancy & collision risk in the future environment.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Formulate State PBN Implementation Action Plan including:
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Terminal Operations & Approaches
Project Team, Regulator & ANSP
Terminal Operations & Approaches
Project Team, Regulator & ANSP
A B C D E F G J
3
35
36
37
38
39
40
41
42
43
44
45
5
No. Occurance Start Complete Owner RemarksArea of Operation
2.2.1.3 Recurring
2.2.1.4 Recurring
2.2.1.5 Develop Corrective Action Plans for CNS Systems implementation. Recurring
2.2.1.6 Develop Corrective Action Plans for ATM Systems implementation. Recurring
2.2.2 Recurring
2.2.3 Develop PBN Performance Measurement Plan. Recurring
2.2.3.1 Recurring
2.2.4 Develop Safety Assessment Plan. Recurring
Develop Corrective Action Plans for Air Operator equipage and approval implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Develop Corrective Action Plans for ATC Automated Systems implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Develop Timeline for Implementation per each specific PBN Implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Prepare Performance Measurement Plan, including gas emission, safety, efficiency and cost benefits.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
A B C D E F G J
3
46
47
48
49
50
51
52
53
6
No. Occurance Start Complete Owner RemarksArea of Operation
2.2.4.1 Recurring
2.2.4.2 Prepare a data collection programme for airspace safety assessment. Recurring
2.2.5 Recurring
2.2.6 Recurring
2.2.7 Recurring
2.2.8 Recurring
2.3 Conduct a Cost-Benefit Analyses per each specific PBN Implementation. Recurring
2.4 Recurring
Determine which methodology shall be used to evaluate procedure safety, depending on the navigation specification. Consider Airspace Modelling, ATC simulations (fast time and/or real time), Live Trials, etc.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Development of Legislation and Regulation Amendment Plan including scope of amendments required, publication alternatives, approval processes and timelines (if required).
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, State & Regulator
Development of Standards and Procedures Plan including ATS, Air Operator, airworthiness and certification processes.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Develop a PBN Training Needs Plan addressing ATS, Air Operator, airworthiness and certification requirements.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Develop a Progress Reporting Plan including reports to ICAO regional office, state representatives, and all stakeholders as required.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Conduct Process 2, Identifying an ICAO Specification for Implementation as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 3 for each specific PBN implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 3
A B C D E F G J
3
54
55
56
57
58
59
60
61
7
No. Occurance Start Complete Owner RemarksArea of Operation
3 IMPLEMENTATION PHASE
3.1 Execute Corrective Action Plans for Gap Analyses. Recurring
3.1.1 Execute Corrective Action Plans for WGS-84 implementation. Recurring
3.1.2 Execute Corrective Action Plans for eTOD implementation. Recurring
3.1.3 Recurring
3.1.4 Recurring
3.1.5 Execute Corrective Action Plans for CNS Systems implementation. Recurring
3.1.6 Execute Corrective Action Plans for ATM Systems implementation. Recurring
3.2 Execute State PBN Implementation Plan including: Recurring
3.2.2 Recurring
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Terminal Operations & Approaches
Project Team, Regulator & ANSP
Terminal Operations & Approaches
Project Team, Regulator & ANSP
Execute Corrective Action Plans for Air Operator equipage and approval implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Execute Corrective Action Plans for ATC Automated Systems implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Conduct Process 3, Planning and Implementation as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 4 for each specific PBN Implementation (i.e. Oceanic and Remote, Continental En-route, Arrivals and Departures, and Approaches).
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
A B C D E F G J
3
62
63
64
65
66
67
68
69
70
71
8
No. Occurance Start Complete Owner RemarksArea of Operation
3.2.2.1 Recurring
3.2.2.2 Recurring
3.2.2.3 Recurring Approaches
3.3 Execute PBN Performance Measurement Plan. Recurring
3.3.1 Execute Performance Measurement Plan for gas emissions. Recurring
3.3.2 Execute Performance Measurement Plan for safety. Recurring
3.3.3 Execute Performance Measurement Plan for efficiencies. Recurring
3.3.4 Execute Performance Measurement Plan for cost benefits. Recurring
3.3.5 Undertake harmonisation of procedures with adjacent states. Recurring
3.4 Recurring
Optimise the airspace structure, by reorganising the network or implementing new routes based on the strategic objectives of the airspace concept.
Oceanic & Remote; Continental En-route
Project Team, Regulator, ANSP & Air Operators
Optimise the airspace structure, by implementing new SIDs and STARs, based on the strategic objectives of the airspace concept.
Terminal Operations
Project Team, Regulator, ANSP & Air Operators
Design Instrument Approach Procedures (RNP APCH/APV Baro-VNAV or RNP AR), based on the strategic objectives of the airspace concept.
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote; Continental En-route
Project Team, Regulator & ANSP
Execute Safety Plan as per each specific PBN implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
A B C D E F G J
3
72
73
74
75
76
77
78
79
80
81
9
No. Occurance Start Complete Owner RemarksArea of Operation
3.4.1 Prepare preliminary procedure (s) safety assessment. Recurring
3.4.2 Prepare final procedure (s) safety assessment. Recurring
3.5 Execute Legislation and Regulation Amendment Plan (if required). Recurring
3.5.1 Develop and publish regulations for PBN and GNSS use. Recurring
3.5.2 Develop and publish AIC notifying PBN implementation planning. Recurring
3.5.3 Publish AIP Supplement including applicable standards and procedures. Recurring
3.6 Execute Standards and Procedures Plan. Recurring
3.6.1 Develop, harmonise and obtain approval for ATS operational procedures. Recurring
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, State & Regulator
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, State & Regulator
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team & Regulator
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team & Regulator
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
A B C D E F G J
3
82
83
84
85
86
87
88
89
10
No. Occurance Start Complete Owner RemarksArea of Operation
3.6.2 Review and update the Procedural Manuals of the ATS units involved. Recurring
3.6.3 Update Letters of Agreement between ATS units, if necessary. Recurring
3.6.4 Recurring
3.6.5 Develop and publish procedures for the suspension of PBN. Recurring
3.6.6 Recurring
3.6.7 Develop and publish standards for the charting of PBN. Recurring
3.6.8 Recurring
3.6.9 Develop and publish pilot certification requirements. Recurring
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Develop and publish procedures to accommodate non-approved RNAV/RNP aircraft, when applicable.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Develop and publish procedures for aircraft found to be non-compliant through monitoring.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Develop and publish weather and contingency procedures for applicability under PBN if required.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
A B C D E F G J
3
90
91
92
93
94
95
96
97
11
No. Occurance Start Complete Owner RemarksArea of Operation
3.6.10 Develop and publish Air Operator approval requirements. Recurring
3.6.11 Develop and publish airworthiness approval requirements. Recurring
3.6.12 Develop and publish aircraft certification approval requirements. Recurring
3.7 Execute Training Needs Plan. Recurring
3.7.1 Recurring
3.7.2 Recurring
3.7.3 Recurring
3.7.4 Recurring
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Hold seminars for stakeholders indicating the plans and the operational and financial benefits expected.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Develop and implement a training programme and documentation for operators (pilots, dispatchers and maintenance).
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
Develop and implement a training programme and documentation for Air Traffic Controllers and AIS Operators.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & ANSP
Develop and implement training programme and documentation for regulators (aviation safety inspectors).
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team & Regulator
A B C D E F G J
3
98
99
100
101
102
103
104
105
12
No. Occurance Start Complete Owner RemarksArea of Operation
3.8 Recurring Regulator
3.8.1 Recurring
3.8.2 Recurring Regulator
3.8.3 Recurring
3.8.4 Verify operations with a continuing monitoring programme. Recurring
3.9 Recurring
3.9.1 Evaluate operational documentation availability (ATS, OPS/AIR). Recurring
3.9.2 Recurring
Execute ATS, Aircraft and Air Operators Approvals for each type of procedure and navigation specification.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Analyse ATS, aircraft and Air Operator approval requirements, i.e. approval requirements for the navigation specifications to be implemented, as contained in the ICAO PBN Manual.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Approval of ATS, aircraft and Air Operators for each type of procedure and navigation specification.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Establish and keep updated a record of approved ATS, aircraft and Air Operators.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Decision for implementation per each specific PBN implementation (i.e. Oceanic and Remote, Continental En-route, Arrivals and Departures, and Approaches).
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Evaluate the percentage of approved aircraft and operations (mixed equipage concerns).
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator & Air Operators
A B C D E F G J
3
106
107
108
109
110
111
112
113
13
No. Occurance Start Complete Owner RemarksArea of Operation
3.9.3 Review safety assessment results. Recurring
3.10 Execute Progress Reporting Plan. Recurring
3.10.1 Recurring
3.10.2 Recurring
3.10.3 Report planning and implementation progress to stakeholders. Recurring
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team, Regulator, ANSP & Air Operators
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Report planning and implementation progress to the corresponding Regional Office including lessons learnt.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Report planning and implementation progress to the state representative.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
A B C D E F G J
3
114
115
116
117
118
14
No. Occurance Start Complete Owner RemarksArea of Operation
4 POST-IMPLEMENTATION PHASE
4.1 System Performance Monitoring. Recurring
4.1.1 Recurring
4.1.2 Recurring
4.1.3 Recurring
4.1.4 Recurring
Occurrence OnceRecurring
Area of Operations
Approaches
Owner StateRegulatorANSP
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Develop post-implementation monitoring programme per each specific PBN implementation including safety, efficiency and environmental issues.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Execute post-implementation operations monitoring programme per each specific PBN implementation.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Perform periodically, other data collections (e.g. ASE stability) in order to ensure that the parameter values used remain current.
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Project Team
Perform periodical assessments of harmonisation with neighbouring states.
Oceanic and Remote & Continental En-route
Project Team
Oceanic & Remote, Continental En-route, Terminal Operations & Approaches
Oceanic & Remote; Continental En-route
Terminal Operations & ApproachesOceanic & RemoteContinental En-routeTerminal Operations
A B C D E F G J
3
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
15
No. Occurance Start Complete Owner RemarksArea of Operation
Air Operator
Project Team
A B C D E F G J
3
144
145