The 300 MW Sakaka IPP is the first plant in the Saudi national renewable energy program. The plant, located at Al Jouf, will cover an area of 6 square kilometres, which is the equivalent of approximately 1,000 football fields. Sakaka IPP will harness solar energy by utilizing photovoltaic (PV) technology to generate electricity at a world record-breaking tariff of US Cents 2.3417/kWh (8.781 halalas/kWh). The total investment in the project is US $302 million. Through the Sakaka IPP, ACWA Power is pioneering renewable energy projects in the country and contributing to the Saudi national renewable energy programme which aims to produce 9.5GW of renewable energy by 2023. KINGDOM OF SAUDI ARABIA Al Jouf TECHNO-COMMERCIAL Offtaker Saudi Power Procurement Offtake Contract PPA-BOO 25 years Power 300 MW Project Cost USD 302 Mn ACWA Power Effective Stake 70% STAKEHOLDERS Other Investors Al Gihaz (30%) EPC A consortium of Mahindra Susten Private Limited & Chint Solar (Zheijang) Company LTD O&M NOMAC Sakaka IPP 300 MW Company

Sakaka IPP (compressed) - ACWA Power · The 300 MW Sakaka IPP is the first plant in the Saudi national renewable energy program. The plant, located at Al Jouf, will cover an area

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sakaka IPP (compressed) - ACWA Power · The 300 MW Sakaka IPP is the first plant in the Saudi national renewable energy program. The plant, located at Al Jouf, will cover an area

The 300 MW Sakaka IPP is the first plant in the Saudi national renewable energy program. The plant, located at Al Jouf, will cover an area of 6 square kilometres, which is the equivalent of approximately 1,000 football fields. Sakaka IPP will harness solar energy by utilizing photovoltaic (PV) technology to generate electricity at a world record-breaking tariff of US Cents 2.3417/kWh (8.781 halalas/kWh). The total investment in the project is US $302 million.

Through the Sakaka IPP, ACWA Power is pioneering renewable energy projects in the country and contributing to the Saudi national renewable energy programme which aims to produce 9.5GW of renewable energy by 2023.

KINGDOM OF SAUDI ARABIA Al Jouf

TECHNO-COMMERCIAL Offtaker Saudi Power Procurement Offtake Contract PPA-BOO 25 years Power 300 MW Project Cost USD 302 Mn ACWA Power Effective Stake 70%

STAKEHOLDERS

Other Investors Al Gihaz (30%)

EPC A consortium of Mahindra Susten Private Limited & Chint Solar (Zheijang) Company LTD

O&M NOMAC

Sakaka IPP

300 MW

Company

Page 2: Sakaka IPP (compressed) - ACWA Power · The 300 MW Sakaka IPP is the first plant in the Saudi national renewable energy program. The plant, located at Al Jouf, will cover an area

Sakaka IPP