12
GIS Application in Sabah Sarawak Gas Pipeline Group -9 Anshu, AIIM 1

Sabah Sarawak Gas Pipeline

Embed Size (px)

Citation preview

Page 1: Sabah Sarawak Gas Pipeline

GIS Application in Sabah Sarawak Gas Pipeline

Group -9

Anshu, Abhishek, Vineet

AIIM

1

Page 2: Sabah Sarawak Gas Pipeline

Overview

• Problem Statement• Old Way, New Way• Route Influences• Least-Cost Path

AIIM

2

Page 3: Sabah Sarawak Gas Pipeline

Problem

Select alignment alternatives for optimal cross-country pipeline construction that meet project requirements.

Summarize alignment alternatives to facilitate real dollar cost estimation for early concept development (+/- 50%)

AIIM

3

Page 4: Sabah Sarawak Gas Pipeline

Old Problem, Old Solution

The Manual Method Small Scale Paper Maps (State Regulatory

Dept, etc…) Hand Delineation(marking out) Terrain Evaluation from Aerial Photographs

AIIM

4

Page 5: Sabah Sarawak Gas Pipeline

Old Problem, New Solution

The GIS Method Digital Maps Spatial Database (retrieval & storage) Data Manipulation Raster Analysis (Map Algebra, LCP, etc.)

Used properly, GIS methods are faster, more efficient, more

comprehensive, and less expensive than traditional methods.

AIIM

5

Page 6: Sabah Sarawak Gas Pipeline

Route Influences

Engineering/Cost

BiophysicalSocioeconomic

AIIM

6

Page 7: Sabah Sarawak Gas Pipeline

AIIM

7

Page 8: Sabah Sarawak Gas Pipeline

What is Least-Cost Path?

LEAST-COST PATHCOST SURFACE LEAST-COST SURFACE(VECTOR)

LEAST-COST PATH(VECTOR)

Land Cover

+ =

COST SURFACE COST SURFACE LEAST-COST Surface

Land Cover Terrain-SlopeAIIM

8

Page 9: Sabah Sarawak Gas Pipeline

Cost-Weighted Surface

LEAST-COST/WEIGHTED

Terrain-Slope

* .60 =

* .40 =

Land Cover

+ =

Influence

AIIM

9

Page 10: Sabah Sarawak Gas Pipeline

Inserting Dollar Costs

Pipe Summary

• Length• Geometry

Crossing Report

• Type• Subtype• Frequenc

y• Length

Productivity

• -• -• -

Construction

Summary• Labor

Crew• Equipmen

t

Cost Estimate Spread Sheet

GIS Cost Estimating Manual

AIIM

10

Page 11: Sabah Sarawak Gas Pipeline

SSGP Status

Social objections

Completion extended from 2011 to 2013.

AIIM

11

Page 12: Sabah Sarawak Gas Pipeline

Thank You

AIIM

12