Why Should Every Day Count
For You?
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
2/33
Todays Agenda
What is Every Day Counts (EDC)?
First Round
State Transportation Innovation Council Exchanges
Round II
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
3/33
What is Every Day Counts?
EDC was launched in 2010
It is FHWAs effort to provide National
leadership in the quest to meet the
transportation demands of the 21st Century. The Purpose is to identify and deploy
innovation aimed at shortening project
delivery, enhancing the safety of our roadways,and improving environmental sustainability
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
4/33
It has a finite number of initiatives
Performance measure developed
Implementation teams formed with federal,state, local and industry partners
What is Every Day Counts?
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
5/33
Why Every Day Counts?
Doing more with less with new technology
and research
Moving research into practice
Common platform for consistency across the
country
Dont duplicate research
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
6/33
These innovations offer benefits such as enhanced
safety during construction and throughout the life of
the project; better quality, so that highways and
bridges last longer and require less maintenance; andless impact on the driving public during construction
Every state transportation agency has applied one or
more of the technologies, and many are now widely
used
Benefits of Every Day
Counts?
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
7/33
Summit / Kickoff
Albuquerque, NM on October 25-26, 2010
LA Representatives attended from
Construction Planning
Environmental Real Estate
Project Development Bridge Design
Traffic Operations Materials/Pavement
Utilities LegalChief Engineer FHWA
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
8/33
3 Areas of Focus
Accelerating Technology and Innovation
Deployment
Shortening Project Delivery Toolkit
Accelerated Project Delivery Methods
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
9/33
Accelerating Technology and
Innovation Deployment
Warm mix asphalt
Prefabricated bridge elements and systems
Adaptive signal control technology
Shoulder wedge
Geosynthetic reinforced soil
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
10/33
Warm Mix Asphalt
Allows producers of hot mix asphalt to lower
their mixing temperature
Reduces costs because 30-35% less fuel is
required
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
11/33
Warm Mix Asphalt
Research - Final construction project (US 61near New Orleans) completed fall 2012
LTRC is in the final stages of evaluating the
research data They feel all indications will show the WMA
should perform as well, if not better than
conventional HMA
They anticipate only a few minor changes may be
proposed to the current specifications
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
12/33
Shoulder Wedge
Safety Edge tapers the edge of the roadwaypavement 30-35 degrees to allow drivers who
drift off highways to return to the pavement
safely and helps eliminate the problem ofvertical drop-offs
This is the optimal angle for recovery
Helps even the lighter cars which are morevulnerable
Even at higher speeds it allows a safe recovery
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
13/33
Shoulder Wedge
Memorandum from DOTD Chief Engineer and
Chief of Operations to DOTD designers to
incorporate Shoulder Wedge in constructionplans on all projects where applicable sent
February 21, 2011
DOTD is monitoring the crash history
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
14/33
Shoulder Wedge
The Safety Edge for has been applied to
pavements in all 50 states, Puerto Rico, and
the District of Columbia and in each Federal
Lands Highway office.
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
15/33
Shortening Project Delivery
Toolkit Planning and environmental linkages
Legal sufficiency enhancements
Expanding the use of programmatic agreements
Use of in-lieu fee and mitigation banking
Clarifying the scope of preliminary design
Flexibilities in right-of-way
Flexibilities in utility accommodation and relocation
Enhanced technical assistance on delayed EISs
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
16/33
Planning and Environmental
Linkages (PEL)
Decision making early in the planning stage
that considers environmental, community and
economic goals and carries them through the
project development, design and construction
The Stage 0, environmental and MPO
checklists were updated with the PEL
language and are being used on all projects
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
17/33
Expanding Programmatic
Agreements
In May 2012 the Corps hired staff to fill the
funded position
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
18/33
Clarifying the Scope of
Preliminary Design
Identifies the amount of design work
allowable under current law prior to NEPA
completion
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
19/33
Clarifying the Scope of
Preliminary Design
DOTD Environmental Section
determines that a preliminary CE
is required and notifies PM
Preliminary design begins
60% Preliminary Plans submitted
to the Environmental Section
with a request to initiate the
environmental process
Environmental Section notifies
PM when CE is complete
Final Design commences
Categorical Exclusion
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
20/33
Clarifying the Scope of
Preliminary Design
EA/EIS process begins
Concurrent:
Some preliminary designactivities for widening/
limited alternatives
coordinate with FHWA
Line & Grade foralternatives considered
Environmental
document complete
FHWA approves FONSI /ROD
Preliminary & final
design complete
Environmental Assessment/Environmental Impact Statement
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
21/33
Accelerated Project Delivery
Methods Construction Manager/General Contractor
Design Build
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
22/33
Design Build
Process where design and construction phases
are combined into one contract and allow
aspects of design and construction to run
concurrently
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
23/33
Design Build
Time savings
Early contractor involvement
Elimination of a separate construction contractor
bid phase
Fewer change and extra work orders
Project innovations for project needs and
contractor capabilities
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
24/33
Design Build
DOTD is pursuing future design build projects
The Design Build Manual has been completed
and was place on the DOTD website
November 21, 2012
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
25/33
State Transportation
Innovation Council (STIC)
Brings stakeholders together to work together
to lead innovation in their state transportation
program
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
26/33
Mission: Facilitate the rapid implementation
of technology, tactics and techniques among
transportation program delivery professionalsat all levels of state government and
throughout the private and non-profit sector
to ensure smart, efficient investment in theirStates highway infrastructure
State Transportation
Innovation Council
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
27/33
State Transportation
Innovation CouncilMembership
DOTD
FHWA
LTAP
Local Public Agencies
MPOs
Contractors
Consultants
LTRC
Secretary LeBas, Ann Wills
Wes Bolinger, Mary Stringfellow
Mary Walsh
Tom Stephens, Dennis Woodward
Jeff Roesel
Ken Naquin, Don Weathers
Mike McGaugh
Sam Cooper, Mark Morvant
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
28/33
Exchanges
EDC-Exchanges are regularly scheduled series
of webinars on EDC topics
Attendees are in seminar rooms across the
country and interact with webinar presenters
by text chat, polls, surveys, or voice calling in
questions to the subject matter experts who
will then respond during the program
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
29/33
Exchanges in 2011- 2012
Exchange #1 Construction Manager / GeneralContractor (CMGC) delivery method December 15,2011
Exchange #2 Geosynthetic Reinforced Soil (GRS)
Integrated Bridge System (IBS) February 16, 2012 Exchange #3 Flexibility in ROW April 19, 2012
Exchange #4 In-Lieu Fees / Mitigation Banking June21, 2012
Exchange #5 Adaptive Signal Control Technology(ASCT) August 16, 2012
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
30/33
EDC Round II
FHWA is focused on a new set of technologies andworking with their state and local partners to deliver
better, faster and safer roads and bridges that have
higher quality and last longer
FHWA is promoting 13 innovations to state, local and
regional transportation agencies and to the design
and construction industries
Summit/Kickoff was held November 7-8, 2012 inDallas, TX
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
31/33
EDC Round II Topics
Programmatic Agreements II
Locally Administered Federal-Aid Projects
Three-Dimensional Modeling
Intelligent Compaction
Accelerated Bridge Construction
Design Build Construction Manager/General Contractor
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
32/33
EDC Round II Topics
Alternative Technical Concepts
High Friction Surfaces
Intersection and Interchange Geometrics
Geospatial Data Collaboration
Implementing Quality Environmental
Documentation
SHRP 2 National Traffic Incident Management
Responder Training
7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013
33/33
Summary & Questions