S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

Embed Size (px)

Citation preview

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    1/33

    Why Should Every Day Count

    For You?

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    2/33

    Todays Agenda

    What is Every Day Counts (EDC)?

    First Round

    State Transportation Innovation Council Exchanges

    Round II

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    3/33

    What is Every Day Counts?

    EDC was launched in 2010

    It is FHWAs effort to provide National

    leadership in the quest to meet the

    transportation demands of the 21st Century. The Purpose is to identify and deploy

    innovation aimed at shortening project

    delivery, enhancing the safety of our roadways,and improving environmental sustainability

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    4/33

    It has a finite number of initiatives

    Performance measure developed

    Implementation teams formed with federal,state, local and industry partners

    What is Every Day Counts?

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    5/33

    Why Every Day Counts?

    Doing more with less with new technology

    and research

    Moving research into practice

    Common platform for consistency across the

    country

    Dont duplicate research

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    6/33

    These innovations offer benefits such as enhanced

    safety during construction and throughout the life of

    the project; better quality, so that highways and

    bridges last longer and require less maintenance; andless impact on the driving public during construction

    Every state transportation agency has applied one or

    more of the technologies, and many are now widely

    used

    Benefits of Every Day

    Counts?

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    7/33

    Summit / Kickoff

    Albuquerque, NM on October 25-26, 2010

    LA Representatives attended from

    Construction Planning

    Environmental Real Estate

    Project Development Bridge Design

    Traffic Operations Materials/Pavement

    Utilities LegalChief Engineer FHWA

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    8/33

    3 Areas of Focus

    Accelerating Technology and Innovation

    Deployment

    Shortening Project Delivery Toolkit

    Accelerated Project Delivery Methods

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    9/33

    Accelerating Technology and

    Innovation Deployment

    Warm mix asphalt

    Prefabricated bridge elements and systems

    Adaptive signal control technology

    Shoulder wedge

    Geosynthetic reinforced soil

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    10/33

    Warm Mix Asphalt

    Allows producers of hot mix asphalt to lower

    their mixing temperature

    Reduces costs because 30-35% less fuel is

    required

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    11/33

    Warm Mix Asphalt

    Research - Final construction project (US 61near New Orleans) completed fall 2012

    LTRC is in the final stages of evaluating the

    research data They feel all indications will show the WMA

    should perform as well, if not better than

    conventional HMA

    They anticipate only a few minor changes may be

    proposed to the current specifications

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    12/33

    Shoulder Wedge

    Safety Edge tapers the edge of the roadwaypavement 30-35 degrees to allow drivers who

    drift off highways to return to the pavement

    safely and helps eliminate the problem ofvertical drop-offs

    This is the optimal angle for recovery

    Helps even the lighter cars which are morevulnerable

    Even at higher speeds it allows a safe recovery

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    13/33

    Shoulder Wedge

    Memorandum from DOTD Chief Engineer and

    Chief of Operations to DOTD designers to

    incorporate Shoulder Wedge in constructionplans on all projects where applicable sent

    February 21, 2011

    DOTD is monitoring the crash history

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    14/33

    Shoulder Wedge

    The Safety Edge for has been applied to

    pavements in all 50 states, Puerto Rico, and

    the District of Columbia and in each Federal

    Lands Highway office.

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    15/33

    Shortening Project Delivery

    Toolkit Planning and environmental linkages

    Legal sufficiency enhancements

    Expanding the use of programmatic agreements

    Use of in-lieu fee and mitigation banking

    Clarifying the scope of preliminary design

    Flexibilities in right-of-way

    Flexibilities in utility accommodation and relocation

    Enhanced technical assistance on delayed EISs

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    16/33

    Planning and Environmental

    Linkages (PEL)

    Decision making early in the planning stage

    that considers environmental, community and

    economic goals and carries them through the

    project development, design and construction

    The Stage 0, environmental and MPO

    checklists were updated with the PEL

    language and are being used on all projects

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    17/33

    Expanding Programmatic

    Agreements

    In May 2012 the Corps hired staff to fill the

    funded position

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    18/33

    Clarifying the Scope of

    Preliminary Design

    Identifies the amount of design work

    allowable under current law prior to NEPA

    completion

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    19/33

    Clarifying the Scope of

    Preliminary Design

    DOTD Environmental Section

    determines that a preliminary CE

    is required and notifies PM

    Preliminary design begins

    60% Preliminary Plans submitted

    to the Environmental Section

    with a request to initiate the

    environmental process

    Environmental Section notifies

    PM when CE is complete

    Final Design commences

    Categorical Exclusion

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    20/33

    Clarifying the Scope of

    Preliminary Design

    EA/EIS process begins

    Concurrent:

    Some preliminary designactivities for widening/

    limited alternatives

    coordinate with FHWA

    Line & Grade foralternatives considered

    Environmental

    document complete

    FHWA approves FONSI /ROD

    Preliminary & final

    design complete

    Environmental Assessment/Environmental Impact Statement

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    21/33

    Accelerated Project Delivery

    Methods Construction Manager/General Contractor

    Design Build

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    22/33

    Design Build

    Process where design and construction phases

    are combined into one contract and allow

    aspects of design and construction to run

    concurrently

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    23/33

    Design Build

    Time savings

    Early contractor involvement

    Elimination of a separate construction contractor

    bid phase

    Fewer change and extra work orders

    Project innovations for project needs and

    contractor capabilities

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    24/33

    Design Build

    DOTD is pursuing future design build projects

    The Design Build Manual has been completed

    and was place on the DOTD website

    November 21, 2012

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    25/33

    State Transportation

    Innovation Council (STIC)

    Brings stakeholders together to work together

    to lead innovation in their state transportation

    program

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    26/33

    Mission: Facilitate the rapid implementation

    of technology, tactics and techniques among

    transportation program delivery professionalsat all levels of state government and

    throughout the private and non-profit sector

    to ensure smart, efficient investment in theirStates highway infrastructure

    State Transportation

    Innovation Council

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    27/33

    State Transportation

    Innovation CouncilMembership

    DOTD

    FHWA

    LTAP

    Local Public Agencies

    MPOs

    Contractors

    Consultants

    LTRC

    Secretary LeBas, Ann Wills

    Wes Bolinger, Mary Stringfellow

    Mary Walsh

    Tom Stephens, Dennis Woodward

    Jeff Roesel

    Ken Naquin, Don Weathers

    Mike McGaugh

    Sam Cooper, Mark Morvant

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    28/33

    Exchanges

    EDC-Exchanges are regularly scheduled series

    of webinars on EDC topics

    Attendees are in seminar rooms across the

    country and interact with webinar presenters

    by text chat, polls, surveys, or voice calling in

    questions to the subject matter experts who

    will then respond during the program

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    29/33

    Exchanges in 2011- 2012

    Exchange #1 Construction Manager / GeneralContractor (CMGC) delivery method December 15,2011

    Exchange #2 Geosynthetic Reinforced Soil (GRS)

    Integrated Bridge System (IBS) February 16, 2012 Exchange #3 Flexibility in ROW April 19, 2012

    Exchange #4 In-Lieu Fees / Mitigation Banking June21, 2012

    Exchange #5 Adaptive Signal Control Technology(ASCT) August 16, 2012

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    30/33

    EDC Round II

    FHWA is focused on a new set of technologies andworking with their state and local partners to deliver

    better, faster and safer roads and bridges that have

    higher quality and last longer

    FHWA is promoting 13 innovations to state, local and

    regional transportation agencies and to the design

    and construction industries

    Summit/Kickoff was held November 7-8, 2012 inDallas, TX

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    31/33

    EDC Round II Topics

    Programmatic Agreements II

    Locally Administered Federal-Aid Projects

    Three-Dimensional Modeling

    Intelligent Compaction

    Accelerated Bridge Construction

    Design Build Construction Manager/General Contractor

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    32/33

    EDC Round II Topics

    Alternative Technical Concepts

    High Friction Surfaces

    Intersection and Interchange Geometrics

    Geospatial Data Collaboration

    Implementing Quality Environmental

    Documentation

    SHRP 2 National Traffic Incident Management

    Responder Training

  • 7/29/2019 S56_Why Should Every Day Count for You How Every Day Has Counted in Louisiana Our Successes So Far!_LTC2013

    33/33

    Summary & Questions

    Contact Person

    Ann Wills

    Director of Local Public AssistancePrograms

    225-379-2515

    [email protected]

    mailto:[email protected]:[email protected]