9
Scale: 1:250 m 2ND FLR FRAMING PLAN 2 Scale: 1:250 m 3RD FLR FRAMING PLAN 3 CERTIFIED BY: PROPOSED INFORMATION & COMMUNICATION TECHNOLOGY CENTER (ICTC) ACADEMIC BLDG. VICE CHANCELLOR FOR ADMIN. & FIN. ENGR. POLAUS M. BARI, D.M. EXECUTIVE DIRECTOR, ICTC EMMANUEL M. LAGARE, Ph.D. ENGR. PRESCO A. ERAT STRUCTURAL ENGINEER PRC No.: PTR No.: DATE ISSUED: TIN No.: PREPARED BY: CHRISTIAN C. CAÑETE ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT SUKARNO D. TANGGOL, DPA RECOMMENDING APPROVAL: APPROVED BY: ARCHT. ANACLETO Y. TAMOSO OIC - DIRECTOR, PHYSICAL PLANT DIVISION SHEET No.: DATE: FEBRUARY 7, 2013 A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. Scale: 1:250 m FOUNDATION PLAN 1 Scale: 1:50 m COMBINED FOOTING 1 (CF-1) DETAIL 4 Scale: 1:50 m COMBINED FOOTING 4 (CF-4) DETAIL 5 S1 8 of 30

S-ICTC

Embed Size (px)

Citation preview

  • Scale: 1:250 m

    2ND FLR FRAMING PLAN

    2

    Scale: 1:250 m

    3RD FLR FRAMING PLAN

    3

    CERTIFIED BY:

    PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERATSTRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    CHRISTIAN C. CAETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    Scale: 1:250 m

    FOUNDATION PLAN

    1

    Scale: 1:50 m

    COMBINED FOOTING 1 (CF-1) DETAIL

    4

    Scale: 1:50 m

    COMBINED FOOTING 4 (CF-4) DETAIL

    5

    S18 of 30

  • Scale: 1:250 m

    ROOFDECK FRAMING PLAN

    1

    Scale: 1:250 m

    ROOF FRAMING PLAN

    3

    Scale: 1:250 m

    ROOF BEAM PLAN

    2

    CERTIFIED BY:

    PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERATSTRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    CHRISTIAN C. CAETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    Scale: 1:50 m

    COMBINED FOOTING 2 (CF-2) DETAIL

    4

    Scale: 1:50 m

    COMBINED FOOTING 3 (CF-3) DETAIL

    5

    S29 of 30

  • Scale: 1:50 m

    TRANSVERSE STRUCTURE PROFILE OF TIE BEAM

    4

    Scale: 1:40 m

    TIE BEAM DETAIL

    5

    TYPICAL TIE BEAM PROFILE (TB)

    TIE BEAM PROFILE AT ELEVATOR SHAFT (TB-X)

    CERTIFIED BY:

    PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERATSTRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    CHRISTIAN C. CAETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    Scale: 1:50 m

    COMBINED FOOTING 5 (CF-5) DETAIL

    1

    Scale: 1:25 m

    COLUMN DETAIL

    3

    Scale: 1:50 m

    WALL FOOTING DETAIL

    2

    S310 of 30

  • CERTIFIED BY:

    PROPOSED INFORMATION &

    COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.

    VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.

    EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERAT

    STRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSO

    OIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    Scale: 1:25 m

    SCHEDULE OF BEAM

    1

    S411 of 30

  • CERTIFIED BY:

    PROPOSED INFORMATION &

    COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.

    VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.

    EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERAT

    STRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    ENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSO

    OIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    Scale: 1:25 m

    SCHEDULE OF BEAM

    1

    S512 of 30

  • CERTIFIED BY:

    PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERATSTRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    CHRISTIAN C. CAETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    S614 of 30

    Scale: 1:25 m

    SECOND FLOOR SLAB DET.

    1

    Scale: 1:25 m

    CONCRETE CANOPY DET.

    2

    Scale: 1:25 m

    CONCRETE GUTTER DETAIL

    3

    SECOND FLOOR SLAB PLAN DETAIL

    SECOND FLOOR SLAB SECTION THRU - X

    REAR CON. CANOPY

    FRONT CON. CANOPY

    SEC

    ON

    D F

    LOO

    R S

    LAB

    SEC

    TIO

    N T

    HR

    U -

    Y

    REAR CON. GUTTER @ LOBBY

    INSIDE CONCRETE GUTTERREAR CONCRETE GUTTER

  • CERTIFIED BY:

    PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERATSTRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    CHRISTIAN C. CAETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    S715 of 30

    Scale: 1:25 m

    MAIN STAIR FOOTING DETAIL

    2

    Scale: 1:25 m

    SIDE STAIR LANDING PLAN

    7

    Scale: 1:25 m

    SIDE STAIR LANDING SECTION

    6

    Scale: 1:50 m

    SIDE STAIR PROFILE

    5

    Scale: 1:25 m

    MAIN STAIR SECTION

    1

    Scale: 1:60 m

    MAIN STAIR PROFILE

    4

    Scale: 1:60 m

    MAIN STAIR PLAN

    3

    Scale: 1:25 m

    SIDE STAIR DETAIL

    8

    Scale: 1:25 m

    TYPICAL STEEL HAND RAIL DET.

    9

  • CERTIFIED BY:

    PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERATSTRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    CHRISTIAN C. CAETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    Scale: 1:30 m

    ELEVATOR FOOTING DET.

    1

    Scale: 1:30 m

    ELEVATOR FOOTING SECTION X

    2

    Scale: 1:30 m

    ELEVATOR SHAFT DETAIL

    3

    Scale: 1:20 m

    PLANTED COL. DET.

    7

    Scale: 1:20 m

    FOLDED SLAB DET.

    8

    Scale: 1:50 m

    MACHINE ROOM LAYOUT

    4

    Scale: 1:60 m

    MACHINE ROOM ROOF DET.

    6

    Scale: 1:60 m

    MACHINE ROOM ROOF FRAMING PLAN

    5

    S816 of 30

  • CERTIFIED BY:

    PROPOSED INFORMATION &COMMUNICATION TECHNOLOGY CENTER

    (ICTC) ACADEMIC BLDG.VICE CHANCELLOR FOR ADMIN. & FIN.

    ENGR. POLAUS M. BARI, D.M.EXECUTIVE DIRECTOR, ICTC

    EMMANUEL M. LAGARE, Ph.D.ENGR. PRESCO A. ERATSTRUCTURAL ENGINEER

    PRC No.:

    PTR No.:

    DATE ISSUED:

    TIN No.:

    PREPARED BY:

    CHRISTIAN C. CAETEENGINEERING ASSISTANT, PHYSICAL PLANT DIVISION CHANCELLOR, MSU-IIT

    SUKARNO D. TANGGOL, DPA

    RECOMMENDING APPROVAL: APPROVED BY:

    ARCHT. ANACLETO Y. TAMOSOOIC - DIRECTOR, PHYSICAL PLANT DIVISION

    SHEET No.:

    DATE:

    FEBRUARY 7, 2013A. BONIFACIO AVE., MSU-IIT CAMPUS, TIBANGA, ILIGAN CITY

    DRAWINGS & SPECIFICATIONS & OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED, OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY & DOCUMENTS OF MSU - ILIGAN INSTITUTE OF TECHNOLOY , WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR

    NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF & FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS.

    5-25mmX25mmX5mm BAR FLOORING

    25mmX25mmX5mm BAR

    38mmX38mmX5mm BAR

    25mmX25mmX5mm BAR

    38mmX38mmX5mm BAR

    A

    X

    G.I. PIPE

    G.I. PIPE

    38mmX38mmX5mm BAR

    38mmX38mmX5mm BAR

    5-25mmX25mmX5mm BAR FLOORING

    38mmX38mmX5mm BAR

    38mmX38mmX5mm BAR

    SECTION THRU-XSCALE: 1:30m

    SECTION THRU-ASCALE: 1:15m

    PLANSCALE: 1:30m

    G.I. PIPE

    G.I. PIPE

    G.I. PIPE

    G.I. PIPE

    G.I. PIPE

    G.I. PIPE

    G.I. PIPE

    Scale: 1:30 m

    STEEL STAIR DETAIL

    1

    Scale: 1:40 m

    WATER TANK PLATFORM DET.

    2

    Scale: 1:25 m

    STEEL TRUSS 1 (T-1) DETAIL

    3

    Scale: 1:25 m

    STEEL TRUSS 3 (T-3) DETAIL

    5

    Scale: 1:25 m

    STEEL TRUSS 4 (T-4) DETAIL

    6

    Scale: 1:25 m

    STEEL TRUSS 2 (T-2) DETAIL

    4

    S917 of 30

    08. S-109. S-210. S-311. S-412. S-514. S-615. S-716. S-817. S-9