2
RSS Lab 1 Checkoff Your mission, should you choose to accept it, is to familiarize yourselves with the μOrcboard, the multimeter, the oscilloscope, and the Wiki. Upon completion of each section, please signal a member of the RSS staff for a checkoff. Team Number: Name: 1 Learning about the μOrcboard Staff Initials 11 1 10 9 7 6 5 4 3 8 2 Word Bank Power Switch ESTOP Motor Drivers QuadPhase Encoder Input DC Input (7-24V) Battery DC Input (7-24V) Slow Digital I/O Fast Digital I/O Ethernet Port USB Port Analog Input 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 1

RSS Lab 1 Checkoff - courses.csail.mit.educourses.csail.mit.edu/6.141/.../labs/Orcboard/Orcboard/Checkoff-Sheet.pdf · RSS Lab 1 Checkoff Your mission, should you choose to accept

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RSS Lab 1 Checkoff - courses.csail.mit.educourses.csail.mit.edu/6.141/.../labs/Orcboard/Orcboard/Checkoff-Sheet.pdf · RSS Lab 1 Checkoff Your mission, should you choose to accept

RSS Lab 1 CheckoffYour mission, should you choose to accept it, is to familiarize yourselves with the

µOrcboard, the multimeter, the oscilloscope, and the Wiki. Upon completion of each

section, please signal a member of the RSS staff for a checkoff.

Team Number: Name:

1 Learning about the µOrcboard

Staff Initials

11

1

10

9

7 6 5

4

3

8

2

Word Bank

Power Switch ESTOP

Motor Drivers QuadPhase Encoder Input

DC Input (7-24V) Battery DC Input (7-24V)

Slow Digital I/O Fast Digital I/O

Ethernet Port USB Port

Analog Input

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

1

Page 2: RSS Lab 1 Checkoff - courses.csail.mit.educourses.csail.mit.edu/6.141/.../labs/Orcboard/Orcboard/Checkoff-Sheet.pdf · RSS Lab 1 Checkoff Your mission, should you choose to accept

2 Using the Multimeter and Scope

Staff Initials

Multimeter Oscilloscope

PWM % Voltage Total Period High Duration Signal Magnitude

-100%

-80%

-60%

-40%

-20%

0%

20%

40%

60%

80%

100%

3 Personal and Team Wiki Page

Staff Initials

2