0 Réseau électrique métropolitain (REM) cdpqinfra.com Technical briefing Project update March 21, 2017

Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

0

Réseau électrique

métropolitain

(REM)

cdpqinfra.com

Technical briefing

Project update

March 21, 2017

Page 2: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

OUR WORK CONTINUES

> Consultation process

> Improvements made to date

> Three priority areas

> Innovative agreement with the UPA and the CMM

1

Page 3: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

CONSULTATION PROCESS2

> Meetings with more than 3,000 citizens and

300 representatives, including elected officials,

environmental groups, heritage specialists

> Regularly-scheduled working groups on fluidity

and project integration with municipal experts and

transit authorities

> Ongoing meetings to refine technical aspects

of the project

> Consultation and collaboration process to continue

throughout the development and construction phases

Page 4: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

IMPROVEMENTS (AUGUST 2016)

IMPROVEMENTS MADE TO DATE3

> Three new downtown Montréal stations

announced to improve the REM’s integration:

• Two new connections to the Montréal métro

(Green and Blue lines)

• Bassin Peel Station intended to serve both

Griffintown and Pointe-St-Charles

> Acquisition of the CN structure leading to Central

Station to avoid impacts on heritage buildings

(Rodier Building and New City Gas) and closure

of three streets

> Underground tunnel to avoid the Des Sources

nature park

> Facilities moved at the Ste-Anne-de-Bellevue

station to avoid wetlands

NEW STATIONSNEW STATIONS

Page 5: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

IMPROVEMENTS MADE TO DATE4

> Partnerships to allow for multimodal access

to stations

> Provide concrete alternatives to solo driving

by allowing future REM users to access

stations in diverse and complementary ways

PLANTING OF 250,000 TREES

> A partnership with Jour de la Terre to offset GHG

emissions during the REM’s construction phase

> Ensure that the project helps reduce GHG

emissions right from the start of construction

TRANSPORTATION COCKTAIL

Page 6: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

TODAY: WORK CONTINUES

> Consultations identified needs in three priority areas

in which improvements are ongoing:

5

Increased service

frequency

FREQUENCY

More seamless commute

and easier access

to stations

FLUIDITY

Better

integration into urban

development plans,

transit systems

and the environment

INTEGRATION

Page 7: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

FREQUENCY: +20% DEPARTURES

> 40 new cars added to increase service quality and

reduce pressure on the Orange line

6

(1) Theoretical capacity of a REM metro train: 600 passengers

Morning peak time (three-hour period)

TRAVEL TIME FREQUENCYNUMBER OF

DEPARTURES

GROWTH IN NUMBER OF

DEPARTURES (%)

THEORETICAL

CAPACITY(1)

From the South Shore

to downtown

(including the central section

to Bois-Franc)

under 16 min (to downtown)

2.5 min3 min before

72 departures +20% 43,200

From Deux-Montagnes

to downtownunder 35 min 5 min

6 min before36 departures +20% 21,600

From the West Island

to downtownunder 35 min 10 min

12 min before18 departures +20% 10,800

From the airport

to downtownunder 26 min

Express: 18-20 min10 min

12 min before18 departures +20% 10,800

Page 8: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

FREQUENCY: PEAK TIME OPERATING PLAN7

+20%DEPARTURES

Page 9: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

FLUIDITY: EASY ACCESS TO STATIONS8

> Raised tracks at avenue des Bois and at

rue des Érables in Laval

> Raised roadway at rue Henri-Dunant

in Deux-Montagnes

PEDESTRIAN AND BIKE ACCESS ROAD ACCESS NEAR STATIONS

> Pedestrian overpass at Ville Mont-Royal

railway tracks

> Pedestrian overpass for western access

to Brossard’s du Quartier station

> More direct access from Central Station

to the Bonaventure métro station

> Connections to existing bike paths

Page 10: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

INTEGRATION: ENVIRONMENT AND MUNICIPALITIES9

> Wildlife territories to be built within the coulée verte

du ruisseau Bertrand eco-territory

> Commitment to preserving wildlife and

the environment, including wetlands and protected

areas

> Relocation of the Kirkland station to

Jean-Yves Street

> Access to the shared Pointe-Saint-Charles

Maintenance Centre

ENVIRONMENT STATIONS AND FACILITIES

Page 11: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

SUMMARY OF IMPROVEMENTS10

Legend

August 2016

improvements

November 2016

improvements

March 2017

improvements

March 2017

Improved frequency

throughout

the network

NOVEMBER 2016 • Three new

stations in downtown Montréal

and connections to the Green

and Blue métro lines

AUGUST 2016 • Direct access

to Central Station through

the structure acquired from

CN and tunnel plan to preserve

the Des Sources nature park

MARCH 2017 • Optimized

facilities

Page 12: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

PROJECT COST UPDATE11

Project costs(in millions of dollars)

Estimated

costs

REM project April 2016 5,500

Three new stations in downtown Montréal November 2016 400

> Recent improvements March 2017 140

CONSTRUCTION COSTS 6,040

Page 13: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

PROMOTING THE USE OF AGRICULTURAL LAND

> Three partners join forces to promote the use of agricultural land

12

Participation in

the creation of a trust

and its financing

CDPQ INFRA

Management

of trust activities

UPA

Designation

of a metropolitan

agricultural park

CMM

Protection and cultivation

of agricultural land

AGRICULTURAL

LAND

TRUST

AGRICULTURAL LAND

acquired to create a belt

An innovative agreement

Page 14: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

A NEW INNOVATIVE AGREEMENT13

Land trust objectives

> Ensure the vitality and use of agricultural

land around the REM

> Better promote the use of woodlands

and forest corridors

> Contribute to maintaining production on

agricultural land and cultivation of unused land

Page 15: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)

NEXT STEPS14

Environmental /

agricultural decrees

Start of

construction

Operation of

first trains

Call for

proposals

Spring

2017

Fall

2017

End of

2020

Summer

2017

Page 16: Réseau électrique métropolitain (REM)...Mar 21, 2017  · the Des Sources nature park MARCH 2017 • Optimized facilities. PROJECT COST UPDATE 11 Project costs (in millions of dollars)