Tamaki River Studio 3rd Year BLA UNITEC, NZ
Citation preview
Case Studies_
ROTARY CYCLEWAY
Scale 1:100,000
WAKAARANGA CREEK TO HALF MOON BAY EXTENSION
The Tamaki region is expected to grow substantually in the next 30 years, as prediceted it will need to house another 300,000 people. My question lies heavily around transport and how people are going to get to the main transport stops such as ferry, train and bus.
After the initial investigation of the Tamaki regions transport network, I had an interest in the cycling aspect and what developments would help the growing region. This led to an investigation of the Tamaki, focusing on waterfronts and I identified 20 initial sites from which 3 were selected for further investigation.
After evaluating the maps I spotted a missing link in the Rotary Walkway network between Wakaaranga Creek and Half-Moon Bay ferry terminal, and I choose to fill this gap with a shared cycle/walkway along the coast.
This brought up many problems from: unsuitable sloped areas, mangrove infested waters and stormwater issues.
The designing of the site was particularly hard due to the inaccessability of most of my designs path. This meaned a heavy reliance on GIS mapping and on-site investigation.
ROTARY CYCLEWAY
Å
Å
Å
Å
Å
Å
Å!(
¿
¿
¿
¿
¿
1_Green Space 2_Existing Cycleways and Walkways
3_Watersheds and Streams 4_Transport System 5_Sand + Mangroves 6_Slope 15 Degrees +0_Site Location
Scale 1:100,000 Scale 1:100,000 Scale 1:100,000 Scale 1:100,000 Scale 1:100,000 Scale 1:100,000
0_ 1_ 2_ 5_4_3_ 6_
Ørnesvingen is the most spectacular viewpoint along the eagle road, a zig-zag road along the steep valley sides of Geiranger-fjord in Møre and Romsdal. Located at one of its many bends the viewpoint gives tourists breathtaking views over the recently acknowledged UNESCO world heritage site, making it one of Norway’s major tourist attrac-tions.
The project consists of three overlapping white concrete slabs overhanging the edge of a 600 me-ter vertical drop, enabling the observer to step out into the airspace. The river on site is guided over a glazed front, forming a waterfall on the very edge of the viewpoint. Information boards in glass ex-plain specific locations in the scenery
NEW PLYMOUTH COASTAL WALKWAYORNESVINGEN VIEWPOINT
The Coastal Walkway is an award-winning, 10 kilo-metre (6.2 mile) long walkway located along the coast of New Plymouth, New Zealand. The length of the walkway stretches out from Hickford Park, in the centre of the city, to Bell Block, north-east of New Plymouth.
A design-led approach was followed for the exten-sion, with care to make the coastal walkway and cycleway accessible for all. This accessibility has been a key to the overall projects success and the high level of community buy-in and ownership for the project.
_Connection to Half-Moon Bay Marina
_Wastewater Treatment
_Protection of Environmental features
_Creation of Viewshafts and amenities
Aims_Aims_
Kieran Dove
Lookout
Boardwalk Concrete Path Reclamation
StormwaterManagement
Existing Path Lookout Concrete Path Sand Mangroves
Open Space
A
B
C
B
A
C
Wakaaranga Creek_A_ This section explains the reclamation along the Half Moon Bay cliff. The width varies depending on the site conditions along the edge but it will have atleast 2m of planting at the base of the cliff for stabilisation purpose.
B_ The lookout is a feature that was designed to create an amenity vantage point over the creek from Venus Place and Curacao Place. This was influenced by the stormwater treatment plan that was going to re-vegetate and help clean stormwater outlets and make them an amenity rather than a eye sore.
C_ This section helps identify the interaction you and the plants, also it helps connection with the existing pathways.
Wakaaranga Creek_
Lookout_
Reclamation
A_
B_
C_
Kieran Dove
TheThe lookout is designed to react to the existing plant-ing, with an organic form that suits the vegetation and does not disturb the slope.
ReclamationReclamation is an essential move to create a link to Half Moon Bay Marina. But along the cliff edge there can be a different kind of
design intervention than reclamation, this is dependent on site conditions and which suits it more. I have given a list of a few ex-amples of other types of intervention that can be implemented along the route:
1_ Reclaim land
2_ Boardwalk
3_ On land path
4_ Bridge
When needed, one of these types could be used, along with others not
mentioned. This will create a different experience
through the cycleway and give the user a greater enjoy-ment of biking or walking rather than using vehicles.
1_
4_3_2_
Kieran Dove