EX CONCRETE WALKWAY EX SWINGS LOCATION MAP Plan scale 1" = 10'-0" 5 - 12 years area 2 - 5 years area LEGEND Existing PIP rubber surfacing to remain 1 1 3 GENERAL NOTES: 1. Fence entire playground area with snow fence or rigid construction fence prior to construction. 2. Protect all trees within the limit of construction by installing snow fence at the drip line. 3. Protect all playground equipment and site amenities within the limit of construction. 4. Staging and stockpiling areas will be in proximity to the playground and will be determined at the pre-construction meeting. 5. Restore all areas disturbed during construction per the specifications. 6. Any existing concrete or asphalt surfaces, playground equipment, etc. damaged by the Contractor during construction will be repaired/replaced by the Contractor to the Owner's satisfaction at no cost to the Owner. SITE PLAN CONSTRUCTION FENCE Remove all existing sand (18"d.) and stockpile at the Thompson Park maintenance area. Excavate 8" of subsoil and remove off site. Install 8" of drainage stone, a layer of geotextile fabric and 18" of new playsand. CONSTRUCTION, REPAIR & CLEANING NOTES: 1. Powerwash all play equipment surfaces, uprights, posts, decks, stairs, panels, rooves, benches, etc.. Note: A water source is not available in proximity to the project site. The Contractor is responsible for providing a water storage tank. Coordinate with the Park System to fill the tank at the Park maintenance facility. 2. Remove clear panels on composite structures and clean off all mold, dirt, etc. 3. Remove all existing engineered wood fiber and play sand. Dispose of off site. 4. Replace straight slide and view panel per the Plans. 5. Excavate sandplay area and install drainage stone per the Plan and Detail. 6. Install subsurface drainage system and clean-outs per the Plan. 7. Install geotextile fabric in the sandplay area and in other areas if directed. 8. Install new engineered wood fiber and play sand to the depths shown on the Plans and Details. CLEAN-OUT DETAIL Remove existing 18" playsand and install with new Install geotextile fabric Excavatesubsoil and install 8" drainage (washed) stone Install corrugated polyethylene pipe as shown on the Plan ex subgrade not to scale not to scale Install clean-out with cap in areas shown on the Plan Install perforated polyethylene pipe as shown on the Plan. Connect to existing sub-surface drainage pipe. Undisturbed subgrade * Project Area Compacted DGA Install cap Install cap Install cap

EX CONCRETE WALKWAY

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EX CONCRETE WALKWAY

EX CONCRETE WALKWAY

EX SWINGS

LOCATION MAP

Planscale 1" = 10'-0"

5 - 12 yearsarea

2 - 5 yearsarea

LEGENDExisting PIP rubber surfacing toremain

1

1 3

GENERAL NOTES:1. Fence entire playground area with snow fence or rigidconstruction fence prior to construction.

2. Protect all trees within the limit of construction by installing snowfence at the drip line.

3. Protect all playground equipment and site amenities within thelimit of construction.

4. Staging and stockpiling areas will be in proximity to theplayground and will be determined at the pre-constructionmeeting.

5. Restore all areas disturbed during construction per thespecifications.

6. Any existing concrete or asphalt surfaces, playgroundequipment, etc. damaged by the Contractor during constructionwill be repaired/replaced by the Contractor to the Owner'ssatisfaction at no cost to the Owner.

SITE PLAN

CONSTRUCTION FENCE

Remove all existing sand (18"d.)and stockpile at the ThompsonPark maintenance area.Excavate 8" of subsoil and removeoff site. Install 8" of drainagestone, a layer of geotextile fabricand 18" of new playsand.

CONSTRUCTION, REPAIR &CLEANING NOTES:1. Powerwash all play equipment surfaces, uprights, posts,decks, stairs, panels, rooves, benches, etc..

Note: A water source is not available in proximity to theproject site. The Contractor is responsible for providing awater storage tank. Coordinate with the Park System to fill thetank at the Park maintenance facility.

2. Remove clear panels on composite structures and cleanoff all mold, dirt, etc.

3. Remove all existing engineered wood fiber and play sand.Dispose of off site.

4. Replace straight slide and view panel per the Plans.

5. Excavate sandplay area and install drainage stone per thePlan and Detail.

6. Install subsurface drainage system and clean-outs per thePlan.

7. Install geotextile fabric in the sandplay area and in otherareas if directed.

8. Install new engineered wood fiber and play sand to thedepths shown on the Plans and Details.

CLEAN-OUT DETAIL

Remove existing 18" playsandand install with new

Install geotextile fabric

Excavatesubsoil and install 8"drainage (washed) stone

Install corrugated polyethylenepipe as shown on the Plan

ex subgrade

not to scale

not to scale

Install clean-out with cap inareas shown on the Plan

Install perforated polyethylenepipe as shown on the Plan.

Connect to existing sub-surfacedrainage pipe.

Undisturbed subgrade

*

ProjectArea

Compacted DGA

Install cap

Install cap

Install cap

Page 2: EX CONCRETE WALKWAY

2

2 3

REPLACEMENT: REPAIRS:

CLEANING:

Replace clear view panel with new. Replace cracked slide with new - model # Repair thermoplastic coating of composite structurestairs and platforms

Remove panels, clean mold & dirt on both surfaces andreinstall panels.

The folllowing photos show the (typ) dirt and mold onthe playground equipment and site furniture.Powerwash all play equipment and site furituresurfaces.

Repair areas on the metal play equipment where rustedor worn; sand, prepare and apply primer and paint withcolor matched GameTime® paint.

FILLY RUN PLAYGOUND PHOTOS

Mold and dirt on posts. Mold and dirt on posts on panel frames. Mold on underside of shelter roof edge. Mold on top of shelter roof.

Mold and dirt on platforms and stairs. Mold on sides of stairs. Mold on platform edges. Mold on site furniture.

Note: A water source is not available in proximity tothe project site. The Contractor is responsible forproviding a water storage tank. Coordinate with thePark System to fill the tank at the Park maintenancefacility.

Page 3: EX CONCRETE WALKWAY

3

3 3

scale 1" = 20'-0"

ALTERNATE BID ITEM:FOREST EDGE PLAYGROUND SITE PLAN

GENERAL NOTES:1. Fence entire playground area with snow fence or rigidconstruction fence prior to construction.

2. Protect all trees within the limit of construction by installingsnow fence at the drip line.

3. Protect all playground equipment and site amenities withinthe limit of construction.

4. A staging area will be in proximity to the playgrounds and willbe determined at the pre-construction meeting.

5. Any existing concrete or asphalt surfaces, playgroundequipment, edging, etc. damaged by the Contractor duringconstruction will be repaired/replaced by the Contractor to theOwner's satisfaction at no cost to the Owner.

PLAYGROUND SEALING NOTES:1. Clean existing EPDM wear mat by gently powerwashing to remove all dirt and debris. Let surfacedry for at least 24 hours before applying seal coat.

Note: A water source is not available in proximityto the project site. The Contractor is responsible forproviding a water storage tank. Coordinate withthe Park System to fill the tank at the Parkmaintenance facility.

2. Seal all existing areas of wear surface withMistabond H3602 aliphatic moisture curerefinishing and repair coat. Spray or roll at a rateof one one (1) galon per 150 square feet.

3. Existing EPDM wear mat shall be sealedusing Mistabond H3602 aliphatic moisturecure refinishing and repair coat. Spray at arate of one (1) gallon per 150 square feet.

scale 1" = 20'-0"

LEGENDExisting PIP rubber surfacing to bepower washed and sealed

Construction FenceLEGEND

Remove existing EPDM rubbersurfacing and install new EPDMsurfacing.

CONSTRUCTION FENCE

SHARK RIVER PARK LOCATION MAP

DETAIL-POURED-IN-PLACE EPDM/TPV WEARMAT OVER EXISTING SBR BASE MAT

new EPDM/TPV wear mat -apply binder to existing basemat prior to installation

install turned down edgesin areas adjacent to ex.engineered wood fibermulch

cut 2 inch key into ex wearmat to accommodate newwear mat

EPDM/TPV wear mat to meetexisting grade

PLAYGROUND SURFACING NOTES:1. Carefully revove all existing EPDM wear mat from existing SBRbase.

2. Access into the playground area is limited. Use hand equipmentand wheel barrows to remove the existing poured-in-place rubber.

3. Vacuum off all loose SBR particles and debris from base.

4. Repair recycled rubber base mat in areas where it may havebeen damaged during EPDM removal.

5. Key all edges of proposed wear mat into the existing SBR basemat (see detail).

6. Apply binder tack coat to entire play surfacing at a rate of 5gallons per 300 square feet. Apply with a roller to ensure an evencoat to entire surface.

7 - Install new 12 inch EPDM/TPV wear mat per the specifications.

8 - Proved Owner with ±10 sf (.5 cf) of each EPDM dry mix and 1 pintof binder for minor future repairs.

HOLMDEL PARK LOCATION MAP

DETAIL- OVERLAPED SEAM -POURED-IN-PLACE EPDM/TPV WEAR MAT