35
Edwards Concrete blends art and concrete to achieve award-winning results that are as visually stunning as they are eco-friendly and sustainable. Since 1982 we have completed hundreds of decorative concrete designs including polished interior floors, to exterior concrete walkways, curbs and poolside hardscapes for retail stores, commercial builders and architects throughout the state of Florida and the US South Eastern regions. Since 1982 we have completed hundreds of decorative concrete designs for retail, commercial and theme park projects. BUILDING GREEN SINCE 1982

Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

 

 

 

 

Edwards Concrete blends art and concrete to achieve award-winning results that are as visually stunning as they are eco-friendly and sustainable. Since 1982 we have completed hundreds of decorative concrete designs including polished interior floors, to exterior concrete walkways, curbs and poolside hardscapes for retail stores, commercial builders and architects throughout the state of Florida and the US South Eastern regions. Since 1982 we have completed hundreds of decorative concrete designs for retail, commercial and theme park projects.  

BUILDING GREEN SINCE 1982

Page 2: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

UPTOWN ALTAMONTE

ALTAMONTE SPRINGS, FLORIDA

Over 100,000sf of stamped road, integral color concrete walkway.

Article in Florida Concrete Magazine, March 2008 “The Beauty of Concrete”.

GC: Wharton-Smith

Page 3: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Uptown Altamonte

Stamped concrete road

Page 4: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Uptown Altamonte

Spring beige Integral color placed, and band recesses with brick pavers

Page 5: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Uptown Altamonte

Walkway area at the Amphitheater .

Page 6: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Uptown Altamonte

Styles of stamp patterns : Slate gray Cobblestone and Ashlar Slate

Page 7: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Uptown Altamonte

Cobblestone and Ashlar Slate

Page 8: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

A stencil was used to display the crane, which resulted in a two tone color effect of white concrete. With a sandblasted finish for the outer band, and a

French gray colored inner field with a sponge finish.

Uptown Altamonte

Page 9: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Fields Land Rover Dealership

Over 5,000 sf placed, used regular gray concrete with Bisque Tan color hardener and Silver Gray release powder.

Page 10: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Ashlar Slate design pattern

Page 11: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

West Volusia Town CenterOrange City, Florida

28,000sf, placed with integral color.

GC: J Raymond Construction

Page 12: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Placed the bands first and then placed the fields with integral color

Page 13: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Cobblestone bands

Page 14: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

The Caribbean Beach ResortWalt Disney World

32,000sf placed, used mesa beige integral colored concrete with beige cream color hardener, and pecan tan release.

GC: Tatro Contracting

Page 15: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Stamped pool deck area, restrooms, and Children water play area

Page 16: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Caribbean Beach Resort pool Framed out the entire pool and placed the concrete for the pool

floor

Page 17: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Framed and poured the concrete for the staircase wall to the slide, framed & poured the Tower

Page 18: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Stetson UniversityDeland, Florida

Placed with integral color

Page 19: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Diamond Polishing

Page 20: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Stetson University

Finished Diamond Polished Floor

Page 21: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

JK2 Homes

Concrete stained floor and a Diamond polished

Page 22: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

JK2 Homes

Diamond Polished Hallway

Page 23: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Disney Epcot -Soarin AttractionOverlay Stained Concrete Topping and Polished

Preparation Overlay ToppingPreparation

Page 24: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Kennedy Space Center

Page 25: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Custom designed finish to resemble the moons surface.

Page 26: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Integral colored bands

Page 27: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Dress BarnEntrance Walkway

Page 28: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Conway Middle School

Orlando, FL

Page 29: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Sea World- AquaticaWaterstone Grill Restaurant

Page 30: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Sea World - Manta Rollercoaster AreaThroughout the park walkways, curbs, and drains are Exposed Aggregate

Page 31: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Close up look at the exposed aggregate walkway and curb

Page 32: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Sea WorldSeat walls which match the exposed Aggregate Walkways

Page 33: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

A variety of colors used with color hardeners

Marriott Grande Vista Resort

Page 34: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

Caribe Royale Resort

Placed with black integral concrete , with a black hardener and a black form release

Page 35: Edwards Concrete blends art and concrete to achieve award ... · Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was started on January

The Church of Jesus Christ of Latter Day SaintsWindermere, Florida

The original walkway around the building was made of concrete pavers. Over time, the weight of the lift which was used to pressure wash the massive building destroyed the paver walkway.

This is where David Edwards, president and owner of Edwards Concrete Company, an official Bomanite Franchise Partner, was brought into the plans. With over 25 years of experience in the concrete business, and since Mr.

Edwards had done some work for LDS Temple in the past, he was the right man for the job.It was decided that a product made from a South Florida concrete mix composed of ground lime rock would be used for the 27,000 square feet of walkway surrounding the Temple. Edwards Concrete worked for two weeks

doing samples to make sure the right look and strength was achieved for this project.Edwards Concrete Company completed the 27,000 square feet of walkway April 11, 2008. The project was

started on January 9, 2008, and over 750 cubic yards of concrete and 34 tons of steel were placed and installed.Edwards Concrete Company was presented the Eagle Award for this project by the Associated Builders and Contractors, Inc. in 2008. It is also featured on the cover of Florida Concrete Magazine, March 2008, and an

article in Concrete Décor, Feb. 2009.

BEFORE AFTER