28
201 FIRST FLOOR 343' - 5" 3 CONTINUOUS SEALANT TERMINATION BAR STAINLESS STEEL METAL COUNTER FLASHING TPO MEMBRANE ROOFING OVER BONDING ADHESIVE MEMBRANE FLASHING 5/8" DENSGLASS SHEATHING 4" ARRISCRAFT VENEER 8" RIGID INSULATION WITH STAGGERED AND TAPED JOINTS 5/8" DENSGLASS SHEATHING OVER 1-1/2" METAL DECK CEILING AS SCHEDULED MASONRY TIES AT 24" OC VERTICALLY 1" NOMINAL AIR SPACE 2" RIGID INSULATION 8" CMU REINFORCED CONCRETE SLAB OVER METAL DECK - REFER TO STRUCTURAL DWGS STEEL BEAM W/ FIREPROOFING SCALE: MURRAY ASSOCIATES ARCHITECTS, P.C. 1 1/2" = 1'-0" ROOF DETAIL CONSTRUCTION DOCUMENTS - PHASE 2 3502/ PENNSYLVANIA HOUSING FINANCE AGENCY/ MAY 22, 2017 RD-16 1 05/30/2017 ADDENDUM 01 1

ROOF DETAIL 201 FIRST FLOOR - the PADCthepadc.org/wp-content/uploads/2017/06/Detail-Reference-Manual... · 201 first floor 343' - 5" 3 continuous sealant ... staggered and taped joints

Embed Size (px)

Citation preview

20

1 FIR

ST F

LO

OR

343' - 5

"

3

CO

NTIN

UO

US S

EALANT

TER

MIN

ATIO

N B

AR

STAIN

LESS S

TEEL M

ETAL

CO

UNTER

FLASHIN

G

TPO

MEM

BR

ANE R

OO

FIN

G

OVER

BO

ND

ING

AD

HESIV

E

MEM

BR

ANE F

LASHIN

G

5/8" D

ENSG

LASS

SHEATHIN

G

4" A

RR

ISCR

AFT V

ENEER

8" R

IGID

INSULATIO

N W

ITH

STAG

GER

ED

AND

TAPED

JO

INTS

5/8" D

ENSG

LASS S

HEATHIN

G

OV

ER

1-1/2" M

ETAL D

ECK

CEIL

ING

AS S

CHED

ULED

MASO

NR

Y T

IES A

T 2

4"

OC V

ER

TIC

ALLY

1" NO

MIN

AL A

IR S

PACE

2" R

IGID

INSULATIO

N

8" C

MU

REIN

FO

RCED

CO

NCR

ETE

SLAB

OVER

METAL

DECK -

REFER

TO

STR

UCTUR

AL D

WG

S

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-16

10

5/30/2017

AD

DEND

UM

01

1

20

1 ATTIC

FLO

OR

363' - 4

1/4"

1' - 2 1/

4"

3 5

/8"

1"

2"

7 5

/8"

4" A

RR

ISCR

AFT V

ENEER

1" NO

MIN

AL A

IR S

PACE

2" R

IGID

INSULATIO

N

PR

E-F

OR

MED

METAL C

OPIN

G

WIT

H M

ETAL C

LEATS

2 L

AYER

S 3

/4" P

LYW

OO

D

CO

MPR

ESSIB

LE F

OAM

EXPANSIO

N T

APE

MEM

BR

ANE F

LASHIN

G O

VER

BO

ND

ING

AD

HESIV

E

TPO

MEM

BR

ANE R

OO

FIN

G

OVER

BO

ND

ING

AD

HESIV

E

5/8" D

ENSG

LASS S

HEATHIN

G

8" R

IGID

INSULATIO

N

WIT

H S

TAG

GER

ED

AND

TAPED

JO

INTS

5/8" D

ENSG

LASS

SHEATHIN

G

1-1/

2" M

ETAL D

ECK

8" C

MU

MASO

NR

Y T

IES A

T 2

4"

OC V

ER

TIC

ALLY

CEIL

ING

AS

SCHED

ULED

5/8" T

YPE 'X

' GYPSUM

BO

AR

D O

VER

7/8" M

ETAL

FUR

RIN

G

CAV

ITY V

ENT

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-17

10

5/30/2017

AD

DEND

UM

01

1

INSULATIO

N A

ND

INSULATIO

N

RETAIN

ER

CLIP

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

8" R

IGID

INSULATIO

N

OVER

5/8" D

ENSG

LASS

SHEATHIN

G O

N 1-

1/2"

METAL D

ECK

TPO

MEM

BR

ANE R

OO

FIN

G O

VER

BO

ND

ING

AD

HESIV

E O

N 5

/8"

DENSG

LASS S

HEATHIN

G

CO

MPR

ESSIB

LE F

OAM

EXPANSIO

N J

OIN

T

TPO

MEM

BR

ANE F

LASHIN

G

TER

MIN

ATIO

N B

AR

WIT

H

CO

NTIN

UO

US S

EALANT

STAIN

LESS S

TEEL M

ETAL

CO

UNTER

FLASHIN

G

CO

NTIN

UO

US S

EALANT

5/8" G

YPSUM

BO

AR

D

ON IN

TER

IOR

SID

E

VAPO

R B

AR

RIE

R

NEW

METAL T

RUSSES @

16" O

C. (P

HASE 1) R

EFER

TO

STR

UCTUR

AL

DR

AW

ING

S

EXTEND

STUD

S,

INSULATIO

N, V

APO

R

BAR

RIE

R, A

ND

GYPSUM

BO

AR

D T

O

UND

ER

SID

E O

F D

ECK

3/4" C

EM

ENTIT

IOUS

RO

OF S

HEATHIN

G

(PHASE 1)

1 1/2" M

ETAL R

OO

F

DECK (P

HASE 1)

10" S

TR

UCTUR

AL IN

SULATED

PANEL (P

HASE 1)

EXIS

TIN

G B

RIC

K W

ALL

STAIN

LESS S

TEEL

GR

AVEL S

TO

P W

/

DR

IP E

DG

E

TPO

MEM

BR

ANE R

OO

FIN

G

OV

ER

ICE &

WATER

SHIE

LD

MEM

BR

ANE

CO

NTIN

UO

US S

EALANT

CO

NT. 2

X P

.T. W

OO

D

BLO

CKIN

G

TAPER

ED

RIG

ID

INSULATIO

N C

RIC

KET

-TAPER

1/2" /

FT. T

O

RO

OF D

RAIN

NEW

BR

ICK T

O

MATCH E

XIS

TIN

G

CO

RR

OG

ATED

MASO

NR

Y T

IES

THR

U W

ALL F

LASHIN

G

CAV

ITY W

EEP

CO

NT. 2

X P

.T. W

OO

D

BLO

CKIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-18

10

5/30/2017

AD

DEND

UM

01

1

MIN.

8"

PAIN

TED

STEELR

OO

F

LAD

DER

WIT

H W

ELD

ED

STEEL

PAIN

TED

LAD

DER

RUNG

S A

ND

ANCHO

RED

TO

MASO

NR

Y

WALL

7"

STAIN

LESS S

TEEL M

ETAL C

OUNTER

FLASHIN

G W

ITH C

ONTIN

UO

US

SEALANT IN

REG

LET

TER

MIN

ATIO

N B

AR

WIT

H

CO

NTIN

UO

US S

EALANT

CO

MPR

ESSIB

LE F

OAM

EXPANSIO

N J

OIN

T

CO

MPR

ESSIB

LE IN

SULATIO

N IN

INSULATIO

N R

ETAIN

ER

CLIP

8" R

IGID

INSULATIO

N O

VER

5/8"

DENSG

LASS S

HEATHIN

G O

N 1-

1/2" M

ETAL D

ECK

TPO

MEM

BR

ANE R

OO

FIN

G

OVER

BO

ND

ING

AD

HESIV

E

5/8" D

ENSG

LASS S

HEATHIN

G

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

EXIS

TIN

G 2

01 M

ASO

NR

Y W

ALL

TO

REM

AIN

CEIL

ING

AS S

CHED

ULED

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-19

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

5

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

6" B

ALLAST R

OO

FIN

G

8" C

ONTIN

UO

US

RIG

ID IN

SULATIO

N

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB

OV

ER

1-1/2" M

ETAL

DECK. R

EFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

1" TYPE X

GYPSUM

BO

AR

D

3-5/8" M

ETAL S

TUD

S A

T 16

"

OC T

YP. W

ITH 3

-1/2"

MIN

ER

AL W

OO

L IN

SULATIO

N

2' - 0"

10"

5/8" F

IRE R

ATED

DENSG

LASS

SHEATHIN

G

3" K

AR

RIE

R IN

SULATED

METAL

PANEL S

YSTEM

STAIN

LESS S

TEEL M

ETAL

FLASHIN

G

CO

NTIN

UO

US S

EALANT

TER

MIN

ATIO

N B

AR

CO

NTIN

UO

US B

ENT P

LATE

- R

EFER

TO

STR

UCTUR

AL D

WG

s

#5 B

AR

S, T

YP. R

EFER

TO

STR

UCTUR

AL D

WG

s

CO

NCR

ETE C

UR

B - R

EFER

TO

STR

UCTUR

AL D

WG

s

AIR

/ V

APO

R B

AR

RIE

R

CO

RR

UG

ATED

METAL

PANEL S

IDIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-25

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

CO

NTIN

UO

US B

ENT P

LATE

- R

EFER

TO

STR

UCTUR

AL D

WG

s

#5 B

AR

S, T

YP. R

EFER

TO

STR

UCTUR

AL D

WG

s

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB O

VER

1-1/

2" M

ETAL D

ECK -

REFER

TO

STR

UCTUR

AL

DW

Gs

8" C

ONTIN

UO

US R

IGID

INSULATIO

N

RO

OT S

TO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

24" X

24" H

ANO

VER

PR

EST P

AVER

OV

ER

HANO

VER

ELEVATO

R

PED

ESTAL S

YSTEM

4" T

OP A

ND

4" B

ASE

HANO

VER

ELEVATO

R

PED

ESTAL, T

YP.

PR

ESSUR

E T

REATED

WO

OD

BLO

CKIN

G

AD

HER

ED

TO

CO

NCR

ETE C

UR

B

PR

E-FO

RM

ED

METAL

CO

PIN

G (B

Y

CUR

TAIN

WALL

MANUFACTUR

ER

)

1/2" L

AM

INATED

GLASS IN

ALUM

INUM

WIN

DO

W

SYSTEM

- BO

TTO

M A

ND

SID

ES R

AIL

ING

SYSTEM

1-3/4" T

HIC

K IN

SULATED

GLASS

6" M

INER

AL W

OO

L B

ATT

INSULATIO

N

(2) L

AYER

S 3

/4"

PLYW

OO

D A

DHER

ED

TO

CO

NCR

ETE C

UR

B

PR

EFIN

ISHED

ALUM

INUM

WIN

DO

W

SYSTEM

HO

RIZ

ONTAL M

ULLIO

N

9 1/

4"

1 1/4"

10"

1' - 4"

8"

1' - 8

1/2"

GALVANIZ

ED

SUPPO

RT

FR

AM

ING

- R

EFER

TO

STR

UCTUR

AL 11 O

N D

RW

G

S5.5

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-28

10

5/30/2017

AD

DEND

UM

01

1

4"Ø

GALVANIZ

ED

STEEL P

IPE

BO

LTED

THR

OUG

H S

LAB A

ND

TO

CO

LUM

N -

REFER

TO

STR

UCTUR

AL

DW

Gs

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

6" B

ALLAST R

OO

FIN

G

8" C

ONTIN

UO

US

RIG

ID IN

SULATIO

N

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB

OV

ER

1-1/2" M

ETAL

DECK. R

EFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

ASE P

LATES B

OLTED

THR

OUG

H S

LAB

- R

EFER

TO

STR

UCTUR

AL D

WG

s

PR

ESSUR

E T

REATED

2X12

X18

"

LO

NG

SELECT S

TR

UCTUR

AL

WO

OD

BLO

CKIN

G

1' - 0"

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-29

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

6.3

24" X

24" H

ANO

VER

PR

EST P

AVER

OV

ER

HANO

VER

ELEV

ATO

R P

ED

ESTAL S

YSTEM

4" T

OP A

ND

4" B

ASE H

ANO

VER

ELEVATO

R P

ED

ESTAL, T

YP.

PER

FO

RATED

GAR

DENED

GE M

ETAL E

DG

E

RESTR

AIN

T U

ND

ER

GAR

DEND

RAIN

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

6" B

ALLAST R

OO

FIN

G

8" C

ONTIN

UO

US

RIG

ID IN

SULATIO

N

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB

OV

ER

1-1/2" M

ETAL

DECK. R

EFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

STEEL C

OLUM

N, R

EFER

TO

STR

UCTUR

AL D

WG

s

MECHANIC

AL E

QUIP

MENT

SCR

EEN

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

8"

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-30

10

5/30/2017

AD

DEND

UM

01

1

1

GR

EEN R

OO

F

428' - 10

"

STEEL B

ASE P

LATES B

OLTED

THR

OUG

H S

LAB

- R

EFER

TO

STR

UCTUR

AL D

WG

s

PR

ESSUR

E T

REATED

2X12

X18

"

LO

NG

SELECT S

TR

UCTUR

AL

WO

OD

BLO

CKIN

G

4"Ø

GALVANIZ

ED

STEEL P

IPE

BO

LTED

THR

OUG

H S

LAB - R

EFER

TO

STR

UCTUR

AL D

WG

s

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

6" B

ALLAST R

OO

FIN

G

8" C

ONTIN

UO

US

RIG

ID IN

SULATIO

N

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB

OV

ER

1-1/2" M

ETAL

DECK. R

EFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-31

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

H

24" X

24" H

ANO

VER

PR

EST P

AVER

OV

ER

HANO

VER

ELEV

ATO

R P

ED

ESTAL S

YSTEM

4" T

OP A

ND

4" B

ASE H

ANO

VER

ELEVATO

R P

ED

ESTAL, T

YP.

PER

FO

RATED

GAR

DENED

GE M

ETAL E

DG

E

RESTR

AIN

T U

ND

ER

GAR

DEND

RAIN

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

6" B

ALLAST R

OO

FIN

G

8" C

ONTIN

UO

US

RIG

ID IN

SULATIO

N

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE

SLAB

OVER

1-1/

2" M

ETAL D

ECK.

REFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

8"

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-32

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

GALVANIZ

ED

SUPPO

RT

FR

AM

ING

. ALIG

N W

ITH

CUR

TAIN

WALL M

ULLIO

NS -

REFER

TO

STR

UCTUR

AL 11

ON D

WG

S5.5

PR

ECAST B

EAR

ING

CO

NNECTIO

N B

Y

PR

ECAST

MANUFACTUR

ER

PR

ECAST C

ONCR

ETE

PANEL

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB O

VER

1-1/

2" M

ETAL D

ECK -

REFER

TO

STR

UCTUR

AL

DW

Gs

8" C

ONTIN

UO

US R

IGID

INSULATIO

N

RO

OT S

TO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

24" X

24" H

ANO

VER

PR

EST P

AVER

OV

ER

HANO

VER

ELEVATO

R

PED

ESTAL S

YSTEM

4" T

OP A

ND

4" B

ASE

HANO

VER

ELEVATO

R

PED

ESTAL, T

YP.

7"x

1/2"x

8" P

LATE

ANCHO

RED

WIT

H (4

)

1/2"Ø

HIT

-HY 15

0

EPO

XY A

NCHO

RS

PR

E-FO

RM

ED

METAL

CO

PIN

G

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

CO

NTIN

UO

US B

ENT P

LATE

- R

EFER

TO

STR

UCTUR

AL D

WG

s

#5 B

AR

S, T

YP. R

EFER

TO

STR

UCTUR

AL D

WG

s

1/2" T

EM

PER

ED

GLASS

IN A

LUM

INUM

WIN

DO

W

SYSTEM

- BO

TTO

M A

ND

SID

ES R

AIL

ING

SYSTEM

(2) L

AYER

S 3

/4"

PLYW

OO

D A

DHER

ED

TO

CO

NCR

ETE C

UR

B

AND

PANEL

PR

ESSUR

E T

REATED

WO

OD

BLO

CKIN

G

BEYO

ND

CO

NTIN

UO

US S

EALANT

AT P

ER

IMETER

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

2' - 0

"

5"

5"

6 1/2"

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-33

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

GALVANIZ

ED

SUPPO

RT

FR

AM

ING

- R

EFER

TO

STR

UCTUR

AL 11 O

N D

RW

G

S5.5

PR

ECAST B

EAR

ING

CO

NNECTIO

N B

Y P

RECAST

MANUFACTUR

ER

PR

ECAST C

ONCR

ETE

PANEL

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB O

VER

1-1/

2" M

ETAL D

ECK -

REFER

TO

STR

UCTUR

AL

DW

Gs

8" C

ONTIN

UO

US R

IGID

INSULATIO

N

RO

OT S

TO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

24" X

24" H

ANO

VER

PR

EST P

AVER

OV

ER

HANO

VER

ELEVATO

R

PED

ESTAL S

YSTEM

4" T

OP A

ND

4" B

ASE

HANO

VER

ELEVATO

R

PED

ESTAL, T

YP.

PR

ESSUR

E T

REATED

WO

OD

BLO

CKIN

G

AD

HER

ED

TO

CO

NCR

ETE C

UR

B

PR

E-FO

RM

ED

METAL

CO

PIN

G (B

Y

CUR

TAIN

WALL

MANUFACTUR

ER

)

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

CO

NTIN

UO

US B

ENT P

LATE

- R

EFER

TO

STR

UCTUR

AL D

WG

s

#5 B

AR

S, T

YP. R

EFER

TO

STR

UCTUR

AL D

WG

s

1/2" T

EM

PER

ED

GLASS IN

ALUM

INUM

WIN

DO

W

SYSTEM

- BO

TTO

M A

ND

SID

ES R

AIL

ING

SYSTEM

(2) L

AYER

S 3

/4"

PLYW

OO

D A

DHER

ED

TO

CO

NCR

ETE C

UR

B

AND

PANEL

1' - 4" 10"

1"1' -

1"

2' - 0

"

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-34

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

G

3/4"

24" X

24" H

ANO

VER

PR

EST P

AVER

OV

ER

HANO

VER

ELEV

ATO

R P

ED

ESTAL S

YSTEM

4" T

OP A

ND

4" B

ASE H

ANO

VER

ELEVATO

R P

ED

ESTAL, T

YP.

PER

FO

RATED

GAR

DENED

GE M

ETAL E

DG

E

RESTR

AIN

T U

ND

ER

GAR

DEND

RAIN

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

LIT

ETO

P E

XTENSIV

E

GR

OW

ING

MED

IA -

MAIN

TAIN

3/4"

BELO

W M

ETAL E

DG

E

PER

IMETER

8" C

ONTIN

UO

US

RIG

ID IN

SULATIO

N

EXTENSIV

E P

LANT

MATER

IAL

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE

SLAB

OVER

1-1/

2" M

ETAL D

ECK.

REFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

8"

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-35

10

5/30/2017

AD

DEND

UM

01

1

GR

EEN R

OO

F

428' - 10

"

3/4"

PER

FO

RATED

GAR

DENED

GE M

ETAL E

DG

E

RESTR

AIN

T U

ND

ER

GAR

DEND

RAIN

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

LIT

ETO

P E

XTENSIV

E

GR

OW

ING

MED

IA -

MAIN

TAIN

3/4" B

ELO

W

METAL E

DG

E P

ER

IMETER

8" C

ONTIN

UO

US

RIG

ID IN

SULATIO

N

EXTENSIV

E P

LANT M

ATER

IAL

RO

OTSTO

P

HYD

RO

FLEX 3

0

MM

612

5EV

-FR

4-1/

2" R

EIN

FO

RCED

CO

NCR

ETE S

LAB

OVER

1-

1/2" M

ETAL D

ECK. R

EFER

TO

STR

UCTUR

AL D

WG

s

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G -

REFER

TO

STR

UCTUR

AL D

WG

s

6" B

ALLAST R

OO

F

SYSTEM

FIL

TER

GAR

DEND

RAIN

GR

50

GALVANIZ

ED

STEEL C

OLUM

N

- R

EFER

TO

STR

UCTUR

AL

DW

Gs

MECHANIC

AL E

QUIP

MENT

SCR

EEN

STEEL B

ASE P

LATES B

OLTED

THR

OUG

H S

LAB

- R

EFER

TO

STR

UCTUR

AL D

WG

s

PR

ESSUR

E T

REATED

SELECT

STR

UCTUR

AL 2

X12

X18

" WO

OD

BLO

CKIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-37

10

5/30/2017

AD

DEND

UM

01

1

1

MA

X. LIM

IT =

42"

STE

EL B

EAM

W/ F

IREPR

OO

FIN

G

GALV

ANIZE

D S

TEEL P

IER

NO

TES:

1. 1,00

0 L

BS. W

OR

KIN

G L

OAD

IN A

NY D

IRECTIO

N.

2. A

SSEM

BLY S

HO

WN IS

STD

. 15" A

ND

18" H

IGH M

OD

ELS F

OR

WELD

ING

TO M

INIM

UM 4

" WID

E F

LANG

E.

3. S

TEEL

PIE

R S

IZE V

AR

IES W

ITH A

NC

HO

R H

EIG

HT (S

EE A

NC

HO

R C

HAR

T)

4. A

SSEM

BLY S

HO

WN W

ITH C

ONV

ENTIO

NAL S

ING

LE P

LY R

OO

FIN

G (B

Y O

THER

S) - N

O F

LASHIN

G.

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-38

10

5/30/2017

AD

DEND

UM

01

1

1,00

0 lb

s. M

AX. W

OR

KIN

G L

OAD

STAIN

LESS S

TEEL

BAR

FO

R

SUS

PENSIO

N L

INE

DETAC

HAB

LE

WEATHER

PR

OO

F C

AP W

ITH

WIN

G N

UT L

OC

KIN

G D

EV

ICE

HO

T D

IP G

ALV

ANIZ

ED

HSS 4

" O.D

.

STEEL P

LATE (E

AC

H

SID

E) H

OT D

IP

GALV

ANIZ

ED

STEEL 'C

' CHANNEL

HO

T D

IP

GALV

ANIZ

ED

12"TETHER

STEEL B

EAM

W/

FIR

EPR

OO

FIN

G

TYP.

1/4"

STEEL P

LATE H

OT

DIP

GALV

ANIZ

ED

TYP.

1/4"

STEEL P

LATE

HO

T D

IP G

ALV

ANIZ

ED

1' - 0"

8" MIN.

1" MAX.

L = 144" MAX.

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-39

10

5/30/2017

AD

DEND

UM

01

1

10" X

PS IN

SULATIO

N

WATER

PR

OO

FIN

G

MEM

BR

ANE -

PR

OTECTIO

N

SHEET O

VER

125 M

ILS H

OT-

APPLIE

D R

UB

BER

IZED

ASPHALT O

VER

REIN

FO

RCEM

ENT L

AYER

OV

ER

90 M

ILS H

OT A

PPLIE

D

RUBB

ER

IZED

APHALT

SEE S

TR

UCTUR

AL D

RAW

ING

S

FO

R R

OO

F S

TR

UCTUR

E

ASSEM

BLY

STAIN

LESS

STEEL R

OUND

BAR

GALVANIZ

ED

STEEL P

IER

PAV

ER

SYSTEM

STR

UCTUR

AL S

TEEL W

/

FIR

EPR

OO

FIN

G - S

EE

STR

UCTUR

AL D

RAW

ING

S

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

3" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-40

10

5/30/2017

AD

DEND

UM

01

1

1' - 0

"

1' - 0" 3/4"

REG

LET

METAL

CO

UNTER

FLASHIN

G,

TO

REM

AIN

TPO

MEM

BR

ANE

FLASHIN

G

LAP S

EALANT

EXIS

TIN

G T

PO

MEM

BR

ANE R

OO

FIN

G

EXIS

TIN

G S

TEEL

BEAM

EXIS

TIN

G P

RECAST

CO

NC. P

ANEL

TUR

N U

P T

PO

MEM

BR

ANE R

OO

FIN

G

EXIS

TIN

G P

LYW

OO

D

SHEATHIN

G

NEW

ELASTO

MER

IC

CO

ATIN

G

NEW

FULLY R

EIN

FO

RCED

,

FLUID

APPLIE

D R

ESTO

RATIO

N

CO

ATIN

G S

YSTEM

.

REPLACE E

XIS

TIN

G

SEALANT

REUSE A

ND

REIN

STALL W

ALL

MO

UNTED

CAB

LE H

OLD

ER

.

CAB

LE

REM

OV

E A

ND

REIN

STALL A

IR

TER

MIN

AL A

FTER

INSTALLATIO

N

OF E

LASTO

MER

IC C

OATIN

G

REM

OVE A

ND

REIN

STALL B

IRD

BE

GO

NE S

YSTEM

AFTER

INSTALLATIO

N

OF E

LASTO

MER

IC C

OATIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-46

1

10

5/30/2017

AD

DEND

UM

01

1' - 0" 3/4"

7"

REG

LET

EXIS

TIN

G S

TEEL

BEAM

REM

OV

E A

ND

REIN

STALL P

AR

APET

WALL M

OUNTED

BR

ACKET A

NCHO

RED

TO

PR

ECAST W

ALL P

ANEL

AIR

TER

MIN

AL

NEW

ELASTO

MER

IC C

OATIN

G

METAL

CO

UNTER

FLASHIN

G,

TO

REM

AIN

LAP S

EALANT

EXIS

TIN

G T

PO

MEM

BR

ANE R

OO

FIN

G

TUR

N U

P T

PO

MEM

BR

ANE R

OO

FIN

G

EXIS

TIN

G P

LYW

OO

D

SHEATHIN

G

NEW

FULLY R

EIN

FO

RCED

,

FLUID

APPLIE

D

RESTO

RATIO

N C

OATIN

G

SYSTEM

.

REPLACE E

XIS

TIN

G

SEALANT

REUSE A

ND

REIN

STALL W

ALL

MO

UNTED

CAB

LE H

OLD

ER

.

CAB

LE

REM

OV

E A

ND

REIN

STALL A

IR

TER

MIN

AL A

FTER

INSTALLATIO

N

OF E

LASTO

MER

IC C

OATIN

G

REM

OVE A

ND

REIN

STALL B

IRD

BE

GO

NE S

YSTEM

AFTER

INSTALLATIO

N

OF E

LASTO

MER

IC C

OATIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-47

1

10

5/30/2017

AD

DEND

UM

01

EXIS

TIN

G S

TEEL B

EAM

EXIS

TIN

G G

YPSUM

RO

OF

BO

AR

D

EXIS

TIN

G T

PO

MEM

BR

ANE F

LASHIN

G

CO

UNTER

FLASHIN

G

VERIFY

1' - 0 1/2"

TR

EATED

WO

OD

BLO

CKIN

G

PR

EFABR

ICATED

METAL

INSULATED

RO

OF C

UR

B

AND

CAP F

LASHIN

G

3/4" x

1/4" W

IDE G

ASKET

FO

R C

UR

B F

RAM

E A

ND

ALL

DUCT S

UPPO

RT S

UR

FACES

FULLY R

EIN

FO

RCED

FLUID

APPLIE

D

RESTO

RATIO

N C

OATIN

G S

YSTEM

GETS

APPLIE

D U

P T

O A

ND

BEYO

ND

CO

UNTER

FLASHIN

G A

S F

AR

AS P

OSSIB

LE.

METAL S

LIP

FR

AM

ING

MAY A

LSO

BE U

SED

.

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-48

10

5/30/2017

AD

DEND

UM

01

1

EXIS

TIN

G M

ETAL D

ECK

EXIS

TIN

G G

YPSUM

SUB

STR

ATE B

OAR

D

EXIS

TIN

G R

IGID

INSULATIO

N

EXIS

TIN

G W

OO

D B

LO

CKIN

G

NEW

TAPER

ED

INSULATIO

N

EXIS

TIN

G G

YPSUM

RO

OF B

OAR

D

EXIS

TIN

G M

EM

BR

ANE

RO

OFIN

G, C

OVER

WIT

H

NEW

LAYER

OF

ALPHAG

UAR

D B

IO

RESTO

RATIO

N S

YSTEM

OVER

TPO

EXIS

TIN

G S

PLIC

ING

CEM

ENT

AND

SEALANT

EXIS

TIN

G R

OO

F D

RAIN

WIT

H C

LAM

PIN

G R

ING

REM

OV

E S

TR

AIN

ER

AND

CLAM

PIN

G

RIN

G, G

RIN

D S

UR

FACES T

O C

LEAN

BAR

E M

ETAL, E

XTEND

RESTO

RATIO

N

CO

ATIN

G S

YSTEM

INTO

DR

AIN

BO

X.

REIN

STALL C

LAM

PIN

G R

ING

AND

STR

AIN

ER

. REPLACE P

LASTIC

STR

AIN

ER

S (IF

ANY) W

/ C

AST IR

ON

EXIS

TIN

G M

EM

BR

ANE

RO

OFIN

G, C

OVER

WIT

H

NEW

LAYER

OF

ALPHAG

UAR

D B

IO

RESTO

RATIO

N S

YSTEM

OVER

TPO

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-49

1

10

5/30/2017

AD

DEND

UM

01

1' - 11 7/8"

WATER

PR

OO

F

MEM

BR

ANE

EXIS

T. P

RECAST

CO

NCR

ETE P

ANEL

EXIS

T. R

EIN

F. C

ONC. F

LO

OR

SLAB

REPLACE A

ND

RESEAL

TER

MIN

ATIO

N B

AR

NEW

TAPER

ED

INSULATIO

N

NEW

PV

C-T

PA

WATER

PR

OO

F M

EM

BR

ANE

NEW

HP M

AT

REM

OV

E A

ND

REIN

STALL

PR

ECAST C

ONCR

ETE

PAV

ER

, REPLACE 5

%

WIT

H N

EW

PAVER

S

EXIS

T. P

IPE S

LEEV

ES

EXIS

T. C

ONC. C

UR

B

PR

ECO

MPR

ESSED

FO

AM

SEALANT B

ACKER

RO

D

AND

SEALANT

EXIS

TIN

G P

REFIN

ISHED

METAL G

UAR

D R

AIL

SYSTEM

REPLACE S

EALANT A

RO

UND

SLEEV

ES

CLEAN O

UT S

EALANT

JO

INTS. P

RIM

E S

UR

FACES,

INSTALL N

EW

BACKER

RO

D A

ND

SEALANT

NEW

ELASTO

MER

IC C

OATIN

G

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-50

10

5/30/2017

AD

DEND

UM

01

1

EXIS

TIN

G C

OM

PENSATO

R

PED

ESTAL

EXIS

TIN

G IN

SULATIO

N

WATER

PR

OO

FIN

G

MEM

BR

ANE -

PR

OTECTIO

N

SHEET O

VER

125 M

ILS H

OT-

APPLIE

D R

UB

BER

IZED

ASPHALT O

VER

REIN

FO

RCEM

ENT L

AYER

OV

ER

90 M

ILS H

OT A

PPLIE

D

RUBB

ER

IZED

APHALT

EXIS

TIN

G R

OO

F S

TR

UCTUR

E

ASSEM

BLY

REM

OV

E A

ND

REIN

STALL

PR

ECAST C

ONCR

ETE

PAV

ER

, REPLACE 5

%

WIT

H N

EW

PAVER

S

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

3" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-51

1

10

5/30/2017

AD

DEND

UM

01

REM

OV

E A

ND

REIN

STALL

EXIS

TIN

G E

LEVATED

DUCT

SUPPO

RT L

EG

(GALV. P

IPE)

REM

OV

E A

ND

REIN

STALL

EXIS

TIN

G M

ETAL

SUPPO

RT L

EG

BASE

EXIS

TIN

G R

OO

F IN

SULATIO

N

EXIS

TIN

G T

PO

RO

OF M

EM

BR

ANE

EXIS

TIN

G G

YP.

RO

OF B

OAR

D

NEW

RO

OF M

EM

BR

ANE

PR

OTECTIO

N P

AD

PR

OVID

E T

EM

PO

RAR

Y S

UPPO

RT F

OR

DUCTW

OR

K D

UR

ING

INSTALLATIO

N O

F

ALPHAG

UAR

D B

IO R

ESTO

RATIO

N

SYSTEM

OV

ER

EXIS

TIN

G A

DHER

ED

TPO

NEW

ALPHAG

UAR

D

BIO

RESTO

RATIO

N

SYSTEM

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-52

10

5/30/2017

AD

DEND

UM

01

1

2' - 0"

EXIS

TIN

G B

ASE

INSULATIO

N

EXIS

TIN

G B

ASE

INSULATIO

N

EXIS

TIN

G R

OO

F D

ECK

NEW

RIG

ID IN

SULATIO

N

MATCH E

XIS

TIN

G T

HIC

KNESS

EXIS

TIN

G IN

SULATED

DUCT

NEW

RO

OFIN

G

MEM

BR

ANE

EXIS

TIN

G M

ETAL T

RIM

5/8" E

XTER

IOR

GR

AD

E P

LYW

OO

D

ON 2

1/2" M

ETAL S

TUD

S @

16" O

.C.

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-53

10

5/30/2017

AD

DEND

UM

01

1

REM

OV

E A

ND

REIN

STALL E

LEVATO

R

PED

ESTAL

REM

OV

E A

ND

REIN

STALL

CO

MPENSATO

R P

ED

ESTAL

DECK D

RAIN

& O

VER

FLO

W

DR

AIN

CO

MB

INATIO

N

INSTALL N

EW

RIG

ID R

OO

F

INSULATIO

N

EXIS

TIN

G W

ATER

PR

OO

FIN

G

MEM

BR

ANE

REM

OV

E, C

LEAN A

ND

REIN

STALL R

OO

F D

RAIN

S

EXIS

TIN

G R

OO

F

STR

UCTUR

E

ASSEM

BLY

REM

OV

E A

ND

REPLACE

EXIS

TIN

G R

OO

F P

AVER

SYSTEM

1'-0"

INSTALL N

EW

RIG

ID R

OO

F IN

SULATIO

N

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-55

10

5/30/2017

AD

DEND

UM

01

1

REM

OVE D

AM

AG

ED

PO

RTIO

N O

F

EXIS

TIN

G R

OO

F IN

SULATIO

N

EXIS

TIN

G T

PO

RO

OF M

EM

BR

ANE

EXIS

TIN

G R

OO

F

INSULATIO

N T

O R

EM

AIN

INSTALL N

EW

ALPHAG

UAR

D B

IO

RESTO

RATIO

N S

YSTEM

OV

ER

ENTIR

E

RO

OF

REM

OV

E E

XIS

TIN

G R

OO

F T

PO

AND

RO

OF S

UBSTR

ATE IN

AR

EA

OF D

AM

AG

ED

RO

OF IN

SULATIO

N

REM

OVE D

AM

AG

ED

PO

RTIO

N O

F

EXIS

TIN

G R

OO

F IN

SULATIO

N

EXIS

TIN

G T

PO

RO

OF M

EM

BR

ANE

EXIS

TIN

G R

OO

F

INSULATIO

N T

O R

EM

AIN

INSTALL N

EW

RIG

ID R

OO

F

INSULATIO

N, T

YPE A

ND

THIC

KNESS

TO

MATCH E

XIS

TIN

G. C

OVER

WIT

H

LAYER

OF N

EW

1/2" E

XT. G

RAD

E

GYP. B

OAR

D S

UB

STR

ATE A

ND

CO

AT W

ITH L

AYER

OF N

EW

RO

OF

TPO

TO

MATCH E

XIS

TIN

G.

DEM

O O

F D

AM

AG

ED

RO

OF IN

SULATIO

N

INSTALLATIO

N O

F N

EW

RO

OF IN

SULATIO

N

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-57

10

5/30/2017

AD

DEND

UM

01

1

1' - 0

"

3/4"

REG

LET

METAL

CO

UNTER

FLASHIN

G,

TO

REM

AIN

TPO

MEM

BR

ANE

FLASHIN

G

LAP S

EALANT

NEW

5/8" E

XTER

IOR

GR

AD

E G

YP.

SUB

STR

ATE B

OAR

D

TUR

N U

P T

PO

MEM

BR

ANE R

OO

FIN

G

EXIS

TIN

G P

LYW

OO

D

SHEATHIN

G

NEW

ELASTO

MER

IC

CO

ATIN

G

NEW

FULLY R

EIN

FO

RCED

,

FLUID

APPLIE

D R

ESTO

RATIO

N

CO

ATIN

G S

YSTEM

.

REPLACE E

XIS

TIN

G

SEALANT

REUSE A

ND

REIN

STALL W

ALL

MO

UNTED

CAB

LE H

OLD

ER

.

CAB

LE

REM

OV

E A

ND

REIN

STALL A

IR

TER

MIN

AL A

FTER

INSTALLATIO

N

OF E

LASTO

MER

IC C

OATIN

G

REM

OVE A

ND

REIN

STALL B

IRD

BE

GO

NE S

YSTEM

AFTER

INSTALLATIO

N

OF E

LASTO

MER

IC C

OATIN

G

NEW

BUIL

T-UP R

OO

F

INSULATIO

N A

T 1/

2" P

ER

FO

OT, S

LO

PE T

O R

OO

F

DR

AIN

AS S

HO

WN O

N R

OO

F

PLAN S

HEET A

2.2

5-A4

SCALE:

MUR

RAY A

SSO

CIA

TES A

RCHIT

ECTS, P

.C.

1 1/2" = 1'-0

"

RO

OF D

ETAIL

CO

NSTR

UCTIO

N D

OCUM

ENTS - P

HASE 2

350

2/ P

ENNSYLV

ANIA

HO

USIN

G F

INANCE A

GENCY/ M

AY 2

2, 2

017

RD

-58

10

5/30/2017

AD

DEND

UM

01

1