Management of Safety during Construction and Installation activities in Nuclear Power Plant
Marek Rolinec
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Introduction MO34 Project
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
4.6mld€>150contractors
5500workers
>800SE/Enel
2/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Statistics Construction Industry in Slovakia
• ThirdplaceintheEmploymentRate• SecondandThirdplaceintheAccidentRate
• 48FataliCesand457HBIduring6years
• Implementa+onofcorrecttoolsmaysignificantlydecreasethenumbers
Ac+vityFatali+es
HeavyBodyInjury(HBI)HBI+42Sick.Leave
HBIbasedon111/1975(2009-2010)
2009 2010 2011 2012 2013 2014 2009 2010 2011 2012 2013 2014
Industry 8 11 9 12 12 7 720 750 58 61 43 46
Transport,Storage 6 13 10 9 6 9 229 205 8 27 16 16
ConstrucCon 14 3 3 14 7 7 299 164 25 19 22 23
AgricultureandForestry 4 3 5 5 9 5 174 144 11 16 12 11
Injuriesintotal 44 48 38 53 53 39 1948148
1755162 137 167 155 146
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
3/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
Statistics European Union Standardized incidence rate of fatal accidents at work for 2012 and average rate for 2009 - 2011 (Eurostat)
Member State Eurostat - Standardised Incident Rate (per 100,000 workers)
2012 Average (2009-2011)
1,3 1,55 1 United Kingdom 0,58 0,67 2 Netherlands 0,72 0,76 3 Sweden 0,8 1,26 4 Germany 0,9 0,8 5 Estonia 1,02 2,43 6 Denmark 1,18 1,1 7 Greece 1,2 0,85 8 Italy 1,29 1,58 9 Poland 1,42 3,3 10 Ireland 1,43 1,19 11 Belgium 1,46 2,04 12 Hungary 1,6 2,18 13 Finland 1,62 1,04 14 Switzerland 1,68 1,57 15 Malta 1,7 0,5 16 Slovakia 1,78 0,59 (2/29) 17 Spain 1,99 1,98 18 Czech Republic 2,1 2,01 19 Cyprus 2,25 3,48 20 Austria 2,37 2,13 21 France 2,64 3,22 22 Slovenia 2,7 1,93 23 Portugal 2,71 2,9 24 Luxembourg 2,91 2,53 25 Romania 2,94 4,53 26 Bulgaria 3,06 2,26 27 Croatia 3,17 1,68 28 Lithuania 3,93 3,75 29 Latvia 4,7 3,52
Slovakia 2009 -2011 • 2 of 29
Slovakia 2012 • 16 of 29
4/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Statistics MO34 Project status up to 31 Dec 2015
2010 2011 2012 2013 2014 2015Fatality/HBI 0/0 0/0 0/0 0/0 0/0 1/0InjurieswithSL>1day 5 5 4 2 6 5TreatmentwithoutSL 15 8 7 22 25 14Dangerouseventexcl.damage 12 11 5 11 39 40Dangerouseventincl.damage 1 2 4 2 2 0Fire 2 2 2 1 0 0SicknessLeavedaysintotal 97 183 124 115 148 143Workedouthours/year 4.741662 5.416731 5.820423 7.420031 11.424854 12.527882
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
Conclusion
0,64 0,65 0,65 0,64
0,62 0,61
0,59 0,58
0,57 0,56
0,55 0,55
0,010 0,015 0,020 0,025 0,030 0,035 0,040
0,52 0,54 0,56 0,58 0,60 0,62 0,64 0,66
FI
SI
Yearly FR trend (FI – SI)
Combined Frequency Rate (FI – SI)
0,68 0,63 0,57 0,55
0,0207 0,0180 0,0165 0,0155 0,0000
0,0100
0,0200
0,0300
0,0400
0,00
0,20
0,40
0,60
0,80
2013 2014 2015 2016
FI
SI
5/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Human Behavior Human Factor Failure
Absenceofpersonalprecondi+onfor
properjob45%
Usingofdangerousmethods,includingac+ngwithout
authority,againstorder,againstprohibi+onandinstruc+on,remainingin
dangerouszone30%
Causeofaccidents2009-2015
71,4%
30%
45%
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
V-45Staircase,ladders,ascents-fallofworkerson
20%
III-24Grinders,cleaningand
polishingmachines10%
IV-44In-plantworkplaces(roads,
pathways,corridors)-
horizontalfallofworkers10%
V-47Depressions,pits,notcoveredopenings-fallofworkersintodepth
10%
Vb-50Loads-accidentscaused
byloads10%
VII-61Toxicsubstances-solid,liquid,toxicand
unbreathablegases10%
Sourceofaccidents2015
6/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Human Behavior Human Factor Failure
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
• 32 fatalities • Dozens of injured
• Francesco Schettina – 16 years of sentence
7/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
• approx.80%ofinjuriesonMO34maybeassignedtohazardousbehavior
Selection of Activity
Observing the activity
Filling in the Checklist Feedback Data completion
Observation
One Safety - important
no.
2014
Observers 28
Checklists filled in 1234
Observations in total 2482
Safe Behavior 2073
HazardousBehavior 409
HazardousBehaviorin% 20
Tab4:ONESAFETYbasicdata
Human behavior initiatives ONE SAFETY
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
8/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Outcomes from CSI
• Detailed information on all nonconformities
• Analysis focusing on critical workplaces
• Detection of new possible hazards
• Data about contractors’ Safety performance
• Analysis on efficiency of actions’ taken
• Analysis on human behavior
• Data about activities of all Safety Supervisors
• Data about all Yellow and Red cards applied
• Environment included
PPA TOTAL October 2015 November 2016
December 2015 Januray 2016 February
2016 March 2016 April 2016
Počet kontrol / NO. of inspections 14409 2789 1837 2113 2122 2999 2549
Počet zistení / NO. of findings 2444 302 262 306 428 640 506
Žlté karty / Yellow cards 164 30 37 23 29 26 19
Červené karty / Red cards 5 0 0 2 0 3 0 October November December January February March April
FR = Počet zistení na 100 kontrol / No. of findings on 100 inspection 17 11 14 14 20 21 20
Areas of findings FR Q4 PPA 2015
FR Q4 MO34 2015
FR Q1 PPA 2016
FR Q1 MO34 2016
FR Januray
FR February
FR March
El. Equipment 13 11 20 17 19 22 19
Chemical substances N/A N/A N/A N/A N/A N/A N/A
Scaffold 31 31 38 39 42 38 33
Waste 3 16 4 13 6 6 0
PPE 23 26 40 36 41 38 42
Fire Prevention 12 17 21 24 13 21 29
PráWork at height 14 13 18 15 19 16 18
Machine, Crane N/A N/A N/A N/A N/A N/A N/A
Human behavior 2 3 3 4 1 4 4
Povolenie na práce 3 4 6 5 7 7 3 FR = Počet zistení na 100 kontrol / No. of findings on 100 inspection
Program introduction Construction Safety Indicator program
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
9/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Construction Safety Indicator program CSI – figures
• CSISystemfocusesonfindings’iden+fica+on(nothavingcharacterofincident)
• CAPAaresubmigedtotheSafetyCoordinatorandtoContractors
• Evalua+onofcollecteddataresultsfromdefinedselec+oncriteria
• ThebestCAPAeffec+vityisfoundinrange65%-80%
• CAPAefficiencyshallbecountedbasedonperiodicityoffindingsasfollows:
January–December2015 Observers No.ofinspecCons/2015Shortcomingswithhighlevelof
hazard
CSI 42 65.045 635
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
10/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
MeasurestakenajerinjuriesandCSIresults
Ini+a+vessetupforyear
PRACUJTE BEZPEČNECHRÁNITE TÝM SEBA AJ SVOJU RODINU
WORK SAFELYPROTECT YOURSELF AND YOUR FAMILY
HSE Initiatives HSE Integrated Improvement Program
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
11/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
• How many of you find the positive motivation as the most effective tool for improvement of the human behavior (bonuses, rewards, etc.)?
• How many of you find the negative motivation as the most effective tool for improvement of the human behavior (penalization, stopping of
activities, etc.)?
• How many of you use the positive and negative tool of motivation?
HSE Initiatives Reward and Punishment
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
12/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
HSE Initiatives Reward and Punishment
627 vouchers issued in total
In 2015 issued 2425 Yellow and 80 Red Cards
100 pcs in total
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
13/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Induction Periodical and topic trainings
1640
48032
51668
17908
11080
16792
2221220592
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0
10000
20000
30000
40000
50000
60000
2008 2009 2010 2011 2012 2013 2014 2015
Manhoursoftrainings
No.ofworkers
265,502739,60
13266,40
14155,90
22658,65
16828,05
23766,90
24774,90
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
0
5000
10000
15000
20000
25000
30000
2008 2009 2010 2011 2012 2013 2014 2015
Manhoursoftrainings
No.ofworkers
HSE Initiatives Trainings and Education
Scaffolders, Head of Works, Pre Job Brief, Load Binders, Work at Height, Use of Harness, Work in Confined Spaces, etc.
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
14/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
HSE Initiatives Trainings and Education
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
15/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
HSE Initiatives Communication Campaigns
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
16/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
HSE Initiatives Communication Campaigns
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
17/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
HSE Initiatives Communication Campaigns
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
18/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
HSE Initiatives Communication Campaigns
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
19/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
HSE Initiatives Communication Campaigns
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
20/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Conclusion Achieved results
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
21/22
Safety during nuclear power plant construction HSE Excellence Europe 2016, 18.5.2016
Use: External Author: Marek Rolinec HSE MO34
Conclusion Achieved results
Tab5:AccidentRateofMO34+SK*
MO34 Construction
SK Construction
MO34 Effectivity Index
1 ml. of man hours 6 years
1 ml. of man hours 6 years
Fatality Indicator / HBI (FaR) 0,019 0,056 + 300 %
Frequency Rate (FR) 0,55 1,979 + 360 %
Severity Index (SI) 0,015 0,113 + 750 %
Posi+vesintheHSEArea9.160.000hourswithoutregisteredOccupa+onalInjury
SafeEnterprisein2012GoodPrac+ce3rdplacein2014
*Ing.RobertBullaHlavnýinšpektorpráceIPNitra:SYSTÉM CELOŽIVOTNÉHO VZDELÁVANIA V BOZP V PODMIENKACH SR
1Introduc+on
2Sta+s+cs
3HumanBehavior
4CSI
Program
5HSE
Ini+a+ves
6Conclusion
22/22