L tfNL '0'6 Roberts, Kathryn, NMENV From: Roberts, Kathryn, NMENV Sent: Tuesday, June 10, 2008 8:39 AM To: 'Susan Stiger' Cc: Bearzi, James, NMENV; '[email protected]'; Cobrain, Dave, NMENV; Kieling, John, NMENV Subject: Final Signature Page and Tables XII-2 and XII-3 Attachments: Signature_page_footnote{6-10-2008).pdf; Order_ Mod_Table_Footnote_Change_ Clean(5-2008).pdf; Order_Mod_Table_Footnote_Change_redline(5-2008).pdf Sue, The changes you proposed to the signature page are fine. I have attached the clean and redline versions of Tables XII-2 and XII-3 as well as the signature page. Please have Mr. Winchell and Mr. Anastasio sign the signature page as soon as possible and return to our office. Please let me know if you have any additional questions. Thanks, Katie From: Susan Stiger [mailto:[email protected]] Sent: Thursday, June OS, 2008 4:55 PM To: Roberts, Kathryn, NMENV Subject: FW: Draft Signature page and Table Katie, will this signature page work for you-it fixes a very minor nit on LANS vs LANL? We're okay with what we discussed this morning if you want to send the final paper. We don't have a need on our end for a new letter from you, so it's okay with us if you just want to email the new pages. Please let me know. Thanks. SGS From: [email protected] [mailto:[email protected]] Sent: Thursday, June OS, 2008 12:56 PM To: [email protected] Subject: Fw: Draft Signature page and Table Susan - Gust left you a voice mail message) The approach looks good (and the Tables have been corrected). But we need to revise the Signature Page to add "Los Alamos National Security, LLC" as the Party to the Consent Order that Jan will sign on behalf of (revision attached). This is the way we have done it for the other two Modifications and it should not be a problem. Please forward the attached to Katie for her to include in the package. Thanks for working this out. (See attached file: Consent Order Modification 3 SignaturePage MayOS.doc) Deborah W oitte Practice Group Leader 31366 ""'" "'" '"'' "''' ",,,,,,, '''' 611012008

Roberts, Kathryn, NMENV - hwbdocuments.env.nm.gov Alamos National Labs/Permit... · Tuesday, June 10, 2008 8:39 AM : To: ... 11/5/04 23 days past due ... AOCs C-21-009, C-21-012 de

  • Upload
    trannga

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

L tfNL '0'6

Roberts, Kathryn, NMENV

From: Roberts, Kathryn, NMENV

Sent: Tuesday, June 10, 2008 8:39 AM

To: 'Susan Stiger'

Cc: Bearzi, James, NMENV; '[email protected]'; Cobrain, Dave, NMENV; Kieling, John, NMENV

Subject: Final Signature Page and Tables XII-2 and XII-3

Attachments: Signature_page_footnote{6-10-2008).pdf; Order _ Mod_Table_Footnote _Change _ Clean(5-2008).pdf; Order_Mod_Table_Footnote_Change_redline(5-2008).pdf

Sue,

The changes you proposed to the signature page are fine. I have attached the clean and redline versions of Tables XII-2 and XII-3 as well as the signature page. Please have Mr. Winchell and Mr. Anastasio sign the signature page as soon as possible and return to our office.

Please let me know if you have any additional questions.

Thanks, Katie

From: Susan Stiger [mailto:[email protected]] Sent: Thursday, June OS, 2008 4:55 PM To: Roberts, Kathryn, NMENV Subject: FW: Draft Signature page and Table

Katie, will this signature page work for you-it fixes a very minor nit on LANS vs LANL? We're okay with what we discussed this morning if you want to send the final paper. We don't have a need on our end for a new letter from you, so it's okay with us if you just want to email the new pages. Please let me know. Thanks. SGS

From: [email protected] [mailto:[email protected]] Sent: Thursday, June OS, 2008 12:56 PM To: [email protected] Subject: Fw: Draft Signature page and Table

Susan - Gust left you a voice mail message) The approach looks good (and the Tables have been corrected). But we need to revise the Signature Page to add "Los Alamos National Security, LLC" as the Party to the Consent Order that Jan will sign on behalf of (revision attached). This is the way we have done it for the other two Modifications and it should not be a problem. Please forward the attached to Katie for her to include in the package. Thanks for working this out.

(See attached file: Consent Order Modification 3 SignaturePage MayOS.doc)

Deborah W oitte Practice Group Leader

31366

""'""'" '"''"'''",,,,,,,''''611012008

Environmental, Safety and Health Office ofLaboratory Counsel (505) 667-8758 (505) 699-1811 (cell)

This inbound email has been scanned by the MessageLabs Email Security System.

6110/2008

\.

Modification # 3 to the March 1,2005 Order on Consent consists of changes to the footnotes in Tables XII-2 and XII-3 concerning "Notice Dates" for Corrective Measures Evaluations (CME) and Corrective Measure Studies (CMS). This modification to the March 1, 2005 Order on Consent is hereby AGREED and CONSENTED TO by the Parties, pursuant to Section IILJ:

For the NEW MEXICO ENVIRONMENT DEPARTMENT:

Ron Curry Date Cabinet Secretary New Mexico Environment Department

For the UNITED STATES DEPARTMENT OF ENERGY:

Donald L. Winchell, Jr. Date Manager Los Alamos Site Office U.S. Department of Energy

For LOS ALAMOS NATIONAL SECURITY, LLC:

Michael R. Anastasio Date Director Los Alamos National Laboratory

&-{D-oUX%

Table Modification # 2

Table XII-2 Schedule of Deliverables by Watershed

ACTUAL DELIVERABLE DUE DATE NOTICE DATE' NOTICE DATE

Investigation Report Submitted 9-Nov-06

29-Feb-04 Submitted

18-Sep-06 Submitted

19-Dec-lO

Submitted

6-Feb-06 Submitted

31-May-04

16-Jan-07

6-Jun-06

6-Nov-11 6-Mar-12

Remedy Design Work Plan 30-Apr-04 2-Sep-04

Investigation Work Plan

Investigation Report

Investigation Work Plan

Investigation Report

Remedy Completion Repore

Submitted Remedy Completion Report 5-Apr-07 3-Aug-07

May 2008

19-May-05

28-Sep-06

Table Modification # 2

DELIVERABLE DUE DATE NOTICE DATEI ACTUAL

NOTICE DATE

May 2008 2

''''',

Table Modification # 2

DELIVERABLE

Investigation Report

DUE DATE

30-Apr-04 Submitted

NOTICE DATEI

27-0ct-04

ACTUAL NOTICE DATE

II-May-05

II-Dec-06

Investigation Work Plan 31-JuJ-03 I-Jun-04 6-Apr-05 Submitted

May 2008 3

Table Modification # 2

DELIVERABLE

Investigation Report

DUE DATE

6-Dec-06 Submitted

NOTICE DATE!

5-Apr-07

ACTUAL NOTICE DATE

29-Jun-04 25-Jun-04 Submitted

30-Sep-05

Supplemental SAP 31-May-04

Investigation Report

Revised Investigation Report

27-Feb-06 14-Aug-06 Submitted lS-May-07 31-Jan-OS

30-Dec-06 Submitted

Phase II Work Plan 30-Jan-07

Interim Measures Report 30-Nov-06

I-Mar-07

31-Mar-04 29-Jun-04 2S-Jun-04Investigation Work Plan Submitted

31-Jan-06 I-May-06 25-0ct-06Investigation Report Submitted

May 2008 4

Table Modification # 2

ACTUAL DELIVERABLE DUE DATE NOTICE DATEI NOTICE DATE

Investigation Work Plan 31-Mar-05 29-Jul-05 19-Aug-05 Submitted

21-Jun-07 19-5ep-07

' ...:.:;::i·.2;. ·~?;·;:·(\; ..·;;:·I;:!;~·; ;~i.(:;·~\ .\.[1};;:.:~~ ..... ...• ..,;\'i;·!Yii ",rf1"X·£:·;.~ 30-Sep-03 I-Mar-05 21-Jun-04 Submitted

CMS Report for Surface System/Alluvial

Phase III RFI Report

Submitted l-Mar-05 13-0ct-06 Groundwater

CMI Plan for Surface System/Alluvial Groundwater 13-May-07 30-Sep-07 Submitted

Investigation Report for Intermediate and Regional 31-Aug-06 29-Nov-06 Groundwater Submitted

CME Report for Intermediate and Regional 31-May-07 2S-Sep-07 Groundwater

CMI Plan for Intermediate and Regional 30-Nov-07 2S-Feb-OS Groundwater

Investigation Work Plan (includes 30-Sep-06 29-Mar-07 Ancho/Chaquehu i/IndiolFencelPotrillo Canyons) Submitted

Investigation Report (Water Canyon/Canon de 31-Dec-1O 30-Apr-l1 Valle)

I'h"'vl,,.,e"sc"tn<i=g'·"a't~ion ~g-11 129-Nov-ll ,b; [.U\1~?",'" '':'';;'M:;I·:::i'';ll.!t·f';'ljIl~~ '. ,., 1;S:~E!;~;J:·;;:i~lft;/.';:.j:}.: ~.Al;i"';~ it "......... '.. ' Investigation Work Plan2 30-Sep-06 l2-Feb-07

Submitted

;,I;(;;:)~;~j~: :l;;;:·j;;';~j:{t;~~1·[[.'~·1~:~: Irf~;:;rt~~l!~;:;:~(::;;:~.;;~~:, :\;;;,~~

30-Sep-07 2S-Jan-OS

Investigation Work Plan2 31-Aug-1O 29-Dec-IO

:;·.~.;,,;.~j;;1:;~ .;ii;; ·,~i~:;i:;:;:.. :l;;::'j,i(;j!~tl·;;,;~tE .5.~.. t

11';'_.~"f.""","' .. ',. ~ m;'~; ':·i·;;,. ;)'l~~~~;f~;;~~':;;;:;;;;:;';";' ,' ..,'_' .::A

III vestigation Work Plan2 30-Sep-12 29-Dec-l2

PO.tnH, Investigation Work Plan2 13-Aug-09

Sandia W""l:'l shed ~'fV~lt: ".>!C,. 1,,,,(&Oj:':;;~;;{);C:;,;.;~:/,,

Investigation Report 30-Jan-04 30-May-04 25-Jul-06 Submitted

II) VI .:. Ition Rtvull 31-Aug-09 29-Der-OQ ct~;;~5::;~·.;~7~~i~);> i;:.ll'lt;g.;{+:;:; tf. :.i;;~(~~~~~~)l.(.l·l~ij fi1;i~F' ...• ·")'E...·.·,;";;...:.:..;::~.:~~;jj@~.:. ,;f;g~t? ·;:~f+;~~:;;{~;;~('Nt.:r;i

May 2008 5

Table Modification # 2

DELIVERABLE DUE DATE NOTICE DATE] ACTUAL

NOTICE DATE

May 2008 6

Table Modification # 2

DELIVERABLE

Investigation Work Plan2

ILower 0;;.' , ... :. '1 '~ "

Investigation Work Plan2

IPajarito Watershed

DUE DATE

31-Mar-08

30-Apr-09

NOTICE DATEl

l3-Aug-08 r;;,~

,'. '. .'. l3-Aug-09

ACTUAL NOTICE DATE

CMS Report 31-May-03 31-Dec-04 Pending

CMIPlan IRpmpoy Completion Report Il::SWIV),I..,..I ' it~;;;ifi;i~Tj:",,~'''I'':NTI'i''III,

Investigation Work Plan

Investigation Report

CMEReport

Submitted

IPendin\J [PeI1dillg Pendinp ~

..... :bill/!!i ""i~"""';:'i'i IEl. ' · ·':':t:,.« '~: ;:;~II:~:\II;""";:.I.'. :1' '. 'IY!.S,II:~'I" i,' " ',I" .', i ,

31-Aug-03 31-Mar-04 28-Sep-04 Submitted

13-Sep-05 Submitted

Pending

31-Jul-07 1~

6-Nov-11 1;1; 1"';II~\~':li~:!:i i 1 Ii:,til!Z :1,'1' ,;' iT i "

Investigation Report 31-Aug-05 29-Nov-05 Submitted

Investigation Work Plan 30-Sep-03 31-Jul-04

Investigation Report

CME Work Plan

CME Report3

Submitted

8-Sep-05 Submitted

6/512006

Submitted

9/12/2008 Pending

21-Jan-06

i3-!-~~ 31-Dec 07 11~il1g

Investigation Work Plan2 31-Jul-1O l3-Dec-1O

,rv.I'~C,;I::~Ilf1W~yUIl i '

Investigation Work Plan2

Investigation Work Plan2

30-Sep-lO l2-Feb-11

31-Jan-1O l5-Jun-1O

5-Nov-04

T> .11rellulllg

May 2008 7

T able Modification # 2

DELIVERABLE DUE DATE NOTICE DATEl ACTUAL

NOTICE DATE

May 2008 8

Table Modification # 2

DELIVERABLE DUE DATE NOTICE DATE I ACTUAL

NOTICE DATE

Investigation Work Plan2 31-0ct-ll 29-Jan-12

Note: All deliverables marked as "Submitted" were submitted to the Department on or before the due date.

1. "Notice Date" is described in Section IILM.2 of the Order on Consent.

2. Investigation Work Plans for the Aggregate Areas shall include a schedule for submitting the Investigation Reports.

3. NMED has issued a Certificate of Completion for the SWMU(s) and AOC(s) covered by this document. Pending a Class 3 permit modification to remove the SWMU(s) from the list of SWMUs requiring corrective action, NMED will no longer require submittal of this document.

May 2008 9

Table Modification # 2

Table XII-3 Schedule of Deliverables by Calendar Year

50-009 (MDA C) IInvestigation Work Plan 7/31/03 6/1/04 4/6/05 Submitted 309 days past due

n Work Plan 9/30/03 7/31/04 11/5/04 Submitted 97 days past due

8/31/03 3/31/04 9/28/04 Submitted 181 days past due

9/30/03 3/1/05 6/21/04

Submitted 785 days past due

2/29/04 5/31/04 5/19/05 Submitted 353 days past due

I"VJ.1UU"'-' MortandadlTen Site Canyon Aggregate Area 3/31/04 6/29/04 6/25/04 Submitted

16-003(0) Work Plan 3/31/04 6/29/04 6/28/04 Submitted

Investigation Report 10/27/04 5/11105 196 days past due

73-001(a-d), 73-004(d) (Airport Landfill- Mesa Top) IRemedy Design Work Plan 8/28/04 I 9/2/04 5 days past due

s 21-013(b, g), 21-018(a, b) (MDA V) Investigation Work Plan 10/13/04 I 11/5/04 23 days past due

21-015(MDAB) Investigation Work Plan 10/28/04 I 12/21/04 54 days past due

Site Aggregate Area Investigation Work 1/28/05 I 4/13/05 75 davs past due

"

May 2008 Page 1

Table Modification # 2

s 21-017(a-c), 21-022(0 (MDA U)

21-014 (MDA A)

16-008(a)

Canyon Aggregate Area

54-004 (MDA H)

Canyon Aggregate Area (including SWMUs 1O-002(a,b), 1O-003(a-o), 1O-OO4(b), and 10-007)

e/Barrancas/ Rendija Canyons Aggregate Area

54-006 (MDA

e Mortandadrren Site Canyon Area

IIVUUUJC Los Alamos Canyon Aggregate

s 21-017(a-c), 21-022(0 (MDA U)

1/31/05 jSubmitted

ork Plan 13/31/05

NOTICE DATE"

3115/05

5117/05

7/29/05

9/28/05

9/28/05

Pending

12/26/05

10/29/05

11129/05

6/6/06

ACTUAL NOTICE DATE 3/21/05

591 days past due

7/26/05 70 days past due

8/19/05 21 da s ast due 9/23/05

9/30/05 2 days past due

12/19/05

1/5/06 68 days ast due

8/14/06 16~<lays past dU~--l 5/30/06

due

May 2008 Page 2

Table Modification # 2

DELIVERABLE IDUEDATE I NOTICE ACTUAL DATEl NOTICE DATE

Completion Report 3/3/06 611/06 8/30/06 Submitted 90 days oast due

21-015 (MDA B) iation Work 3126/06 1131/074

Submitted Los Alamos Canyon Aggregate Area 8128/06 1116/06

70 days past due 10l31/o6 12/31/07

16-021(c),16-003(k) Report for 18/31106 11/29/06 and Regional

Report 9/12106 12111/06 Not submitted

etion Report Pending Pendin

21-001, 21-01O(a-h), 21-0l1(a, c-j), 21-016(a-c), 21­ 1116/07 ; AOCs C-21-009, C-21-012 de Valle Aggregate Area 2112/07

3/29/07

SWMUs 21-013(b, g), 21-0J8(a, b) (MDA V)

SWMU 21-014 (MDA A)

May 2008 Page 3

Table Modification # 2

Investigation Work Plan 10/31/07

Investigation Work Plan 10/31/07

NOTICE DATE' 9/28/07

2/28/08

2/28/08

ACTUAL NOTICE DATE

May 2008 Page 4

Table Modification # 2

ACTUAL

May 2008 PageS

Table Modification # 2

ACTUAL NOTICE DATE

Note: All deliverables marked as "Submitted" were submitted to the Department on or before the due date.

1. "Notice Date" is described in Section III.M.2 of the Order on Consent. 2. Investigation Work Plans for the Aggregate Areas shall include a schedule for submitting the Investigation Reports. 3. NMED has issued a Certificate of Completion for the SWMU(s) and AOC(s) covered by this document. Pending a Class 3 permit modification to remove the SWMU(s) from the list of SWMUs requiring corrective action, NMED will no longer require submittal of this document.

May 2008 Page 6

Table Modification # 2

Table XII-2 Schedule of Deliverables by Watershed

3J-Jan-05 17-May-05 26-Jul-05Investigation Work Plan Submitted

9-Nov-06 9-Mar-07Investigation Report Submitted

Investigation Work Plan 29-Feb-04 31-May-04 19-May-05 Submitted

Investigation Report 18-Sep-06 16-Jan-07 Submitted

ACTUAL DELIVERABLE DUE DATE NOTICE DATEl NOTICE DATE

Investigation Work Plan

Investigation/Remediation Work Plan

30-Jun-04 Submitted

26-Mar-06 Submitted

28-0ct-04

31-Jan-07

21-Dec-04

Investigation Work Plan

Investigation Report

Investigation Work Plan

Investigation Report

30-Nov-04 Submitted

6-Feb-06

30-Jun-04 Submitted

31-0ct-06 Submitted

15-Mar-05

6-Jun-06

13-0ct-04

28-Feb-07

21-Mar-05

28-Sep-06

5-Nov-04

May 2008

Table Modification # 2

DELIVERABLE DUE DATE NOTICE DATEl ACTUAL

NOTICE DATE

May 2008 2

Table Modification # 2

DELIVERABLE

Investigation Report

DUE DATE

30-Apr-04 Submitted

NOTICE DATE!

27-0ct-04

ACTUAL NOTICE DATE

Il-May-05

Investigation Work Plan 31-May-05 28-Sep-05 30-Sep-05 Submitted

Investigation Report 12-Sep-06 II-Dec-06 Not submitted

May 2008 3

Table Modification # 2

DELIVERABLE

Investigation Report

Investigation Report

Revised Investigation Report

Interim Measures Report

Phase II Work Plan

Investigation Work Plan

Investigation Report

DUE DATE

6-Dec-06 Submitted

Submitted

30-Jan-07

31-Mar-04 Submitted

31-Jan-06 Submitted

NOTICE DATE!

5-Apr-07

30-Dec-06

I-Mar-07

29-Jun-04

I-May-06

ACTUAL NOTICE DATE

I4-Aug-06

28-Jun-04

25-0ct-06

May 2008 4

Table Modification # 2

ACTUAL DELIVERABLE DUE DATE NOTICE DATEl NOTICE DATE

II I,

31-Mar-05Investigation Work Plan 29-Jul-05 19-Aug-05 Submitted

30-Sep-03 I-Mar-05 21-Jun-04Phase III RFI Report Submitted

CMS Report for Surface System/Alluvial Submitted I-Mar-05 13-0ct-06

Groundwater;l

CMI Plan for Surface System/Alluvial Groundwater 13-May-07 30-Sep-07 Submitted

Investigation Report for Intermediate and Regional 31-Aug-06 29-Nov-06 Groundwater Submitted

31-May-07CME Report for Intermediate and Regional 28-Sep-07

Groundwater;l

CMI Plan for Intermediate and Regional 30-Nov-07 28-Feb-08 Groundwater

III II:

Investigation Work Plan (includes 30-Sep-06 29-Mar-07 Ancho/ChaquehuilInd iolFencelPotrillo Canyons) Submitted

31-Dec-IOInvestigation Report (Water Canyon/Canon de Valle) 30-Apr-11

May 2008 5

Table Modification # 2

ACTUAL DELIVERABLE DUE DATE NOTICE DATE1 NOTICE DATE

Investigation Work Plan

Investigation Report

CME Wark Plan

13-Sep-05 Submitted

8l9la007

30-Sep-03 Submitted

8-Sep-05 Submitted

6/512006 Submitted

21-Jan-06

5-Nov-04

Pending

May 2008 6

Table Modification # 2

DELIVERABLE DUE DATE NOTICE DATE' ACTUAL

NOTICE DATE

Investigation Work Plan2 31-Jan-1O 15-Jun-IO

May 2008 7

Table Modification # 2

ACTUAL DELIVERABLE DUE DATE NOTICE DATEl NOTICE DATE

May 2008 8

Table Modification # 2

DELIVERABLE DUE DATE NOTICE DATE1 ACTUAL

NOTICE DATE ')

Investigation Work Plan~ 31-0ct-ll 29-Jan-12

Note: All deliverables marked as "Submitted" were submitted to the Department on or before the due date.

I. "Notice Date" is described in Section III.M.2 of the Order on Consent.

2. Investigation Work Plans for the Aggregate Areas shall include a schedule for submitting the Investigation Reports.

3. For GMS aRe GM£; Reports, the "Notice Date" FReRRS R eecisioR OR £iRal Femee}, selectioR by the DepartmeRt

4. The Rolice eate reflects the time aRticipatee to issl:le a pl:lblic Rotice of the remeey, FespoRd to commeRts, aRd mal€e chaRges to the docl:lmeRt based OR commeRts.

~ 3. NMED has issued a Certificate of Completion for the SWMU(s) and AOC(s) covered by this document. Pending a Class 3 permit modification to remove the SWMU(s) from the list of SWMUs requiring corrective action, NMED will no longer require submittal of this document.

May 2008 9

Table Modification # 2

Table XII-3 Schedule of Deliverables by Calendar Year

50-009 (MDA C)

-006 (MDAL)

21-001, 21-01O(a-h), 21-01 1 (a,c-j), 21-016(a-c), 21­C-21-OO9, C-21-012 (MDA T)

IMiddle Mortandadffen Site Canyon Aggregate Area

I':HYlnU 16-003(0)

IInvestigation Work Plan

Iinvestigation Work Plan

73-00 l(a-d), 73-004(d) (Airport Landfill- Mesa Top) 1~C:IlIC:uy

21-013(b, g), 21-018(a, b) (MDA V)

21-015(MDA B)

Site Aggregate Area

17/31103

18/31103

1 6/L104 1 4/6/05 309 da}'s East due 1115/04 97 days oast due

1 3131104 1 9128/04 181 days past due

311105 I 6121104

due

353 days past due

6129/04 6/25104

6129104 6/28/04

10127/04 due

23 days past due

10128/04 I 12/21/04 54 days past due

1128/05 14113105 75 days oast due

May 2008 Page 1

Table Modification # 2

s 21-017(a-c), 21-022(f) (MDA U)

21-014 (MDAA)

1 6-008 (a)

and 10-007)

Rendija Canyons Aggregate Area

54-006 (MDA L)

------------

Mortandadrren Site Canyon Aggregate Area

Los Alamos Canyon Aggregate Area2,~

Report for Surface ystemJ Alluvial Groundwater;!

Investigation Work Plan

Investigation Work Plan

IInvestigation Work Plan

r Work Plan

IInvestigation Work Plan2,~

Report

Report

Investigation Report

Investigation Report

Investigation Work Plan

Iinvestigation Report

7/30/05 Submitted

7/31105

8131/05 Submitted 9/8/05

19/13/05

9/30/05 Submitted 12/31/05

591 days past due

5/17/05 I 7126/05 70 due

9128/05 I 21 days East due

9/23/05

9128105 I 9/30/05 2 nast due

12/26/05 12119105

10/29/05 115/06 68

11129/05

1/21106

1 7/31/07

2/27/06 18/14/06 168 days past due

5/30106

due 6/6106

due

May 2008 Page 2

Table Modification # 2

DELIVERABLE

Remedy Completion Report

Los Alamos Canyon Aggregate Area

MClrtJlnliJlI1 Canyon

s 21-013(b, g), 21-0l8(a, b) (MDA V)

21-014 (MDA A)

NOTICE DATE I

6/1/06

8/28/06

10131,106 12/31107 11l29/06

12/11/06

2112107

3129107

2125107

11/18/-06 2128/07 3/9/07

May 2008 3

Table Modification # 2

s 16-021(c), 16-003(k)

NOTICE DATEl

9/28/07

ACTUAL NOTICE DATE

.'

May 2008 Page 4

Table Modification # 2

ACTUAL NOTICE DATE

May 2008 PageS

Table Modification # 2

ACTUAL NOTICE DATE

s 49-001(a-g), 49-003, AOC C-49-008(d) (MDA AB, 1, 3,4, 11, and 1

G Completion Report 12/6/15 4/4/16

Note: All deliverables marked as "Submitted" were submitted to the Department on or before the due date.

1. "Notice Date" is described in Section III.M.2 of the Order on Consent. 2. For CMS aRs CME Refl0rts, tHe "~~otiee Date" meaRS a seeisioR OR fiRal remesy seleetioR by tHe DeflartmeRL J.:.2. Investigation Work Plans for the Aggregate Areas shall include a schedule for submitting the Investigation Reports. 4. THe Rotiee sate refleets tHe time aRtieiflates to issHe a flHblie Rotiee of tHe remesy, resfloRs to eommeRts, aRs make eHaRges to tHe soeHmeRt bases OR eOfl'lfReRts ~L-NMED has issued a Certificate of Completion for the SWMU(s) and AOC(s) covered by this document. Pending a Class 3 permit modification to remove the SWMU(s) from the list of SWMUs requiring corrective action, NMED will no longer require submittal ofthis document.

May 2008 Page 6