20
Tech TOC Asia 2018 Road to “Terminal 4.0” For existing brownfield facilities Mahim Khanna | Regional Director TBA Group | TOC Singapore | April 2018 Mobile +61 468 719 077 | [email protected]

Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

© TBA2017

Tech TOC Asia 2018

Road to “Terminal 4.0”For existing brownfield facilities

Mahim Khanna | Regional Director TBA Group | TOC Singapore | April 2018

Mobile +61 468 719 077 | [email protected]

Page 2: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Background

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 2

Technology is now come of age. “Industry 4.0” is here– Artificial Intelligence (AI), automation, Digitization, IoT, data analytics, interconnectivity– AI is beating us at our own game(s). AlphaGo “Master” beat the highest ranked Go player.

Then AphaGo “Zero” after 21 days of self learning became even better than Alpha “Master”. – In 2017 for the first time machine was better than humans on one of a reading test

Potential & opportunity with technology & AI is undisputed & enormous

For our industry - Fully automated terminals are increasingly fast & all across the globe

Ports, shipping lines, supply chain participants & tech companies are all actively talking about Artificial intelligence, digitization,, block chain, big data, IoT etc.

While greenfield automated container facilities can create a “state of the art” inter-connected IT infrastructure, what about the existing brownfield facilities - What should they do to?

1997 Kasparov Vs. Deep blue

Page 3: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Topic

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 3

First creating a state of the art IT infrastructure is not a prerequisite for launching digital transformation

TopicThe digital journey/transformation for most brownfield sites is best advised via a stepped approach & leveraging the existing infrastructure

A few examples– Using AI to automating RTG dispatching in existing facility– Automate Straddle terminal main yard – Automated RTG & Auto TT – Data Vs Information ; managing data Vs exception management

Conclusion – What is needed for success ?

Page 4: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

TBA Group Highlights - Design, Operations & SoftwareTBA – Globally a recognized leader in terminal design, simulation, optimization & terminal automation.

Over 600 terminal projects around the world. 9 of top 10 largest global operators use TBA services including, DP World, AP Moller terminals, PSA, Hutchison etc..

Been involved in many of the cutting edge & most innovative terminals. APMT Maasvlakte II, Rotterdam World Gateway, Long Beach Container Terminal, EuroMax, London Gateway Etc

TBA Equipment Control System (ECS) is controlling majority of the AGVs operating in fully automated container terminals. TBA has been providing this software for +18 years, linking to TOS & handling equipment

IntroductionTBA Group

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 4

Long Beach Container Terminal – controlled by TBA TEAMS Yanghan Phase IV- TBA worked on design

Page 5: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

The digital journey for brownfield facilitiesExample 1Automating RTG dispatch

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 5

Page 6: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

RTG productivity is highly variable on an hourly basisObservations at current RTG operations

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0

RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8 to 12 up to 16.Typically one RTG is very productive one hour and not so productive the next due to work load distributionRTG dispatching is done manually - With high numbers of RTG it becomes more challenging to distribute workload !Solution – Yard crane Scheduler - use AI to automate RTG dispatching?

6

RTG Performance

EC status reports received to date

0

2

4

6

8

10

12

14

16

0 2 4 6 8 10 12 14 16 18 20

Num Active RTGs

Av

era

ge

RT

G P

erf

orm

an

ce

Typically RTG productivity varies hour by hour between 0 and 25 productive moves

Typical range of productive moves per hour per RTG (8 – 12)

Page 7: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0

Automated dispatching of RTGs- Using AI TBA Yard Crane Scheduler (YCS)

Neighbouring RTG helps out automatically, workload is spread over the available

cranes, no more uncovered moves

Zone assigned to 1 yard crane, with all the moves in time, and their execution

position in the yard

Optimized path, with recommended number of RTGs per block

Each path shows a separate RTG

7

Moves are added in real-time to the schedule from vessel, gate or rail

Page 8: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

What is the benefit ?Euro 1.8 M a year

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 8

Improvement of RTG productivity: +10%

Labour cost: 25€/h

1M TEU operation

Savings in CAPEX & QC saving (+3%)

performance is additional

Page 9: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

AI – visibility about RTG workload & manages ranges Moving RTGs with Blocks & Lanes

10

Incorrect machine status– Breakdowns (unreported)– Unmanned machines (driver left, kept logged on)

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0

Lack of discipline ADAPT

Page 10: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

What does AI do ?

11

Learning gate patterns– Real-time and over time

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0

PREDICT

Page 11: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Example 2Straddle Automation

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 12

Page 12: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Example 2 for brownfield sites: Auto Straddle Carrier – decoupled roll out

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 13

Automated main yard(Blue straddle)

Manual Water side (Yellow Straddle)

Benefits- Staged implementation- use existing infrastructure- Use existing manual Straddles - Manage social impact & transformation - 3 over 1 yard, but 1 over 1 shuttle on WS

Page 13: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Example 3 –Auto RTG – Auto TT

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 14

Page 14: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Example 2 ConceptualBrownfield sites: Auto RTG + AutoTT

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 15

Auto TT working in brownfield site- showing

claimed length

Page 15: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Example 4 –Managing to Exception Management

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 16

Page 16: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Current Operation Managing Vs Exception management

17

Control Room

Multiple screens

Vessel & berth planner

Yard planner TOS

EQU Dispatcher

Current operations set up.Lots of screen & active operations staff

Current operations set up.Lots of screen & active operations staff

TBA TOS field applicationPhone, PC or tablet

Page 17: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Managing Vs Exception management

Action Board from TBA Group TOS – AutostoreAvailable now!

18

TOS

New operations set-up.Action Board

only manage exceptions

Highlights & warnings only

Page 18: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Action Board - Exception management only

19

New operations set-up.Action Board

manage exceptions from same screen

Page 19: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Conclusion : Mind shift change for brownfield sites

20

Give due & more weight to IT infrastructure & tools – Increasing productivity from 20 to 24/28 gmph adds 20%/40% TEUs capacity. It costs far less using IT

tool to achieve Vs. CAPEX on hardware, such as QC.

Building IT from the ground up to stepped approach – leveraging their existing infrastructure (for brownfield)

Competition to collaboration in an IT agnostic context (different manufacturers, hardware, software )

Singular system hierarchy to - System networks vs (example GOS/TOS/ECS/)

Big data to Information & data analytics

Management to exception management

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0

For brownfield terminal doing nothing is not an option, standing still is going backward very rapidly

Distinct or extinct(if operating in a contestable market)

< 2.5% OPEX is spent on software

Knocking the door of the manufacturer

Page 20: Road to “Terminal 4.0”...Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 RTGs have individual performances from 1 to 25 productive moves, but the average is typically ~ 8

Contact Details

Tech TOC | Asia 2018 | TBA PPT : Road to Terminal 4.0 21

TBA GroupKarrepad 2A2623 AP DelftThe Netherlandswww.tba.group

Contact informationOffice +31 (0) 15 3805775Fax +31 (0) 15 [email protected]

Thank you for your attention

Regional Contact :Mahim Khanna/ Regional Director Asia PacificMobile +61 468 719 [email protected]