"" RMIS View/Print Document Cover Sheet"" This document was retrieved from the Documentation and Records Manaqement (DRM) ISEARCH System. It is intended for Information only and may not be the most recent or updated version. Contact a Document Sewice Center (see Hanford Info for locations) if you need add iti o n al retrieval i n fo r mati o n . Accession #: Dl96027043 Document #: SD-WM-ATR-105 TitlelDesc: DIESEL GENERATOR ACCEPTANCE TEST REPORT Pages: 47

RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

"" RMIS View/Print Document Cover Sheet""

This document was retrieved from the Documentation and Records Manaqement (DRM) ISEARCH System. It is intended for Information only and may not be the most recent or updated version. Contact a Document Sewice Center (see Hanford Info for locations) if you need add it i o n al retrieval i n fo r m at i o n .

Accession #: Dl96027043

Document #: SD-WM-ATR-105

TitlelDesc: DIESEL GENERATOR ACCEPTANCE TEST REPORT

Pages: 47

Page 2: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

2. TO: (Receiving Organization)

Characterization Plant Engi neeri nq 5. P r o j ./Prog./Dept ./Div.:

Core Samplinq Aux. Equipment

3. From: (Originating Organization) 4. Related EDT NO.:

Characterization Equipment N/A Improvement 6 . cog. Engr.: 7. Purchase Order NO.:

J .L. Smalley 404886 8. Originator Remarks:

This Acceptance Test Report is transmitted for approval. ETN-94-0023-D

The report documents compliance with specification WHC-S- 0252 Rev.0. 11. Receiver Remarks:

. . . . . . b o o WHC-CM-55. 2. Relooso 5. Post-Review 2. Approved wlcommsnt 5. Reviewed wlcomrnant Sac.12.71 3. Information 6. Dist. IRecipt Acknow. Requimdl 3. Dirappmvod wlcornment 6. Receipt acknowledged

IGI IHI 1 7 ' IGI IHI SlGNATURElDlSlRiBUTlON lSos Approval Designator for requimd eignatum.1

IKI Signature ILI Data IMI MSIN I IJI Name IKI Signature ILI Date IMI MSlN I I DisD.

9. Equip./Component NO.:

N/A

200 General

N/A

N/A

10. System//Bldg./Facility:

12. Major Assm. Dug. No.:

13. Permit/Permit Application NO.:

14. Required Response Date:

ED-7400-172-2 (04/94) GEF097

15. DATA TRANSUlTTED

(El Tnls or Description of Data IAI IC) ID1

Sheet Re". nern IBI DocumentlDrawing No. Transmined NO. NO. NO.

813-7400 7 72- 1

5/12/95 ( F ) (GI ( H ) (1)

Desig- for nator or Approval Reason Origi- Rscaiv-

nator Trans- Disoo- Disoo-

1 minai stion sition

4 1 l \ Diesel Generator Acceptance Test Report WHC-SD-WM-ATR-105 N/A 0

Page 3: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105, Rev. 0

DIESEL GENERATOR ACCEPTANCE TEST REPORT

ALOIS J. KOSTELNIK WESTINGHOUSE HANFORD COMPANY, Richland, WA 99352 U. S. Department o f Energy Contract DE-AC06-87RL10930

EDT/ECN: 612070 UC: Z C ' 7 C

Org Code: 75230 Charge Code: N4H2B B&R Code: E W Z I Z C C J Y Tota l Pages: 45

Key Words: S p e c i f i c a t i o n WHC-S-0252, Cummins, Onan, 150KW Generator, Purchase Order 404866, Core Sampling A n c i l l a r y Equipment

Abs t rac t : requirements o f s p e c i f i c a t i o n WHC-S-0252. accord ing t o WHC-SD-WM-ATP-105 Rev.0.

ETN-94-0023-0, Core Sampling, D iese l Generator,

Th is Acceptance Test Report documents compliance w i t h t h e The equipment was t e s t e d

TRMEUARK DISCLAIMER. Reference herein to any specif ic c m r c i a l product, process, or service by trade n e , trademark, manufacturer, or otherwise, does not necessarily consti tute or imply i t s endorsement, recmnda t ion , o r favoring by the United States Govermnt or any agency thereof or i t s contractors or subcontractors.

Printed i n the United States of America. To obtain copies of t h i s docunent, contact: UHC/BCS D o c M n t Control Services, P.O. Box 1970, Mailstop H6-08, Richland UA 99352. Phone (509) 372-2420; Fax (509) 376-4989.

V'.'--,yn I Y

,

,,~ -5

Release Stanp h z

U e e t + e A roval Date/

Approved for Public Release A-6400-073 (10/95) GEF321

Page 4: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 REV. 0

Page 2

TABLE OF CONTENTS

SUMMARY

APPENDIX A (ATP results for Genset SN E940542240)

APPENDIX 6 (ATP results for Genset SN F940547197)

APPENDIX c (NEC Inspection Results)

APPENDIX D (Receipt Inspection Report)

Page 3

Page A1

Page B1

Page C 1

Page D 1

Page 5: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 6: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 - Rev. 0 Appendix A-1 o f A-19 1 of-

RING DATA TRANSMITT 608068 > lo! laeecivina Organiration) I 3. From: (Originating Or -. . -. . . - Core Sampling 5. Proj./Prog./Dept./Div.:

Core Sampling Aux. Equipment

Characterization Equipment N/A 6. cog. Engr.: 7. Purchase Order Yo.:

J.L. Smalley 404886

[I Awroved u/tmnnmts u Disapproved uicocamts otiainmor

8. Originator Remrks:

ETN-94-0023-D This Acceptance Test Procedure i s transmitted f o r approval.

performed a t the Sel lers locat ion. I t w i l l show compliance with specif icat ion WHC-S-0252 Reva.1 .4Ks-;r-tty

The procedure was prepared by the Se l le r and w i l l be

11. Receiver Remarks:

BD-7600-172-2 (04/96) CEF097

9 . Equip./Conponmt No.:

N/A 10. SystdBLdg./FaciLity:

200 General 12. Major *om. Dwg. No.:

807400-172-1 (07191)

Page 7: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-2 o f A-19

RELEASE AUTHORIZATION

Document Number: WHC-SD-WM-ATP-105, REV 0

Document Title: Diesel Generator Tra i 1 e r Acceptance Test Procedure ~~

Release Date: 9/23/94

* + + * + * * * + * + * *

This document was reviewed following the procedures described in WHC-CM-34 and is:

APPROVED FOR PUBLIC RELEASE

WHC Information Release Administration Specialist:

9 1 23/94 (Signature) (Date)

Page 8: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

SUPPORTING DOCUMENT

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-3 o f A-I9

2. T i t l e

D iese l Generator T r a i l e r Acceptance Test Procedure 5. Key Uords

ETN-94-00234 &e Sampling, D iese l Generator, S p e c i f i c a t i o n WHC-5-0252, T r a i l e r , Cumins, Qnan-, 150KW Generator, Purchase Order a 4 8 8 6 , Core -3zp l i n i - - A u x i l i a r y Eq AFTROVED FOF 7. mstract ' PUBLIC RELEASE

- 3. W h r 2 . Key I O .

WHC-SD-WM-ATP-105 0

N-: A l o i s J K o s t e l n i k 6. Author

Organization/Charge Code 7EA40 1

Th is Acceptance Test Procedure (ATP) w i l l document compliance w i t h t h e requirements o f WHC-S-0252 Rev.1 and ECNs 609271, and 609272. The equipment be ing t e s t e d i s a 150KW D iese l Generator mounted on a t r a i l e r w i t h switchgear. The u n i t was purchase as a Design and F a b r i c a t i o n procurement a c t i v i t y . The ATP was w r i t t e n by t h e S e l l e and w i l l be oerformed bv the S e l l e r w i t h reb resen ta t i ves o f t h e Westinghouse Hanfor

sseminared or used fo ve before ptmt approval f o r such

cured, upon request, frm the Patent Counsel, U S . Energy F ie ld Office, R i c h l d . UA.

DISCUIUER - This report was prepared as an a c c m t of work sponsored by an agmcy of the United States Govermnt. Neither the United States Oovcrmnt nor any agency thereof, nor any of t he i r arployees, nor any of t he i r contractors, subcontractors or the i r aployeea, makes any warranty, express or ilrplied, o r attunes any legal L i a b i l i t y o r responsibi l i ty f o r the accuracy, cnpletmess, or any t h i r d party's use o r the results of such usc of any information, apparatus, product, or process disclosed, or represents that i t s use u w l d not in f r inge pr ivate ly oHKd r ights. Reference herein t o any speci f ic cannercia1 product, procere, or service by trade IIM, t radaurk , manufacturer, or otherwise. does ~t necessarily const i tute o r i v l y i t s endorrant, rummmdatim. or favoring by the United states Goverrnent or any agency thereof or i t s Contractors or SYbCMtraCtOrS. The vieus a d opinions of authors expressed herein do not necessarily s ta te or re f lect those of the United States Govemtmt or any agency thereof.

10. RELEASE STAMP

Page 9: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-4 o f A-19

TABLE OF CONTENTS

3

3

. . . 3

1.0 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 Test Performance . , . . . . . . . . . . . . . . . . . . 3.0 Inspection Plan . . I . . . . . . . . . . . . . . . . . . 4.0 RunTest . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a TEST EXCEPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

SUSPECT FASTENER HEADMARK LIST . . . . . . . . . . . . . . . . 13

Page 10: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

1.0

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-5 of A-19

scope

This acceptance test procedure is t o ve r i fy t h a t the t r a i l e r mounted 150KW Cummins/Onan Diesel Generator Se t meets t h e requirements of Westinghouse Hanford s p e c i f i c a t i o n WHC-S-0252.

2.0

3.0

Test Performance

Cummins Northwest will complete the following test i n t h e o rde r deemed b e s t by Cummins personnel . s h a l l witness a l l t e s t i n g and s h a l l perform t h e inspec t ion por t ion of the t e s t . on t h e a t tached exception shee t along w i t h the r e so lu t ion . Cummins Northwest shall reso lve a l l except ions w i t h the concurrence of WHC.

I n spec t i on P1 an

3.1 Record t h e model and s e r i a l numbers of t h e Generator S e t and Tr

Westinghouse Hanford Company (WHC) personnel

All steps will be completed and any except ions s h a l l be noted

m? I , ( I L'

-5Pr,m\ 3.2

& 3.2.1 3-phase, 4-wire, 277/480 VAC and single-phase 240/120 VAC.

/& 3.2.2 Operating frequency i s 60 Hertz t 0.5%.

+'& 3.2.3 Standby Rating Range is 150KW @ 0.8 power f a c t o r .

[@ 3.2.4 Prime Rating Range i s 135KW @ 0.8 power f a c t o r .

& 3.2.5 Voltage d i p does not exceed 20% of r a t e d vol tage upon

@

Verify by record review t h a t the genera tor i s capable o f ' t h e following:

app l i ca t ion of r a t ed load a t r a t e d power f a c t o r . k; &=,,3:*r. 2 p:&&

within f 2% of r a t ed vol tage , (210 V ) .

G,& %/ / 3.2.6 Voltage r e G l a t i o n under load from no load t o 100% load i s

& 3.2.7 Frequency regul a t ion under varying 1 oads. from no 1 oad t o 100% load is w i t h i n f 3 Hz.

Page 11: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-6 of A-19

3.3

+<3.3.1 Run-Off-Auto switch: (Run: manually start engine) (Off: (Auto: start engine by closing of a remote

3.3.2 Accessible remote start-stop terminals.

Verify controls are provided to shutdown and lock out the engine under the following abnormal operating conditions:

Verify the control panel contains the following:

stop engine) contact) kuk- && - Rem

3.4

4 3 . 4 . 1 Engine failure to start after a specified cranking time.

3.4.2 Engine over-speed.

3.4.3 Engine low lube oil pressure.

3.4.4 Engine high operating temperature.

3.4.5 Remote manual stop activated.

3.5 Verify the following instrumentation is provided as a minimum:

3.5.1 Engine lube oil pressure gauge.

3.5.2 Coolant temperature gauge. % & 3.5.3 Hour meter.

& 3.5.4 Battery volt meter.

A 3 . 5 . 5 Fuel gauge for day tank.

3.5.6 Cranking time meter (Internal timer, alarm light indicator) 3.y I

3.5.7 Other instruments normally provided by the manufacturer for the proper opera,tion and maintenance of their engine- generator set. r e Y:,h k-6 tq ;~~e '&-,F,c. f ,,, -e

/ 7 ;e Lc rz L . 1 L prey;.&: Verify battery-pawered visual and audible alarms for the following condition as a minimum are provided. lamp test switch and alarm reset switch and contacts for each alarm for remote signaling are provided:

3.6.1 Over-crank shutdown.

Verify alarm test switch,

. / i J . h / g . ciA ( I t \ I fiqk 3.6.2 High engine temperature shutdown.

3.6.3 Low engine lube oil pressure shutdown.

3.6.4 Over-speed of engine shutdown.

Page 12: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 13: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 14: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 15: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-IO of A-I9

3.10 Verify the following engine requirements are satisfied:

4 3.10.1 Diesel fuel engine.

[&"& 3.10.2

/,+@ 3.10.3

@ 3.10.4

+- //&3 .IO. 5

@ 3.10.6

e . 1 0 . 7

& 3.10.8 3.10.9

,4+& 3.10.10

@3.10.11

4.0 Run Test

Engine shall be electric start from negative grounded battery supplied.

Battery shall be charged with alternator having automatic voltage regulation supplied with engine.

A fuel tank is on the unit that will supply fuel for the engine to operate at full load for at least 24 hours. (Capacity 2 2 gal, Consumption rate 97 gal /hr)

Two (2) stage dry type air cleaner with a restriction gauge.

Furnished with the capability for cold weather starting such as electric glow plugs. start 1500 watt, 110 volt heater.

Engine hot

Record the freeze point of the engine antifreeze. (s 'F) Drip pan to catch fuel or oil leaks.

Painted inside and out. Exterior is White.

Verify there are no Suspect Fasteners as identified on the U . S . Custom's Fasteners Headmark List.

Verify all visible welds are acceptable per AWS D 1 . l .

4.1

q 4 . 1 . 1 Switch Run-Off-Auto switch to Run.

No Load Cold start: 1800 29 rpm in the specified time. (MFR f i - /rsec.)

Verify that the engine starts and comes to

(Time from close of contacts to 1800 rpm A sec.)

value indicated is within the range specified by the manufacturer:

4.1.2 Verify the following instrumentation i s functional and the

4.1.2.1

4.1.2.2

Engine lube oil pressure gauge. (m psi, MFR j , . - . psi) i - t - \

Cool ant temperature gauge. ((rcC 'F, MFR Fc - AX) 'F)

Page 16: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix A - I 1 of A-I9

Hour meter. ( a h r s 1

@(I. 1.2.3

Battery volt meter.

Fuel gauge for day tank. ( EL+: 1 eve1

volts, MFR 24 - 7 ~ volts) $. 4.1.2.4 $4.1.2.5

Other instruments normally provided by the manufacturer for the .proper operation and maintenance of their particular engine-generator set.

,+,& 4.1.2.6

4 1.3 Record and with a sound meter the generator noise level at &. * the electrical control panel and verify that it is less than 85 deci bel 5. E decibel s . A:+ & S r i p p . 1 I\; 1 *. .-r *?>+ 5 .-key<

4.2 Loaded Cold start with Remote/Auto start: load bank on line, that the engine starts, comes to 1800 k9 rpm, and the load is automatically switched on-line in the specified time. (MFR c - / ? sec.)

Verify, with the 100 KW

(& 4.2.1 Switch Run-Off-Auto switch to Auto.

/$ 4.2.2 Close contacts on a temporarily installed switch. (Time from close of contacts to load on-line. ," sec.)

& 4.2.3 Switch Run-Off-Auto switch to Off. (Remove temporary switch.)

4.3 Verify controls shutdown .and lock out the engine under the following simulated abnormal operating conditions. (Temporarily install contacts and jumpers as required to simulate conditions. Restart the generator between each alarm test.) test switch, lamp test switch and alarm reset switch are operational :

d k 4 . 3 . 1 Engine failure - to start after a specified cranking time, Verify alarm

with alarm. - :.,c!yclt:.=,, 1.7 . I - ~ c _ cr, l 7 5rc. re;+ /;++ . 4.3.2 Engine over-speed, with m. &lYpk'ph- \e& &-&?yTGbt I . . k-\- ')

I fqh+

4.3.3 Engine low lube oil pressure, with&nn,ci-r;ur L- , ' ; r ' , I P i ~ . \ ~ , c - - '- ' -+

&& 4.3.4 Engine high operating temperature, with .a-l-wm.-~~p!:~ l!.5L,i-,,s\ok & 4.3.5 Remote manual stop activated. (.teeakd on a i m - - L w p r < c y 5..2:&k

Page 17: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-12 of A-19

4 .4 Verify proper operation of the generator, power distribution components and load bank according to the manufacturer's supplied information. step prior to recordi.ng information.)

4.4.1 Step 1 (25KW Resistive Load for 15 min.)

(For load bank test operate for 15 minutes at each

4 4.4.1.1 && 4.4.1.2 &+& 4.4.1.3 Frequency Ld,Hz

Amperage I=, 2 3 ~ \ h 3% amps

Voltage 1 - 2 m 2 - 3 w , 1 - 3 B 3

4.4.1.4 Oil Pressure &psi

4.4.1.5 Water Temperature &'F

4.4.2 Step 2 c(50KW Resistive Load for 15 min.)

4.4.2.1 Amperage l a , 2%, 3 4 , amps

4.4.2.2 Voltage 1-2=, 2-3%, 1-3-

4.4.2.3 Frequency &&HZ

% $

Oil Pressure 7Apsi 4 & 4.4.2.4 & 4.4.2.5 Water Temperature meF

4.4.3 Step 3 (IOOKW Resistive Load for 15 min.)

@ 4.4.3.1 & 4.4.3.2 q& 4.4.3.3 Frequency U H z

4 .( 4.4.3.4

Amperage I,/-&, 2J&, 3- amps

Voltage 1-24& 2-3y&, 1 - 3 m

oil Pressure &psi

4.4.3.5 dater Temperature = O F

foll owing : 4.4.4 Verify voltage and clockwise phase rotation as noted for the

f& 4.4.4.1 UTILITY 480 VAC 110 AMPS outlet

@ i 4.4.4.1.1 Phase rotation &

4.4.4.1.2 Voltage 1-2%, 2-3483, - 1 - 3 m

Page 18: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-13 of A-19

g k 4 . 4 . 4 . 2

n 4.4.4.3 BREATHING AIR COMPRESSOR 480 VAC 50 AMPS o u t l e t

SERVICE TRAILER 240 VAC 80 AMPS o u t l e t

4.4.4.2.1 Voltage 1 - 2 A L ‘

4.4.4.3.1 Phase r o t a t i o n & 4.4.4.3.2 Voltage l-Z-, 2-3 - VfS , 1 - 3 x 3

4 4 4.4.4.4

q c 4 . 4 . 4 . 5

240 VAC 20 Amp Single Receptacle

4.4.4.4.1 Voltage&t’ - 120 VAC 20 Amp Duplex Receptacle

4.4.4.5.1 Voltage &c @ 4.4.4.6 PURGE GAS TRAILER 120 VAC 30 Amp Single

Receptacle

4.4.4.6.1 Voltage /a(7 4.4.5 Switch Run-Off-Auto switch t o Off.

No load hot start: 1800 rpm i n the spec i f i ed time. (MFR r - / L ’ s e c . )

4 .5

e,& 4.5.1 Switch Run-Off-Auto switch t o Run. Time - 2 sec.

- && 4.5.2 Switch Run-Off-Auto switch t o Off.

Verify t h a t the engine starts and comes t o

- 4.6 Loaded h o t s tart : Verify, w i t h t he 100 KW load bank on l i n e , t h a t

the engine s t a r t s , comes t o 1800 f9 rpm, and the load i s au tomat ica l ly switched on-line i n the spec i f i ed time. (MFR c? - / p s e c . )

@ 4.6.1 Switch Run-Off-Auto switch t o Run.

&4.6.2 Switch Run-Off-Auto switch Off

(Time from d o s e of con tac t s t o load on-l ine. a sec . )

i

Page 19: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 20: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 21: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 22: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 23: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 24: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

' ONAN CORPORATION GenSize 2 Version 4.00

Project Name: (WESTINGHOUSE HANFORD) Project Parameters:

WHC-SD-WM-ATR-105 Rev. 0

Appendix A-19 o f A-19

Duty: . . . . . . . . . . . . . . . . . . . . . . . . . : Voltage: ...................... :

Max. Temp. Rise . . . . . . . . . . . . . . . : Max. Altitude . . . . . . . . . . . . . . . . . : Altitude Scale . . . . . . . . . . . . . . . . : Max. Amb. Temp . . . . . . . . . . . . . . . . : Temperature Scale . . . . . . . . . . . . . : Cooling System . . . . . . . . . . . . . . . . :

Frequency ..................... :

Max. VDIP% .................... :

Fuel Type . . . . . . . . . . . . . . . . . . . . . :

Stationary Standby 2 7 7 / 4 8 0 W E 60 105 35 500 Feet 77 Fahrenheit Radiator Diesel

Load Listing

Load Number: 1 Load Type: Resistive Phase 3

Load Name: (135 KW PRIME) Comment :

Input KW: 135

Step Sequence/Load

Step Number: 1 Surge KW: 135 Surge SKVA: 135

Step Name: START 135 KW PRIME LOAD Comment :

Load # Q ~ Y SKW SKVA SKVAR 1 1 135.0 135.0 0

Step Total: 1 3 5 . 0 135.0 0

SPF RKW 1.00 135.0

1.00 135.0

RKVA RKVAR RPF 135.0 0 1.00

135.0 0 1 . 0 0

Criteria Selection Results: Mode1:lSODGFA

1. Running load requirements

Required by Loads from Model Result

Ava i 1 ab 1 e

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ 135 KW 150 Acceptable

Page 25: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 26: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 27: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 28: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

1.0

2.0

3 .0

4.0

WHC-SD-WM-ATR- 105 Rev. 0

Appendix 8-4 o f B-I9

TABLE OF CONTENTS

Scope . . . . . . . . . . . . . . . . . . . . . . ,

Test Performance . . . . . . . . . . . . . . . . ,

Inspection Plan . . . . . . . . . . . . . . . . Run Test . . . . . . . . . . . . . . . . . . .

1 .

. . . . . . .

. . . . . . . . . . . I . . . .

TEST EXCEPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SUSPECT FASTENER HEADMARK LIST . . . . . . . . . . . . . . . . . . . .

3

3

3

8

12

13

Page 29: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 30: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 31: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix 8-7 of B-19

3 . 7 Verify the generator A t power output monitoring and controls include the following as a minimum: 4 3.7.1

{& 3.7.2

@, 3.7.3 c 4 3 . 7 . 4

A t voltmeter with a phase selector switch with an OFF position.

AC ammeter with a phase selector switch with an OFF position.

Frequency meter.

At voltage adjust rheostat.

Generator output circuit breaker with manual reset.

3.8

@ rack located on the. f the engine-generator set

Verify the following equipment has been installed:

3.8.1 The basic trailer with an electrical equipment

enclosure that does not increase the total width dimension of the unit. The equipment rack is located for easy access but allows accessibility to the engine-generator set for maintenance and operation. All receptacles are on the same side of the generator and labels are mechanically fastened to the equipment with screws.

w 3 . 8 . 2 The distribution and wiring system have been installed per

3.8.3 There is a 25KVA transformer on the unit to provide single

NFPA 70, National Electrical Code. :)rc. C-KCC-,S(,~....

phase power of 240/120 volt. protection on the primary side.

The transformer has fault

3.8.4 A IOOKW load bank is on the unit. The load bank is divided 4 into 3 sections, 2 (two) 25KW and 1 (one) 50KW sections, which may be manually switched on individually as required to maintain the generator near 70% of capacity. The load bank is wired for operation in parallel with the normal 1 oad. -

Page 32: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 33: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 34: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 35: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 36: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR- 105 Rev. 0

Appendix 8-12 of 8-19

4 . . 4 Verify proper operation of the generator, power distribution components and load bank according to the manufacturer's supplied information. step prior to recordi.ng information.)

(For load bank test operate for 15 minutes at each

4 . 4 . 1 Step 1 (25KW Resistive Load for 15 min.) / I [ , 3 c 30 !?'I, Amperage &, 2&, 3 e amps

Voltage 1-2 - ?t%, 2-3*, 1-3 - Y)TC

Frequency &&HZ

@ 4 . 4 . 1 . 4 Oil Pressure z p s i

,,'# 4 . 4 . 1 . 5 Water Temperature U ' F

4 . 4 . 2 Step 2 (50KW Resistive Load for 15 min.)

/I 4 . 4 . 2 . 1 Amperage I&, 2&, 3 M f amps

Voltage I - Z X , 2-3=, 1 - 3 m 4

3

@ 4 . 4 . 2 . 2

@ 4 . 4 . 2 . 3 Frequency&2&Hz 4 4 . 4 . 2 . 4 Oil Pressure =psi

,& 4 . 4 . 2 . 5 Water Temperature E ' F

4 . 4 . 3 Step 3 (100KW Resistive Load for 15 min.)

4 . 4 . 3 . 1 Amperage 1m, 2-, 3 J L 1 amps $ 4 . 4 . 3 . 2 Voltage 1-2%, 2 - 3 a , 1 - 3 s

4 / 4 . 4 . 3 . 3 Frequency L&Hz fg / ,(' 4 . 4 . 3 . 4

qg 4 . 4 . 3 . 5

4 . 4 . 4 Verify voltage and clockwise phase rotation as noted for the

/&L 4 . 4 . 4 . 1 UTILITY 480 VAC 110 AMPS outlet

. oil Pressure - 7 ~ . psi

- Water Temperature m"F

foll owing:

4 . 4 . 4 . 1 . 1 Phase rotation

4 . 4 . 4 . 1 . 2 Voltage 1-2& 2 - 3 ~ , 1 - 3 a

Page 37: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 38: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix B-14 of B-19

TEST EXCEPTIONS

- TEST COMPLETED BY:

t I

* Make additional copies as required.

Page 39: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix 8-15 o f B-19

SUSPECT FASTENER HEADMRK LIST

Page 40: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SO-WM-ATR-105

- Standby

WHC-SO-WM-ATR-105 Rev. 0

Appendix B-16 o f B-19 GENERATOR SET

KW KVA ’,

- X Mounted - Remote _. Heat Rad ia to r Radiator Exchanger

Other

Test Spec. I Ambient Temp 98126 85 Deg F

Barometer 28.47 I n Hg

Rev. 0 Appendix B-16 o f B-19 U GENERATOR SET onon

Model 150DGFA 68913H S/N F940547197 / ~ - - - \ Customer CUMMINS NORTHWEST I N C Order F i l e Number U434358D’P.O. 11353R , SERVICE RATING

I x Prime I KW 135 I KVA , 169 //

FUEL TYPE

GOVERNOR TY PI I Brand BOSCH - X Mechanical - E l e c t r i c a l

COOL I NG SYSTEM

ITEMS CHECKED/ ADJUST ED

TEST CONDITIONS I B a t t Charge Syst Vol tage

1 -2 482

1-N 278

UNIT RESULTS* 2-3 482 1-3 482 28.01 V o l t s - Amps

No Load > V o l t Re Adj 450-517 2-N 278 3-N 278

Frequency 62.7 HZ

Cool an t Temp ILube ;)ss 176

Phase Sequence - x uvw - Other

B a t t Charge Syst Vol tage

28.01 X V o l t s - Amps

1-2 480 12-3 480 1-3 480

3-N 277 1

1-N 277 12-N 277 F u l l Load (4 / 4) ’

KW 135

Current 1 203 2 203 3 203

Power Fac tor .8

Frequency 60 HZ

Cool an t Temp ILube ; y s s 178

Maximum Powet 167

Freq I V;A;age I IS0 Cor rec t i on Fac tor 1 Test Date I Running Time 59.6 HZ 1 .o OJ/ 15/94 .8

I

Data Recorded & C e r t i f i e d By: R HOGEN 4139

2 m 10/91

Page 41: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 42: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 43: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

N CORPORATION GenSize 2 Version 4 . 0 0

Project Name: (WESTINGHOUSE HANFORD) Project Parameters :

File Nam WHC-SD-WM-ATR-105

Rev. 0 Appendix B-19 o f 6-19

Duty: ......................... : Stationary Standby Voltage: ...................... : 2 7 7 / 4 8 0 W E Frequency ..................... : 60 Max. Temp. Rise ............... : 105 Max. VDIP ?b. .................... : 35 Max. Altitude . . . . . . . . . . . . . . . . . : 500 Altitude Scale . . . . . . . . . . . . . . . . : Feet Max. Amb. Temp ................ : 7 7 Temperature Scale . . . . . . . . . . . . . : Fahrenheit Cooling System . . . . . . . . . . . . . . . . : Radiator Fuel Type ...................... Diesel

Load Listing

umber: 1 Load Type: Resistive Phase 3

ame: (135 KW PRIME) t:

Input KW: 135

Step Sequence/Load

umber: 1 Surge KW: 135 Surge S ~ A : 135

ame: START 135 KW PRIME LOAD t:

Q ~ Y SKW SKVA S W A R 1 135.0 135.0 0

'otal : 135.0 135.0 0

SPF 1.00

RKW 135.0

RKVA 135.0

1.00 135.0 135.0

RKVAR 0

0

RPF 1.00

1 . 0 0

-ia Selection Results: 15 ODGFA

ining load requirements

Required Available by Loads from Model Result - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

135 KW 150 Accept ab le

Page 44: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON

WHC-SD-WM-ATR-105 Rev. 0

Appendix C-1 o f C-2 Internal Memo Westinghouse

HanfordcOmpany . FIMn: E l e c t r i c a l Power Systems Engineer ing

Date October 17, 1994 s u b l a CORE SAMPLING EQUIPMENT GENERATORS

Phone: 376-8109 L4-90

TO: A1 Kos te ln i k R1-17

cc: CMM F i l e /LB

Two Diesel generator se ts by Cummins Diesel , 800 Grady Way, Renton Washington, 200 Kva each. The generators are 480Y/277 v o l t u n i t s .

The generators are i n s t a l l e d on t r a i l e r s f a b r i c a t e d f o r the u n i t s . t r a i l e r s have an i n d u s t r i a l c o n t r o l panel enclosure. The enclosure i s a NEMA 4 outdoor r a t e d enclosure. The c o n t r o l panel has a dead f r o n t through which the handles o f a l l c i r c u i t breakers are access ib le .

The c i r c u i t breakers are p roper l y r a t e d and i n s t a l l e d , examined and found t o be c o r r e c t .

The

Wire s izes were

Also on the t r a i l e r i s a 25 Kva t ransformer t o supply 120/240 v o l t s i n g l e phase power. panel . A 100 KW l oad bank i s mounted on t h e f r o n t o f t h e generator u n i t . The load bank can be .switched t o p rov ide load i n increments o f 25 KW.

Items r e q u i r i n g f u r t h e r a t t e n t i o n .

The neu t ra l ground p o i n t i s l oca ted i n t h e i n d u s t r i a l c o n t r o l

1.

2.

3.

4.

The on ly p r o v i s i o n f o r connect ion o f a grounding e lec t rode i s i n s i d e the generator enclosure. t h e generator f rame. inside t h e louvered door on t h e r i g h t s ide o f the u n i t . Th is l o c a t i o n does no t a l l ow connect ion o f the grounding e lec t rode conductor and c l o s i n g o f t h e louvered doors.

A mechanical s e t screw type l u g i s b o l t e d t o

The generator n e u t r a l i s i n t e r n a l l y grounded t o t h e generator frame, however t h e generator i s mounted on rubber v i b r a t i o n i s o l a t i o n pads. The neu t ra l ground p o i n t o f t h e generator and t h e t r a i l e r mounted t ransformer must be the same p o i n t .

The procurement s p e c i f i c a t i o n s r e q u i r e t h a t two ground rods ( s i z e was no t spec i f i ed ) and 100 f e e t o f grounding e lec t rode conductor be provided. The grounding e lec t rode conductor and t h e ground rods were no t prov ided w i t h t h e two u n i t s observed.

The acceptance c r i t e r i a c a l l e d f o r r o t a t i o n checks o f t h e t h r e e phase power. A l l t h r e e phase c i r c u i t breakers and receptac les- were checked and found t o have cons is ten t c lockwise r o t a t i o n . However, t h e r o t a t i o n requ i red by t h e ac tua l t h ree phase loads t o be connected was no t evaluated.

Page 45: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 46: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON
Page 47: RMIS View/Print Document Cover Sheet/67531/metadc... · Information 6. Dist. IRecipt Acknow. Requimdl Dirappmvod wlcornment 6. Receipt acknowledged IGI IHI 17' IGI IHI SlGNATURElDlSlRiBUTlON