28
Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Embed Size (px)

Citation preview

Page 1: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Risk-based sampling using CobiT

By Rune Johannessen and Børre Lagesen

October 13th 2004 Lisabon

Page 2: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

IS THIS YOUR DAY?

?PO8PO1

DS11AI6

PO11

AI1

PO1DS5

Page 3: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

The purpose of this session!

Page 4: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Presentation

• Rune Johansen– CISA, CIA, Dipl. Int revisor– 8 years experience in IT audits and quality insurance from various ministries with their subordinate agencies, private companies and system development projects.

• Børre Lagesen– CISA– 5 years experience in IT audit from various ministries with their subordinate agencies.

Page 5: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Agenda

1. What is the objective for this workshop

2. Background

3. Method for Risk-based sampling

4. Case studies

5. Experiences from practical use in Norway.

6. Sum up and questions

Page 6: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

1. The objective for this workshop.

1. Help the auditor to select the right areas and processes.

2. Contribute to improving the quality and performance of the IT audits in the SAI’s.

3. Contribute to an open discussion and knowledge sharing.

Page 7: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

2. Background

1. More use of CobiT

2. CobiT is highly comprehensive and its use quite time consuming.

3. This in stark contrast to our everyday situation, where time is a critical factor.

Page 8: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Background4. CobiT does not provide clear guidelines on

how to carry out an overall (or “high level”) audit risk assessment.

Page 9: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Method for Risk-based sampling1. The method presented is not intended as a final

template.

2. The presentation is based on qualitative assessments of risks.

3. The method uses the following sources:• Audit Guidelines

• Controll Ojectives

but could also use the maturity model in “Management Guidelines”

Page 10: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Selection based on targets/processes/resources

Risk assessment of selected processes

IT audit

Phase 1

Phase 2

Phase 3

Method for Risk-based sampling

Page 11: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

P1 P2 P3

Page 12: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Results of Phase 1:

The auditor have a list of preferred processes.

In our example, AI2 and AI6 were identified as the most relevant within the domain “Acquisitions and implementation”.

P1 P2 P3

Page 13: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

P1 P2 P3

Page 14: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

P1 P2 P3

Page 15: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

 

Scale Control routines

Documented The audited entity has a routine, process or documentation that deals with the matter.

Undocumented The audited entity does not have routines, processes or documentation that deal with the matter.

P1 P2 P3

Page 16: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Scale Probability

H It is regarded as highly probable that this process will be negatively affected by internal or external events.

M It is regarded as possible that this process will be negatively affected by internal or external events.

L It is not regarded as very probable that this process will be negatively affected by internal or external events

P1 P2 P3

Page 17: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Method for Risk-based samplingScale Consequence

H Negative internal or external incidents are expected to have major consequences for the process.

M Negative internal or external incidents are expected to have medium consequences for the process.

L Negative internal or external incidents are expected to have minor consequences for the process.

P1 P2 P3

Page 18: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Each process is then subject to a risk assessment where probability and consequences are considered together.

On the basis of how the process is rated in terms of risk (H high, M medium, L low – in our example), they are selected for further IT audit (phase 3).

P1 P2 P3

Page 19: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Method for Risk-based samplingIT process and audit

questionsResults of evaluation

and testingRecommendation Ref.

AI6 Change management      

  Has a method been established for prioritisation of change recommendations from users, and if so, is it being used? Have procedures been compiled for sudden changes, and if so, are they being used? Is there a formal procedure for monitoring changes, and if so, is it being used?Etc. 

Observation: Method for changes… There is no procedure for sudden changes … Etc. Assessments: The methodology is incomplete in terms of sudden changes…  Conclusion: The methodology is inadequate …

We recommend …

 

P1 P2 P3

Page 20: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

WORK!!!!

1. Identify relevant questions for chosen processes (PO9, DS4, DS5) based on your points in “and takes into consideration”. (from 14.10 to 14.30 – 20 minutes)

2. Use the questions on the case study. Evaluate risk and conclude on further audit. (from 14.30 to 15.35 – 65 minutes including break. )

3. Discussions (from 15.35 to 16.30 – 55 minutes)

Page 21: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

5. Practical use and experiences from Norway

Page 22: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Selection based on targets/processes/resources

Risk assessment of selected processes

IT audit

Phase 1

Phase 2

Phase 3

Method for Risk-based sampling

Page 23: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Selection of processes P1 P2 P3

Page 24: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

The risk assessment of processesP3P1 P2

Page 25: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Result of risk assessment in four

different government agencies

P1 P2 P3

Page 26: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Result of audit

 

P1 P3P2

Agency 1 Agency 2 Agency 3 Agency 4

PO9

Findings reported to department

Findings reported to department

Findings reported to department

Findings reported to department

DS4

Findings reported to department

Findings reported to department

Findings reported to department

Findings reported to department

DS11

Findings reported to department

Findings reported to

agency

Findings reported to

agency

Nothing reported

Government agencies

Page 27: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

Experience

• it took time to develop the questions

• good overview of the different processes and their risks in the government agencies

• able to develop a good risk profile

• able to select the right process to audit

Conclusion

The risk evaluation and the IT audit led to a lot of findings that where reported

Page 28: Risk-based sampling using CobiT By Rune Johannessen and Børre Lagesen October 13 th 2004 Lisabon

You can’t hide – we see it all