27
The Coastal Highway Route E39 : - an improved and continuous road by 2035 21/09/2016 Børre Stensvold Project Manager The NPRA Directorate of Public Roads

Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Embed Size (px)

Citation preview

Page 1: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

The Coastal Highway Route E39 : - an improved and continuous road by 2035

21/09/2016

Børre StensvoldProject Manager

The NPRA Directorate ofPublic Roads

Page 2: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Attracts a lot of attention at homeand abroad

The E39 Coastal Highway Route

21/09/2016

How comfortable would you feel driving through a submerged tunnel? (Image credit: Statens Vegvesen/NPRA)

Forbes, 22 July, 2016

Page 3: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

FacebookNærmere 13 mill visninger - 91k likes

21/09/2016

Video

Page 4: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Discussed in Parliament June 2013

● From the Government’s Report to theStorting (White Paper) No. 26 (2012-2013):

– Ambition: An upgraded and continuous E39 Coastal Highwaywithout ferries

– Within 20 years if construction takesplace as one continuous project

– NOK 150 billion will reduce travel time with 7-8 hours

● The Storting agreed

National Transport Plan 2014-23

21/09/2016

Page 5: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

PopulationThe E39 Coastal Highway Route

21/09/2016

• 35 % of ourpopulation

• 48 % of ourexport value

Page 6: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Today’s E39

● The E39 Kristiansand-Trondheim: Approx. 1100 km, including 7 ferrycrossings

● E39 ferry connectionKristiansand-Hirtshals in Denmark

● E39 links up with the E45 Aalborg - Italia

21/09/2016

Page 7: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Improved and continuous - how?

● Main transport artery throughWestern Norway

– Improved standard, in both urban and rural areas

– A number of fiord crossingsrequire new untried solutions

● Travel and transport times reduced by 50 %

● Open road 24/7

The E39 Coastal Highway Route

21/09/2016

Page 8: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Major savings for freight transport by road

21/09/2016

21 hours8 ferriesNOK 28,355

9381

6410

6410

13477

6996

6996

5497

9222

1003

0 5000 10000 15000 20000 25000 30000

2016

2035

2050

Dist dep cost Time cost Ferry/road tolls

10,5 hours0 ferriesNOK 22,628

10,5 hours0 ferriesNOK 14,408

The E39 Coastal Highway Route

Page 9: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Work in progressThe national transport plan (NTP) 2018-2029

● The transport agencies’ proposalfor the NTP was handed over to the Ministry of Transport and Communications on February2016

● Development strategy for an improved and continuous E39 Coastal Highway RouteKristiansand-Trondheim

● Consultations/commenting and political processing towardsspring 2017

21/09/2016

Page 10: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

EnvironmentThe E39 Coastal Highway Route

● Major construction-related impact in a vulnerable coastal landscape

● Emissions of greenhouse gasesare to be cut

● Emissions over a 40-year periodwill be almost the same as for today’s E39 – despite strongincrease in traffic volumes

● Underlying parameters areconstantly changing; new energysources exploited

21/09/2016

Foto: Statens vegvesen

Page 11: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Enerergy harvesting, storage, efficiency improvement and charging

The Sustainable Infrastructure

Assessing the potentialfor:

• Wave power• Tidal power plants• Wind power• Solar power

Power road?

21/09/2016

Page 12: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

New technology and competenceThe E39 Coastal Highway Route

21/09/2016

● The five largest fiord crossingsrequire development of newtechnology and more knowledge

● Development costs estimated to make up 5 % of constructioncosts for each project

● Competence building

Photo: Statens vegvesen

Page 13: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Costs and financial challengesThe E39 Coastal Highway Route

● NOK 340 billion, incl VAT– Inital estimate NOK 150 billion– The extent of the project has increased

to include improved road standard with higherspeeds etc.

● Potential for road toll collection: NOK 110 billion

21/09/2016

Page 14: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Alternative methods for fjord crossings

• Suspension bridge

• Floating bridge

• Submerged floating tube bridge

• Immersed tunnel or subsea rock tunnel

21/09/2016

Page 15: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Recent developments in offshore structures

21/09/2016

Illustration: Kurt Wathne

Page 16: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Julsundet: Suspension Bridge Romsdal fjord

Video Romsdalsfjorden21/09/2016

Page 17: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design:Suspension bridge across the Sognefjord

21/09/2016

Illustration: Statens vegvesen

Page 18: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design:Suspension bridge across the Sognefjord

21/09/2016

Illustration: Statens vegvesen/Aas Jakobsen

Page 19: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design: End-anchored floating bridges across the Sognefjord

21/09/2016

Illustration: Statens vegvesen

Page 20: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design, floating bridge:Cable stayed bridges on floating pontoons

Based on offshore technology:

Tension leg platforms (TLP)

21/09/2016

Illustrations: Statens vegvesen

Page 21: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design:Submerged Floating Tube Bridge

21/09/2016

Illustration: Statens vegvesen

Page 22: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design:Submerged Floating Tube Bridge

21/09/2016

Illustration: Statens vegvesen

Page 23: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design: Floating bridge in combination with suspension bridge, Bjørnafjord

21/09/2016

Illustration: Statens vegvesen

Page 24: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design: Side-anchored floating bridge in combination with cantilever bridge

21/09/2016

Illustration: Plan arkitekter/Statens vegvesen

Page 25: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design: Submerged floating tube bridge anchored with inclined tethers

21/09/2016

Illustrations: Plan arkitekter/Statens vegvesen

Page 26: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

Conceptual design: Submerged Floating tube bridge with pontoons

Aas-Jakobsen/COWI/Johs Holt/Skanska/NGI

Aas-Jakobsen/COWI/Johs Holt/Skanska/NGI

21/09/2016

Illustration: Statens vegvesen/Vianova

Page 27: Børre Stensvold Project Manager The NPRA Directorate of ...wpstatic.idium.no/ · The Coastal Highway Route E39 : -an improved and continuous road by 2035. 21/09/2016. Børre Stensvold

SummaryThe E39 Coastal Highway Route

21/09/2016

Illustration: Global Maritime

• Technologically feasible - YES• Possible from a planning perspective - YES

• Financially challenging –the NTP will give us the answer

• Will it be realised? - YES, I believe

• http://www.vegvesen.no/Vegprosjekter/ferjefriE39