9
RHIC Machine/Detector Planning Meeting 5 Jan 05 Agenda Schedule Issues – (Montag) General Remarks (Pile) Report from Accelerators (Pilat) Polarized Proton Update (Bai) Report from experiments (STAR,PHOBOS,PHENIX,BRAHMS) When will experiment be ready to accept high luminosity? RCF Issues (Throwe) Other business ng Meeting Web Site: http://server.c-ad.bnl.gov/esfd/RMEM/rhic_planning.htm

RHIC Machine/Detector Planning Meeting 5 Jan 05

  • Upload
    damita

  • View
    53

  • Download
    4

Embed Size (px)

DESCRIPTION

RHIC Machine/Detector Planning Meeting 5 Jan 05. Agenda Schedule Issues – (Montag) General Remarks (Pile) Report from Accelerators (Pilat) Polarized Proton Update (Bai) Report from experiments (STAR,PHOBOS,PHENIX,BRAHMS) When will experiment be ready to accept high luminosity? - PowerPoint PPT Presentation

Citation preview

Page 1: RHIC Machine/Detector Planning Meeting 5 Jan 05

RHIC Machine/Detector Planning Meeting 5 Jan 05

Agenda

Schedule Issues – (Montag) General Remarks (Pile) Report from Accelerators (Pilat) Polarized Proton Update (Bai) Report from experiments (STAR,PHOBOS,PHENIX,BRAHMS)

When will experiment be ready to accept high luminosity? RCF Issues (Throwe) Other business

Planning Meeting Web Site: http://server.c-ad.bnl.gov/esfd/RMEM/rhic_planning.htm

Page 2: RHIC Machine/Detector Planning Meeting 5 Jan 05

BNL Energy Use FY 2004-5(C-AD Bldg power is in site base)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

50.001

-Oct

-03

1-N

ov-

03

1-D

ec-

03

1-J

an

-04

1-F

eb

-04

1-M

ar-

04

1-A

pr-

04

1-M

ay-

04

1-J

un

-04

1-J

ul-0

4

1-A

ug

-04

1-S

ep

-04

1-O

ct-0

4

1-N

ov-

04

1-D

ec-

04

1-J

an

-05

Da

ily A

ve

rag

e P

ow

er

(MW

)Peak-Av

Site Base

RHIC other

AGS

RHIC Cryo

as of 2 Jan

Page 3: RHIC Machine/Detector Planning Meeting 5 Jan 05

BNL Energy Use FY 2005(C-AD Bldg power is in site base)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

15

-Oct

-04

22

-Oct

-04

29

-Oct

-04

5-N

ov-

04

12

-No

v-0

4

19

-No

v-0

4

26

-No

v-0

4

3-D

ec-

04

10

-De

c-0

4

17

-De

c-0

4

24

-De

c-0

4

31

-De

c-0

4

7-J

an

-05

14

-Ja

n-0

5

21

-Ja

n-0

5

28

-Ja

n-0

5

Date

Da

ily A

ve

rag

e P

ow

er

(MW

)

Peak-Av

Site Base

RHIC other

AGS

RHIC Cryo

Page 4: RHIC Machine/Detector Planning Meeting 5 Jan 05

• Shutdown from 3 Dec-27 Dec (24 days) for short repairs– Energy use during this period, above the 5 MW RHIC/AGS base– 9162 MWhr (actual use) – (5 MW*24 days*24 hrs/day)=6282 MWhr– Cost: $59.72/MWhr*6282MWhr = $375K + $35K for lost helium =

$410K

• Full RHIC Program runs at ~23 MW above the 5 MW base – So cost for 24 days is:– $54/MWhr*23MW*24hrs*24days = $715K– Lost days = 24*410/715 = 13.8 days

• Our initial rough estimate of 1 day lost for every 2 shutdown days was about right.

• So we can add 10 days to a nominal 30 week run

Translating the short fix time into lost running days…UPDATE

Page 5: RHIC Machine/Detector Planning Meeting 5 Jan 05

RHIC Machine/Detector Planning Meeting• Details – as run/planned (based on DOE expectation of 30 cryo weeks)

18 Nov 04 – Cool down begins 23 Nov 04 – Blue Ring Cold 28 Nov 04 – Yellow Cold 29 Nov 04 – Short in D6-D8 dipoles Yellow Ring, schedule delay 3 Dec 04 – quad bus-bus short in sector 12, shutdown to repair 27 Dec 04 – short problem resolved, rings at 4 degrees again 27 Dec 04 - “2 week” RHIC setup with beam began 28-29 Dec 04 – found & fixed aperture problem in Yellow Ring (piece of Al

foil) 5 Jan 05 – “2 week” ramp-up with colliding beams begins 19 Jan 05 – 9 week physics with Cu-Cu begins (actual # of weeks TBD) 23 Mar 05 – End of 9 week Cu-Cu run 23 Mar 05 – begin 3 week pp setup 13 Apr 05 – Begin 9.6 week pp Physics run 15 Jun 05 – BNL Power Curtailment Program begins? 19 Jun 05 – end 9.6 week pp run, RHIC Run 5 ends 26 Jun 05 – Cryo switch to LN2 complete, 30 effective (31.4 actual) weeks of

RHIC cryo operation ends

As of 4 Jan 05

We’ll develop an actual plan once we get a budget from DOE!

Page 6: RHIC Machine/Detector Planning Meeting 5 Jan 05

RHIC Machine/Detector Planning Meeting

Archive

Page 7: RHIC Machine/Detector Planning Meeting 5 Jan 05

RHIC Machine/Detector Planning Meeting 17 November 2004

Purpose of this meeting:

To address issues and priorities relating to the optimization of physics output from RHIC experiments.

To discuss and promulgate policy (when needed).

Page 8: RHIC Machine/Detector Planning Meeting 5 Jan 05

RHIC Machine/Detector Planning Meeting 17 November 2004

PAC Recommendations (very short summary):

8-10 week pp run should have highest priority

Cu-Cu run should accumulate an integrated delivered luminosity of at least 7 nb-1 at = 200 GeV

Cu-Cu at = 62.4 GeV and 1 day at injection is advisable if above goals are met

1-2 day pp (unpolarized) run at = 400-500 GeV desirable

s

s

s

Page 9: RHIC Machine/Detector Planning Meeting 5 Jan 05

RHIC Machine/Detector Planning Meeting

End of Run?

Minimum Goal

* = 1 meter