Danish Assistance to Afghan Rehabilitation and Technical Training RFQ the installation of water and sewage systems for afghan Kot School at Faryab province Announcement No: DAARTT-107/04092019 Background: DAARTT (Danish Assistance to Afghan Rehabilitation and Technical Training) is an NGO established in Afghanistan by the Danish People’s Aid (DPA) in 2003. DAARTT is specialized in construction and capacity building in all aspects of construction. DAARTT’s core staff consists of experienced Afghan engineers, architects and management board. DAARTT has constructed more than 100 schools, clinics and other buildings in Afghanistan; and also enhanced the capacity of the Afghan people and public organizations. Item description and specification : Installation Water Supply System and canalization System (external, internal) without materials from starting up to finishing for Afghan Kot School project. Attachment: water and wastewater systems Drawing For Further information please contact this number : +93(0)707600373 Delivery location: Faryab province Type: long term Announcement period:02.10.2019 07.10.2019 6:00 PM Budget: The quotation must be in Afghani Currency, including transportation and other relevant cost. غانی و شامل تمامی مصارفید به پول اف قیمت ها با باشد. دولت طبق ماده مالیه72 ون قانستان وضع وفغانت ا مالیانتقال می گلیه ارت ماب وزا به حسا ردد.Quotation validation: 8 days from date of submission The Quotation Must be Sealed and Submitted to the DAARTT Head Office before the end of bidding date and must be dropped In the bidding box. DAARTT Office Address : Kabul City, 4 th District, kulola pushta, Radio, across from Jalal Tower No: +93(0)791910566 Note: The quotation must have the announcement No, and subject, otherwise the quotation won’t be considered.

RFQ the installation of water and sewage systems for ...5-septic tank 6-steel water tank 7-water facilities 8. rotary water well plan description 1-40 class room r.c.c brunt brick

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Danish Assistance to Afghan Rehabilitation and Technical Training

RFQ the installation of water and sewage systems for afghan Kot

School at Faryab province

Announcement No: DAARTT-107/04092019

Background:

DAARTT (Danish Assistance to Afghan Rehabilitation and Technical Training) is an NGO established in Afghanistan by the Danish People’s Aid (DPA) in 2003. DAARTT is specialized in construction and capacity building in all aspects of construction. DAARTT’s core staff consists of experienced Afghan engineers, architects and management board. DAARTT has constructed more than 100 schools, clinics and other buildings in Afghanistan; and also enhanced the capacity of the Afghan people and public organizations.

Item description and specification :

Installation Water Supply System and canalization System (external, internal) without materials from starting up to finishing for Afghan Kot School project.

Attachment: water and wastewater systems Drawing

For Further information please contact this number : +93(0)707600373

Delivery location: Faryab province

Type: long term

Announcement period:02.10.2019 – 07.10.2019 6:00 PM

Budget: The quotation must be in Afghani Currency, including transportation and other relevant cost.

باشد. قیمت ها باید به پول افغانی و شامل تمامی مصارف ردد.به حساب وزارت مالیه انتقال می گ مالیات افغانستان وضع وقانون 72مالیه دولت طبق ماده

Quotation validation: 8 days from date of submission

The Quotation Must be Sealed and Submitted to the DAARTT Head Office before the end of bidding date and must be dropped In the bidding box.

DAARTT Office Address : Kabul City, 4th District, kulola pushta, Radio, across from Jalal Tower No: +93(0)791910566

Note: The quotation must have the announcement No, and subject, otherwise the quotation won’t be considered.

100

450

4943

PAVEMENT PLAN

Main Gate

S

l

o

p

e

S

l

o

p

e

S

l

o

p

e

S

lo

p

e

Slope

S

lo

p

e

S

lo

p

e

S

lo

p

e

S

lo

p

e

100

300

70

200

WATER WELL

8CANAL FOR TERRACE 5

SEPTIC TANK(82 M )

GARDE ROOM

300

BASKET BALL PLAY GROUNDVOLLEYBALL PLAY GROUND9

10

6

WATER FACILITIES7

5

SEPT

IC TA

NK

500

2372

500

10 BO

XES L

ATRI

NES

SID

E W

AL

K

SIDE WALK

SID

E W

AL

K

200

N

30

KINDERGARTEN3002730120140513545535

135

1055

281

415

120

610465

350

626

200

1560

557

450

430

20072926009172437617580670200

VENTILATION BOX

300376 241 100

S

W

E

643

1680

SCHOOL WAY

800

40 class room1

2

4

3

GARBAGE

GARBAGE11

11

11

GARBAGE11

GARBAGE11

GARBAGE11

GARBAGE11

6000

11000

N

HIGHT=2.2 M8=WATER CANAL AREA=6600SQNOTE:ALL DAMNATION ARE BY METER

9-BASKET BALL PLAY GROUND10-VOLLEYBALL PLAY GROUND11-GARBAGE7-BRUNT BRICK BOUNDARY WALLL=110+59.30+110+59.30=338.6-(5.3)=333.6

4- KINDERGARTEN5-SEPTIC TANK6-STEEL WATER TANK7-WATER FACILITIES8. ROTARY WATER WELL

PLAN DESCRIPTION1-40 CLASS ROOMR.C.C BRUNT BRICK WALL IRON SHEET2-GARDE ROOM3-10 SETS OF LATRINE BRUNT BRICK WALL

NOTE:

WATER CANAL VARIABLE AS PER SITE CONDITIONS

DRANGE

DRANGE

WATER CANAL VARIABLE AS PER SITE CONDITIONS

6

WATER CANAL

6

WATER CANAL6

WATER CANAL

STEEL WATER TANK

J-1A

J-3AJ-4A

J-5A

J-6A

P

E

O

D

6

3

PE OD 32.0 mm

PE

O

D 32.0 m

m

PE OD 40.0 mm

PE

O

D 40.0 m

m

P

E

O

D

4

0

.

0

m

m

L

=

5

m

L=3 m

L=

7 m

L=12 m

L=

16 m

L

=

1

2

m

J-7

O

D

4

0

L

=

3

m

J-1

J-2

J-3

J-5

J-6

J-7

J-9

J-10

P

E

O

D

3

2

.

0

m

m

P

E

O

D

3

2

.

0

m

m

L

=

3

m

PE

O

D 40.0 m

m

P

E

O

D

3

2

.

0

m

m

PE OD 40.0 mm

P

E

P

N

1

6

O

D

5

0

.

0

m

m

PE OD 40.0 mm

L

=

1

1

m

L

=

2

1

m

L

=

4

m

L

=

6

m

L=

3 m

L

=

4

m

L=33 mL=31 m

P

E

O

D

3

2

.0

m

m

J-8

PE

O

D 32

L=

5 m

PE

O

D 32

L=

5 m

WAT

ER CA

NAL V

ARIA

BLE A

S PER

SITE

COND

ITION

S

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDATE :

DAARTT CONSTRUCTION PROGRAMDANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE: N.T.S

W.S.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari1

6

Engineer Mohammad Arif AyoubiLarse "Pederson"

30/05/2019

Larse "Pederson"

LEGEND

SymbolFittings

PIPE

DOUBLE FLANGED CONCENTRIC TAPER

GATE VALVE

DOUBLE FLANGED BEND

ALL FLANGE TEE

FLANGE ADAPTER

PIPE SADDLE

BLANK FLANGE / END CAP FOR PE PIPE

FLAP VALVE

AIR RELEASE VALVE

P

E

O

D

3

2

PE

OD

50

DOUBLE FLANGED GATE VALVE DN 40 & 32

DOUBLE FLANGED TAPER PE OD 50x40 PN12.52

1

NODE : J-1

NO

3

UNIT TOTALDESCRIPTION

1 NO 1 NO

1 NO 1 NO

1,1 NO1,1 NO

PE

OD

40

4

5

6

7

FLANGED ADAPTER FOR PE PIPE OD 40 PN12.5

FLANGED ADAPTER FOR PE PIPE OD 50 PN16

FLANGED ADAPTER FOR PE PIPE OD 32 PN 12.5

1 NO1 NO

1 NO1 NO

2 NO2 NO

1 NO1 NO 1 1 NO 3 NO

NODE : J-3

NO UNIT TOTALDESCRIPTION

PE OD 40

PE

O

D 40

1 1 NO 1 NO

NODE : J-3A

NO UNIT TOTALDESCRIPTION

PE OD 40

PE

O

D 40

1 1 NO 2 NO

NODE : J-5A

NO UNIT TOTALDESCRIPTION

PE OD 32

PE

O

D 32

DOUBLE FLANGED GATE VALVE DN 40

DOUBLE FLANGED TAPER PE OD 63x40 PN102

1

NODE : J-1A

NO

3

UNIT TOTALDESCRIPTION

1 NO 1 NO

1 NO 1 NO

2 NO2 NO

FLANGED ADAPTER FOR PE PIPE 40 PN 104 2 NO2 NO

FLANGED ADAPTER FOR PE PIPE 63 PN 105 1 NO1 NO

P

E

O

D

4

0

P

E

O

D

4

0

P

E

O

D

6

3

PE

O

D 3

2

3 1,1 NO

2 1 NO

1 1 NO

NODE : J-4A

NO UNIT TOTALDESCRIPTION

DOUBLE FLANGED ELBOW 90 OD 40 PN10

DOUBLE FLANGED GATE VALVE DN 32

FLANGE ADAPTER FOR PE OD 40 & 32 PN 10

PE OD 40

1,1 NO

1 NO

1 NO

4 1 NODOUBLE FLANGED TAPER PE OD 40x32 PN10 1 NO

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDATE :

DAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE: N.T.S

W.S.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari2

6

Engineer Mohammad Arif Ayoubi

30/05/2019

OD

1m

0.1

m

OD

Surface

Road pavement,

if any

0.4m

Compacted main

backfill

Compacted initial

backfill ( Sand)

Compacted

sand bed

0.2

m

Warning tape

Va

rie

s

For OD 40mm and 32mm

OD

1m

0.1

m

OD

Surface

Road pavement,

if any

OD+0.4m

Compacted main

backfill

Compacted initial

backfill ( Sand)

Compacted

sand bed

0.2

m

Warning tape

Va

rie

s

For OD 63mm and 50mm

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

3

6

L

A

HLayout

Section A-A

1) TEES

THRUST BLOCKS

Pipe DN

H

Section A-A

Two layers in

bitumious

cardboard

Two layers in

bitumious

cardboard

Layout

2) PIPE END

L

A

L

Layout

A

Section A-A

H

A

A

A

L H

Section A-ALayout

A

A

3) HORIZONTAL BEND 4) VERTICAL BEND - RESULTING FORCE AGAINST SOIL

0.250.25

LEGEND :

Concrete ... ... ... ... ... ... ... ... ... ...

Reinforced concrete ( r.c ) ... ... ... ... ...

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

4

6

Section A - A

Section C - C

6

4

5

2

6

4

5

3

0.1

5

BB

A

Section B - B

C

C

/ 0.50

GATE VALVE (FOR DN 40 TO 500 IN

PAVED ROADS AND FOOTPATHS

Concrete support block

Concrete support block

0.1

5

/ 0.50

Pavement

0.1

5

Section A - A

GATE AND BUTTERFLY VALVE IN

UNPAVED ROADS AND FOOTPATHS

/ 0.70

0.3

0

Pavement

A

3

2

1

Min

.0

.2

5

Max.0.50

0.3

0

Spinddle

RCC Base plate

0.1

5

RCC Base plate

Gate Valve

EXTENSION SPINDLE

GATE VALVE, LONG TYPE3

4

ITEM DESCRIPTION

PROTECTION TUBE5

SURFACE BOX ACC. TO DIN 4056-16

1 ALL FLANGED TEE

LEGEND :

Reinforced concrete ( r.c ) ... ... ... ... ... ... ... ... ...

Concrete ... ... ... ... ... ... ... ... ... ... ... ... ... ...

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

5

6

HDPE pipe

RCC Slab Size (58x58x6.5)cm

Metallic plate size (28x28x0.3)cm

Metallic lock able hook

plaster thickens 1.5cm

F

F

C/C length 274cm

Cross section of (F-F)

Bar specification for valve box

Top plan of cover slab

Bar description of cover slab

PCC thickness 8cm Mark 150

Layer of Compacted Gravel thickness 8cm

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

6

6

Surface Water level

cabel

Water pipeD= 50 mm

Water pump

Non main water estate

AquiferFilter Pipe

min.. heightfrom finishing level as per sitecondition

Main Water level

Gravel for externalaround of filter pipe

Sand & Gravel for externalaround of casing pipe

Clay Backfillaround of casing pipe

30

Clay Backfillaround of casing pipe

1-The casing material will be Steel pipe2-The delivery pipe material will be PVC orgalvanized Steel3-Eqivalent imperial distances the well must be :- 50 M from sewege effluent discharge the groundsurface.- 100 M -from a sewege lagoon.- 3-4 M from existing buildings.- 6 M from the road and public highway.NOTE-2:for implementation & accomplishment of project ,we need to the following investigation to be done :1-site and environmental investigations.2-geotechnical investigation.3-hydrological investigation.4-sampling.

ROTARY WELL.

Air relive valve

Non returnvalve

Gate valve Air pressure Gage

From water wellto water reservoir

naturel soilGravel 15 cm

p c c 5cm

8773

8 slop=3%

casingd= 8 inch

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

1

1

VACUUM RELIEF VALVE

FLASH TANKFT

V.R.V

HOT WATER

COLD WATER

VENT PIPE

FLOOR SIPHON

WASTE PIPE

VP

FS

WP

HW

CW

ANGLE VALVE

PIPE TURNING DOWN

PIPE TURNING UP

FLOOR DRAIN

HOSE BIBB, PLAN

Y-TYPE STRAINER

FLOOR CLEANOUTFCO

HB

CHECK VALVE

GATE VALVE

AV

GV

CHK V

FD

EQUIPMENT IDENTIFICATION

PLUMBING

-0.295

VENTC.W. H.W. WASTEFIXTURE NAMESYMBOL

-- 50 50

(MM) (MM) (MM) I.L (MM)

PLUMBING FIXTURE SCHEDULE

REMARKSWATERDRAIN

-0.245 - -

C.L C.LHIGH

FLOOR DRAIN

+0.535LAVATORY WALL OR COUNTER MOUNTED 20 20 50 50 +0.560 +0.495 +0.850 LOW FLOW EFFICIENTFIXTURE

COLD WATER (CW)

HOT WATER (HW)

WASTE PIPE (WP)

VTR VENT THROUGH ROOF

ی��اد داش��ت ھ��ا

تم���ام ان���دازه ھ���ا ب���ھ مل���ی م���تر اس���ت در غ���یر آن ص���ورت ذک���ر م���ی ش���ودتم�����ام ن�����ل ھ�����ای فاض�����الب ی�����ا کانالیزاس�����یون از ن�����وع م�����ی باش�����د

در تم�����ام خ�����روجی ھ�����ا از تجھ�����یزات نص�����ب گردی�����ده ت�����ا از انتش�����ار گ�����ازات جلوگ�����یری ش�����ود

در ص����ورت نی����از تم����ام ن����ل ھ����ا ب����رای جلوگ����یری از ی����خ زدگ����ی و ع����رق ی����ا ش����بنم ع����ایق ش����ودتم���ام ش���یرآب ھ���ای آب س���رد ب���ھ س���مت راس���ت و آب گ���رم ب���ھ س���مت چ���پ نص���ب ش���ود

تم�����ام خ�����روجی ھ�����ای فاض�����الب از س�����اختمان ب�����ھ فاص�����لھ س�����ھ م�����تر از دی�����وار س�����اختمان ب�����ھ س�����پتیک ی�����ا منب�����ع دیگ�����ری ری�����زش

فاض���الب وص���ل م���ی ش���ود

م����تر نص����ب گ����ردد 0.8ب����رای جلوگ����یری از ی����خ زدگ����ی تم����ام ن����ل ھ����ای آب و فاض����الب ب����یرون از س����اختمان ب����ھ عم����ق

مل����ی م����تر ب����ھ س����مت راس����ت از دی����وار ج����انبی نص����ب م����ی گ����ردد ش����یرآب ب����ا پای����پ 300 ش�����یرآب س�����رد ب�����ھ ارتف�����اع

ن������رم و انعط������اف پ������ذیر و ن������ازل اس������پری تھی������ھ گ������ردد ط������وری ک������ھ اس������تفاده کنن������ده بتوان������د ب������االی توال������ت را بش������ویدش�����یرآب ھ�����ای گ�����ردن ق�����از مانن�����د نی�����از نیس�����ت و نبای�����د اس�����تفاده ش�����ود

-1

-3

-4

-5

-6

-7

-8

-9

-10

PVC SCH 40

P-TRAP

تم���ام ن���ل ھ���ای آبرس���انی از ن���وع م���ی باش���د -3PPR SDR7.4 PN 16

-0.295WITH FLASH TANK

EASTERN WATER CLOSET - 20 100 50 -0.245 - WATER+0.300

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION

& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:

CHEKED & ADVISE BY:

APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif Ayoubi

Larse "Pederson"

120

WC

HB

FT

WC

HB

FT

WC

FT

HB

WC

HB

FT

WC

HB

FT

WC

HB

FT

WC

HB

FT

HB

LV

LV

WC

HB

FT

WC

HB

FT

EWH-01

50 LITRE

EWH-02

80 LITRE

FROM ROOF

TANK

GV

GV

SH

LV LV

LV LV

11(15x30)

RUMP M =10 %

FIRST FLOOR WATER SUPPLY PLAN

SECTION A

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

FD

SH

FLOOR DRAIN

SHOWER

COLD WATER PIPE

LVLAVATORY

HOT WATER PIPE

KEY PLAN

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

2

20

WC

HB

FT

WC

HB

FT

WC

FT

HB

WC

HB

FT

WC

HB

FT

WC

HB

FT

WC

HB

FT

HB

LV

LV

WC

HB

FT

WC

HB

FT

EWH-01

50 LITRE

EWH-02

80 LITRE

FROM ROOF

TANK

GV

GV

SH

LV LV

LV

11(15x30)

SECOND FLOOR WATER SUPPLY PLAN

SECTION B

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

FD

SH

FLOOR DRAIN

SHOWER

COLD WATER PIPE

LVLAVATORY

HOT WATER PIPE

KEY PLAN

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

3

20

WC

HB

FT

WC

HB

FT

WC

FT

HB

WC

HB

FT

WC

HB

FT

WC

HB

FT

WC

HB

FT

HB

LV

LV

WC

HB

FT

WC

HB

FT

EWH-01

50 LITRE

EWH-02

80 LITRE

FROM ROOF

TANK

GV

GV

SH

LV LV

LV

LV

THIRD FLOOR WATER SUPPLY PLAN

11(15x30)

SECTION C

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

FD

SH

FLOOR DRAIN

SHOWER

COLD WATER PIPE

LVLAVATORY

HOT WATER PIPE

KEY PLAN

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

4

20

V=4000LI

GV

DUCT

V=4000LI

GV

DUCT

SECTION A

SYMBOL DESCRIPTION

TECHNICAL LEGEND

GVGATE VALVE

COLD WATER PIPE

KEY PLAN

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

5

20

LV

LV

GV

EWH-02 SEE

SHEET 001

FT

GV

WC

HB

GV

CHV

EWH-01 SEE

SHEET 001

HB

SH

FT

GV

WC

HB

FT

GV

WC

HB

FT

GV

WC

HB

HB

LV

LV

GV

HB

GV

GV

GV

RO

OF

W

AT

ER

T

AN

K

TH

IR

D F

LO

OR

SE

CO

ND

F

LO

OR

LV

LV

WC

LV

LV

GV

EWH-02 SEE

SHEET 001

FT

GV

WC

HB

GV

CHV

EWH-01 SEE

SHEET 001

HB

SH

FT

GV

WC

HB

FT

GV

WC

HB

FT

GV

WC

HB

HB

LV

LV

GV

HB

GV

GV

GV

LV

LV

GV

EWH-02 SEE

SHEET 001

FT

GV

WC

HB

GV

CHV

EWH-01 SEE

SHEET 001

HB

SH

FT

GV

WC

HB

FT

GV

WC

HB

FT

GV

WC

HB

HB

LV

LV

GV

HB

GV

GV

GV

LV

LV

GV

FT

FT

GV

LV

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

SECTION B

6

20

SECTION C

SECTION A

F

O

R

T

H

E

O

T

H

E

R

S

I

D

E

O

F

T

H

E

W

A

L

L

S

E

E

R

I

S

E

R

D

I

A

G

R

A

M

-

2

GV

CHV

EWH-01 SEE

SHEET 001

FT

GV

WC

HB

FT

GV

WC

HB

FT

GV

WC

HB

HB

LV

LV

GV

HB

GV

GV

LV

LV

GV

EWH-02 SEE

SHEET 001

FT

GV

WC

HB

HB

SH

GV

R

I

S

E

R

D

I

A

G

R

A

M

-

2

WC

LV

LV

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

SECTION A

7

20

F

O

R

T

H

E

O

T

H

E

R

S

I

D

E

O

F

T

H

E

W

A

L

L

S

E

E

R

I

S

E

R

D

I

A

G

R

A

M

-

2

GV

CHV

EWH-01 SEE

SHEET 001

FT

GV

WC

HB

FT

GV

WC

HB

FT

GV

WC

HB

HB

LV

LV

GV

HB

GV

GV

LV

LV

GV

EWH-02 SEE

SHEET 001

FT

GV

WC

HB

HB

SH

GV

R

I

S

E

R

D

I

A

G

R

A

M

-

2

LV

GV

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

SECTION B

8

20

F

O

R

T

H

E

O

T

H

E

R

S

I

D

E

O

F

T

H

E

W

A

L

L

S

E

E

R

I

S

E

R

D

I

A

G

R

A

M

-

2

GV

CHV

EWH-01 SEE

SHEET 001

FT

GV

WC

HB

FT

GV

WC

HB

FT

GV

WC

HB

HB

LV

LV

GV

HB

GV

GV

LV

LV

GV

EWH-02 SEE

SHEET 001

FT

GV

WC

HB

HB

SH

GV

R

I

S

E

R

D

I

A

G

R

A

M

-

2

LV

GV

LV

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

SECTION C

9

20

WC

WC WC WC

FCO

FD

LV

WC

WC

LV

FD

WC WC

LV

WC

SH

FD

LV

FCO

FD

FD

FCO

FD

FD

LV LV

FD

PIP

E T

O S

EP

TIC

T

AN

K

PIP

E T

O D

RA

IN

AG

E

FIRST FLOOR SEWER PLAN

11(15x30)

RUMP M =10 %

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

FD

FCO

VTR

FLOOR DRAIN

FLOOR CLEAN OUT

VENT TROUGH ROOF

SEWER PIPE

LVLAVATORY

SECTION A

10

20

WC

WC WC WC

FD

LV

WC

WC

LV

FD

WC WC

LV

WC

SH

FD

LV

FCO

FD

FCO

FCO

FD

FD

FD

FD

11(15x30)

SECOND FLOOR SEWER PLAN

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

FD

FCO

VTR

FLOOR DRAIN

FLOOR CLEAN OUT

VENT TROUGH ROOF

SEWER PIPE

LVLAVATORY

SECTION B

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

11

20

WC

WC WC WC

FD

LV

WC

WC

LV

FD

WC WC

LV

WC

SH

FD

LV

FCO

FD

FD

FCO

FCO

FD

FD

FD

FD

THIRD FLOOR SEWER PLAN

11(15x30)

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

FD

FCO

VTR

FLOOR DRAIN

FLOOR CLEAN OUT

VENT TROUGH ROOF

SEWER PIPE

LVLAVATORY

SECTION C

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

12

20

FD

FD

FD

FD

FD

FCO

FCO

FCO

LV

LV

WC

WC

WC

WC

WC

SH

WC

WC

WC

WC

FD

LV

LV

P

I

P

E

T

O

S

E

P

T

I

C

T

A

N

K

FD

LV

LV

P

I

P

E

T

O

D

R

A

I

N

A

G

E

FD

FD

FD

FD

FCO

FCO

LV

LV

WC

WC

WC

WC

WC

SH

WC

WC

WC

FD

LV

LV

FD

WC

FCO

FD

FD

FD

FD

FD

FD

FCO

FCO

LV

LV

WC

WC

WC

WC

WC

SH

WC

WC

WC

FD

LV

LV

FD

WC

FCO

LV

LV

FD

LV

FD

FD

SECTION B

SECTION A

SECTION C

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

13

20

FD

FD

FD

FD

FD

FCO

FCO

FCO

LV

LV

WC

WC

WC

WC

WC

SH

WC

WC

WC

WC

FD

LV

LV

P

I

P

E

T

O

S

E

P

T

I

C

T

A

N

K

FD

LV

LV

P

I

P

E

T

O

D

R

A

I

N

A

G

E

FD

SECTION A

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

14

20

FD

FD

FD

FD

FCO

FCO

LV

LV

WC

WC

WC

WC

WC

SH

WC

WC

WC

FD

LV

LV

FD

WC

FCO

LV

FD

FD

SECTION B

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

15

20

FD

FD

FD

FD

FD

FCO

FCO

LV

LV

WC

WC

WC

WC

WC

SH

WC

WC

WC

FD

LV

LV

FD

WC

FCO

LV

FD

LV

SECTION C

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

16

20

WATER SUPPLY PLAN

HB

EWH-01

50 LITRE

WC

LV

KS

EL

EV

AT

ED

T

AN

K

FT

WATER SUPPLY PLAN

HB

EWH-01

50 LITRE

WC

LV

KS

ELE

VA

TE

D T

AN

K

FT

SECTION A

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

KSKITCHEN SINK

COLD WATER PIPE

LVLAVATORY

HOT WATER PIPE

KEY PLAN

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

17

20

WC

LV

KS

PIP

E T

O S

OA

K A

WA

Y P

IT

PIPE TO SEPTIC TANK

FD

FD SEWER PLAN

WC

LV

KS

PIP

E T

O S

OA

K A

WA

Y P

IT

PIPE TO SEPTIC TANK

FD

FD

SECTION A

SYMBOL DESCRIPTION

TECHNICAL LEGEND

WCWATER CLOSET

KSKITCHEN SINK

COLD WATER PIPE

LVLAVATORY

HOT WATER PIPE

KEY PLAN

FDFLOOR DRAIN

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

18

20

PLUMBING VENT PIPE

RUBBER PIPE BOOT WITH STAINLESS STEEL COLLAR

SET IN DIAMOND CONFIGURATION, BEND TO FORM WITH

PROFILE CONTOUR OF PANEL, SET CONTINUOUS TAPE

SEALANT AND FASTEN TO ROOF PANEL

METAL ROOF PANELS

VENT PIPE CAP

SCALE:

PLUMBING VENT THROUGH ROOF DETAIL

NTS

01

WATER SUPPLY DETAILS

SINK OF LAVATORY

E.R.F 25X1/2"

+

0

.

7

6

C

O

L

D

W

A

T

E

R

L

I

N

E

H

O

T

W

A

T

E

R

L

I

N

E

MIX VALVE

T.R

SCALE:

LAVATORY DETAIL

NTS

02

WATER SUPPLY DETAILS

SCALE:

TYPICAL LAVATORY DETAIL

NTS

04

WATER SUPPLY DETAILS

1800

DISCHARGE PIPE

W.C

PVC PIPE DN100mm

FLUSH TANK

FLOOR SLOPE 2.0%

WALL

Min 1.8m

JOINT FOR DISPLACEMENT OF PIPE

P-TRAP

SLOPE

PVC PIPE 100mm

SLOPE 2.0%

S

L

O

P

E

2

.

0

%

FLOOR

S

L

O

P

E

2

.

0

%

EQ

UA

LE

QU

AL

C

L

300

WC-SQUATTING

WC

CO-P-04

A

CO-P-04

A

GATE VALVE

CO

-P

-04

B

CO

-P

-04

B

FOR 2" PIPE TRAP SEAL NOT

LESS THAN (51mm) &

FOR 4" PIPE TRAP SEAL (102mm).

CERAMIC

CERAMIC

SAND

CONCRETE

CONCRETE

SCALE:

WATER CLOSET PLAN

NTS

03

WATER SUPPLY DETAILS

SCALE:

SECTION A-A

NTS

06

WATER SUPPLY DETAILS

SCALE:

SECTION B-B

NTS

05

WATER SUPPLY DETAILS

NO. DATE DESCRIPTION

RCC 42+6 CLASSROOM SCHOOL BUILDINGMAIMANAH, FARYAB PROVINCE

TENDER SET SUBMISSIONDAARTT CONSTRUCTION PROGRAM

DANISH ASSISTANCE TO AFGHAN REHABILITATION& TECHNICAL TRAINING

REVISION:

SHEET NO:

SCALE:

ARCH.DESIGNED & DRAWING BY:CHEKED & ADVISE BY:APPROVED BY:

Afghan Kot School Building WATER SUPPLY &SEWER SYSTEM

Naweed Haidari

30/05/2019

Engineer Mohammad Arif AyoubiLarse "Pederson"

20