    1 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    REQUEST FOR PROPOSAL

    (RFP No: SPAD/RFP/007/2011)

    HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT

    Suruhanjaya Pengangkutan Awam DaratLevel 19, 1 Sentral

    Jalan TraversKuala Lumpur Sentral50470 Kuala Lumpur

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    2/34

    2 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    Contents1. INSTRUCTION TO TENDERER..................................................................................................... 4

    1.1. Foreword ............................................................................................................................. 4

    1.2. RFP Issuance and RFP Briefing ......................................................................................... 4

    1.3. Submission of Proposal...................................................................................................... 4

    1.3.1 Time and Date .................................................................................................................. 4

    1.3.2 Mode of Delivery and Address ....................................................................................... 5

    1.3.3 Marking and Separation of Sections of Proposals ................................................. 5

    1.3.4 Borang Tender and Keterangan Mengenai Penender ................................... 6

    1.3.5 Format of RFP ............................................................................................................. 6

    1.3.6 Schedule ...................................................................................................................... 6

    1.3.7 Secretariat................................................................................................................... 6

    1.3.8 Short-listing................................................................................................................. 7

    1.3.9 Presentation................................................................................................................ 7

    2. TERMS AND CONDITIONS ........................................................................................................... 7

    2.1. Tenderer(s)s Responsibilities.......................................................................................... 7

    2.2 Mandatory Requirements .................................................................................................. 7

    2.3 Request for Proposal (RFP)............................................................................................... 7

    2.3.1 Amendments to the RFP ........................................................................................... 7

    2.4 Proposal ............................................................................................................................... 8

    2.4.1 Language.......................................................................................................................... 8

    2.4.2 Currency.............................................................................................................................. 8

    2.4.3 Prices / Costs ..................................................................................................................... 8

    2.4.4 Contract Price Variation ................................................................................................. 8

    2.4.5 Cost of Proposal ............................................................................................................... 8

    2.4.6 Contents.............................................................................................................................. 8

    2.4.7 Validity of the Proposal.................................................................................................... 9

    2.4.8 Amendments to the proposals ........................................................................................ 9

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    3/34

    3 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    2.4.9 Advertisement .................................................................................................................. 9

    2.4.10 Performance Bond........................................................................................................... 9

    2.4.11 Process to be Confidential .......................................................................................... 10

    2.4.12 Notification of Award ................................................................................................... 10

    2.5 Failure of Negotiation ..................................................................................................... 10

    2.6 Contract .............................................................................................................................. 10

    2.7 Rights of SPAD .................................................................................................................... 10

    2.7.1 Governing Law.................................................................................................................... 10

    2.7.2 Non Liability ....................................................................................................................... 11

    2.7.3 Confidential Information .................................................................................................. 11

    2.7.4 Acceptance or Rejection of Any Part or All of the Proposal...................................... 11

    2.7.5 Withholding Tax ................................................................................................................. 12

    2.7.6 Acceptance of Above RFP Terms and Conditions by Tenderer(s) ............................. 12

    2.7.7 Ownership of RFP............................................................................................................... 12

    2.7.8 Licenses and Permits ....................................................................................................... 12

    2.7.9 Non-Collusion/Lobbying .................................................................................................. 12

    2.7.10 Annulment ....................................................................................................................... 13

    2.7.11 No Agency or Partnership ............................................................................................. 13

    2.7.12 Declaration on Non-Corruption Practices .................................................................. 13

    3. BACKGROUND............................................................................................................................ 13

    4. PROJECT BACKGROUND........................................................................................................... 14

    5. SCOPE OF WORK AND PROJECT REQUIREMENTS ................................................................. 14

    6. PROPOSAL EVALUATION CRITERIA ......................................................................................... 21

    7. FORMAT FOR RESPONSE .......................................................................................................... 22

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    4/34

    4 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    1.INSTRUCTION TO TENDERER1.1.ForewordSuruhanjaya Pengangkutan Awam Darat (SPAD) invites proposals from qualifiedtenderer(s) to participate in the development of a feasibility study on High Speed Rail Phase 1B Project.

    This Request for Proposal (RFP) outlines descriptive background information toenable SPADs requirements to be addressed in the proposal to be submitted byTenderer(s). Specifically, sections 1 - 7 of the RFP detail:

    Instructions for Tenderer(s)

    Terms and Conditions

    Descriptive Background Information

    Scope of Work

    Implementation Requirements Format of Proposals

    1.2.RFP Issuance and RFP Briefing

    1.2.1 RFP Enquiries

    Enquiries regarding the RFP will only be accepted if in writing by mail, fax or e-mailto our tender secretariat, En. Shamsul Afif Abdul Waris. All requests for clarificationor additional information or questions shall be forwarded to the appointed

    secretariat via email [email protected].

    No questions or enquiries shall be entertained after 1200 hours, Malaysian Time,22 December, 2011.

    1.3.Submission of Proposal

    1.3.1 Time and Date

    Proposals shall be submitted during office hours not later than 1200 hours Malaysian

    Time, 5 January, 2012. Proposals submitted after this time shall not be considered.

    Normal office hours are:

    Monday Thursday: 0845 1245, 1400 1745Friday: 0845 1215, 1445 1700

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    5/34

    5 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    1.3.2 Mode of Delivery and Address

    Proposals shall be delivered by hand at the address below:

    Procurement Department,Suruhanjaya Pengangkutan Awam Darat,

    Level 19, 1 Sentral,Jalan Travers,Kuala Lumpur Sentral,50470 Kuala Lumpur

    SPAD may at its sole discretion extend the closing date and time by issuing anaddendum. Submission via ordinary post or courier will not be accepted.

    Any document left out/not included in the submission envelope shall not be acceptedeven though delivered to the Procurement Division before the closing date and timeby whatever means and/or method.

    Any Proposal received after the closing date and time will be declared Late Tenderand shall be kept unopened by SPAD.

    Proposals submitted and already received by SPAD shall not be withdrawn ormodified.

    1.3.3 Marking and Separation of Sections of ProposalsThe Proposals shall be submitted by Tenderer(s) in three different volumes, namely

    (i) Volume 1: Technical Proposal(ii) Volume 2: Financial Proposal

    (iii) Volume 3: Financial Information

    Each of the volumes must be submitted in four (4) copies, one (1) marked Originaland three (3) marked Duplicate. In the event of discrepancy between the originaland the duplicate, the original shall prevail. The Tenderer(s) is also required todeliver one softcopy of the proposal in each of the volumes.

    Each shall be sealed and clearly marked in a separate envelope or container.

    The three separate proposals should subsequently be enclosed in one envelope or

    container, marked: High Speed Rail Feasibility Study Phase 1B Project

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    6/34

    6 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    The Proposals submitted shall be labeled by Tenderer(s) in a properly sealedenvelope with the tender title such as follows:

    High Speed Rail Feasibility Study Phase 1B Project

    Tender No. SPAD/RFP/007/2011

    1.3.4 Borang Tender and Keterangan Mengenai PenenderProposals shall be submitted with the following documents included in therespondents Financial Proposal:

    (a) Borang Tender - Appendix 1(b) Keterangan Mengenai Penender - Appendix 2

    1.3.5 Format of RFPThe format of RFP is as per Section 7.

    1.3.6 Schedule

    The following dates are the key milestone events of this RFP procurement process.SPAD will solicit the Proposals complying with the dates as tabulated below whichmay be amended by SPAD from time to time. Any amendments will be notified toTenderer(s) via email.

    Date Action

    1 December 2011 Invitation & collection of RFP Document

    22 December 2011 Deadline for Receipt of Questions by 1700 hours

    29 December 2011 Clarification responses issued by 1700 hours

    5 January 2012 RFP Due Date, by 1200 hours

    Early January 2012 Tender evaluation by Tender Board

    End January 2012 Presentations by Tenderer(s)

    1.3.7 SecretariatThe appointed secretariat for this RFP is En. Shamsul Afif Abdul Waris. All requestsfor clarification or additional information or questions shall be forwarded to theappointed secretariat via email [email protected].

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    7/34

    7 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    1.3.8 Short-listingThe first phase of the evaluation process will identify a shortlist of respondents.Respondents not selected for this shortlist will be advised accordingly. SPAD is notobligated to enter into any discussion regarding the rejection of any respondentsubmission.

    1.3.9 PresentationTenderer(s) understand and accept that they may be required at their own costs andexpenses to provide and conduct presentation(s) to SPAD or other governmentalagencies, authorities or organisations as requested by SPAD.

    2.TERMS AND CONDITIONS

    2.1. Tenderer(s)s ResponsibilitiesIt is the Tenderer(s)s responsibility to understand the RFP, including thebackground materials and requirements therein and to make all examinationsnecessary in order to ascertain all factors, enquiries and questions, which mightaffect the Tenderer(s)s proposal.

    2.2 Mandatory Requirements

    Tenderer(s) are required to comply with the RFPs instructions, procedures,

    terms, conditions and solution requirements as described in this document.Failure to do so may cause the proposal to be disqualified and rejected.

    2.3 Request for Proposal (RFP)

    2.3.1 Amendments to the RFP

    SPAD may revise, amend, alter, modify and/or clarify this RFP by issuing anaddendum no later than five (5) working days before the closing date and timefor submission of the Proposals. Every addendum issued will become part of this

    RFP. The receipt thereof must be acknowledged by Tenderer(s) failing whichwould result in the rejection of the Proposals.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    8/34

    8 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    2.4 Proposal

    2.4.1 Language

    All proposals shall be in English Language. Associated appendices can besubmitted in Bahasa Malaysia or English.

    2.4.2 Currency

    Currency in the Tenderer(s)s financial proposal shall be quoted in RinggitMalaysia (RM).

    2.4.3 Prices / Costs

    The contract price shall include professional fees, services charges, out-of-

    pocket expenses, at site (if applicable) and all other related cost required toexecute the Services and complying with the requirements of this RFP and shallrepresent the complete and all-inclusive cost to SPAD. No claims in respect ofany increase in the cost will be entertained.

    The quoted contract price or the Schedule/Breakdown of Price (or part thereof)may be rationalized prior to finalization of the contract/agreement.

    2.4.4 Contract Price Variation

    The Proposed Price is to be firmed for the whole Contract Period. Any

    contract price variation thereafter shall be mutually agreed upon.

    2.4.5 Cost of Proposal

    SPAD shall not be liable for any payment or costs incurred in the preparationand submission of the proposal in response to the RFP. All expenses incurred bythe Tenderer(s) in providing the proposal shall be borne by the Tenderer(s).

    2.4.6 Contents

    Proposals shall contain specific and detailed replies to all requests for

    responses, requirements, costs, terms and conditions as particularly set out inthe RFP in the corresponding Appendices and Sections. Responses shall be inthe order specified making reference to the numbering system as supplied inSection 7. All materials submitted by the Tenderer(s) in response to this RFPwill become the property of SPAD and will not be returned.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    9/34

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    10/34

    10 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    2.4.11 Process to be Confidential

    After the issuance of the RFP, information relating to the contents,examination, evaluation and comparison of proposals and recommendationsconcerning the award of contract shall not be disclosed to the Tenderer(s) orother persons not officially concerned with the process. SPAD is not obliged to

    inform or provide the details of the selection process to either successful orunsuccessful Tenderer(s) in this bid.

    2.4.12 Notification of Award

    The successful Tenderer(s) (if any) shall be notified by a Letter of Award(referred to as Surat Setujuterima) within the RFP validity period or anyextended period thereof.

    2.5 Failure of Negotiation

    It shall be agreed and understood that in the event that the negotiation failsand a contract is not signed, there shall be no cause of action against SPAD, norshall it be possible to pursue a cause of action against the SPAD for any actionhowsoever arising.

    2.6 Contract

    The successful Tenderer(s) shall be required to enter into a formal contractwith SPAD for the consultancy work for developing the Feasibility Study on HighSpeed Rail Phase 1B Project. Pending the formalisation of the contract

    agreement, the Surat Setujuterima together with the successfulTenderer(s)s acknowledgement thereto shall constitute a binding contractbetween the SPAD and the Tenderer(s) notwithstanding whether such acontract agreement is or is not subsequently prepared or executed. Thesuccessful Tenderer(s) should at its own risk carry out the contract inaccordance with the conditions, specifications and schedules forming partthereof and in doing so shall comply with the provisions of any statue,regulations or by-laws, and the requirements of any local or other authoritywith regard thereto.

    2.7 Rights of SPAD

    2.7.1 Governing Law

    This RFP and any contract executed pursuant to this RFP shall be governed byand construed in accordance with the laws of Malaysia. SPAD and allTenderer(s) responding to this RFP and parties to any contract executed

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    11/34

    11 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    pursuant to this RFP shall submit to the exclusive jurisdiction of the MalaysianCourts.

    2.7.2 Non Liability

    Whilst care is taken to ensure that the facts and information contained in thisRFP are correct at the time it is presented, SPAD hereby makes norepresentation as to the accuracy or adequacy of such facts and informationcontained in the RFP. SPAD shall not be held liable for any inaccuracy orinadequacy of such facts and information.

    2.7.3 Confidential Information

    All information of a confidential nature whether generated in Malaysia oroverseas, shall be subject to Malaysian Laws. Without prejudice to the right ofSPAD under any laws, a breach by the Tenderer(s) may entitle SPAD to

    terminate dealings with the organisation without prior notice to theTenderer(s).

    Recipients (be it the Tenderer(s) or their respective employees, representativesor agents) of this RFP, any other elements, information or details in relationhereto howsoever obtained shall be treated as private and confidential and saidrecipients shall not divulge or disseminate the same save and unless requiredby law or with the written approval of SPAD.

    Similarly SPAD shall treat the Proposals as confidential and as far as reasonablypracticable shall not divulge the information contained therein to any thirdparty save and unless required by law or policy or regulation.

    2.7.4 Acceptance or Rejection of Any Part or All of the Proposal

    SPAD reserves the right to accept or reject any proposal, to annul the tenderingprocess and reject any Tenderer(s) at any time prior to the award of Contractwithout thereby incurring any liability to the affected Tenderer(s) or anyobligation to inform the affected Tenderer(s) of the grounds of SPAD action.

    SPAD reserves the right at the time of Contract to vary the services specified inthe Technical Specifications, without any changes to other terms andconditions. The contract sum if required will be adjusted accordingly after

    being mutually agreed upon. The decision of SPAD is final and SPAD is notobligated to give any reason for the non-acceptance or rejection of anyproposal.

    SPAD is not duty bound to accept any lowest bid or any offer related to theServices.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    12/34

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    13/34

    13 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    Tenderer(s) are also forbidden from lobbying any of SPADs employees, agentsand/or representatives with regard to the process of this RFP.

    2.7.10 Annulment

    SPAD reserves the right to annul this RFP and reject all submissions withoutproviding any reason whatsoever at any stage of the exercise or process of thisRFP and Tenderer(s) shall have no legal recourse against SPAD its employees,agents and/or representatives for such annulment and/or rejection in anyrespect whatsoever.

    2.7.11 No Agency or Partnership

    Nothing in this RFP shall designate the Tenderer(s) as agent of SPAD or deemedthe Tenderer(s) and SPAD as being in a partnership.

    2.7.12 Declaration on Non-Corruption Practices

    The implementation of Integrity Pact in Government Procurement is one of theinitiatives agreed under the National Key Result Areas - Corruption. TheIntegrity Pact is a concept introduced by Transparency International to assistGovernments, Business Institutions and the Public in the fight to curbcorruption in Government Procurement.

    The Integrity Pact comprises of a declaration process by bidders not to offer orgive any form of bribes as a means to obtain a contract or to facilitate certainprocesses in Government Procurement. In addition, bidders and civil servantsare required to sign a pact to refrain from getting involved in corrupt practicesthroughout the procurement processes until the project is completed. The pactalso underlines the measures that should be taken in the event that the pact isbreached.

    Tenderer(s) are to complete Appendix 3 and submit together as part of theProposal in both Technical and Financial.

    3.BACKGROUND3.1 Suruhanjaya Pengangkutan Awam Darat (SPAD) or Land Public Transport

    Commission was officially established on June 3, 2010 as the central governingbody for all Land Public Transport related areas within the powers derived fromthe Land Public Transport Act 2010 already passed by the Parliament. The LandPublic Transport Act 2010 gives SPAD the powers to achieve its mission, namely to

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    14/34

    14 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    ensure the provision of safe, reliable, efficient, responsive, accessible, efficient,planned, integrated and sustainable Land Public Transport.

    3.2 More information on SPAD can be found atwww.spad.gov.my.

    4.PROJECT BACKGROUND4.1 This project is a continuation from the High Speed Rail Feasibility Study - Phase 1A

    Project (Prefeasibility Study) in which SPAD is exploring high speed rail (HSR) as analternative mode of public transport travel from national capital-Kuala Lumpur andSingapore.

    4.2 High speed rail (HSR) linking cities with a significantly faster train promises totransform the nation. HSR is used by many cities or countries for various reasons,ranging from merely meeting demand, catalyst for economic growth, improvequality of life leading to increase in long-term competiveness and relationship.

    4.3 HSR link operates within a tight band, known as sweet spot, for optimaleffectiveness. Where travel speed is 250 km/hour upwards, travel time comparableto flight and connecting large and megacities. National Key Economic Areas (NKEA)Greater Kuala Lumpur / Klang Valley Laboratory discussed and suggested thepossibility of HSR linking Kuala Lumpur and Singapore. In its report, a feasibilitystudy was proposed and was performed by SPAD, i.e. HSR Phase 1a Feasibility Study(Prefeasibility).

    4.4 HSR Phase 1a Feasibility Study was performed to assess HSRs viability, risks and

    benefits. It is the intention of this project to expand the findings with further depthand detail over the lifespan of 50 years.

    4.5 The outcome of the Prefeasibility Study was presented to the Economic Council (EC)on 17 October 2012 upon which the approval and direction was given to implementPhase 1B Project.

    5.SCOPE OF WORK AND PROJECT REQUIREMENTS5.1 Project Objectives

    The objective of this feasibility study of a HSR link:

    a. To validate findings of HSR Phase 1a Feasibility Study

    http://www.spad.gov.my/http://www.spad.gov.my/http://www.spad.gov.my/http://www.spad.gov.my/
  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    15/34

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    16/34

    16 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    iii. Refine commercially viability analysis based on local context

    and global exemplary case studies

    c. Detail operational profitability / sustainability and financial model:

    i. Develop detail operating model (base case) and reference with

    global exemplary case studies and future trendsii. Develop or simulate operating performance and characteristics,

    such as schedule, frequency, capacity, speed, fare, journey

    experience etc

    iii. Develop other source of revenue and commercial opportunities

    iv. Develop detail financial model over the lifespan of HSR with

    ability to simulate various scenarios, e.g. involvement of

    different entities and level of involvement

    v. Perform financial projection and performance ratios for each

    models, provide financial ratios such as internal rate of return,

    cash-flow, break-even period and payback period

    vi. Identify financing gap (if any) where public support is needed;

    indicate the mode and level of support to enable the HSR to be

    commercially viable

    vii. Perform financial risks and contingent liabilities assessment

    with option for financial model audit

    d. Detail cost estimate based on bottom-up approach (not limited by the list

    below):

    i. Cost of construction includes construction risks provisions,

    mitigation actions (e.g. installation of additional noise barrier,

    utility diversion, compensation etc)ii. Cost of construction of other facilities or development that

    supports HSR (if any)

    iii. Cost of land acquisition based on type of land

    iv. Cost of rolling stocks include parts and replacement

    v. Cost of operation include operation, maintenance, service

    vi. Cost of services include design, project monitoring and

    commissioning

    vii. Determine cost-benefits with incremental ratios for various

    alternatives with corresponding risk analysis

    viii. Ensure all cost-benefits analysis does not result in additionalcounting of impacts

    e. Key enablers:

    i. Refine value engineering potential

    ii. Identify control and best practices:

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    17/34

    17 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    Identify preferred governance and operational model of

    HSR

    Identify new regulation / regulatory amendment

    required

    Identify public governance and regulatory setup needed

    to protect interest of publiciii. Identify preferred organizational structure for implementation

    iv. Identify preferred public-private-partnership (PPP) and

    financing option

    v. Prepare implementation, project contracting and tendering plan

    vi. Prepare procurement strategy and tender requirement

    specifications

    5.2.3.Feasibility Study - Technical & Engineering

    a. Define HSR alignment, location for stations and depots:i. Identify feasible and optimal alignment, location for stations

    and alignment pairing (city pair)options with comparative

    evaluations

    ii. Identify terminus stations facility and development potential

    with indicative layout

    iii. Identify border stations facility and requirement, i.e. custom,

    immigration, quarantine, safety and security with indicative

    layout

    iv. Identify (for all stations), intermodal transfers with green

    building index

    v. Identify suitable location and space for depots with indicative

    layout for train maintenance and service facility

    vi. Identify suitable location and space for command and control

    centre facility with indicative layout

    vii. Identify supporting system, such as fare collection system,

    public facilities and infrastructures etc

    viii. Alignment scale (on map) to be within limit sufficient for

    planning by SPAD (and other relevant authorities).

    Recommended scale is:

    Scale 1:25,000 non-urban and 1:10,000 urban

    Deviation of +/- 250mix. Develop attributes for each options such as:

    Service : transit time, traffic capacity etc

    Physical : length, size, terrain / ground conditions

    Features : tunnels, viaducts, other structures

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    18/34

    18 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    Any other impacts : social, land-use, environmental (e.g.

    noise, vibration, visual impact), major road and utility

    diversion

    x. Develop integrated regional development concept along the HSR

    corridors:

    Identify land-use plan and development plan along thecorridor with government agencies and local authorities

    Identify HSR development concept that will maximize

    values with strong economic, social impact including

    lifestyle and other impacts

    Review success and lessons learnt from other HSR

    experiences

    xi. Develop geographical information system (GIS), maps and

    databases to facilitate detail engineering analysis and design

    with footprints:

    Alignment, stations and depots including tunnel, ventand access shaft for emergency

    Neighbouring structures

    Road and other major utilities including power supply

    Temporary working space

    b. Detail technical feasibility and environmental studies:

    i. Identify and perform comprehensive assessment of alignment

    and station constraints, i.e. land use, topography, soil condition,

    geological and sustainability features such as environmental

    ii. Site survey to establish geological condition sufficient to

    establish risks considerations

    iii. Estimate noise, landscape/visual and vibration pollution and its

    impact and identify mitigation actions and costs

    c. Define technology requirements:

    i. Develop infrastructure, rolling stock, control system and power

    system requirements based on local requirement and

    environment particularly:

    Infrastructure : standards, alignment geometry, safety

    etc

    Rolling stock : standards, capacity, performance etc

    d. Define operating specifications:

    i. Develop operation specifications in compliance with local

    regulation

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    19/34

    19 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    ii. Define system operation requirement to ensure reliability,

    maintainability, availability, safety and maintain cost

    effectiveness

    iii. Provision for future growth, replacements and technical

    development / improvement

    iv. Develop requirement on other systems and facilities to supportHSR, e.g. integration to other public transportation, road access

    etc

    5.2.4.Engagementa. Stakeholder engagement and consultation; government agencies, local

    authorities, public and private

    b. Develop and implement engagement plan during project

    c. Develop post project engagement plan

    5.2.5.Project Management Officea. Project management office service:

    i. Project manage, coordinate and track

    ii. Status report and documentation

    iii. Liaison with various agencies, both public and private, to

    facilitate the study

    b. Quality assurance and document control

    5.3 Project DeliverablesThe Tenderer(s) is expected to submit the deliverables according to Appendix 4 insoftcopy (1 CD) and printed hardcopy (4 sets). Expected digital file format will beMicrosoft Office based documents.

    - The remainder of this page has been intentionally left blank -

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    20/34

    20 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    5.4 Project TimelineThe project and service shall begin immediately upon contract award and to be

    completed no later than by end of month twelve (12). Project will review findings

    from interim report and mid-term report to determine the need to continuethe feasibility study till end of project, i.e. final report. Major focus of each

    report would be:-

    a. Inception report

    i. Confirmation of project management team,

    workstreams/modules, plans (project quality, strategic &

    economic, technical & engineering, engagement, detail work

    plan)

    b. Interim report

    i. Phase 1b Feasibility Study progress in particular risk and

    benefits of HSR

    ii. Validation of findings from HSR Phase 1a Feasibility Study

    c. Mid-term report

    i. Phase 1b Feasibility Study progress in particular HSR model

    ii. Engagement effort progress and acceptance assessment

    d. Final report

    i. Phase 1b Feasibility Study findings and summary

    ii. Action plans for next step

    Figure 1: Project timeline

    Deliverable acceptance criteria will be validation of deliverable (review, analysis,

    demonstration by consultant, test / inspections) and sign-off by Project Manager.

    Phase 1b

    T + 2 monthsT = 0 month T + 6 months T + 12 months

    Milestone Project

    kick-off

    Interim

    report

    Mid-term report Final report

    Timeline

    Expected up to 12 months

    Inception

    report

    T + 1 month

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    21/34

    21 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    6.PROPOSAL EVALUATION CRITERIAThe evaluation of proposal will be based on, but not limited to, the following factors:

    6.1 Mandatory Requirements(a) Compliance with the mandatory requirements of this RFP as stated in

    paragraph 2.0 and 5.0 of this section.

    (b) Compliance with the general conditions of the proposal, including format ofsubmission as stated in paragraph 7.0 of this RFP.

    (c) Valid registration with the Ministry of Finance (MOF) at the time ofengagement under the MOF kodbidang 230000 and 240000 (The registrationmust be kept valid throughout the engagement period).

    (d) Last 3 years audited account, (certified true copies).

    (e) Last 3 months bank statement.

    6.2 Track Record and Capability to Deliver

    The Tenderer(s) must have at least 1 or more years of experience in deliveringsimilar work and scope as outlined in this RFP.

    6.3 Relevant Experience of Team Members

    (a) The Tenderer(s) must demonstrate the strength of the core team, including topmanagement and project leaders, with their specified roles and responsibilities.They must have proven experience in delivering similar projects in terms ofscope and complexity.

    (a) Should the Tenderer(s) wishes to team up with 3rd parties, teaming partnerresources need to be also identified, and their expertise made clear for thisproject.

    (c) Resume and credential of full-time or part-time consultants and Subject MatterExperts (SME) identified shall be submitted in the proposal.

    6.4 Methodology and Approach

    The Tenderer(s) must demonstrate an approach / methodology suitable for theMalaysian context leveraging on proven solutions elsewhere.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    22/34

    22 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    6.5 Quality and Conciseness of Proposal

    The Tenderer(s) should demonstrate a clear understanding of the specific needs ofthis Project, and provide an approach which addresses these needs as efficientlyand effectively as possible.

    6.6 Pricing

    (a) The Tenderer(s) should aim to provide a price that is fair and reflective ofwhat is being requested of them.

    (b) The Tenderer(s) shall propose schedule of payment for the Project. Theformat for fees and cost pricing to follow Schedule C.

    (c) The Proposed Price is advised to follow the guideline Manual PerolehanPerkhidmatan Perunding Edisi 2011 by Ministry of Finance for ProfessionalFees, Out-of-Pocket Expenses and Service Tax.

    (d) The quoted contract price or the Schedule/Breakdown of Price (or partthereof) may be rationalized prior to finalization of the contract/agreement.

    7.FORMAT FOR RESPONSEThe Tenderer(s) information furnished must be in direct response to this RFPspecifically including being formatted in accordance with the items listed below.SPAD wishes to provide every opportunity to the Tenderer(s) to present their services

    to the best advantage.

    The format of the Technical and Financial proposal shall be as per the following sub-sections.

    7.1 Technical Proposal

    7.1.1 Table of Content

    There shall be a table of contents outlining the sections and subsections in theProposal including supporting document and literature.

    7.1.2 Cover Letter

    The cover letter shall include the following:

    The company name, address, telephone number, fax number and emailaddress.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    23/34

    23 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    Name of person(s) who will be the principal contact authorised to makecommitments for and on behalf of the Tenderer(s).

    A statement declaring the accuracy and completeness of ALL informationprovided in the RFP document including commitments and compliance ofconditions and terms by the Tenderer(s).

    7.1.3 Management/Executive Summary

    A summary of the Technical Proposal with emphasis on the following:

    A summary of the company profile

    Proposed solution and its key features

    A Project Timeline highlighting the major work tasks and milestone proposedto ensure successful implementation of the Project

    7.1.4 Project Methodology, Approach and Deliverable

    The Tenderer(s) shall describe the methodology, approach and deliverables tobe undertaken in the Project.

    7.1.5 Project Work Plan

    The Tenderer(s) shall provide the project work plan that describes the keyproject activities, duration and deliverable to be undertaken in the Project.The Tenderer(s) shall prepare and submit weekly and monthly reports that willenable SPAD to monitor the progress of the Project.

    7.1.6 Proposed Engagement Team

    List of proposed team members with their relevant capabilities, roles andresponsibilities (including man-days involvement in the project)

    Project team structure and/or experiences (please attach team memberscurriculum vitae)

    7.1.7 Company Profile and Capabilities

    The Tenderer(s) shall provide company profile. The company profile shalldescribe the company background, ownership structure, services offered, andorganisation structure.

    7.1.8 Project Reference

    This will include:

    A statement of the Tenderer(s)s current workload including project names,client name and contact details, amount of contract commencement dateand completion date.

    Statement of Tenderer(s)s experience in similar projects within the past 5years.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    24/34

    24 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    7.1.9 Appendices

    The Tenderer(s) shall submit the following forms:

    Appendix 2 Keterangan Mengenai Penender

    Appendix 3 Integrity Pact

    Appendix 4 Compliance to mandatory requirements

    Schedule A Proposed Project Team

    Schedule B Project References

    7.2 Financial Proposal

    7.2.1 Table of Content

    There shall be a table of content outlining the sections and subsections in theProposal including supporting document and literature.

    7.2.2 Cover Letter

    The cover letter shall include the following:

    The company name, address, telephone number, fax number and emailaddress.

    Name of person(s) who will be the principal contact authorised to makecommitments for and on behalf of the Tenderer(s).

    A statement declaring the accuracy and completeness of ALL informationprovided in the RFP document including commitments and compliance ofconditions and terms by the Tenderer(s).

    7.2.3 Management/Executive Summary

    A summary of the Financial Proposal with emphasis on the following:

    Summary of the proposed solution

    Summary of major tasks and milestone proposed; and

    Summary of project cost

    7.2.4 Fees and Costs

    The Financial Proposal must include a detailed breakdown and total sum of all

    Professional Fees and Out-of-Pocket Expenses. The professional fees shallitemise the monthly/daily rate per consultant and the man-days required perconsultant. The tenderer(s) will also need to provide this input in the form ofMS Excel format as part of their softcopy submission along with the printedhardcopies submission. Please refer to Schedule C for the format of the feesand cost pricing table.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    25/34

    25 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    All financial information provided by the Tenderer(s) will be treated withcommercial-in-confidence.

    7.2.5 Borang Tender and Keterangan Mengenai Penender

    The above form must be filled and submitted in the Financial Proposal.

    7.2.6 Appendices

    The Tenderer(s) shall submit the following forms:

    Appendix 1 Borang Tender

    Appendix 3 Integrity Pact

    Schedule A Proposed Project Team

    Schedule C Schedule of Fees and Cost

    7.3 Financial Information

    The Tenderer(s) is required to furnish SPAD with the following information:

    Last 3 years audited financial statements (certified true copies)

    Last 3 months bank statement

    Banking / credit facility given by bank(s) or financial institution(s), if any

    - The remainder of this page has been intentionally left blank -

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    26/34

    26 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    APPENDIX 1 - BORANG TENDER

    Kepada:

    Ketua Pegawai EksekutifSuruhanjaya Pengangkutan Awam DaratLevel 19, 1 SentralJalan TraversKuala Lumpur Sentral50470 Kuala Lumpur

    Tuan,

    Permohonan Kertas Cadangan bagi HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B

    PROJECT (RFP No: SPAD/RFP/007/2011)

    Mengikut syarat-syarat Tawaran yang dikembarkan bersama, Syarikat kami,

    ___________________ bersetuju menawarkan perkhidmatan seperti yang telah dicatat

    dan diterangkan dalam penentuan yang akan dihantarkan dan disempurnakan dengan

    harga-harga seperti tercatat dalam Jadual Harga yang dikembarkan bersama-sama ini.

    Jumlah harga tawaran adalah:

    RM ____________ (Ringgit: _____________________________)

    2. Kami telah menyemak dan bersetuju mematuhi butir-butir penentuan dengan

    lengkap mengikut seperti yang dikehendaki.

    3. Jika tawaran kami disetujuterima, kami mengakujanji bahawa semua pembekalan,

    penghantaran, pemasangan dan pengujian dan perkhidmatan akan disempurnakan dalam

    tempoh ______ selepas Surat Setujuterima Tender diterima oleh pihak kami.

    4. Kami bersetuju bahawa tuan berhak menerima atau menolak mana-mana tawaran

    sama ada tawaran itu rendah, tinggi atau sama dengan lain-lain tawaran yang

    dikemukakan. Kami bersetuju bahawa tawaran ini sah selama 6 bulan dari tarikh tutup

    Tender dan bersetuju melanjutkan tempoh sah tawaran jika dipohon secara bertulis oleh

    SPAD.

    5. Sekiranya tawaran ini disetujuterima, kami bersetuju mengikat kontrak denganSPAD dan mengemukakan cagaran keselamatan seperti yang dinyatakan dalam Notis

    Tender dalam masa 14 hari daripada tarikh penerimaan Surat Setujuterima Tender.

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    27/34

    27 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    6. Kami mengesahkan bahawa kami telah menyemak dokumen-dokumen dan

    memperakui bahawa semua dokumen yang digunakan untuk penyediaan Tawaran ini

    adalah salinan asal.

    Tandatangan Penender

    Nama :

    Alamat :

    Cop Resmi Syarikat :

    Telefon :

    Tarikh :

    Tandatangan Saksi

    Nama :

    No. K/P :

    Alamat :

    Tarikh :

    *** Potong yang tidak berkenaan

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    28/34

    28 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    APPENDIX 2 - KETERANGAN MENGENAI PENENDER

    1 NAMA PENENDER

    2 ALAMAT PEJABAT

    3 NO. TELEFON

    NO. FAX

    4 NO. PENDAFTARAN SYARIKAT

    5 NO. PENDAFTARAN KEMENTERIAN

    KEWANGAN

    (Sertakan Salinan)

    6 MODAL:

    MODAL DIBENAR

    MODAL DIBAYAR

    7 BUATAN DALAM MALAYSIA

    (a) Sebutkan samada barang-barang yang

    hendak dibekalkan itu dibuat dalam

    Malaysia ataupun di luar Malaysia

    (b) Jika barang dibuat dalam Malaysia,

    nyatakan peratus nilai barangan yangdibuat dalam Malaysia.

    8 PEKERJA-PEKERJA

    Beri peratus pembahagian pekerja dari segi ras (bangsa) yang digunakan oleh Firma tuan bagi

    menjalankan tender ini.

    (1) Warganegara

    (a) Melayu : ........%

    (b) Cina : ........ %

    (c) India : ........ %(d) Lain-lain : ........%

    (2) Bukan Warganegara : ........%

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    29/34

    29 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    9 PENGALAMAN

    Beri butir mengenai pengalaman tuan

    dalam membekal barang-barang dan

    kerja dalam pelawaan tawaran ini

    kepada SPAD dalam tempoh lima tahun

    yang terakhir,

    10 KONTRAK DENGAN KERAJAAN PADA MASA

    YANG LALU

    Jika Penender pernah mengikat

    Kontrak dengan mana-mana Jabatan

    Kerajaan/ Badan Berkanun, nyatakan

    samada Firma tuan pernah mengalami

    penggantungan atau penamatan kontrak

    dengan Kerajaan oleh kerana

    perlanggaran syarat-syarat Kontrak.

    11 TEMPOH PEMBEKALAN

    Nyatakan tempoh penyempurnaan

    pembekalan, penghantaran, pemasangan

    dan pengujian peralatan.

    12 LAIN-LAIN KETERANGAN MENGENAI

    PENENDER

    Saya mengaku bahawa segala keterangan di atas adalah benar.

    Tandatangan Penender Tandatangan Saksi:

    Nama Penender: Nama Saksi:

    No. K/P: No. K/P:

    Jawatan: Jawatan:

    Tarikh: Tarikh:

    Cop Syarikat:

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    30/34

    30 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    APPENDIX 3 INTEGRITY PACT

    SURAT AKUAN PEMBIDA

    Bagi

    (RFP No: SPAD/RFP/ 007 / 2011 )

    Saya, .. .. .. . nombor K.P. .. .. .. .. ... .. .. yang

    mewakili ................................................................ nombor

    Pendaftaran................. dengan ini mengisytiharkan

    bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau

    memberi rasuah kepada mana-mana individu dalam

    .......................... atau mana-mana individu lain, sebagai

    sogokan untuk dipilih dalam tender/ sebut harga* seperti di atas. Bersama-sama ini

    dilampirkan Surat Perwakilan Kuasa bagi saya mewakili syarikat seperti tercat at di atas

    untuk membuat pengisytiharan ini.

    2 . Sekiranya saya atau mana-mana individu yang mewakili syarikat ini didapat i

    bersalah menawar atau memberi rasuah kepada mana-mana

    individu dalam.............. atau mana-mana individu lain sebagai

    sogokan untuk dipilih dalam tender/ sebut harga* sepert i di atas, maka saya sebagai wakil

    syarikat bersetuju tindakan-tindakan berikut diambil:

    2 .1 penarikan balik tawaran kontrak bagi tender/ sebut harga* di atas; atau

    2 .2 penamatan kontrak bagi tender/ sebut harga* di atas; dan

    2 .3 lain-lain tindakan tatatertib mengikut peraturan perolehan Kerajaan.

    3 . Sekiranya terdapat mana-mana individu cuba meminta rasuah daripada saya

    atau mana-mana individu yang berkaitan dengan syarikat ini sebagai sogokan untuk

    dipilih dalam tender/ sebut harga* seperti di atas, maka saya berjanji akan dengan

    segera melaporkan perbuatan tersebut kepada pejabat Suruhanjaya Perkhidmatan

    Rasuah Malaysia (SPRM) atau balai polis yang berhampiran.

    Yang Benar,

    ...... (Nama dan No.KP)

    Cop Syarikat :

    Catatan: * Potong mana yang tidak berkaitan.

    (Nama Wakil Syarikat)

    (Nama Syarikat)

    MOF PKK CIDB ROS ROC ROB

    Suruhanjaya Pengangkutan Awam Darat

    (Tandatangan)

    Suruhanjaya Pengangkutan Awam Darat

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    31/34

    31 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    APPENDIX 4 - COMPLIANCE TO MANDATORY REQUIREMENTS

    Tenderer(s) to fill in this Schedule and submit in Technical ProposalFailure to comply with any of the following requirements may cause the proposal to be disqualified and rejected.

    i. Proposed solution Description of overall solution description of mandatory scope and optionalscope (if any) and demonstrate clear understanding of projects needs,

    expectations and appreciation of constraints and challenges. Detail description for each itemized scope items include:

    descriptions

    best practices from global insight

    roles and responsibilities of consultant

    roles and responsibilities of SPAD

    expected outcome and deliverable

    key assumptions, exclusions, dependencies (if any)

    ii. Project management andimplementation methodology

    Description of best practices in project management and methodology orapproach to be employed to ensure the success of the project.

    iii. Technical compliance Compliance to Scope of Work as per Para. 5.3

    iv. Implementation schedule and milestones Project plan with timeline and key milestones indicated as per requirement

    v. Organisation structure, personnelqualifications / resume, certification andjob roles

    Project organisational structure chart with indicative resources

    List of key personnel identified for the project Key resource role & responsibility descriptions (as per project

    organisational structure), full time equivalent (FTE) and duration ontimeline.

    Key personnel are expected to be based in SPAD office premise.

    vi. Consultant background, track record andcredentials

    Corporate background, core service and expertise

    Relevant experience both local and international Project and post project achievements and credentials

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    32/34

    32 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    SECTION 2APPENDICES

    SCHEDULE A

    PROPOSED PROJECT TEAM

    Tenderer(s) to fill in this Schedule and submit in BOTH Technical and FinancialProposals

    Personnel Curriculum Vitae

    Project Role Projectresponsibilities

    ResourceName, IC No,CurrentPosition/Title

    Number ofyears ofPracticalExperience

    ProjectInvolvement(Man-Days)

    Experience and projectsundertaken by Namedresource>Generalqualification/certifications> Project Name> Month/Year Start-End> Brief description of nature& scale of project> Summarized role &responsibilities

    ProjectManager(example)

    Technical lead(example)

    Proposed Project Team Structure: Diagram of project team structure

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    33/34

    33 | P a g e HIGH SPEED RAIL FEASIBILITY STUDY PHASE 1B PROJECT (RFP No: SPAD/RFP/007/2011)

    SECTION 2APPENDICES

    SCHEDULE B

    PROJECT REFERENCES

    Tenderer(s) to fill in this Schedule and submit in BOTH Technical and Financial Proposals

    Company Project Experience (list only projects within the past 5 years, grouped byproject type)

    Project Name

    Location

    Project

    Type

    Scope of

    servicesprovided

    Client name

    address andcontactdetails

    Status of

    project

    Value of project

    (RM000)

    - The remainder of this page has been intentionally left blank -

  • 8/3/2019 Rfp Hsr Feasibility Study Phase 1b (Version5)-2

    34/34

    SECTION 2APPENDICES

    SCHEDULE C

    SCHEDULE OF FEES AND COST

    Tenderer(s) to fill in this Schedule and submit in ONLY Financial Proposal

    Table 1: Price breakdown for in-scope services

    No Description(position, e.g. project manager,

    consultant, associate, analyst)

    Cost(RM/

    manday)

    Effort(manday)

    TotalPrice

    (RM)

    TotalPrice

    (%)1

    2

    3

    4

    5 Out of pocket expenses

    6 Others (taxes, government dutiesetc)

    TOTAL (RM)

    Table 2: Price schedule for in-scope services

    No Description(key milestones, e.g. preliminaryassessment, findings etc)

    Total Price(RM)

    Total Price(%)

    Schedule(week #)

    1

    2

    3

    4

    TOTAL (RM)

    - The remainder of this page has been intentionally left blank -