Commonly applicable RFC KPIs
RFC Atlantic
June 2020
Commonly applicable RFC KPIs
CAPACITY MANAGEMENT
Volume of offered capacity – PaPs (at X-11)
9.9 mio (path) km
11.4 mio (path) km*
7.8 mio (path) km
2018
2019
2020 for TT 2021
for TT 2020
for TT 2019
4.5 mio (path) km
4.6 mio (path) km
4.0 mio (path) km
2018
2019
2020 for TT 2021
for TT 2020
for TT 2019
Volume of requested capacity – PaPs (at X-8)
1
*In case of some countries, the capacity was offered for a calendar year in order
to solve some technical interfaces between PCS and national capacity IT tools.
Commonly applicable RFC KPIs
CAPACITY MANAGEMENT
Volume of requests – PaPs (at X-8)(number of PCS dossiers)
46
52
41
2018
2019
2020
Number of conflicts – PaPs (at X-8)(number of conflicting PCS dossiers)
0
0
2018
2019
2020
0
for TT 2020
for TT 2019
for TT 2021
for TT 2020
for TT 2019
for TT 2021
2
Commonly applicable RFC KPIs
CAPACITY MANAGEMENT
Volume of pre-booked capacity – PaPs (at X-7.5)
4.5 mio (path) km
4.6 mio (path) km
4.0 mio (path) km
2017
2018
2019
for TT 2019
for TT 2018
for TT 2020
3
Commonly applicable RFC KPIs
59.8
61.5
51.1
37.0
68.9
58.8
52.9
55.1
47.9
53.0
56.0
51.0
50.4
51.8
63.1
45.2
62.1
49.0
55.3
49.6
52.0
Irún/Hendaya - Mannheim (1367)
Vaires - Mannheim (590/548)
Metz /Woippy - Mannheim (258/214)
Le Havre - Mannheim/Forbach (794)
Irún/Hendaya - Valenton (801)
Madrid - Irún/Hendaya (313)
Grisén - Irún/Hendaya (313)
Noain - Irún/Hendaya (156)
Bilbao - Irún/Hendaya (300)
Lisbon - Irún/Hendaya (1014)
Leixoes - Irún/Hendaya (1172)
Entroncamento - Madrid (724)
Lisbon - Madrid (857)
Entroncamento - Mérida (218)
TT2021
TT2020
CAPACITY MANAGEMENT
km/h
4
Section and Length (km)
Average planned speed of PaPs(calculation per O/D pairs, km/h)
different section for TT2020
different section for TT2020
different section for TT2020
different section for TT2020
different section for TT2020
different section for TT2020
different section for TT2020
*This KPI should be perceived as qualitative as journey times might include commercial and operational stops.
Commonly applicable RFC KPIs
CAPACITY MANAGEMENT
Volume of offered capacity –Reserve Capacity (at X-2)
2.1 mio (path) km
2.1 mio (path) km
TT 2018
TT 2019
TT 2020
1.1 mio (path) km
5
Commonly applicable RFC KPIs
CAPACITY MANAGEMENT
0
0
0
TT 2017
TT 2018
TT 2019
6
Volume of requests –Reserve Capacity (at X+12)
(number of PCS dossiers)
Volume of requested capacity –Reserve Capacity (at X+12)
0.0 (path) km
0.0 (path) km
0.0 (path) km
TT 2017
TT 2018
TT 2019
Commonly applicable RFC KPIs
OPERATIONS
7
2019:
2018:
2017:
Punctuality at origin (RFC entry)
2019:
2018:
2017:
N/A
N/A
N/A
N/A
N/A
N/A
Punctuality at destination (RFC exit)
(delay ≤ 30 minutes) (delay ≤ 30 minutes)
Commonly applicable RFC KPIs
OPERATIONS
for RFC internal use only
*The calculation of this KPI is based on data in RNE’s TIS. International freight trains crossing a border of an RFC are considered in the calculation.
Overall number of trains on the RFC*
8
Commonly applicable RFC KPIs
MARKET DEVELOPMENT
2019
Total DE - FR: 10,819
Hendaye: 3,046
Irún: 2,117
Total ES - PT: 2,392
9
Total DE - FR-9.9%
Hendaye -3.7%
Irún-9.1%
Total ES - PT
2017
12,002
3,162
2,329
1,947
2018
10,198
2,907
2,036
2,397
*The calculation of this KPI is based on data in IMs’ systems. The total sum of the figures per border does not correspond to the figure of the KPI
‘Overall number of trains on the RFC’ due to, among other reasons, the potential double-counting of trains crossing more than one border.
Overall number of trains per border*
+22.9%
The change in percentage compares the latest figures for 2019 against the figures for 2017 as a basis.
Commonly applicable RFC KPIs
MARKET DEVELOPMENT
10
Relation between the capacity allocated by the C-OSS and the total allocated capacity*
*In case of border points with more than one C-OSS responsible (in case of common offer or in case of overlapping sections), the KPI figure
presents the combined number of all C-OSSs concerned. The figures are applicable for 2019.
Commonly applicable RFC KPIs
» Please refer to the annual reports of the RFC for comprehensive information concerning the
figures and their analysis. In addition, you can find the description of each commonly applicable
KPI in the RNE ‘Guidelines for Key Performance Indicators of Rail Freight Corridors’.
Disclaimer
11