_ , . . , '. CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT UNIT 0 END PATH PROCEDURE 2B EMERGENCY OPERATING PROCEDURE: E0P-01-EPP-2B VOLUME VI Rev. 004 gQhgo f)_-:gok. Q . - / j,e# ,q;9 og#cs":k . $'J ' I TY Approved By: /- / tr/) Date: ' / GjneralMan4er/ Hanager - Oper'ations Yage 1 o't 8 8811110[40ggQ$fg4 PDR * * * * - ppR ' .- - - _ _ _ _ _ _ _ _ _ - _ _ _ . _ . _ _ _ _ _ _

Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

_ _ _ _ _ _ - _ _ _ _ ,

. .,

'.

CAROLINA POWER & LIGHT COMPANYBRUNSWICK STEAM ELECTRIC PLANT

UNIT 0

END PATH PROCEDURE 2B

EMERGENCY OPERATING PROCEDURE: E0P-01-EPP-2B

VOLUME VI

Rev. 004

gQhgo f)_-:gok.Q .

-/j,e#

,q;9og#cs":k.

$'J'

I TYApproved By: /- / tr/) Date:' /GjneralMan4er/

Hanager - Oper'ations

Yage 1 o't 8

8811110[40ggQ$fg4PDR * * * * - ppR

'.- - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _

Page 2: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

, .

,

..,,

LIST OF EFFECTIVE PACES

E0P-01-EPP-2B

Page(s) Revision

1-2 4

1

3 2

4 3

5 2

6-7 4

8 2

__

,

f

;

1

|

|

||

|i

||

,

!

|

;

i

BSEP/Vol. VI/EOP-01-EPP-2B Page 2 ef 8 Rev. 4

!t

. _ _ _ - - - , - .

Page 3: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

_ _ _ _ _ _ _ _ _ _ _

.

. .

F

A. TITLE - End Path Procedure 2B i

B. ENTRY CON'DITION

Yhis procedure is entered fron Fievpath 2, 3, 4. OR $ OR f rom the "

~~ ~~Contingsney section of this End Path Manual.

C, OPERATOR ACTIONS,

eneeseeeenemoneenge***eeeeeenamenene*************enen**emenennaennemanneenene.CAUTION P

DO !;0T SECURE or PLACE an ECCS or RCIC in manual mode UNLESS by at least two~

1 dependent indications:

1. Misoperation in the automatic mode is confirmed. ORi

2. Adequate core cooling is assured.

IF an ECCS or RCIC is placed in the manual mode, it vill NOT initiate '

automatically. MAKE frequent checks of the initiating or controlling !

parameter, kHEN t snual operation is tio longer required, RESTORE the system toautomatic / stand'; mode if possible.**e*********************e****************enae******enene***ene***eeeena*******

1. RESTORE and MAINTAIN reactor vessel level between +170 and +200~~ ,

inches. USE one or more of the following systems in an order that{vill minimize high eenductivity feed to the reactor:,

RPV Pressure Range !System for System Operatio.' I

a. Condensate 200-0 psig__ ,

!

b. Condensate / booster 350-C psig__

c. Feed pumps 1250-0 psig ;__

!d. CRD 1490-0 psig__

e. RCIC 1190-62 psig [__

{

f. HPCI 1280-120 psig [__

t

g. RHR 200-L psig [,_

h. Core Spray 300-0 pstg i__

i,

h

|

BSEP/Vol. VI/EOP-01-EPP-2B Page 3 of 8 'ev. 2 !,

i!

I

_ - _ - . . .

Page 4: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

. .

. .

2. IF the CRD Drive Water Pressure Control Valve, C11(C12)-F003, andthe in-service CRD Flow Control Valve, C11(C12)-F002A(F002B), havebeen opened to maintain reactor vessel level b3D the CRD System isno longer needed to maintain reactor vessel level, THEN PERFORM thefollowing steps to restore the CRD System to normal operations

a. SET the setpoint tape on CRDHS Remote Flow Controller,~~ 'C11(C12)-FC-R600, to 100 spm.

b. SHIFT the CRDHS Remote Flow Controller, C11(C12)-TC-R(00, to '~~

the "AUT0" position.

c. IF both CRD pumps are running THEN STOP one CKD pump.

/ d. OPEN and LOCK OPEN CRD Pump Condensate Return Isolation Valve.|

Ind. Ver. COR-V1 (located at CST). I

/___ e. IT Charging Water Header Throttle Valve, C11(C12)-T034, wasInd. Ver. manipulated to maximize CRD flow, THEN CLOSE and IMMEDIATELY |

RIOPEN al turns Charging Vater Header Throttle Valve.C11(C12)-T034.

f. SET the setpoint tape on CRDHS Remote Flow Controller,,_,,

C11(C12)-FC-R600, to between 30 and 80 gpm.

g. ESTABLISM a drive water 1.aader differential pressure betweei; i

260 and 275 paid, as read on C11(C12)-PDI-R602 on RTGB PanelP603, by throttling closed Drive Vater Pressure Control Valve, ;

C11(C12)-F003. |

/ h. IF CRD Pumps Suction Filters Bypass Valve, CO-V306, is open,and. Ver. THEN VERIFY a CRD pump suction filter is in service and CLOSE

the CRD Pumps Suction Filters Bypass Valve, CO-V306.

I 1. IF both CRD pump suction filters are in service, THEN ISOLATEand RFPLACE the filter which has the highest dP.

1

j. IF both CRD drive water 111tsts are in service. THEN ISOLATEand REPLACE the filter which has the highest dP.

3. ENTER the Containment Control section of this End Path Manual and~~

EXECUTE it concurrently with this procedure.

| 4. IT while executing this procedure, reactor vessel level CANNOT bedetermined OR reactor vessel flooding is required, THEN EXIT thisEnd Path Procedura and ENTER the "Flooding Procedure" in theContingency secti n of this End Path Manual.

5. IF reactor vessel level CANNOT be maintained above +170 inches THENKAINTAIN reactor vessel level above 0 inches.

6. IF reactor vessel level CANNOT be maintained above 0 inches THENEXIT this End Path Procedure and ENTER the "Level RestorationProcedure" in the Contingency section of this End Path Manual.

BSEP/Vol. VI/EOP-01-EPP-28 Page 4 of 8 Rev. 3

.

Page 5: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

_. _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _

.

i

* *.

7 IF while executing this procedure, reactor depressuritation isrequired. THEN PERFORM the following steps

e*******e******e****************************ee*****e*****************enenennesCAUTION

DO NOT DEPRESSURIZE below 120 psig UNLESS motor-driven pumps suf ficient toEIintain reactor vessel level are running and available for injection,eeeeeeeee**e.eee*****ene*********e ********eae*******eeeeee******ene**e**enene

a. IF the MSIVs are open. THEN RAPIDLY DEPRESSURIZE the reactorwith the bypass valve opening jack,

b. IF the reactor CANNOT be dep.essurized to the main condenser.~~

TREN mae*; ally OPEN all ADS valver.'

, (1) IF any ADS * CANNOT be opened. THEN OPEN SRVs UNTIL* seven valves , open.

4

(2) IF less than three SRVs are open AND reactor pressure is| greater than 50 psig above suppreIsIon chamber pressure.

THEN ENTER the "Erergency Depressuritation Procedure" inthe Contingency sectien of this End Path Manual and,

.

EXECUTE it concurrently with this procedure.,

c. CONTINUE in this procedure at Step 10.<

,,

********************************ene**eeeee**e2 ***** *************************

CAUTIONIF fuel failure is suspected. DO NOT REJECT RVCU to hotwell.

IF an automatic isolation of a particular system has occurred. DO NOT attemptto deisolate or restore the systen UNTIL all available indications have beenchecked and are found to be normal.

i DO NOT DISPATCH personnel to an area of a suspected break withoutconsideration of adverse environments.

; neeeeeeeeeeeeeeeeeeeee*** **eeeeeeeeeee**eemene**********ene**************** *

l8. waintain reactor pressure below 350 psig with one or more of the

,,

following systems:

| a. HPCI (in full flow test mode)~~

(,

b. RCIC (in full flow test mode),,

c. Main Steam Line Drains,,

d. RVCU,,

e. Feed Purps (in recirculation mode),,

,

] f. SJAEs (in full load),,

1 BSEP/Vol. VI/EOP-01-EPP-25 Page 5 of 8 Rev. 2;

)

i,

. _ _ _ _ _ _ _ _ _ _ _ . _ -

Page 6: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

.- __ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _

. .

!

i !ra

I !; ********enee*****e************************************************************ ,

j CAUTION I' g NOT DEPRESSURIZE below 120 psig UNLESS actor-driven pumps suf ficient to |

| ||; maintain reactor vessel level are running and available for injection.

j **eamene****ene***en*********e*****************************a******eeme***en***1 |

| 9. IF reactor pressure CANNOT be maintained below 350 psig with the ',

above systems AND continuous pneumatic supply is available to the i.

) SRVs THEN OPEN SRVs as necessary to maintain reactor pressure below i

i 350 psig. USE opening sequence B F. E, C, A. C. J. H, and D. ||4 ij

| 10. IF a break outside primary containment is suspected, THEN PERFORM (the following stepst j

L

a. ISOLATE the break by remote or manual operation of the affected j_

valves. L.

i;

; b. REFER to AOP-01.1. :

j t

i 11. IF SJAE, stack, or MSL radiation monitors indicate fuel failure. I

f TIIEN PERFORM the following stepst~

j a. NOTIFY E&RC to sample coolant._

L.

b. MONITOR ARMS stack, and ventilation radiation monitors. |, _

!-

.

c. IF high radiation or high airborne conditions exist, THEN REFERto AOPs 05 through 06. ij

d. PLACE the following valve control switches to "CLOSE." !_

| (1) DW FLOOR DRAIN INBD ISOL VLV G16-F003 L

_

(2) DW FLOOR DRAIN OTBD ISOL VLV, C16-F004_

i

j (3) DW EQUIP DRAIN INBD ISOL VLV, G16-F019_

:

|(4) DW EQUIP DRAIN OTBD 150L VLV, G16-T020

_

| e. NOTIFY Radwaste to place the Reactor Building equipment drain_

j pump into the recirculation mode.J

'f. DO NOT OPERATE the mechanical vacuum pumps. !

I

12. IF_ condensate booster pump suction conductivity is greater than 0.3; paho, TH E PERFORM the following stepst ;

i

a. RDt0VE af fected water boxes f rom service. {_

I,

[I\

BSEP/Vol. VI/EOP-01-EPP-2B Page 6 of 8 Rev. 4

|

|

_ _ - _ _ _!

Page 7: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

_ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _

* *.

,

* *.

L

b. REALIGN CFDs and CDDs to provide better ion removal._

,

c. IF the Condensate /Feedvater System is NOT required to maintainreactor vessel level. THEN PLACE the Condensate System in the [long cycle cleanup mode. ;

d. DO NOT REJECT the hotwell to the CST.

e. REFER to A0P-26.0. I

~L

13. IF while executing this procedure, any of the following systems fail jor have failed, THEN ENTER the associated procedure in the System ;

Recovery section of this End Path Manual and EXECUTE it concurrently |with this procedures

i

a. Conventional Service Water ;_

b. Nuclear Service Water j_

i t

c. Reactor Building Closed Cooling Water !_

('d. Turbine Building Clesed Cooling Water

_

e. Instrument Air (_ ,

f. Auxiliary Electrical Power, _,

L

14. IF the MSIVs are closed. THEN REESTABL?SH the mair, condenser as aheat sink (OP-25).

15. NOTIFY the SOS to perform the following stepst ||_

a. CONSULT PEP, Section 2.1._

b. NOTITY on-call CP&L supervisor. |'

_

| c. NOTITY NRC per RCI-06.5._

d. NOTIFY E&RC to sample coolant._

|f1 e. IMPLEMENT 01-22._

!

i 16. IF RVN has isolated AND a break in the RWCU System is NOT [ouspeeved, THEN RESET the Group 3 isolation and RESTART RWCU j

j (OP-14).

I 17. IF the reactor recirculation pumps have been tripped. TNEN RESTART !

j them (OP-02). |f

| 13. CONTINUE performing Containment Control, local Emergency, and System [; Recovery Procedures UNTIL the exit conditions for the affected [

_

; procedures are met. [r

I:

| BSEP/Vol. VI/EOP-01-EPP-28 Page 7 of 8 Rev. 4 !!

!1

1,

.

- _ _ _ _ - --

Page 8: Rev 4 to Emergency Operating Procedure EOP-01-EPP-2B, 'End

_ _ _ _ _ _ _ _ _ _ . _ _ _ _ .

t

*.o,,

* *.

!

19. RECORD reqeired scram information in the Scram Report (OI-22) and,_

Shift togs. |

20. VRITE Work Request / Job Orders /LCOs to ensure that functional t. ting i~~

is performed on those systems in which jumpers were installed.

.', WHEN systems that rtquire independent verification for return to~~

service are shut down. THEN PLACE the systens en standby readinena ,

per their respective ops. (Refer to Table l'. 7.1 in Volume I. Book i1-AP.) !

i

22. IF reactor cool' nm and depressurization are to be commenced per the !~~

T3S. THEN ENTER the General Plant operating Procedure and EXECUTE it I

concurrently with this procedure.

!

23. WHENt

a. Reactor vcssel level can be maintained above +170 ine.hesAND j

ib. Raaetor pressure can be maintained below 1045 psig

,__

AND !

e. Primary containment parameters are within the linits specified__

in the Containment Control Procedure. ;

I

THEN EXIT this procedure and ENTER the appropriate section of the I

General Plant Opetating Procedure for hot / standby OR cold shutdown !

as directed by the SOS.

>

|

||

BSEP/Vol. VI/EOP-01-EPP-2B Page 8 of 8 Rev. 2 ;