MICHELE EMOND 1Thunderbird Crescent (613) 591-8338 (Residence)
Kanata, Ontario (613) 608-0650 (Cell)
K2M 2H4 [email protected] (email)
CAREER SUMMARY:
Over 27 years’ experience in the field of Facilities Maintenance and Project Management at the
Ottawa Hospital (General Campus, Civic Campus), University of Ottawa Heart Institute (UOHI)
and Renfrew Country District School Board (RCDSB). I have acquired skills and experience in
all phases of construction; including scheduling, estimating, contract review and subcontractor
monitoring and also sat as the co-chair and certified member of the Joint Health and Safety
Committee. Have associated experience in; day to day maintenance requirements of building
operations, budget/cost control, negotiation of construction extras/claims, client liaison,
development of programs requirements, tendering, specification preparation, layout
preparation/presentation, proposal preparation for major construction projects, cost estimating,
site inspection, scheduling and management of unionized staff/construction workers.
WORK EXPERIENCE AND ACCOMPLISHMENTS
RENFREW COUNTY DISTRICT SCHOOL BOARD (RCDSB)
PROJECT MANAGER (July 2015 to Present)
Madawaska Valley District High School Renovations – Estimated Project Cost $7.0 Million
This project involves the renovations of area of the existing high school (grades 9 – 12) to
introduce an elementary classroom wing (grades JK – 8)
The project will create new Science Classrooms, a new Visual Arts Classroom, a new Cooking
Lab, a new Cosmetology Classroom, a new Student Services area, as new Main Office Area, a
new Library space and a dedicated Elementary Classroom Wing c/w a new dedicated entrance.
The project has been broken down into 4 phases, each having a very specific completion date
which cannot be changed.
Phases 2 and 3 of construction are to be completed with the students in their respective
classrooms.
The project also has extensive exterior site work which includes, walkways, playgrounds,
parking areas and landscaping
OTTAWA HOSPITAL - UNIVERSITY OF OTTAWA HEART INSTITUTE
PROJECT MANAGER (2007 TO January 2015)
UOHI Major Projects – Role and Highlights:
MRI/CTScan Equipment Installation – Total Project Cost – Approx $3.5 Million
This project involved the renovation of an existing area within the basement of the Heart Institute
for the installation of a MRI and CTScan equipment.
This project faced many challenges, including excavation within an existing building and
scheduling delays.
This project was completed within an area that saw no lost scheduled procedure time during the
construction phase
MICHELE EMOND 1Thunderbird Crescent (613) 591-8338 (Residence)
Kanata, Ontario (613) 608-0650 (Cell)
K2M 2H4 [email protected] (email)
Managed Project from Implementation (construction, monitoring and control) to Close Out
phases.
UOHI Levels 3, 4, 5 Patient Room Refurbishment – Total Project Cost $910K
This project involved the replacement of patient room washroom fixtures, over-bed lighting, pot
lights, new washroom floors and room painting.
This project saw the work completed in 69 patient rooms over a 60-day continuous schedule.
During the construction, each patient floor was occupied with exception to the areas being
renovated.
Managed Project from Implementation (construction, monitoring and control) to Close Out
phases.
Infrastructure Renewal Program Project- Total Project Cost - Approx $10 Million
The project involved adding a new Air Handling Unit for the UOHI’s Life Support Area and its
associated infrastructure.
This project faced specific challenges regarding structure, permits and the specific location. The
project was completed with no area being closed during construction.
Managed Project from Implementation (construction, monitoring, and control) to Close Out
phases, including final submissions to the Ministry of Health for Cost Sharing.
UOHI Surgical Suites Project - Total Construction Cost - $1.2 Million
This project oversaw the construction of two state of the art Operating Theaters.
This project was completed on time and under budget without losing 1hr of scheduled operating
room time.
Managed Project from Implementation (construction, monitoring and control) to Close Out
phases.
Electro Physiology (EP) Lab Project - Total Construction Cost - $1.7 Million
This project involved the creation of an EP suite (including the coordination of the equipment
installation) within the UOHI Life Support Area.
Managed Project from Implementation (construction, monitoring and control) to Close Out
phases.
Catherization Labs 2 & 3 Project - Total Construction Cost - $2.0 Million
This project involved the removal of existing equipment, room retrofit and coordination of the
installation of new equipment, including all electrical and mechanical.
The major issue for project delivery was obtaining the Electrical Safety Inspection pass for
Equipment Installations.
Managed Project from Implementation (construction, monitoring and control) to Close Out
phases.
Pacemaker Clinic Amalgamation/Relocation Project
This project involved consolidating several ambulatory care clinics and renovating existing
spaces to accommodate the moves.
This project had to be carried out to ensure no clinic time was lost during construction.
Project was on time and under budget.
MICHELE EMOND 1Thunderbird Crescent (613) 591-8338 (Residence)
Kanata, Ontario (613) 608-0650 (Cell)
K2M 2H4 [email protected] (email)
Managed Project from Implementation (construction, monitoring and control) to Close Out
phases.
Various Life Cycle Renewal Projects
41,000 sq/ft. roof replacement, $1.2m
Research Lab Upgrades - $750K
Fire Alarm Upgrade, $450K
Exterior Brick Repair/Shaft Leakage
Fume Hood Fan upgrade/relocation, $535K
Various equipment replacement, including room retrofits, $5m
Health and Safety upgrades (Emergency Eye Wash Stations and Emergency Shower Stations
Upgrading of medical gas lines, alarm panels and shutoff valves located in the ICU of the
UOHI.
Managed these Projects from Implementation (construction, monitoring and control) to
Close Out phases.
OTTAWA HOSPITAL - CIVIC/GENERAL/RIVERSIDE CAMPUSES
RENOVATIONS COORDINATOR (2003 TO 2007)
Diagnostic Equipment (DI) Replacement Project - Total Project Cost - $5.7 Million
This project involved the removal of existing equipment, room retrofit and installation of new DI
equipment, including all electrical / mechanical requirements (7 imaging suites, 4 Angio Suites)
over the three campuses.
This project required the rectification of some major issues with the power requirements of the
equipment and the integration into the building infrastructure.
Managed Projects from Implementation (construction, monitoring and control) to Close Out
phases.
40 Bed In-Patient Ward Renewal
This project involved upgrades to all the patient rooms and associated areas, including medical
gases and nurse call systems
Managed Projects from Implementation (construction, monitoring and control) to Close Out
phases.
Pneumatic Tube Replacement - Total Project Cost - $5 Million
This project involved the replacement of the existing pneumatic tube system.
All components of this system were changed in this project.
Existing tubing was oval, new was 6” round, new piping routes needed to be found.
55 stations were replaced in 12 buildings at the Civic Campus.
Managed Projects from Implementation (construction, monitoring and control) to Close Out
phases.
MICHELE EMOND 1Thunderbird Crescent (613) 591-8338 (Residence)
Kanata, Ontario (613) 608-0650 (Cell)
K2M 2H4 [email protected] (email)
Facilities Management/Project Management Responsibilities/Experience/Acquired Knowledge
gained from the following noted opportunities:
Managed projects thru all phases (initiation, planning, execution, control, close-out)
Liaise with Client Departments to development Project Program of Requirements.
Work directly with consultants and internal clients to develop project plans/documentation.
Develop and author Request for Proposal Documents
Review and interpret plans and specifications supplied by consultants.
Develop work plan schedules.
Prepare contract tender documents.
Management of contract documents.
Negotiate changes and additions to contract agreements with consultants, contractors and suppliers.
Prepare project plans.
Prepare project estimates and budgets.
Monitor and manage construction budgets and schedules and reporting progress to senior
management.
Lead at construction and user group meetings.
Issued Change Order Notices, Change Orders, Cash Allowances
Issued payment for contractor and supplier invoices.
Conduct ongoing inspections throughout the course of a project to ensure conformance to code and
quality assurance and prepare deficiency lists for the contractors.
Extensive knowledge gained by working within a Facility Maintenance Management Team
Managed and monitored maintenance staff
Managed and monitored maintenance budgets
Work directly with internal management staff to accomplish set out tasks/projects.
Hire contractors to carry out physical changes as required.
Mediate situations, to resolution, between Facilities Management and Client Groups.
Preparation and implementation of building life cycle renewal plans and budgets
Management of several large program moves including relocation of large and sensitive equipment
Supervise a staff of construction supervisors and architectural draftspersons
Knowledgeable in Ontario Occupational Health and Safety Regulations
OTTAWA HOSPITAL - CIVIC/GENERAL CAMPUS
ARCHITECTURAL PLANNER (May 1988 TO August 2003)
EDUCATION/ACHIEVEMENTS
Project Management Certificate (2007)Algonquin College, Ottawa, Ontario
Member of Project Managers Institute (PMI)
MICHELE EMOND 1Thunderbird Crescent (613) 591-8338 (Residence)
Kanata, Ontario (613) 608-0650 (Cell)
K2M 2H4 [email protected] (email)
Architectural Engineering Technology Diploma (1983)
Saskatchewan Technical Institute, Moose Jaw, Saskatchewan
Secret Security Clearance valid until Feb 2025.
Received the Saskatchewan Association of Architects Proficiency Award
Working to finalize Project Management Professionals Designation (PMP) with PMI
CONTINUING PROFESSIONAL DEVELOPMENT AND AQUIRED SKILLS
University level Computer Science courses
Leadership Development Institute (LDI) Training
Performance Management Training
Asbestos Awareness Training
Mould Awareness Training
Fall Arrest Training
Service Quality and Excellence training (for providing services to clients)
Team Leader - Service Quality
Several AutoCAD training courses
Proficient with Windows, MS Word, Excel, MS Project and WordPerfect
WHIMS Training
Knowledge of Occupational Health and Safety Regulations
Co-Chair and Certified Lvl 2 Member of Occupational Health and Safety Committee
Knowledge of Ontario Building, Fire and Electrical Codes