RESUME Jitendra Kumar Dubey B-402, Ravindra Heights, Titwala (East), Mumbai, INDIA Pin code- 421605 Mobile: +91 8174967050 +91 9699824490 Email: [email protected] [email protected] Professional Summary Working as the Safety Officer (SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE) with multiple roles on a construction barge(1 Mas 300, Swiber Conquest, Swiber Victories, Ulswater) & prosess platform (Zawtika, Myanmar). Conducting safety council meetings coordinate and conduct drills, regulatory inspections / monitoring and training. I facilitate pre-tour meetings, toolbox talks, HazCom, risk assessment & behavioral safety programs. Conducting periodic test of all H2S/CH4 Gas monitors system including portable and inspection of LSA & FFE. Goal To create an accident free environment where people can work freely and safely, by identifying Hazards and by taking immediate action to eliminate or reduce its potential as reasonably as practicable. Education Qualifications Secondary School Examination from Utter Pradesh Education Board, India in the year Jun 2002. Higher Secondary School in Science & math from Uttar Pradesh Education Board, India, (year Jun 2004). Bachelor Degree in Art from V.B.S. Purvanchal University (Jun 2004 to May 2007 ) Technical Qualifications Diploma in Fire and Safety from ANNA MALAI University in 2010. Professional Training Undertaken NEBOSH IGC & OSHA (General Industry) 30 Hours

Resume (Jitendra dubey)

Embed Size (px)

Citation preview

Page 1: Resume (Jitendra dubey)

RESUME Jitendra Kumar Dubey B-402, Ravindra Heights, Titwala (East),Mumbai, INDIAPin code- 421605Mobile : +91 8174967050 +91 9699824490Email: [email protected] [email protected] Summary

Working as the Safety Officer (SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE) with multiple roles on a construction barge(1 Mas 300, Swiber Conquest, Swiber Victories, Ulswater) & prosess platform (Zawtika, Myanmar). Conducting safety council meetings coordinate and conduct drills, regulatory inspections / monitoring and training. I facilitate pre-tour meetings, toolbox talks, HazCom, risk assessment & behavioral safety programs. Conducting periodic test of all H2S/CH4 Gas monitors system including portable and inspection of LSA & FFE.Goal

To create an accident free environment where people can work freely and safely, by identifying Hazards and by taking immediate action to eliminate or reduce its potential as reasonably as practicable.Education Qualifications

Secondary School Examination from Utter Pradesh Education Board, India in the year Jun 2002. Higher Secondary School in Science & math from Uttar Pradesh Education Board, India, (year

Jun 2004). Bachelor Degree in Art from V.B.S. Purvanchal University (Jun 2004 to May 2007 )

Technical Qualifications

Diploma in Fire and Safety from ANNA MALAI University in 2010.

Professional Training Undertaken

NEBOSH IGC & OSHA (General Industry) 30 Hours

OPITO approved BOSIET (Basic Offshore Safety Induction and Emergency Training) which includes;

Sea survival Training

Offshore Fire Fighting Training

First Aid Training

HUET (Helicopter Underwater Egress Training)

IT Skills

Proficient in MS Office, Excel & PowerPoint

Page 2: Resume (Jitendra dubey)

Duties & Responsibilities:

Implementing and complying Project HSE Plan and Procedures.

Preparing daily, monthly and annual HSE documents.

Conduct and coordinate HSE Committee meeting on monthly basis.

Conduct daily random site inspections, to identify unsafe acts, conditions and hazards, make reports based on observations, report to HSE Manager.

Conducting Mock Drills and creating Safety awareness in staff and workers.

Focal point between Swiber Team and Other Subcontractors onsite (SIMOPS). Conduct SSHE observation and complete the unsafe act/condition report form as required. Conducting the HSE Induction Course for all newly arriving personnel. Conduct regular safety talks covering pertinent topics / Toolbox Meetings for Swiber Team Oversee the investigation and reporting of all accidents and incidents to the project manager

and the HSE manager. Record HSE statistics and report SSHE activities on weekly basis to the SSHE Manager. Participate SSHE meetings and make suggestions. Coordinate Weekly SAFETY Awards.

Work History:

Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPOREProject: WO-15 Pipeline Project, ONGC field (India)Client: ONGC IndiaDesignation: Barge Safety officerDuration: 15 April 2015 to 28 May 2015.

Project Description: Installation of approximately 28 km section of 14” dia pipeline from BPB to WO 16, including replacement of abandoned head pull cable, recovering of 14’’ dia pipeline ,SSIV cage installation with fabrication and installation of 14’’ spool. Installation of approximately 21 km section of 8’’ dia pipeline from WO 5 to WO-15 including fabrication and installation of spool. Recovery of 12’’ dia pipeline and complete the remaining 30 joints at WO-5 to WO-15.

Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPOREProject: Su Tu Nau Development Project, Vietnam.Client: CLJOC Vietnam. Designation: Barge Safety officer Duration: 21 July 2014 to 01 October 2014.

Project Description:Work scope under the Su Tu Nau contract covered detailed engineering procurement construction, transportation and installation, hook up commissioning of two wellhead platforms namely Su Tu Nau north and Su Tu Nau south, in addition PTSC M&C will provide modification work for existing

Page 3: Resume (Jitendra dubey)

platform (WHP-A, WHP-B Su Tu Varg central processing platform) and 37-mile (60Km) of pipeline including riser guard and spool installation at WHP-B & WHP -A.

Company: HALLIN CORPORATE SERVICE PTE LTD, SINGAPORE

Project: REPAIR THE MAIN UMBILICAL, INSTALL INFIELD UMBILICAL AND FLOWLINE. AT G-1 FIELD GODAVARI BASIN, KAKINADA, INDIA. (Oil & Natural Gas Corporation, India)Designation : Safety officerDuration : 14 June 2014 to 18 July.Project Description: Subsea 7 has completed the two phases of offshore campaign in March –May 2012 & 2013 and returns in 2014 to repair the main umbilical, install infield umbilical & flowline; associated hardware and pre-commissioning work. The project has employed construction vessel Hallin Ullswater for offshore support.

Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE

Project: PIPELINE POST TRENCHING AND JET SLED RECOVERY AT TALI FIELD, BRUNEI (Brunei Shell Petroleum) Designation : Safety officerDuration : 14 May 2014 to 24 May 2014.Project Description: The project involves 8’’ dia pipeline post trenching from Tali booster station (E36) to SEPP01-PID2063 and 8’’ dia pipeline jet sled salvage from Tali booster station (E36) to SEPP01-PID2063.

Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE

Project: Drying and N2 Packing of 28” export Pipe Line (ZPQ platform) Zawtika Field, Myanmar)Client: PTTEP Myanmar.Designation: Safety officerDuration: 07th December 2013 to 10th March 2014.Project Description: The scope of work includes drying an N2 packing of existing 28” pipe line from ZPQ process platform to ZOC at Yangon, Myanmar.

Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE

Project: Pipe Laying Work (TOTAL Field, Indonesia)Client: Total Indonesia. Designation: Barge Safety officer Duration: August 2013 to November 2013.Department: HSE.

Project Description:The scope of work for the contract having Engineering, Procurement, Supply, Construction, Installation, Pre-commissioning and Commissioning assistance for: 16" Pipeline 5.483 km with Expansion Spool from WPS2 to MWPS at Sisi Field, 16" Pipeline 7.366 km with Expansion Spool from

Page 4: Resume (Jitendra dubey)

WPN3 to MWPN at Nubi Field and 20" Pipeline 3.326 km with Expansion Spool from SWPJ to MWPA at Peciko Field.

Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE

Project: Cluster 7 Project (Pipe Laying work), ONGC Field Mumbai. IndiaDesignation: Barge Safety officer Duration: Feb.2013 to May 2013.Department: HSE.Project Description:The subsea project involves 116.5 kilometers of infield subsea pipelines comprising: 16-kilometre, 12-inch oil pipeline between the B-178-A and B-193-A wellhead platforms.7.5-kilometre, eight-inch oil pipeline from B-179-A to B-178-A. 5.5 km,12-inch oil pipeline from B-172-A to B-178-A. 16.5-kilometre,10-inch oil pipeline from B-28A-A to B-193-A. 23-kilometrs,12-inch pipeline from B-23A-A to B-193A, with a lateral near the B-28A platform for gas.28-kilometre, 16-inch gas pipeline between the B-193-A and BCP-B platforms. 20 kilometre,12-inch gas pipeline from B-193-A to tie into the Heera pipeline.

Company: JMC Projects India Ltd.

Project: Bhiwandi Fly-over Bridge, Mumbai Client: Mumbai Metropolitan Region Development Authority.Place: Bhiwandi, MumbaiDuration: From Jun 2012 to Feb 2013.Project Description:Mumbai Metropolitan Region Development Authority (MMRDA) proposed to construction of 1.2 km long two lane Flyover Bridge at Bhiwandi - Wada road, Mumbai.

Company: Pratibha Industries Ltd.

Project : Modak Sagar Tunnel Project, Mumbai.Client : Brihanmumbai Municipal Corporation. (BMC)Position held: Asst. HSE OfficerDuration: From July 2010 to Jun 2012

Project DescriptionThe project involves the construction of 7.5 km long tunnel of 4100 mm diameter with all allied works such as intake and pipe line for transportation of water. The tunnel is laid around 100 meter below the ground level, which will have their intake close to Modaksagar dam, and their outlets within the same existing service and bifurcation chamber at Bell Nallah.

Passport Details

Passport No : G4450333

Date of Expiry : 16.08.2017

Page 5: Resume (Jitendra dubey)

Place of Issue : Lucknow, India.

Personal Profile

Father’s Name : Mr. S.C. Dubey

Date of Birth : 10 March 1986

Gender : Male

Marital Status : Married

Nationality : Indian

Languages Known : English and HindiStrength and Vision:

Excellent interpersonal skills and the ability to work as a contributing team leader

Good verbal and written communication skills to exchange information and give/receive instructions.

Proactive, Confident, Independent & problem solving attitude.

Willingness to take responsibilities and challenges.