13
CV - IZWAN ZAINAL ABIDIN Page 1 of 13 CURRICULUM VITAE 1.0. Personal Particulars 1.1. Name : Izwan Zainal Abidin 1.2. Date of Birth : 22 nd December 1977 1.3. Nationality : Malaysian 1.4. Contact Info : B-6-7, Desa Putra Condominium, Wangsa Maju, 53300 Kuala Lumpur, MALAYSIA Telephone : +60-19-918 1221 Email : [email protected] 1.5. Language : English and Malaysian 1.6. Software : (a) Microsoft Office (Words, Excel, Power Point) (b) Microsoft Project (c) AutoCAD (d) SAP 1.7. Speciality : Power Plant’s Operations and Maintenance, Project Management, Marketing and Procurement 2.0. Academic Qualifications 2.1. 1997 - 2000 : B. Sc Electrical Engineering (CGPA : 3.149) Southern Illinois University at Carbondale, Illinois, USA 2.2. 1995 - 1997 : American Associate Degree (CGPA : 2.55) MARA Community College, Kuantan, Pahang, MALAYSIA 2.3. 1993 - 1994 : Sijil Pelajaran Malaysia [SPM] (Aggregate : 16) Secondary School (High Level) Maktab Rendah Sains MARA Kota Bharu, Kelantan, MALAYSIA 2.4. 1990 - 1992 : Sijil Rendah Pelajaran [SRP] (Aggregate : 6) Secondary School (Medium Level) Sekolah Menengah Lembah Keramat, Kuala Lumpur, MALAYSIA 3.0. Employment Experiences 3.1. February 2016 - now : MUSTEQ Hydro Sdn Bhd, MALAYSIA Position : Senior Plant Manager 3.2. January 2015 to January 2016 : EDEN Inc. Bhd, MALAYSIA (Public listed company) Position : Senior Manager, Energy Sector 3.3. January 2014 to December 2014 : PKNP-WAZAN Holdings Sdn Bhd, MALAYSIA Position : Project Manager 3.4. January 2012 to December 2013 : WAZAN Energy Sdn Bhd, MALAYSIA Position : Project Manager 3.5. January 2010 to December 2011 : WAZAN Energy Co. Ltd, SUDAN Position : Country Manager 3.6. March 2008 to December 2009 : WAZAN Corporation Sdn Bhd, MALAYSIA Position : Project Manager 3.7. May 2000 to December 2007 : ZANWA Sdn Bhd, MALAYSIA Final Position : Chief Operating Officer

Resume Izwan Feb 2017

Embed Size (px)

Citation preview

Page 1: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 1 of 13

CURRICULUM VITAE

1.0. Personal Particulars

1.1. Name : Izwan Zainal Abidin

1.2. Date of Birth : 22nd

December 1977

1.3. Nationality : Malaysian

1.4. Contact Info : B-6-7, Desa Putra Condominium, Wangsa Maju,

53300 Kuala Lumpur, MALAYSIA

Telephone : +60-19-918 1221

Email : [email protected]

1.5. Language : English and Malaysian

1.6. Software : (a) Microsoft Office (Words, Excel, Power Point)

(b) Microsoft Project

(c) AutoCAD

(d) SAP

1.7. Speciality : Power Plant’s Operations and Maintenance, Project Management, Marketing and Procurement

2.0. Academic Qualifications

2.1. 1997 - 2000 : B. Sc Electrical Engineering (CGPA : 3.149)

Southern Illinois University at Carbondale, Illinois, USA

2.2. 1995 - 1997 : American Associate Degree (CGPA : 2.55)

MARA Community College, Kuantan, Pahang, MALAYSIA

2.3. 1993 - 1994 : Sijil Pelajaran Malaysia [SPM] (Aggregate : 16) – Secondary School (High Level)

Maktab Rendah Sains MARA Kota Bharu, Kelantan, MALAYSIA

2.4. 1990 - 1992 : Sijil Rendah Pelajaran [SRP] (Aggregate : 6) – Secondary School (Medium Level)

Sekolah Menengah Lembah Keramat, Kuala Lumpur, MALAYSIA

3.0. Employment Experiences

3.1. February 2016 - now

: MUSTEQ Hydro Sdn Bhd, MALAYSIA

Position : Senior Plant Manager

3.2. January 2015 to January 2016 : EDEN Inc. Bhd, MALAYSIA

(Public listed company)

Position : Senior Manager, Energy Sector

3.3. January 2014 to December 2014 : PKNP-WAZAN Holdings Sdn Bhd, MALAYSIA

Position : Project Manager

3.4. January 2012 to December 2013 : WAZAN Energy Sdn Bhd, MALAYSIA

Position : Project Manager

3.5. January 2010 to December 2011 : WAZAN Energy Co. Ltd, SUDAN

Position : Country Manager

3.6. March 2008 to December 2009 : WAZAN Corporation Sdn Bhd, MALAYSIA

Position : Project Manager

3.7. May 2000 to December 2007 : ZANWA Sdn Bhd, MALAYSIA

Final Position : Chief Operating Officer

Page 2: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 2 of 13

4.0. Summaries of Employments Experiences

4.1. More than 16 years of working experiences in domestic and international energy and power projects

and works, including green and renewable energy, for utilities, marine and oil & gas sectors.

4.2. Involved in Project Management, Plant Operations and Maintenance Team with experiences in

handling the power plants, substation, clients, consultants, financiers, main contractors, partners,

suppliers, subcontractors and others.

4.3. Experienced with the installation, testing, commissioning and operation procedures of Electrical,

Mechanical & Instrumentation system and equipment, such as transformers, overhead lines, power

cables, switchgears, circuit breakers, control panels, protection system, among others.

4.4. Experienced in various disciplines related to power plants, construction, manufacturing, fabrication,

operation, maintenance and project managements.

- planning, financial and budgeting, engineering, testing, project and financial control, operation,

procurement, marketing, site supervision, testing and commissioning.

5.0. Employment Experiences : MUSTEQ Hydro Sdn Bhd, MALAYSIA (February 2016 to now)

5.1. Background of Company

(a) MUSTEQ Hydro Sdn Bhd is a 100% subsidiary of EDEN Inc. Bhd, a public listed company.

(b) MUSTEQ Hydro is a power plant owner which is involved in the operation and generation of

electricity from the river or hydro potential of Kenerong River in Kelantan, Malaysia, for a

concession period until 2030. The off-taker of the energy generated is TNB, the Malaysia’s

utility company.

5.2. Position Held :- Senior Plant Manager

5.3. Summary of Employment Experiences

(a) Devised detail daily operations, maintenance, financial and procurement planning for the plant.

(b) Performed continuous daily operation and monitoring of the plant.

(c) Prepared the Monthly Report on the power plant for the submission to the Executive Director.

(d) Reviewed and improved various Standard Operating Procedures [SOP], Working Instructions

[WI] and Emergency Response Plan [ERP] for the improvement of plant's operations.

(e) Liaised directly with the federal and states authorities, namely TNB, Setiausaha Kerajaan Negeri

(State Secretary’s Office), Majlis Daerah (Municipality) and other statutory bodies, on matters

related to the operations of the power plant - both the technical and commercial matters.

(f) Trouble-shoot and rectified technical problems and glitches that caused or may cause

interruptions on the daily operations of the plant.

5.4. Accomplishments

(a) Managed to repair and overhaul the plant’s generators and turbines within two months period

(February to April 2016).

(b) Managed to re-energize back the plant in April 2016 after it was not in operational mode since

2014 due to multiple breakdowns and malfunctions.

Page 3: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 3 of 13

6.0. Employment Experiences : EDEN Inc. Bhd, MALAYSIA (January 2015 to January 2016)

6.1. Background of Company

(a) EDEN Inc. Bhd is a public listed company and listed on the Main Board of Bursa Malaysia

(Malaysia’s Stock Exchange).

(b) The company is involved in various businesses sectors, namely the energy, manufacturing, food

& beverage [F&B], tourism, and property sectors.

(c) There are two power plants under the Energy Sector of EDEN, namely LIBARAN Power Station

(60MW MFO-fuel power plant) and MUSTEQ Hydro (20MW hydro power plant).

6.2. Position Held :- Senior Manager, Energy Sector

6.3. Summary of Employment Experiences

(a) Devised monthly operations, maintenance, financial and procurement planning for the power

plants, based on the weekly and monthly reports submitted by the LIBARAN’s and MUSTEQ’s

plant managers.

(b) Performed continuous monitoring of the power plants’ performances based on the

management's yearly planning and targets, through close coordination and constant

communication with the plants' managers and frequent visit to the power plants.

(c) Prepared the Executive Monthly Report on the performances of the power plants for the

submission to the Directors and COO.

(d) Reviewed and improved various Standard Operating Procedures [SOP], Working Instructions

[WI] and Emergency Response Plan [ERP] for the improvement of plants' operations.

(e) Liaised with the federal and states authorities, namely KETTHA (Ministry), Suruhanjaya Tenaga

(Energy Commission), TNB, SESB, Setiausaha Kerajaan Negeri (State Secretary’s Office),

Majlis Daerah (Municipality) and other statutory bodies, on matters related to the operations of

the power plants - both the technical and commercial matters.

(f) Explored other business opportunities as mandated by the Management. This includes

research, evaluation and reviews all the information pertaining to the potential projects, namely

the technical and financial aspects of the projects, and also visited the potential projects' sites.

6.4. Accomplishments

(a) Managed to repair and overhaul the LIBARAN Power Station’s generators and fuel system

within four months period (March to June 2015).

(b) Managed to re-energize back the plant in July 2015 after it was not in operational mode since

2013 due to multiple breakdowns and malfunctions.

(c) Managed to achieve the highest MW output ever for the plant, higher than any other outputs

throughout its 16 years of operation period.

Page 4: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 4 of 13

7.0. Employment Experiences: PKNP-WAZAN Holdings SdnBhd, MALAYSIA (January to December 2014)

7.1. Background of Company

(a) PKNP-WAZAN Holding is a Joint-Venture entity between Perbadanan Kemajuan Negeri

Pahang (PKNP) and WAZAN Corporation Sdn Bhd. PKNP is the investment arm of the state of

Pahang, Malaysia.

(b) The company is granted a 30 years concession for the development of Hydro Power Plants at

seven (7) locations in Pahang, Malaysia

7.2. Position Held :- Project Manager

7.3. Summary of Employment Experiences

(a) Performed pre-feasibility studies on the potential of hydro power plant at Sungai Pahang and

its tributaries rivers.

(b) Carried out detail engagement and discussion sessions with partners, consultants,

manufacturers, suppliers, developers, construction companies and financiers on the

development of the Hydro Power Plants - including visited similar hydro power plants schemes

in Malaysia and other countries, namely England, Scotland, Italy, Slovenia and France.

(c) Evaluated and reviewed the engineering specifications of the hydro equipment, components

and parts, based on information provided by the consultants and manufacturers.

(d) Prepared evaluation reports to the Management on the engineering specifications of the hydro

equipment, components and parts.

(e) Prepared and submitted projected cash flows and other financial matters to the management

and financiers based on the expected performance of the Hydro Power Plants.

(f) Liaised with the federal and states authorities, namely KETTHA (ministry), Jabatan

Pengairan dan Saliran [JPS] (Water and Irrigation Department), Suruhanjaya Tenaga (Energy

Commission), TNB, Menteri Besar's office (Chief Minister’s Office), Majlis Daerah

(Municipality), Pejabat Tanah dan Galian [PTG] (Land Office), Perhilitan (Forestry Department),

and other statutory bodies, on matters related to the application of approval to develop the

hydro power plant - both the technical and commercial matters.

(g) Liaised with financial institutions and venture capitals in raising the necessary financing facilities

for the execution of the projects.

7.4. Accomplishments

(a) Managed to obtain approvals from the federal and state authorities for the implementation and

execution of the projects.

(b) Managed to assist the management to obtain financing facilities from various institutions.

Page 5: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 5 of 13

8.0. Employment Experiences : WAZAN Energy Sdn Bhd, MALAYSIA (January 2012 to December 2013)

8.1. Background of Company

(a) WAZAN Energy - Malaysia is a Mechanical & Electrical contracting company.

(b) The company is a Vendor to Ministry of Finance, Ministry of Defence, PETRONAS, Malaysia

Marine & Heavy Engineering [MMHE], Boustead Heavy Industries Corporation Bhd [BHIC],

Boustead Naval Shipyard Sdn Bhd [BNS], Labuan Shipyard & Engineering Sdn Bhd [LSE], etc.

8.2. Position Held :- Project Manager

8.3. Summary of Employment Experiences

(a) Performed design review on technical and engineering drawings provided by the

manufacturers of equipment and components.

(b) Communication liaison personnel between the company and the clients' representatives.

(c) Organized and managed the company's overall project management activities, including

developed and monitored the projects’ executions, planning and financial, procurement and

materials status, physical works progress, performance of sub-contractors, safety and health

matters.

(d) Organized and managed the overall internal working coordination among the personnel,

products' principals and affiliate companies.

(e) Coordinated with external parties, such as consultants, main contractors, other sub-

contractors and vendors, on the coordination of the overall works.

(f) Prepared the relevant documentation and procedures related to Safety of Site Works :-

Method Statement (MS), Safety Work Procedures (SWP), Job Safety Analysis (JSA), Job

Hazard Analysis (JHA), and Hazard Identification, Risk Assessment and Risk Control (HIRAC).

8.4. Projects Undertaken and Accomplishments

(a) Supply, install and testing of Heating, Ventilation, and Air Conditioning (HVAC) Equipment and

Ducting system for KD Lekir (naval vessel) at Boustead Naval Shipyard [BNS], Malaysia.

(b) Supply Manpower for Installing Onboard and Securing the Recirculating Air Cooling Unit (RAU)

and Air Handling Unit (AHU) for KD Lekir at BNS, Malaysia.

(c) Electrical Cable Services for KD Kasturi (naval vessel) at BNS, Malaysia - Continuity Test,

Insulation Resistance Test, Glanding and Termination of Electrical Cables.

(d) Supply, Install, Testing and Commissioning of 2 Units Battery Charger for KD Kasturi at BNS,

Malaysia.

(e) Supply of electrical engineer and electrical supervisors to BNS for management and supervision

services of refurbishment works onboard of KD Kasturi and KD Lekir.

(f) Replacement of 35 Cells of Nickel-Cadmium batteries for Tanjung Bin Power Plant, Johor,

Malaysia.

(g) Support team to various contractors for oil & gas industries at Malaysia Marine & Heavy

Engineering [MMHE], Labuan Shipyard and Boustead Naval Shipyard.

Page 6: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 6 of 13

9.0. Employment Experiences : WAZAN Energy Co. Ltd, SUDAN (January 2010 to December 2011)

9.1. Background of Company

(a) WAZAN Energy - Sudan is a Mechanical & Electrical contracting company.

(b) The company is a Vendor to PETRONAS Sudan Ltd, PETRONAS Marketing Sudan Limited

[PMSL], White Nile (5B) Petroleum Operating Company - Sudan [WNPOC], and Red Sea

Petroleum Operating Company - Sudan [RSPOC].

9.2. Position Held : Country Manager

9.3. Summary of Employment Experiences

(a) Performed design review on technical and engineering drawings provided by the

manufacturers of equipment and components.

(b) Communication liaison personnel between the company and the clients' representatives.

(c) Organized and managed the company's overall project management activities, including

developed and monitored the projects planning and financial, procurement and materials

status, physical works progress, performance of sub-contractors, safety and health matters.

(d) Organized and managed the overall internal working coordination among the personnel,

products' principals and affiliate companies.

(e) Coordinated with external parties, such as consultants, main contractors, other sub-

contractors and vendors, on the coordination of the overall works.

(f) Witnessed the Factory Acceptance Test for the equipment and components.

(g) Prepared the relevant documentation and procedures related to Safety of Site Works :-

Method Statement (MS), Safety Work Procedures (SWP), Job Safety Analysis (JSA), Job

Hazard Analysis (JHA), and Hazard Identification, Risk Assessment and Risk Control (HIRAC).

9.4. Projects Undertaken and Accomplishments

(a) Feasibility studies on the Uninterrupted Power Supply (UPS) and Automatic Voltage Stabilizer

(AVS) requirements at the PETRONAS Sudan Complex, for NADA Properties Co. Ltd, Sudan.

(b) Feasibility studies on all the electrical components and its operational and safety aspects for

PETRONAS Sudan Complex - Sudan.

(c) Feasibility studies on all the electrical components and its operational and safety aspects of

service stations for PETRONAS Marketing Sudan Limited [PMSL], Sudan.

(d) Supply, install, testing & commissioning of electronics electrical meters, additional electrical,

networking and IT system for PETRONAS Sudan Complex – Sudan.

(e) Explored the opportunity to revive the proposed 266MW Kilo-X Power Plant at Khartoum,

Sudan. The project was initially awarded to Dar-Ikhtisas, a Joint-Venture between Dar of Sudan

and Ikhtisas Group of Malaysia.

Page 7: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 7 of 13

10.0. Employment Experiences : WAZAN Corporation, MALAYSIA (March 2008 to December 2009)

10.1. Background of Company

(a) WAZAN Corporation is a Mechanical & Electrical contracting company, based in Malaysia.

(b) The company is a Vendor to Ministry of Finance, Ministry of Agriculture, International Islamic

University Malaysia, MMC Corporation, Tg Bin Power Plant, Musteq Hydro, Eden Inc. Bhd, Kapar

Energy Ventures, etc.

10.2. Position Held : Project Manager

10.3. Summary of Employment Experiences

(a) Performed design review on technical and engineering drawings provided by the

manufacturers of equipment and components.

(b) Communication liaison personnel between the company and the clients' representatives.

(c) Organized and managed the company's overall project management activities, including

developed and monitored the projects planning and financial, procurement and materials status,

physical works progress, performance of sub-contractors, safety and health matters.

(d) Organized and managed the overall internal working coordination among the personnel,

products' principals and affiliate companies.

(e) Coordinated with external parties, such as consultants, main contractors, other sub-contractors

and vendors, on the coordination of the overall works.

(f) Witnessed the Factory Acceptance Test for the equipment and components.

(g) Prepared the relevant documentation and procedures related to Safety of Site Works :-

Method Statement (MS), Safety Work Procedures (SWP), Job Safety Analysis (JSA), Job Hazard

Analysis (JHA), and Hazard Identification, Risk Assessment and Risk Control (HIRAC).

10.4. Projects Undertaken and Accomplishments

(a) Feasibility Studies on Alternative Energy Generation under Feed-in-Tariff (FiT) for various

clients in Malaysia.

(b) Feasibility Studies on 1 Mega Watt (1MW) Solar Farm for International Islamic University

Malaysia [IIUM] Gombak Campus.

(c) Feasibility Studies on electricity requirement for new mix-development (commercial &

residential) project in Segambut, Kuala Lumpur, including the relocation of existing 275kV and

132kV Over Head Lines (OHL) for Dewan Bandaraya Kuala Lumpur [DBKL], Malaysia.

(d) Feasibility Studies on 8 Mega Watt (8MW) temporary power supply in Tanjung Pelepas Port and

Tanjung Bin Power Plant for MMC Engineering Services Sdn Bhd (subsidiary of MMC Bhd).

(e) Supply, erection, testing & commissioning of 1 x 100kVA 33/0.433kV Station Transformer at

MUSTEQ Hydro Sdn Bhd, Malaysia

(f) The overall electrical overhead lines and reticulation works for Ministry of Agriculture, Malaysia -

Pembangunan Ladang Satelit untuk Program Fidlot Nasional di Taman Kekal Pengeluaran

Makanan [TKPM], Negeri Sembilan Darul Khusus (Satellite Farming under the National Feedlot

Program at TKPM).

Page 8: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 8 of 13

10.0. Employment Experiences : WAZAN Corporation Sdn Bhd [March 2008 to December 2009]

10.4. Projects Undertaken and Accomplishments (continue)

(g) Feasibility studies on electrical system for main-contractor of Ministry of Agriculture, Malaysia - Pembangunan Ladang Satelit untuk Program Fidlot Nasional di Taman Kekal Pengeluaran Makanan [TKPM], Negeri Sembilan Darul Khusus (Satellite Farming under the National Feedlot Program at TKPM).

(h) Dismantling, relocating, erecting & testing of 8MVA 33kV Interbus Transformer at Kapar Energy

Ventures [KEV], Malaysia.

(i) Supply, erection, testing & commissioning of 1 x 100kVA 33/0.433kV Station Transformer at

MUSTEQ Hydro Sdn Bhd, Malaysia

(j) Transformer inspection and repair works on 1 x 353MVA 6.6/275kV Power Transformer at

Kapar Energy Ventures [KEV], Malaysia.

(k) Transformer oil filtration process on 1 x 353MVA 6.6/275kV Power Transformer at Kapar

Energy Ventures [KEV], Malaysia.

(l) Erection, testing and commissioning of 2 x 90 MVA 132/33kV Power Transformers at PMU

Pandan Maju, Desa Pandan – Kuala Lumpur, Malaysia for Tenaga Nasional Berhad [TNB]

- Including erection of associated panels, accessories, cabling works, transformer oil

filtration, testing and commissioning.

(m) Feasibility studies on technical aspects of Broadband over Power Line (BPL) for Realm Energy

Sdn Bhd, Malaysia - including demonstration of installation of electrical components on 11kV

incoming feeder.

Page 9: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 9 of 13

11. Employment Experiences : ZANWA Sdn Bhd, MALAYSIA (May 2000 to December 2007)

11.1. Background of Company

(a) ZANWA is a manufacturer of Power Transformer under the license of SIEMENS AG, Germany.

In addition, it is also a Mechanical & Electrical contracting company.

(b) The company was a Preferred Vendor for Tenaga Nasional Berhad [TNB]

11.2. Position Held :

(a) March 2006 to December 2007 - Chief Operating Officer & Chairman of Safety Committee.

(b) August 2004 to February 2006 - Manager of Marketing & Project Department

(c) July 2002 to July 2004 - Head of Procurement Section

(d) June 2001 to June 2002 - Assistant Head of Engineering & Testing Department

(e) May 2000 to May 2001 - Engineer of Engineering Department

11.3. Summary of Employment Experiences

(a) Chief Operating Officer (March 2006 to December 2007)

Report directly to the Managing Director.

Established quarterly macro-planning for every department in order to ensure that the

company’s vision, mission and time line are achievable.

Streamlined all the departments’ responsibilities, tasks and job scopes in order to improve

the company’s efficiency and productivity.

Monitored, guided and worked with the Senior Managers and Managers in maximizing the

company’s resources and capabilities, while minimizing and eliminating all the unnecessary

expenses, problems and delays.

Represented the Company on the operational matters during the Annual General Meeting

(AGM) and other meetings called upon by the Shareholders.

Prepared Monthly Management Reports for submission to the Shareholders.

(b) Chairman of Safety Committee (March 2006 to December 2007)

Chaired the Company’s Safety Committee in implementing and overseeing the safety and

health regulations in all the Company’s activities and workplaces, including provided proper

safety & health trainings to all personnel.

Liaised with the Department of Safety and Health (DOSH) officers and other authorities in

regards to safety and health inspections, and renewal of permits for the Company’s

overhead cranes and air compressors.

Prepared and formalized the Company’s Safety & Health Handbook for internal application

and reference.

Continuously recommended to the Managing Director and the management on the safety

improvement needed on all the working procedures, tools, machineries and spaces. This is

to ensure that the safety and health of all the personnel are properly protected.

Page 10: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 10 of 13

11.0. Employment Experiences : ZANWA Sdn Bhd, MALAYSIA (May 2000 to December 2007)

11.3. Summary of Employment Experiences (continue)

(c) Manager of Marketing & Project Department (August 2004 to February 2006).

Coordinated all the works related to marketing, projects implementation, and all the

tendering processes internally with the company’s personnel, and externally with Clients.

Reviewed and streamlined the department’s procedures, responsibilities, tasks and job

scopes in order to improve the Company’s efficiency.

Coordinated and attended meetings with management and Clients, particularly on matters

related to tendering, price negotiation, pre-award, award, kick-off, site-handover, progress,

audits and commissioning meetings.

Management Representative (MR) for the Department for the ISO 9001:2000

implementation,

(d) Head of Procurement Section (July 2002 to July 2004).

Coordinated all the works related to Procurement Department, all the procurement

processes internally with the company’s personnel, and externally with vendors and

suppliers.

Reviewed, improved and streamlined the department’s procedures, responsibilities, tasks

and job scopes in order to improve the Company’s efficiency - budgeting; implementation of

procurement policies, monitoring and control; storage area and arrangements; logistics

arrangement; incoming of materials; disbursement and releasing of materials to the

applicants; payment application process; and evaluation of suppliers and vendors.

Coordinated and attended meetings with management, auditors, suppliers and vendors,

particularly on matters related to stock-take, products demonstration, pre-award, technical

clarification and award meetings of procurement processes.

Management Representative (MR) for the department for the ISO 9001:2000

implementation,

(e) Assistant Head of Engineering & Testing Department (June 2001 to June 2002).

Day-to-day planning and monitoring of the department’s activities and personnel, including

vetted and scrutinized all the engineering and technical drawings prior to recommending for

internal approval by Head of Engineering Department,

Initiated technical enhancement and improvement in order to minimize the overall product

realization cost, i.e. alternative processes and tools to improve production flows, etc.

Liaised with the Technical Provider [SIEMENS-KPT, Croatia] pertaining to the power

transformer technical matters.

Liaised with Quality Assurance Department in witnessing Factory Acceptance Test (FAT)

and physical checks on materials procured from suppliers and vendors; and attending the

pre-award, technical clarification and award meetings on technical matters related to

procurement and engineering aspects.

(f) Engineer of Engineering Department (May 2000 to May 2001)

Provided support to the Head and Assistant Head of Engineering Department in all

engineering matters, particularly on the electrical design scopes.

Prepared weekly progress reports for submission to the Assistant Head of Engineering

Department.

Prepared technical documentations and particulars for all the tendering, production and

procurement activities.

Page 11: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 11 of 13

11.0. Employment Experiences : ZANWA Sdn Bhd, MALAYSIA (May 2000 to December 2007)

11.4. Projects Undertaken and Accomplishments

(a) Manufacturing, supply, install, testing and commissioning 2 Units of 90 MVA 132/33kV GIS

Power Transformers for TNB - PMU Bukit Raja, Selangor, Malaysia.

(b) Manufacturing, supply, install, testing and commissioning 2 Units of 30 MVA 132/11kV GIS Power

Transformers for TNB - PMU Bukit Raja, Selangor, Malaysia.

(c) Manufacturing, supply, install, testing and commissioning 2 Units of 30 MVA 132/11kV GIS

Power Transformers for TNB - PMU UKM Bangi, Selangor, Malaysia.

(d) Manufacturing, supply, install, testing and commissioning 1 Unit of 30 MVA 132/11kV GIS Power

Transformers for TNB - PMU Alor Setar, Kedah, Malaysia.

(e) Manufacturing, supply, install, testing and commissioning 1 Unit of 90 MVA 132/33kV GIS Power

Transformers for TNB - PMU Alor Setar, Kedah, Malaysia.

(f) Reengineering and refurbishment of 1 Unit of 90 MVA 132/33kV Power Transformer for TNB -

PMU Shah Alam South, Malaysia.

(g) Reengineering and refurbishment of Unit No. 1 of 8 MVA 12/3.3kV Transformer for TNB - Port

Dickson Power, Negeri Sembilan, Malaysia.

(h) Reengineering and refurbishment of Unit No. 2 of 8 MVA 12/3.3kV Transformer for TNB - Port

Dickson Power, Negeri Sembilan, Malaysia.

(i) Reengineering and refurbishment of Unit No. 1 of 10 MVA 12.5/6.9kV Transformer for TNB -

Stesen Janakuasa Sultan Iskandar, Pasir Gudang, Johor, Malaysia.

(j) Reengineering and refurbishment of Unit No. 2 of 10 MVA 12.5/6.9kV Transformer for TNB -

Stesen Janakuasa Sultan Iskandar, Pasir Gudang, Johor, Malaysia.

Page 12: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 12 of 13

12.0. Professional Training & Courses Attended

12.1. Year 2007 - 2015

(a) Hydro Power Plant Construction at Aceh, Indonesia.

(b) Hydro Power Plant Operation Courses with Scottish Hydro at Invergarry Dam, Dundreggan Dam and Foyer Hydro Electric Powerhouse at Loch Ness, Scotland

(c) Testing Course of Hydro Turbine - Turbo Institute, Slovenia

(d) Safety Induction Courses - Boustead Naval Shipyard - Perak, Malaysia

(e) Safety Orientation Courses - Tenaga Nasional Berhad [TNB], Malaysia.

(f) Safety Induction Courses - Kapar Energy Ventures Berhad [KEV], Selangor, Malaysia.

(g) Safety Induction Courses - Tg Bin Power Plant - Malakoff Berhad, Johor, Malaysia.

(h) Safety Induction Courses - PETRONAS Sudan Complex, Khartoum - Sudan.

(i) Construction Industry Development Board [CIDB] Courses - Malaysia.

(j) National Institute for Occupational Safety and Health [NIOSH] Courses - Malaysia.

(k) Transformer and Electrical Design - Ukrainian Transformer Institute [OSC-VIT]

12.2. Year 2006

(a) International Exhibition of Electrical and Industrial Electronics Industry (ELECRAMA-2006), Mumbai, India.

(b) Technical and commercial study visit to Crompton Greaves Ltd [CGL], Mumbai, India.

(c) MRcademy Kuala Lumpur 2006 – Bringing New Heights to Power Industry (Reinhausen Asia-Pacific Sdn Bhd), Kuala Lumpur, Malaysia.

(d) Occupational Safety and Health Act 1994 (OSHA - NIOSH), Selangor, Malaysia.

12.3. Year 2005

(a) Internal 5S training, ZANWA Sdn Bhd, Malaysia.

(b) MR-Transform Transformer Seminar, Pattaya, Thailand.

(c) Technical and commercial study visits to Ukrainian Transformer Institute [OSC-VIT] and

Zaporozh Transformator factory, Zaporizhzhya, Ukraine

12.4. Year 2004

(a) Technical study visit to CharoenChai Transformer Co. Ltd and Tira Thai (Transformer) Co. Ltd, Bangkok, Thailand.

(b) Inventory and Store Management at FMM Institute of Manufacturing, Malaysia.

12.5. Year 2003

(a) Technical and commercial study visits to ALSTOM Electrical Endustrisi A.S., Gebze, Turkey.

(b) Technical and commercial study visits to BEST Transformer, Balikesir, Turkey.

(c) Technical and commercial study visit to Crompton Greaves Ltd [CGL], Mumbai, India.

(d) Internal ISO 9001-2000 audit training, ZANWA Sdn Bhd, Malaysia.

12.6. Year 2002

(a) Technical transformer training at SIEMENS-KPT, Croatia.

(b) Technical and commercial study visits to Crompton Greaves Ltd [CGL], Mumbai and Bharat Heavy Electrical Ltd [BHEL], New Delhi and Bhopal, India.

12.7. Year 2001

(a) OSH Management System [SMIDEC], Kuala Lumpur, Malaysia.

(b) Technical and commercial study visits to Triangle Group, Power Grid Company of Bangladesh Ltd and Bangladesh Power Development Board [BPDB], Bangladesh.

12.8. Year 2000

(a) Workshop on AFTA 2003, Bank Pembangunan, Kuala Lumpur, Malaysia.

(b) Technical transformer intensive training at SIEMENS-KPT, Croatia.

Page 13: Resume Izwan Feb 2017

CV - IZWAN ZAINAL ABIDIN Page 13 of 13

13.0. References

13.1. First Reference

Mrs Wan Absah Wan Kadir

Human Resource Manager,

ZANWA Sdn Bhd, MALAYSIA

Telephone : +60-12-210 2001

13.2. Second Reference

Mr. Aznisyam

Senior Manager – Finance,

EDEN Inc Bhd, MALAYSIA

Telephone : +60-12-380 5766