Resolving Supplier Capacity Overloaded Exception Message_SPD

Embed Size (px)

Citation preview

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    1/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Department

    Responsibility/Role

    File Name 27637169.doc

    Revision

    Document Generation Date 15/01/2010 09:49:00

    Date Modified 1/15/2010 09:49:00 AM

    Last Changed by

    Status

    Resolving Supplier Capacity Overloaded Exception MessageTrigger:

    Concept

    In this topic, you will resolve Supplier capacity overloaded exception message.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/15/2010 09:49:00 AM Page 1

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    2/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Procedure

    Step Action

    1. Begin by navigating to the Exception Details page.

    Click the Workbench link.

    Page 2 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    3/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    2. Use the Organizations page to select an instance:organization.

    Last changed on: 1/15/2010 09:49:00 AM Page 3

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    4/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    3. Find organization TST:M1 TST:Seattle Manufacturing.

    Click the vertical scrollbar.

    Step Action

    4. Click the TST:M1 TST:Seattle Manufacturing list item.

    Page 4 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    5/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    5. Click the OKbutton.

    orPress [Alt+O].

    Last changed on: 1/15/2010 09:49:00 AM Page 5

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    6/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    6. Click the Plans tab.

    Page 6 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    7/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    7. Use the Navigator page, Plans tab to view and act on results from the

    material/capacity plan.

    Step Action

    8. Click the View By list.

    Last changed on: 1/15/2010 09:49:00 AM Page 7

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    8/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    9. Click the Actions list item.

    Page 8 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    9/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    10. Click the Plans tree item.

    Step Action

    11. Find plan Unconstrnd.

    Click the vertical scrollbar.

    Last changed on: 1/15/2010 09:49:00 AM Page 9

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    10/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    12. Click the Unconstrnd tree item.

    Page 10 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    11/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    13. Click the (current) tree item.

    Step Action

    14. Find exception group Material and Resource Capacity.

    Click the vertical scrollbar.

    Last changed on: 1/15/2010 09:49:00 AM Page 11

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    12/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    15. Click the Material and Resource Capacity tree item.

    Page 12 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    13/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    16. Click the Supplier capacity overloaded tree item.

    Step Action

    17. Click the TST:M1 tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 13

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    14/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    18. Click the CM66321 tree item.

    Page 14 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    15/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    19. Right-click the CM66321 tree item.

    Step Action

    20. Click the Exceptions menu.

    Last changed on: 1/15/2010 09:49:00 AM Page 15

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    16/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    21. Click the Detail menu.

    Page 16 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    17/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    22. Use the Exception Detailspage to view exception details.

    Step Action

    23. Click in the Exception field.

    Last changed on: 1/15/2010 09:49:00 AM Page 17

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    18/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    24. Click the Suppliers button.

    orPress [Alt+S].

    Page 18 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    19/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    25. Use the Supplier Capacity page to view supplier capacity.

    Last changed on: 1/15/2010 09:49:00 AM Page 19

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    20/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    26. View the supplier capacity for the supplier of the item in the exception message.

    Click the Minimize object.

    Step Action

    27. Click the Supply/Demand button.

    orPress [Alt+u].

    Page 20 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    21/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    28. Use the Supply page to view the planned orders that place the requirements for theitem on the supplier.

    Last changed on: 1/15/2010 09:49:00 AM Page 21

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    22/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    29. Find the planned orders that occur on the date referenced in the exception message.

    Click the vertical scrollbar.

    Step Action

    30. View those planned orders and their quantities.

    Click the Maximize object.

    Page 22 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    23/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    31. Select one of the planned orders and expand and review the pegging tree for it.

    Click the tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 23

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    24/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    32. Continue to expand and review the pegging tree.

    Click the tree item.

    Page 24 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    25/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    33. Continue to expand and review the pegging tree.

    Click the tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 25

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    26/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    34. Continue to expand and review the pegging tree.

    Click the tree item.

    Page 26 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    27/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    35. Continue to expand and review the pegging tree.Click the tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 27

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    28/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    36. Click the Minimize object.

    Step Action

    37. Click the View By list.

    Page 28 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    29/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    38. Click the Suppliers list item.

    Last changed on: 1/15/2010 09:49:00 AM Page 29

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    30/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    39. Click the Plans tree item.

    Step Action

    40. Find plan Unconstrnd.

    Click the vertical scrollbar.

    Page 30 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    31/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    41. Click the Unconstrnd tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 31

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    32/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    42. Find supplier Allied Manufacturing (SAN JOSE).

    Click the vertical scrollbar.

    Step Action

    43. Click the Allied Manufacturing (SAN JOSE) tree item.

    Page 32 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    33/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    44. Click the COMPONENT.ELECTRICAL tree item.

    Last changed on: 1/15/2010 09:49:00 AM Page 33

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    34/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    45. Click the CM66321 tree item.

    Step Action

    46. Click the Horizontal Plan button.

    Page 34 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    35/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    47. Use the Horizontal Plan page to view plan information in a horizontal format.

    Last changed on: 1/15/2010 09:49:00 AM Page 35

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    36/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    48. Click the Maximize object.

    Step Action

    49. Find and review the horizontal plan column that corresponds to the exceptionmessage that you are researching.

    Click the horizontal scrollbar.

    Page 36 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    37/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    50. Click the Minimize object.

    Last changed on: 1/15/2010 09:49:00 AM Page 37

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    38/39

    System Process DocumentResolving Supplier Capacity Overloaded ExceptionMessage

    Step Action

    51. You can check other information.

    Check to see if these exceptions cause Late replenishment for sales order or Late

    replenishment for forecast exception messages; right click the exception messageand select Related Exceptions.

    In the Planner Workbench, Exception Details window, sort the Late replenishment

    for sales order and Late replenishment for forecast exception messages by your

    priority, for example, days late or demand priority.

    Check to see if a resource capacity issue caused early processing of the supply

    order that resulted in the material constraint.

    To resolve the exception message, consider these options and execute at least one

    of them:

    Adjusting sales order line schedule date Adjusting forecast entry date

    Adjusting supplier capacity

    Using an alternate supplier

    Using a substitute component: In unconstrained plans, make a manualsubstitution.

    Arranging and recording new substitute items

    Increasing supplier flexfences

    Changing the sales order or forecast quantity

    Modifying the sourcing rule: For example, change sourcing percentage

    Changing lead-time

    Page 38 Last changed on: 1/15/2010 09:49:00 AM

  • 8/14/2019 Resolving Supplier Capacity Overloaded Exception Message_SPD

    39/39

    System Process DocumentResolving Supplier Capacity Overloaded Exception

    Message

    Step Action

    52. You have successfully resolved Supplier capacity overloaded exception message.

    End of Procedure.