Reference
18/N8514
Prepared By
C. Ross / N. Tonkin
Date
October 2018
REPORT ON THE RESULTS OF A
GEOTECHNICAL SITE
INVESTIGATION FOR THE
PROPOSED HELMSLEY
RESIDENTIAL COUNTRY ESTATE
DEVELOPMENT - BALLITO
October 2018 Davies Lynn & Partners (Pty) Ltd Page ii
Ref. 18/N8514
REVISION HISTORY
Date Rev No. Description Revised By
10/2018 A Creation of New Document C.J.R / N.D.T
October 2018 Davies Lynn & Partners (Pty) Ltd Page iii
Ref. 18/N8514
TABLE OF CONTENTS
1. TERMS OF REFERENCE .................................................................................................................................... 1
2. SCOPE OF WORK ................................................................................................................................................. 1
3. INFORMATION SUPPLIED ................................................................................................................................ 1
4. SITE DESCRIPTION ............................................................................................................................................. 2
5. SUBSURFACE GEOTECHNICAL INVESTIGATION ..................................................................................... 2
6. GEOLOGY AND SUBSOILS ................................................................................................................................ 3
6.1 OVERVIEW ............................................................................................................................................................ 3 6.2 COLLUVIAL TOPSOIL ............................................................................................................................................. 3 6.3 NATAL GROUP SANDSTONE .................................................................................................................................. 3 6.4 DWYKA TILLITE/DIAMICTITE ................................................................................................................................ 4 6.5 POST KAROO DOLERITE ........................................................................................................................................ 5
7. GROUNDWATER .................................................................................................................................................. 6
8. LABORATORY TESTING ................................................................................................................................... 6
9. EXCAVATABILITY .............................................................................................................................................. 8
10. PROPOSED DEVELOPMENT ............................................................................................................................. 9
11. FOUNDING RECOMMENDATIONS ................................................................................................................. 9
11.1 EARTHWORKS .................................................................................................................................................. 9 11.1.1 Excavatability ......................................................................................................................................... 9 11.1.2 Embankment Construction ................................................................................................................... 10
11.2 FOUNDING ...................................................................................................................................................... 11 11.2.1 Founding Conditions ............................................................................................................................ 11 11.2.2 Founding Recommendations ................................................................................................................ 12
12. PROPOSED RESERVOIR SITE ........................................................................................................................ 13
13. PROPOSED WATER TREATMENT WORKS SITE ...................................................................................... 14
14. ROADS ................................................................................................................................................................... 15
14.1 ROAD EARTHWORKS ...................................................................................................................................... 15 14.1.1 Excavatability ....................................................................................................................................... 15 14.1.2 Embankment Construction ................................................................................................................... 15
14.2 ROAD SUBGRADE ASSESSMENT ..................................................................................................................... 16 14.2.1 Subgrade .............................................................................................................................................. 16 14.2.2 Layerworks ........................................................................................................................................... 17 14.2.3 General ................................................................................................................................................ 17
14.3 SUBSOIL DRAINAGE ....................................................................................................................................... 18
15. ENGINEERING SERVICES ............................................................................................................................... 18
15.1 EARTHWORKS ................................................................................................................................................ 18 15.1.1 Excavatability ....................................................................................................................................... 18 15.1.2 Backfill Material Assessment ............................................................................................................... 18
October 2018 Davies Lynn & Partners (Pty) Ltd Page iv
Ref. 18/N8514
APPENDICES
APPENDIX 1 Test Pit Logs
APPENDIX 2 Laboratory Test Results
DRAWINGS 18/N8514-01 Geotechnical Site Plan
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 1
Ref. 18/N8514
1. TERMS OF REFERENCE
Davies Lynn and Partners (Pty) Ltd (DLP) were requested by Bigen Africa (Pty) Ltd to
undertake a Phase 1 Geotechnical Site Investigation for the proposed new Helmsley
Residential Country Estate Development near Compensation, Ballito. The geotechnical
proposal was submitted by Davies Lynn & Partners (Pty) Ltd to Bigen Africa (Pty) Ltd
on 10th
September 2018 and referenced 18/N8514. The quotation was subsequently
accepted and DLP were authorised to proceed with the investigation.
2. SCOPE OF WORK
This report documents the findings of the geotechnical investigation that was carried out
at the site of the proposed new Helmsley Residential Country Estate Development near
Compensation, Ballito.
Accordingly, the scope of this Geotechnical Report is as follows:
▫ to present all the fieldwork and laboratory testing carried out during the
geotechnical investigations;
▫ to assess the geotechnical and geological conditions of the subsoil materials
across the site of the proposed Housing Development with respect to the
development of structures, roads, slope stability and engineering services;
▫ to recommend sound economical development practices and founding guidelines
for the proposed development based on the geotechnical conditions that are
encountered.
3. INFORMATION SUPPLIED
The following information was supplied to Davies Lynn & Partners (Pty) Ltd to assist
with the investigation:
➢ A detailed drawing was provided, titled “Locality Map Project Context”, prepared
by Bigen Africa (Pty) Ltd, dated April 2018, Drawing No. 0938.00AA.01A012.
➢ A Site Layout Plan was provided, titled “Phasing Layout Plan” prepared by
Bigen Africa (Pty) Ltd, dated May 2013, Drawing No. 0938.00ZA.01A014.
➢ A Satellite image was similarly provided with an overlay of the proposed site
layout.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 2
Ref. 18/N8514
4. SITE DESCRIPTION
The proposed Housing Development is located on the Helmsley Farm Compensation,
Ballito.
The proposed Helmsley Residential Country Estate DDevelopment is anticipated to
comprise of three (3No.) Phases with a total of fourty two (42No.) Freestanding
Residential Homes and three (3No.) Planned Unit Development (PUD) Sites. The land
is currently undeveloped and is partially covered by sugar cane plantations and open
undeveloped grassed fields with interspersed shrubs and trees.
Topographically, the site slopes towards the south east, with development mainly
confined along the two (2No) south east trending ridge lines. Slopes vary across the site
from gently sloping ridge lines to moderately to steeply sloping hillside slopes and valley
head areas.
5. SUBSURFACE GEOTECHNICAL INVESTIGATION
The fieldwork for the subsurface geotechnical investigation comprised the following:
i. Excavation, profiling and backfilling of Inspection Pits (IP’s) across the proposed
site. During the investigation, twenty-two (22No.) Inspection Pits (IP’s) were
excavated by TLB to depths ranging between approximately 2m and up to 3.2m
below existing ground levels for the purpose of geotechnical profiling and material
sampling. The logs of the Inspection Pits are presented in Figures 1.1 to 1.22 in
Appendix 1 of this Report.
ii. Twenty-two (22No.) Dynamic Cone Penetrometer (DCP) tests were performed
immediately adjacent to the twenty-two (22No.) Inspection Pits. The DCP tests
were undertaken adjacent to the Inspection Pits in order to assess and correlate the
relative densities of the subsurface materials across site with the profiled
descriptions from the Inspection Pits. The DCP tests were performed to depths of
refusal or to a maximum depth of approximately 3m below existing ground levels.
The DCP test results are presented together with the Inspection Pit logs in Figures
1.1 to 1.22 in Appendix 1 of this report.
iii. Material sampling of representative subsoils was undertaken from the Inspection Pit
excavations and were transported to a commercial soils testing laboratory for Sieve
analyses, Hydrometer analyses, Atterberg Limits, Natural Modified AASHTO
maximum dry density compaction tests and California Bearing Ratio (CBR) tests.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 3
Ref. 18/N8514
Selected undisturbed samples were taken for Collapse and Swell Potential tests.
The results of the Laboratory Tests are included in Appendix 2 of this report.
The locations of the various in-situ tests in relation to the proposed development
are indicated on the Geotechnical Site Plan Dwg. No. 18/N8514-01 enclosed.
6. GEOLOGY AND SUBSOILS
6.1 Overview
The Natal Group Sandstone sequence and its related subsoils mainly underlie the site of
the proposed new development, with Dwyka Group Tillites confined to the south and
south western portions of the site. The Natal Group Sandstone sequence is
approximately 250 to 490 million years old and therefore, over time, has been exposed
to a multitude of different environmental and geological conditions. The geology of the
site is characterised by colluvial topsoil overlying residual clayey subsoils that have
undergone a protracted period of weathering to form a lateritic profile, which in turn
overlie weathered Sandstone bedrock at depth.
6.2 Colluvial Topsoil
The colluvial topsoil horizon comprises slightly moist, dark brown, soft to stiff, silty
SANDY CLAY to moderately clayey SAND which was found to cover the entire site to
depths ranging between approximately 0.2m and up to 1.5m below existing ground
levels. This horizon was found across all three (3No.) Geotechnical Zones.
6.3 Natal Group Sandstone
The majority of the development area is underlain by the Natal Group Sandstones.
Colluvial and residual clayey SAND to SANDY CLAY horizons form the sub-soil cover
of the Natal Group Sandstone bedrock. These soil covers extend to depths of up to 2,2
metres across these portions of the site, with the Hilltop areas consisting of a thinner
colluvial horizon ranging between 0.3m to 1m in depth before weathered, soft to
medium hard rock Sandstone bedrock is encountered.
The depth at which the Sandstone bedrock is encountered across the site, is typically
governed by topographical relief.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 4
Ref. 18/N8514
The subsurface profile typically comprises a dry, pale grey brown, intact, medium
dense, silty fine SAND underlain by a dry to slightly moist, reddish brown to red
mottled orange, nodulised, dense, slightly to moderately clayey SAND (residual
Ferricrete), which in turn underlain by Sandstone bedrock. The bedrock unit typically
occurs either as completely weathered, residual rock, or becomes progressively less
weathered with increasing depth or moderately weathered, hard rock lying close to
surface.
The occurrence of fine grained sandy soils (where collapse potential is possible)
overlying weathered sandstone bedrock, classify the NHBRC founding conditions as
Category C1 (beneath the areas where shallow soils prevail above bedrock), and
Category C2 (where thicker soil cover prevails and the potential for collapse type
settlements exceed 20mm.) These areas shown diagrammatically in Figure D.
Composite Site Classes leading to possible higher differential movements will occur
across cut / fill platforms, where bedrock is exposed in the deeper cut portion and
colluvial and residual soils occur towards the cut / fill line. NHBRC Class R/H2
designations occur where thicker potentially active residual clayey sub-soils occur
overlying the Sandstone bedrock.
6.4 Dwyka Tillite/Diamictite
The Dwyka Group Tillite / Diamictite bedrock is typically found confined to the south
and south-western portions of the site and is generally highly to completely weathered
and of very soft rock strength near the ground surface. Scattered hard corestones and
boulders occur within a silty and clayey residium in certain areas. The soil cover
typically varies between 0,1m and up to 2m depth with topographical variance across
the site.
The NHBRC Site Class Classification in the areas underlain by Dwyka Group Tillite /
Diamictite varies from C1/S1 where shallow sandy and silty colluvium overlies Tillite /
Diamictite bedrock to C2/S2 and / or H2 where deep colluvium / residual soil overlies
bedrock. The NHBRC guidelines Table 3 designates these fine grained soils as
potentially compressible and collapsible where total anticipated soil movements in the
range 5mm to >10mm are possible. Class H2 designations occur where thicker
potentially active colluvial and residual clayey soils occur above the bedrock. The
landform in the area typically requires that cut to fill platforms are undertaken to create
building platforms.
Accordingly, these platforms are likely to expose the Tillite / Diamictite bedrock in the
deeper cut portions of the layout, whilst colluvial and residual soils will be exposed
towards the cut / fill line. The NHBRC class designates are likely to be R/H2 or R/C2,
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 5
Ref. 18/N8514
etc. where Tillite / Diamictite bedrock is exposed in the deep cut portions of the
platforms whilst residual soils are likely to occur adjacent to the cut/fill portion of the
layout.
6.5 Post Karoo Dolerite
Post Karoo Dolerite intrusions were not encountered during the geotechnical site
investigation, however, according to the Geological 1:250 000 map, Dolerite capping is
shown on the elevated north western portion of the site. Residual Dolerite clays are
characteristically expansive and thus prone to heave (swell) and shrinkage movements
in response to moisture level fluctuations.
Saprolitic silty clays often characterise the doleritic residium. These soils are prone to
consolidation settlement under load and hence special founding requirements are
required for development on these soils.
Figure 1: Site Geology according to the 1:250 000 Geological Series.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 6
Ref. 18/N8514
7. GROUNDWATER
No groundwater was encountered across all of the proposed three (3No.) Phases of the
site, during the geotechnical field investigation. Owing to its elevation, the site is
considered to be well drained; however, the rock jointing and soil profile of the
weathered Natal Group Sandstone and/or Dwyka Group Tillite / Diamictite sequence
makes the area susceptible to the development of localized perched water tables,
particularly after heavy rain.
Groundwater seepage was however, encountered in the lower topographical area of the
proposed Waste Water Treatment Works (WWTW) at a depth of approximately 1,5m
below existing ground level. Consideration of this will need to be taken into account
during the design and construction phases of the proposed WWTW.
8. LABORATORY TESTING
In order to classify the major subsoil materials and to assess their suitability for use in
earthworks and road construction, laboratory testing was undertaken on six (6No.)
disturbed and six (6No.) undisturbed samples of soil.
The laboratory testing comprised the following:
▫ Sieve Analyses,
▫ Hydrometer Analyses,
▫ Atterberg limits,
▫ Moisture Contents
▫ Natural Mod. AASHTO maximum dry density compaction tests;
▫ California Bearing Ratio (CBR) tests;
▫ Collapse Potential;
▫ Swell Potential.
A summary of the results of the mechanical size analysis, compaction tests, CBR tests,
Collapse Potential and Swell Potential, are given below with results of the laboratory
testing presented in Appendix 2. The implications of these results, in terms of material
assessment and classification applicable to the proposed development, are briefly
discussed below and, in more detail, subsequently in the relevant sections of this report.
Table 1, overleaf, summarizes the results of the laboratory test results of subsoils
sampled during the geotechnical investigations. Plasticity Indices (PI) of the materials
tested typically ranged between 6% and 33% and Liquid Limits (LL) typically ranged
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 7
Ref. 18/N8514
between 18% and 64%, while the grading moduli ranged between 0.52 and 1.50.
Linear Shrinkages varied from 3% and 14% in the tested subsoils.
Table 1: Summary of Laboratory Test results
Sample No. T12658 T12659 T12660 T12661 T12662 T12663
Field Position IP2 IP4 IP7 IP8 IP11 IP16
Sample Depth
(m)
0m–
1.5m
0.6m–
1.3m
0.7m –
2.0m
0.9m –
2.2m
0.6m–
1.3m
0.6m–
1.6m
Material
Description
Dk.
Grey,
silty
clayey
Sand
Rd. Or.
Brown
sandy
Clay
Pale
Olive
Brown
Gravelly
Clay
Pale Yl
Or. Brown
mod.
Clayey
SAND
Dark
grey Or.
Brown
sandy
silty
CLAY
Rd.
Brown
very
sandy
CLAY
Origin
Colluvial
Topsoil
Residual
Laterite
Residual
Dwyka
Tillite
Residual
Sandstone
Residual
Clay
Residual
Sandstone
Soil M
ortor
% Coarse
Sand
51 19 19 51 6 30
% Coarse
Fine
Sand
15 10 6 9 3 6
%
Medium
Fine
Sand
8 6 8 5 3 4
% Fine
Fine
Sand
6 5 10 3 5 4
% Silt &
Clay
21 60 58 32 82 56
% Clay 9 45 - - 56 38
Liquid Limit % 18 44 26 31 64 41
Plasticity
Index %
6 19 10 12 33 15
Linear
Shrinkage %
3 10 5 6.5 14 8.5
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 8
Ref. 18/N8514
Grading
Modulus
1.33 0.60 1.50 1.28 0.52 0.91
Maximum Dry
Density (kg/m3
)
2062 1812 1976 2020 1823 1836
Optimum
Moisture
Content (%)
8.8 16.2 8.8 10.8 20.6 15.7
CB
R at %
M
od.
AA
SH
TO
100% 22 9.9 21 5.8 1.6 14
98% 18 5.9 13 3.2 1.2 10
97% 17 4.5 10 2.4 1.1 8.6
95% 14 2.7 6.2 1.3 0.8 6.0
93% 12 1.6 3.8 0.7 0.6 4.3
90% 9.3 0.7 1.8 0.3 0.4 2.5
Maximum
Swell (%)
0.0 0.3 0.8 0.7 2.4 0.7
Group Index
Classification
A-1-b(0)
A-7-
6(11)
A-4(0) A-2-6(0)
A-7-
5(26)
A-7-6(5)
TRH 14
Classification
G8 <G10 <G10 <G10 <G10 <G10
Unified
Classification
SM-SC CL SC SC CH ML/OL‡
The colluvial soils exhibited Collapse Potentials in the range of 0.11% to 0.21% for the
samples tested.
The Collapse Potential for the Residual Sandstone materials tested ranged from
between 0.18% and 0.48% with a Swell Potential of the residual Sandstone Clays
sampled at IP 4 of 4.62 kPa.
The residual Tillite / Diamictite Clay sampled at IP 11 exhibited a higher Swell Potential
of 6.32kPa.
9. EXCAVATABILITY
The final depths of the Inspection Pits excavated during the geotechnical investigation
(maximum 3.2m below ground level) gives a good indication of the depth to which
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 9
Ref. 18/N8514
excavations can be carried out with relative ease by a TLB (back-acting excavator) or
similar plant.
Based on the above, as well as engineering experience with subsoils of similar nature,
the classes of excavatability which should be expected and catered for during
excavations into the various materials on site is given below.
The colluvial topsoil and residual Sandstone / Tillite / Diamictite subsoils (typically
encountered within Geotechnical Zones 2 and 3) are considered to be easily
excavatable. In other words, these materials classify as soft in terms of SABS 1200 DA
criteria. Notwithstanding this, materials classifying as intermediate could be encountered
where re-cementation of the residual soils is well formed or where the consistency of the
clayey subsoils has increased due to drying out during months of drier conditions.
Completely weathered Sandstone / Tillite / Diamictite bedrock is expected to range from
soft to intermediate in terms of SABS 1200 DA criteria, while medium to highly
weathered Sandstone / Tillite / Diamictite bedrock could classify as hard, depending on
bedding and joint spacing as well as the nature of the bedrock present. Where relatively
hard Sandstone / Tillite / Diamictite occurs within less than 1m of the surface (within
Geotechnical Zone 1) there is a potential for heavy ripping and / or blasting.
10. PROPOSED DEVELOPMENT
The proposed Helmsley Residential Country Estate Housing Development is anticipated
to comprise freestanding residential single and double storey homes as well as three
(3No.) Planned Unit Developments (PUD). Additionally, the proposed Reservoir and
Waste Water Treatment Works sites were investigated with an Inspection Pit excavated
at each site. No detailed drawings of the proposed structures were provided at the time
of writing this Report.
11. FOUNDING RECOMMENDATIONS
11.1 Earthworks
11.1.1 Excavatability
For the excavatability characteristics of the insitu materials in terms of earthworks for
platform construction, refer to Section 9 of this Report.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 10
Ref. 18/N8514
11.1.2 Embankment Construction
Given the varying slopes, cut to fill platforms are likely to be required across the
majority of the site, in order to facilitate construction of the proposed residential
structures. It is recommended that all earthworks and embankment construction be
carried out in accordance with recommendations given in the current SABS 1200
series.
In general, the insitu subsoils present across the site are suitable for construction of
embankments and terraces in terms of SABS 1200 D criteria. Notwithstanding this, the
following precautions are strongly advised:
▫ Residual Sandstone / Tillite / Diamictite clays should not be used for embankment
and terrace construction.
▫ The top 0.2m to 1.5m of topsoil should be removed and stockpiled for later use.
▫ Boulders or rock fragments greater than 150mm in size should be removed.
▫ The placement of the fill should be in layers not exceeding 200mm, individually
compacted at optimum moisture content to 93% Mod. AASHTO maximum dry
density.
All vegetation and topsoil should be cleared from the areas over which fill is to be
placed. This material should be stockpiled for later use as topsoil and for landscaping. In
the event that fill is to be placed onto loose material, it is recommended that the ground
surface should be well compacted before commencing fill placement. Where the natural
ground slopes exceed 1:6 (approximately 9
degrees), fill should be benched into the
insitu material to promote compaction and stability.
Regular compaction density control tests should be undertaken during development of
fill embankments as set down in SABS 1200 series guidelines.
Where slightly to moderately weathered Sandstone / Tillite / Diamictite bedrock is
excavated, this material should be broken down and stockpiled for use as rock fill in the
lower layers of road embankment fills. Alternatively, rock fill could also be used in the
lower layers of the embankments and terraces provided that all rock fragments greater
than 600mm are screened out. It is important to ensure that the voids inherent in these
poorly sorted rock fill materials are completely choked with finer materials during
compaction.
The topsoil referred to above should be placed onto embankments after construction
and vegetated as soon as possible to promote stability and limit erosion.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 11
Ref. 18/N8514
The following batters are recommended:
▫ 1:2 (26
degrees) for fill embankments subject to maximum height of 1.5m
▫ 1:3 (18
degrees) for fill embankments subject to maximum height of 2.5m
▫ 1:2 (26
degrees) for cuts within subsoils subject to maximum height of 1.5m
▫ 1:1.5 (34 degrees) for cuts within highly weathered bedrock (depending on joint
and bedding orientation)
▫ 1:1+ (45
degrees) for cuts within slightly to moderately weathered bedrock
(depending on joint and bedding orientation)
The cut batters recommended for the bedrock above are subject to the rock being intact
and not showing adverse dip or joint orientations. A geotechnical consultant should
approve these slopes on site immediately after construction.
Where the batters recommended above are not practical due to the steep nature of the
sites, cut to fill platforms in conjunction with retaining walls may be necessary to
facilitate development. To this end, sites with slope grades in excess of 1:5 (11
degrees)
may need to consider retaining measures.
11.2 Founding
11.2.1 Founding Conditions
The variable founding conditions, which are typically controlled largely by the
geomorphological site features, are apparent across the proposed Development. The
variety of founding conditions that may be encountered are described as different
Geotechnical Zones outlined below:
i. Geotechnical Zone 1 : Shallow Bedrock (<1m below existing ground levels).
ii. Geotechnical Zone 2 : Potentially collapsible colluvial topsoil and compressible
residual sandy clay subsoils overlying completely weathered Bedrock (Bedrock
located between 1m and 2m below existing ground levels)
iii. Geotechnical Zone 3 : Deep, slightly active, compressible residual clayey subsoils
(Bedrock located >2m below existing ground levels)
Additionally, there is also:
iv. Differential founding conditions as a result of cut to fill platforms constructed on
gently to moderately sloping portions of the site.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 12
Ref. 18/N8514
11.2.2 Founding Recommendations
The depths to suitable founding materials beneath the low strength and potentially
active, compressible clayey soils or the potentially collapsible sandy clayey soils vary
across the site. In addition, contrasting founding conditions will arise across cut and fill
terraces, usually resulting in relatively shallow founding on suitable materials over the
cut layout, stepping down and deepening significantly beneath the fill portion of the
layout.
As such, a number of founding options to address the anticipated subsoil variability
would apply across the site. Taking into account the nature of the residential
developments proposed on the estate, which is generally anticipated to range between
single storey freestanding houses and double/ multiple storey apartment blocks
(potentially sensitive to movements), it is strongly advised that foundation loads be
transferred onto competent, weathered bedrock wherever possible. Whilst it would be
advisable to geotechnically assess individual sites independently, two (2No.) possible
founding options are listed below for preliminary consideration.
11.3 Option 1: Reinforced Concrete Strip Footings (and/or Ground Beams on
Mass Concrete Pads)
The economic use of a founding solution comprising reinforced concrete strip footings is
likely to prove feasible across the site where suitable founding materials (i.e. weathered
bedrock) occur within 1m of finished platform level.
Where the approved founding materials (ie. weathered bedrock) occur at greater depths
within 1.5m to a maximum of 2m of finished platform level, the use of mass concrete
pads supporting reinforced concrete ground beams should prove more economically
advantageous.
These types of foundation are likely to be feasible within Geotechnical Zones 1 and 2.
However, due to the sloping nature of the above geotechnical zones, deeper founding is
likely to occur over fill portions of platforms. (Refer to Option 2 below for founding
solution where approved founding materials are greater than 2m below finished
platform levels).
For this founding method to provide stable founding, the following precautions are
recommended:
▫ Foundation loads must be transferred through the colluvial topsoils and residual
soils onto the weathered bedrock. It is recommended that the strip and pad footings
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 13
Ref. 18/N8514
are sized according to a net allowable foundation pressure not exceeding
150kN/m2
.
▫ Where differential conditions arise due to structures straddling cut to fill terraces,
and mass concrete pads supporting ground beams are necessary, the reinforced
concrete ground beams would need to be designed to span between pad
foundations. Pad foundations should be founded 0.3m into intact bedrock.
11.4 Option 2: Reinforced Concrete Ground Beams in conjunction with
Augered Mini-Piles
Where the depth to approved founding materials typically exceeds 2m below terrace
level, auger piles socketed into the weathered bedrock could be used in place of the
above-mentioned mass concrete pads. Their use will also be dependent on the
presence of boulder within the fill which may render augering difficult.
Provisionally, this type of foundation is considered to be appropriate over the fill
portions of sites located on sloping ground and within Geotechnical Zone 3.
The number, spacing and length of piles will obviously vary depending on the grading
scheme of the site, the variance in subsoil materials and the nature of the structure.
Accordingly, individual developments should be assessed separately.
12. PROPOSED RESERVOIR SITE
The near-surface conditions at the site of the proposed Reservoir can be inferred from
Inspection Pit IP Res1. The subsoil material typically comprises a colluvial horizon
described as, dry to slightly moist, dark grey, very loose to loose, moderately clayey
SAND to a depth of approximately 0.8m below existing ground level. These colluvial
subsoils are underlain by residual clays typically described as, slightly moist, reddish
orange brown, very stiff, sandy CLAY extending to depths of approximately 1.4m
below existing ground level. Underlying the abovementioned subsoil sequences,
(W5/W4) medium yellowish orange brown, completely to highly weathered, no visible
jointing, very soft to soft rock, fine to medium grained SANDSTONE (Natal Group) was
encountered at a depth of 1.4m below existing ground level.
Accordingly, founding of the Reservoir should be located into the intact albeit highly
weathered Sandstone at a depth of approximately 1,8m below existing ground levels.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 14
Ref. 18/N8514
13. PROPOSED WATER TREATMENT WORKS SITE
The sub-surface conditions at the site of the proposed Waste Water Treatment Works
can be inferred from Inspection Pit IP WWTW1. As the WWTW is located on a lower
topographic elevation, the subsoil material typically comprises colluvial / alluvial sub-
soils described as, moist, medium grey, very loose to loose, voided, moderately clayey
SAND to depths of approximately 0.9m below existing ground level. These colluvial /
alluvial subsoils are in turn underlain by residual Sandstone clays typically described as,
moist to wet, medium grey blotched orange brown, soft to very stiff, intact, SANDY
CLAY extending to depths greater than approximately 3m below existing ground levels.
The final design of the Waste Water Treatment Works was not confirmed at the time of
writing this report, however it is anticipated to comprise a Packaged Treatment Plant
with the foundations anticipated to comprise a combination of shallow conventional
strip footings, reinforced raft foundations, to deeper subsurface structures likely to be
founded to depths of approximately 3,5m below existing ground levels.
It is recommended that ground improvement measures be undertaken beneath all the
proposed shallow founded Structures located in the Alluvial/Residual subsoils, as
detailed below:
Depending on the final platform level selected, it is recommended that the, proposed
shallow founded structures be located on an engineered soil raft in order to restrict
potential total and differential settlements that may arise across the structure.
It is recommended that the soils beneath the plan area of the structure and 1m beyond
the periphery be boxed-out to a depth of 1.5m below underside of foundations and
replaced with an inert granular material, of at least a G5 material classification.
The G5 material should be replaced in 200mm thick layers and compacted to achieve
98% Modified AASHTO maximum dry density. Compaction of the layers should
proceed to underside foundation level.
It is essential that strict quality control is exercised on compaction of the engineered fill
material. In this regard allowance for regular sampling and testing should be made in
the tender.
Provided the above measures are properly implemented angular distortion of the
structure arising from differential settlement should not exceed 1 : 500.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 15
Ref. 18/N8514
Dewatering and subsoil drainage would most likely be required at depths greater than
approximately 1.5m depth, based on Inspection Pit IP WWTW 1.
14. ROADS
14.1 Road Earthworks
14.1.1 Excavatability
For the excavatability characteristics of the insitu materials in terms of road earthworks,
refer to Section 9 of this report.
14.1.2 Embankment Construction
Considering the topography of the area, it is anticipated that a large portion of the road
construction will need to adopt a cut-to-fill methodology. It is therefore recommended
that all earthworks and embankment construction be carried out in accordance with the
specifications given in the current SABS 1200 documentation.
Generally, the colluvial topsoil and residual Sandstone / Tillite / Diamictite subsoils
(which classify as poorer than G10 in terms of TRH 14) are not recommended for the
use in the construction in the road embankments fill due to the potential for longterm
consolidation/settlement.
All vegetation and topsoil should be cleared from the areas over which fill is to be
placed. This material should be stockpiled for later use as topsoil and for landscaping.
In the event that fill is to be placed onto loose colluvial material, it is recommended that
the ground surface should be well compacted before commencing fill placement. Where
the natural ground slopes exceed 1:6 (approximately 9 degrees), fill should be benched
into the insitu material to promote compaction and stability.
Fill should be placed in layers not exceeding 300mm and compacted to a minimum
93% Mod. AASHTO maximum dry density. Boulders larger than 200mm should be
removed from the fill material in order to enhance compaction and reduce the risk of
piping.
Regular compaction density control tests should be undertaken during construction of
fill embankments as set down in SABS 1200 series guidelines.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 16
Ref. 18/N8514
Where slightly to moderately weathered bedrock is excavated, this material should be
broken down and stockpiled for use as rock fill in the lower layers of road embankment
fills. Boulders greater than 600mm that cannot be broken down should be screened
out, and the rock fill then placed in layers not exceeding 600mm and spread in
accordance with SABS 1200 DM criteria. It is important to ensure that the voids
inherent in these poorly sorted rock fill materials are completely choked with finer
materials during compaction.
The colluvial topsoil referred to above should be placed onto the surfaces of
embankments after construction and vegetated as soon as possible to promote stability
and limit erosion.
The following batters are recommended:
▫ 1:2 (26
degrees) for fill embankments subject to maximum height of 1.5m
▫ 1:3 (18
degrees) for fill embankments subject to maximum height of 2.5m
▫ 1:2 (26
degrees) for cuts within subsoils subject to maximum height of 2m
▫ 1:1.5 (34
degrees) for cuts within highly weathered bedrock (depending on joint
and bedding orientation)
▫ 1:1+ (45 degrees) for cuts within slightly to moderately weathered bedrock
(depending on joint and bedding orientation)
The cut batters recommended for the bedrock above are subject to the rock being intact
and not showing adverse dip or joint orientations. A geotechnical consultant should
approve these slopes on site immediately after construction.
14.2 Road Subgrade Assessment
A variation in material characteristics occurs across the proposed Development. Road
subgrade materials range from colluvial topsoils and residual sandy clayey subsoils,
which generally classify as poorer than G10 in terms of TRH 14 guidelines, to shallow
as well as intact bedrock. A more detailed description of the road subgrade materials
and their characteristics is given overleaf.
14.2.1 Subgrade
The roads and parking areas for the Development are likely to require an engineered
material depth of 600mm to 800mm below finished road level.
The potentially compressible and collapsible nature of these subsoils, as well as the poor
CBR values (providing inadequate material strength) and poor TRH 14 classification
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 17
Ref. 18/N8514
(poorer than G10) indicate that these materials are unlikely to be suitable for the use as
insitu subgrade materials.
The colluvial sample selected for testing from IP 4, indicated a TRH14 classification of
G8, indicating that this material could possibly be suitable for re-use as a subgrade in
the road layer works design. However, the variation in topographical elevation and
underlying lithology could likely have an influence on the material properties of the
colluvium encountered across the site. It is therefore our recommendation, that if this
material is considered for re-use in sub-grade construction, that regular onsite testing be
undertaken to confirm the suitability of this material as the material properties could
vary considerably across the site.
Due to the generally poor subsoils encountered across the site, it is therefore
recommended that the subgrade soils are improved to provide a stable foundation for
roads and parking by:
a) removing the existing soils to a suitable depth where the majority of the in-situ
materials provide an adequate sub-grade material – e.g. in the residual weathered
sandstones – and constructing the road layerworks thereon. (This would apply
typically where the vertical road alignment results in cuts of greater than 1,5 to 2m).
Once the road and parking alignments have been finalised and bulk excavations done,
the project Civil Engineer should assess the most economical option of subgrade
improvement vs pavement design. It is also further recommended that additional
confirmatory laboratory testing is undertaken on the subsoils encountered across the
site at the commencement of construction.
14.2.2 Layerworks
As indicated in Section 8, the TRH 14 classification of the insitu materials on site are
typically poorer than G10. Accordingly, these natural materials are unsuitable for use in
sub-base (lower) layers of road layerworks.
It is recommended that suitably inert, imported gravels are used in all layerworks on the
site.
14.2.3 General
Once bulk excavations have been done for the roads and parking areas it may be
necessary to conduct limited, specific assessment of exposed soils – particularly in
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 18
Ref. 18/N8514
drainage lines, or where groundwater is evidenced – to determine subgrade conditions
and a need for “pioneer” layers.
14.3 Subsoil Drainage
It is anticipated that localized seepage activity could develop intermittently within road
cuttings subsequent to road construction. Seepages of this nature can cause minor
erosion of soils and / or localized instability within the bedrock with unfavourable
discontinuity orientations. The requirements for subsoil (for example, herringbone)
drains within such cuttings should be established in consultation with the geotechnical
consultant during construction.
15. ENGINEERING SERVICES
15.1 Earthworks
15.1.1 Excavatability
For the excavatability characteristics of the insitu materials in terms of trenching for
engineering services, refer to Section 9 of this report.
15.1.2 Backfill Material Assessment
Water, electricity and other services are anticipated to run largely within the road
reserves at the proposed Development. However, water borne sewerage is anticipated
to be collected from each unit and fed into the proposed Water Treatment Works.
With regard to the above, a brief assessment of the insitu backfill materials in terms of
pipe trenching is given below.
No material considered suitable in terms of SABS 1200 LB criteria for use as bedding
material, selected gravel or selected fill within pipe trenches was observed on site during
the preliminary geotechnical investigation. As such, provision should be made for
importing bedding sands, selected gravels and selected fill for this purpose.
In terms of SABS 1200 D criteria, the insitu subsoils present across the site are generally
suitable for use as backfill for closing pipe trenches. Notwithstanding this, the following
precautions are advised:
▫ Residual clays should not be used for backfill.
REPORT ON THE RESULTS OF A GEOTECHNICAL SITE INVESTIGATION FOR THE
PROPOSED HELMSLEY RESIDENTIAL COUNTRY ESTATE DEVELOPMENT –
BALLITO.
October 2018 Davies Lynn & Partners (Pty) Ltd Page 19
Ref. 18/N8514
▫ The top 500mm topsoil should be removed and stockpiled for use on
embankments.
▫ Wet, highly fissured materials and boulders or clods greater than 100mm in size
should be screened out.
▫ The placement of the fill should be in layers not exceeding 200mm, individually
compacted at optimum moisture content to 90% Mod. AASHTO maximum dry
density.
-------oo0oo-------
APPENDIX 1
Inspection Pit Logs and DCP Test Results
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 1
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
2 4
1 1
0,5 1 1
1 1
1 1
1 1
1 1
1,0 15 36
15 36
31 50
41 50 1.3m
R
1,5
2,0
2,5 2.5m
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist to moist, dark grey brown, very loose to loose becoming dense, voided,
moderately clayey silty SAND with abundant hard rock Sandstone boulders at base.
(Colluvium)
(W6/W5) Pale yellowish to medium brown blotched light grey, completely weathered, no
visible jointing, residual to extremely soft rock SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 2
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
3 6
2 4
1 1
0,5 1 1
1 1
1 1
2 4
1 1
1,0 3 6
6 12
5 10
7 15
11 25
1,5 5 10 1.5m
6 12
7 15
17 41
16 39
2,0 12 27
15 36
25 50
32 50
40 50
2,5 R
3,0 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist to moist, dark grey brown, very loose to dense, voided, moderately clayey silty
SAND. (Colluvium)
(W6/W5) Pale yellowish orange brown speckled light grey, completely weathered, no visible
jointing, residual to extremely soft rock, fine to medium grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 3
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
4 8
3 6
4 8
3 6
0,5 3 6
3 6
2 4
1 1
2 4
1,0 4 8
5 10
4 8
4 8 1.3m
5 10
1,5 4 8
5 10
6 12
4 8
5 10
2,0
2,5
2.6m
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Dry to slightly moist, dark grey brown, very loose to loose, voided, moderately clayey silty
SAND with abundant gravel at base (pebble marker). (Colluvium)
(W6/W5) pale yellowish orange brown speckled light grey, completely weathered, no visible
jointing, extremely soft rock SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 4
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
3 6
2 4
2 4
2 4
0,5 2 4
2 4 0.60m
2 4
2 4
2 4
1,0 5 10
4 8
6 12
4 8 1.30m
4 8
1,5 3 6
4 8
4 8
8 17
6 12
2,0 6 12
6 12
14 32
11 25
7 15
2,5 12 27
24 50
16 39
16 39
28 50 2.9m
3,0 31 50
3.1m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, loose, voided, moderately clayey silty SAND. (Colluvium)
Moist, reddish orange brown, soft to stiff, intact, SANDY CLAY (Laterite).
Moist, pale orange to yellowish brown blotched light grey, firm to very stiff, intact, SANDY
CLAY. (Residual Sandstone)
(W6) Yellowish brown blotched light grey, residual to completely weathered, no visible
jointing, residual to extremely soft rock SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 5
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
1 1
2 4
0,5 2 4
0 <1
1 1
1 1
1 1 0.9m
1,0 2 4
4 8
3 6
3 6
3 6
1,5 2 4
2 4
15 36
20 50
28 50
2,0 31 50 2.0m
36 50
41 50
R
2,5
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very loose, voided, moderately clayey, silty SAND.
(Colluvium)
(W6/W5) Pale orange brown speckled light grey, completely weathered, no visible jointing,
extremely soft rock, medium grained SANDSTONE (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 6
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
4 8
2 4
5 10
4 8
0,5 1 1
3 6
4 8
3 6 0.8m
6 12
1,0 20 50
28 50
31 50
41 50
R
1,5
2,0 2.0m
2,5
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very loose to loose, voided, moderately clayey silty SAND
with occasional Sandstone boulders. (Colluvium)
(W6/W5) medium orange to yellowish brown speckled light grey, completely weathered, no
visible jointing, extremely soft rock SANDSTONE, becoming W5/W4 with depth. (Natal
Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 7
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
1 1
1 1
1 1
2 4
0,5 4 8
3 6
4 8 0.7m
4 8
10 22
1,0 13 30
19 47
24 50
36 50
41 50
1,5 R
2,0 2.0m
2,5
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very soft to firm, shattered, SANDY CLAY. (Colluvium)
(W5/W4) pale olive brown blotched dark grey, completely to highly weathered, very highly
jointed to fractured, very soft rock Dyka Tillite with occasional hard rock corestone boulders.
(Dwyka Tillite)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 8
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
1 1
2 4
2 4
2 4
0,5 2 4
1 1
3 6
2 4
1 1 0.9m
1,0 4 8
4 8
2 4
2 4
2 4
1,5 5 10
6 12
3 6
3 6
6 12
2,0 12 27
12 27
12 27 2.2m
16 39
26 50
2,5 22 50
25 50
28 50
31 50
36 50
3,0 38 50 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very loose to loose, voided, moderately clayey silty SAND
with occasional Sandstone boulders (Colluvium).
Slightly moist to moist, pale yellowish orange brown, loose to medium dense, intact,
moderately clayey silty, fine to medium grained SAND. (Residual Sandstone)
(W6/W5) pale orange brown blotched speckled light grey, completely weathered, no visible
jointing, residual to extremely soft Residual SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 9
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
2 4
1 1
0,5 2 4
1 1
2 4
4 8
2 4
1,0 2 4 1.0m
2 4
3 6
5 10
9 20
1,5 12 27
9 20
8 17
7 15 1.8m
18 44
2,0 17 41
17 41
17 41
17 41
20 50
2,5 24 50
28 50
31 50
32 50
38 50
3,0 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very loose to loose, voided, moderately clayey silty SAND.
(Colluvium)
Moist, yellowish orange brown, loose to medium dense, intact, moderately clayey silty SAND.
(Residual Sandstone)
(W6/W5) yellowish brown speckled light grey, completely weathered, no visible jointing,
extremely soft rock, fine to medium grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 10
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
3 6
3 6
0,5 2 4
1 1
1 1
1 1
1 1
1,0 2 4 1.0m
2 4
2 4
3 6
5 10
1,5 6 12
8 17
13 30
27 50
31 50
2,0 36 50 2.0m
41 50
R
2,5
2.5m
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist to moist, dark grey brown, very loose to loose, voided, moderate clayey silty
SAND. (Colluvium)
Moist, pale yellowish brown blotched orange brown and light grey, soft to very stiff, intact,
SANDY CLAY. (Residual Sandstone)
(W5/W4) yellowish brown blotched light grey, completely to highly weathered, no visible
jointing, very soft rock SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 11
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
1 1
3 6
22 50
0,5 22 50
11 25 0.6m
5 10
5 10
5 10
1,0 3 6
5 10
11 25
21 50 1.3m
36 50
1,5 R
2,0 2,0m
2,5
3,0 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist to moist, dark grey brown, very soft to very stiff, shattered, SANDY CLAY
(Colluvium)
Moist, reddish orange brown blotched dark grey and yellow brown, stiff to very stiff, intact,
sandy silty CLAY with occasional ferricrete nodules and corestones (Residual Clay).
Moist, yellowish brown blotched light grey, stiff to very stiff, intact, sandy silty CLAY. (Residual
Tillite)
(W5) Pale olive brown blotched yellowish grey, completely weathered, no visible jointing,
extremely soft rock Dwyka Tillite (Dwyka Group).
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 12
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
2 4
1 1
0,5 3 6
2 4
5 10
6 12
3 6 0.9m
1,0 5 10
11 25
19 47
14 32
14 32
1,5 16 39
14 32
28 50
31 50
34 50
2,0 37 50 2,0m
41 50
R
2,5
3,0 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very loose to loose, voided, moderately clayey silty SAND.
(Colluvium)
Slightly moist, medium orange brown blotched dark grey (clay infill joints), medium dense to
very dense, intact, moderately clayey silty fine to medium grained SAND with occasional
gravel fragments. (Residual Sandstone)
(W6/W5) yellowish brown speckled and blotched light grey, completely weathered, no visible
jointing, residual to extremely soft rock, fine to medium grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 13
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
3 6
2 4
0,5 2 4
1 1 0.6m
1 1
2 4
1 1
1,0 1 1
1 1
2 4
3 6
2 4
1,5 2 4 1.5m
2 4
4 8
4 8
7 15
2,0 4 8 2.0m
4 8
6 12
6 12
3 6
2,5 2 4
7 15
19 47
18 44
21 50
3,0 23 50 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, reddish brown, very loose to loose, voided, moderately clayey silty SAND.
(Colluvium)
Moist, reddish orange brown, very soft to firm, intact, sandy silty CLAY. (Laterite)
(W6) medium yellowish orange brown, residual to completely weathered, no visible jointing,
residual to extremely soft rock SANDSTONE. (Natal Group)
(W5) Yellowish brown speckled light grey, completely weathered, no visible jointing, extremely
soft to very soft rock, fine to medium grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 14
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
3 6
3 6
0,5 5 10
9 20 0.6m
13 30
13 30
16 39
1,0 18 44
13 30
14 32
12 27
11 25
1,5 9 20
6 12
8 17 1.7m
14 32
11 25
2,0 17 41
21 50
36 50
R
2,5 2.5m
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, reddish brown, loose to medium dense, voided, moderately clayey silty SAND.
(Colluvium)
Moist, reddish orange brown, stiff to very stiff, intact, sandy silty CLAY. (Residual Sandstone)
(W5/W4) yellowish brown blotched light grey, completely to highly weathered, no visible
jointing, soft rock, medium to coarse grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 15
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
5 10
8 17
7 15
10 22
0,5 17 41
15 36
17 41 0.7m
14 32
15 36
1,0 11 25
11 25
12 27
13 30
13 30
1,5 13 30
9 20 1.6m
12 27
11 25
21 50
2,0 41 50
R
2,5 2.5m
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, reddish brown, loose to dense, voided, moderately clayey silty SAND with
abundant rootlets. (Colluvium)
Moist, reddish orange brown, very stiff, intact, sandy CLAY. (Residual Sandstone)
(W5/W4) Pale yellowish orange brown speckled light grey, completely to highly weathered, no
visible jointing, very soft to soft rock, medium to coarse grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 16
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
3 6
2 4 0.3m
8 17
0,5 4 8
3 6 0.6m
3 6
4 8
10 22
1,0 17 41
22 50
17 41
13 30
24 50
1,5 28 50
37 50 1.6m
41 50
R
2,0
2,5
3,0 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
(W5) yellowish brown, completely weathered, no visible jointing, extremely soft rock, fine to
medium grained SANDSTONE. (Natal Group)
Slightly moist, medium to dark brown, very loose to loose, voided, moderately clayey silty
SAND (Colluvium)
Moist, reddish brown, firm to stiff, intact, SANDY CLAY with abundant gravel fragments.
(Residual Sandstone).
Moist, reddish orange brown speckled yellowish brown, medium dense, intact, moderately
clayey silty SAND. (Residual Sandstone)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 17
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
2 4
2 4
2 4
2 4
0,5 2 4 0.5m
2 4
10 22
11 25
9 20
1,0 9 20
14 32
16 39
19 47
18 44
1,5 13 30
13 30
16 39
19 47
16 39 1.9m
2,0 32 50
41 50
R
2,5
3,0
3.2m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, soft, shattered, SANDY CLAY. (Colluvium)
Moist, reddish orange brown, medium dense to dense, intact, moderately clayey silty SAND
with dark grey brown clay infill joints. (Residual Sandstone)
(W6/W5) Yellowish orange brown speckled light grey, completely weathered, no visible
jointing, residual to extremely soft rock, fine to medium grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 18
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
3 6
3 6
3 6
2 4
0,5 3 6
3 6 0.6m
5 10
7 15
10 22
1,0 13 30
9 20
9 20
10 22
13 30
1,5 12 27
11 25
11 25
8 17
7 15
2,0 6 12
5 10
7 15
5 10 2.3m
7 15
2,5 10 22
9 20
12 27
18 44
26 50
3,0 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
(W6/W5) yellowish brown speckled light grey, completely weathered, no visible jointing,
extremely soft rock SANDSTONE. (Natal Group)
Slightly moist, dark grey brown, very loose to loose, voided, moderately clayey silty SAND
(Colluvium).
Moist, yellowish orange brown, loose to medium dense, intact, moderately clayey, silty fine to
medium grained SAND with dark grey clay infill joints (Residual Sandstone)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 19
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
3 6
2 4
2 4
2 4 0.4m
0,5 2 4
5 10
5 10
4 8
3 6
1,0 3 6
4 8
8 17
11 25
11 25 1.4m
1,5 15 36
19 47
20 50
20 50
14 32
2,0 20 50
24 50
28 50
36 50
40 50
2,5 R 2.5m
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, soft to firm, shattered, SANDY CLAY (Colluvium)
Moist, dark reddish brown, firm to very stiff, intact, sandy CLAY. (Laterite)
(W6/W5) yellowish blotched orange brown, completely weathered, no visible jointing,
extremely to very soft rock, fine to medium grained SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. 20
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
3 6
2 4
1 1
3 6
0,5 2 4
4 8
4 8
6 12 0.8m
4 8
1,0 5 10
7 15
8 17
9 20
9 20
1,5 10 22
13 30
14 32
12 27
15 36
2,0 13 30
13 30
10 22
12 27 2.3m
16 39
2,5 22 50
24 50
27 50
31 50
40 50
3,0 R 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very soft to stiff, shattered, SANDY CLAY (Colluvium).
Moist, orange brown blotched dak grey brown, shattered, firm to very stiff, intact SANDY
CLAY. (Residual Sandstone)
(W6/W5) yellowish brown blotched orange brown and speckled light grey, completely
weathered, no visible jointing, extremely soft to very soft rock, fine to medium grained
SANDSTONE. (Natal Group)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. WT W1
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
1 1
1 1
2 4
2 4
0,5 2 4
1 1
0 <1
0 <1
3 6 0.9m
1,0 1 1
1 1
2 4
1 1
2 4
1,5 6 12
7 15
13 30
8 17
8 17
2,0 13 30
16 39
10 22
15 36
19 47
2,5 8 17
6 12
5 10
6 12
8 17
3,0 8 17 3.0m
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Moist, medium grey, very loose to loose, voided, moderately clayey silty SAND. (Colluvium)
Medium grey, blotched orange brown, very soft to very stiff, intact, SANDY CLAY. (Residual
Sandstone)
PROJECT: Geotechnical Investigation for Helmsley MACHINE: Volvo BL61B INSPECTION PIT NO.
Residential Country Estate Development I.P. RES 1
DATE: 25-26/09/2018
LOCATION: Compensation ELEVATION:LOGGED BY: N. Tonkin
DCP EQV.
Blows/100mm CBR.
1 1
1 1
1 1
2 4
0,5 3 6
3 6
5 10
9 20 0.8m
10 22
1,0 11 25
16 39
16 39
14 32
21 50 1.4m
1,5 34 50
38 50
41 50
R
2,0 2.0m
2,5
3,0
3,5
4,0
4,5
5,0
FROM 0 2 4 6 8 10
TO 2 4 6 8 10 + WATER TABLE -
REFUSAL -
The equivalent CBR values above are provided as an indication only.
REF.No.
18/N8514
FIG.No.
DEPTHDESCRIPTION
(m)
Slightly moist, dark grey brown, very loose to medium dense, voided, moderate clayey silty
SAND. (Colluvium)
Slightly moist to moist, reddish orange brown, very stiff, intact, SANDY CLAY. (Laterite)
(W5/W4) medium yellowish orange brown to pale pink speckled light grey, completely to
highly weathered, no visible jointing, very soft to soft rock, fine to medium grained
SANDSTONE. (Natal Group)
APPENDIX 2
Laboratory Test Results
DRAWINGS
18/N8514-01 – Geotechnical Site Plan
CLIENT
Bigen Africa (Pty) Ltd
PROJECT
Geotechnical Investigation for the Proposed
Helmsley Country Estate Development
TITLE
GEOTECHNICAL SITE PLAN
SCALE
N.T.S
DRAWING NO.
18/N8514-01
Rev
0
LEGEND
Approximate Inspection
Pit and DCP test Position
Geotechnical Zone 1
Geotechnical Zone 2
Geotechnical Zone 3
Phase 1
Phase 2
Phase 3
IP1 SST 1,3m
IP6 SST 0,8m
IP3 SST 1,3m
IP2 SST 1,5m
IP9 SST 1,8m
IP7 DT 0,7m
IP10 SST 2,0m
IP12 SST 2,0m
IP11 DT 2,0m
IP4 SST 2,9m
IP8 SST 2,2m
IP5 SST 0,5m
IP20 SST 2,3m
IP19 SST 1,4m
IP18 SST 2,3m IP13 SST 2,0m
IP14 SST1,7m
IP15 SST1,6m
IP16 SST 1,6m
WWTW 1 SST>3m
IP17 SST 1,8m
RES 1 SST 1,4m
Zone 1
Zone 2 Zone 3