20
Report from Superintendent Board of Education Meeting January 15, 2014

Report from Superintendent

Embed Size (px)

DESCRIPTION

Report from Superintendent. Board of Education Meeting January 15, 2014. January 8, 2014 Field Facility Project Forum. Review of Proposals. Reynolds Field Proposal 1 400 Meter Track 6 Lanes (2 inner lanes) Lower Reynolds stays the same. Reynolds 400 Meter Track 6 lanes (2 inner). - PowerPoint PPT Presentation

Citation preview

Page 1: Report from Superintendent

Report from SuperintendentBoard of Education Meeting

January 15, 2014

Page 2: Report from Superintendent

January 8, 2014Field Facility Project Forum

Page 3: Report from Superintendent

Review of Proposals

Page 4: Report from Superintendent

Reynolds Field Proposal 1

400 Meter Track6 Lanes (2 inner lanes)

Lower Reynolds stays the same

Page 5: Report from Superintendent

Reynolds 400 Meter Track6 lanes (2 inner)

Page 6: Report from Superintendent

Reynolds Field Proposal 2

400 Meter Track6 Lanes, relocate tennis courts

Page 7: Report from Superintendent

400 Meter 6 lane track at Reynolds – Relocate tennis courts

Page 8: Report from Superintendent

Costs – ReynoldsProposal 1 - $2.68 MillionProposal 2 - $2.4 Million (not including tennis court relocation $440K )

**Both proposals include sidewalk at Chauncey Optional Considerations•Walking Lights (6) $ 48,000•Storage Building $120,000

(Cost considerations for every $100K added equals $1.63/year/average house)

In-Kind replacement @ Reynolds $ -750,000(Savings Approx. $12.23/year/average house)

Page 9: Report from Superintendent

Burke Field Proposal 1

Page 10: Report from Superintendent

Burke – Proposal 1

Page 11: Report from Superintendent

Burke Field Proposal 2

Page 12: Report from Superintendent

Burke Option 2

Page 13: Report from Superintendent

Costs - Burke•Proposal 1

– Upper Burke expansion (3 level fields) = $1.06 Million– Lower Burke Tennis Courts =$ 440 K

• Proposal 2- Upper Burke Expansion (3 tiered fields) = $1.7 Million- Lower Burke Tennis Courts = $ 440 K

Optional Considerations• Increase Baseball Right Field $ 60,000• Bathrooms $ 143,000• Landscaping $ 50,000• Aerate, Topdress, Overseed lower field $ 36,000• New Roadway, turnaround and handicapped parking $108,000(Cost considerations for every $100K added equals $1.63/year/average house)

Page 14: Report from Superintendent

Cost Summary• Proposal 1

Reynolds 1 $2.68 Million Burke 1 $1.06 Million Total Fields $3.74 Million Total Buildings $4.05 MillionTotal $7.79 Million

$- 500K (Reserve)

Total Bond $7.29 Million

Total Annual Cost – Average House $ 118.83

Page 15: Report from Superintendent

Cost Summary• Proposal 2

Reynolds 1 $2.68 Million Burke 2 $1.7 Million Total Fields $ 4.38 Million Total Buildings $ 4.05 MillionTotal $8.43 Million

$- 500K (Reserve)

Total Bond $7.93 Million

Total Annual Cost – Average House $ 129.26

Page 16: Report from Superintendent

Cost Summary• Proposal 3

Reynolds 2 $2.4 Million Burke 1 $1.5 Million Total Fields $3.9 Million Total Buildings $4.05 MillionTotal $7.95 Million

$- 500K (Reserve)

Total Bond $7.45 Million

Total Annual Cost – Average House $ 121.43

Page 17: Report from Superintendent

Cost Summary• Proposal 4

Reynolds 2 $2.4 Million Burke 2 $2.1 Million Total Fields $4.5 Million Total Buildings $4.05 MillionTotal $8.55 Million

$- 500K (Reserve)

Total Bond $8.05 Million

Total Annual Cost – Average House $131.21

Page 18: Report from Superintendent

Cost Recap Proposal Total Bond (using $500K from Capital Reserve)

1 (Reynolds 1; Burke 1) $7.29 Million 2 (Reynolds 1; Burke 2) $7.93 Million 3 (Reynolds 2; Burke 1) $7.45 Million 4 (Reynolds 2; Burke 2) $8.05 Million

Options

Reynolds Storage Building $120,000Walking Lights $ 48,000

Burke Increase Baseball Right Field $ 60,000Bathrooms $143,000Additional Landscaping $ 50,000Aerate, Topdress, Overseed lower field $ 36,000New Roadway, turnaround and

handicapped parking $108,000

(Cost considerations for every $100K added equals $1.63/year/average house)

Page 19: Report from Superintendent

Budget Calendar

Page 20: Report from Superintendent

Next Board of Education MeetingJanuary 22 at 7 PM