41
Renewable Energy Renewable Energy Renewable Energy Renewable Energy Projects in Thailand Projects in Thailand Projects in Thailand Projects in Thailand by by by by Mr Mr Mr Mr. . . Payomsarit Payomsarit Payomsarit Payomsarit Sripattananon Sripattananon Sripattananon Sripattananon Deputy Director of Alternative Energy Deputy Director of Alternative Energy Deputy Director of Alternative Energy Deputy Director of Alternative Energy Encouragement Encouragement Encouragement Encouragement And Efficiency And Efficiency And Efficiency And Efficiency Provincial Electricity Authority

Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Renewable Energy Renewable Energy Renewable Energy Renewable Energy

Projects in ThailandProjects in ThailandProjects in ThailandProjects in Thailand

bybybyby

MrMrMrMr.... PayomsaritPayomsaritPayomsaritPayomsarit SripattananonSripattananonSripattananonSripattananonDeputy Director of Alternative Energy Deputy Director of Alternative Energy Deputy Director of Alternative Energy Deputy Director of Alternative Energy

EncouragementEncouragementEncouragementEncouragement And EfficiencyAnd EfficiencyAnd EfficiencyAnd Efficiency

Provincial Electricity Authority

Page 2: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Provincial Electricity Authority 2

PEA’s AREA : as of Dec 2014

AREA : 510,000 km2

REGIONS : 12 Region offices

PROVINCE : 74 Provinces

VILLAGE : 76,121 Villages (98%)

OFFICES : 927 Offices

Yala

Nakhon Si Thammarat

Phetchaburi

Nakhon Pathom

Chon Buri

Nakhon Ratchasima

Ubon Ratchathani

Udon Thani

Phitsanulok

Lop Buri

Chiang Mai

Ayutthaya

PEA HIGHLIGHT

Page 3: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

ELECTRICITY SERVICE : as of Dec 2014

Provincial Electricity Authority 3

PEA HIGHLIGHT

• 18,155 MWMaximum Demand :

• 17.68 Million CustomerTotal Customers:

• 116,501 Million Unit (kWh)Total Sales of Electricity :

• 12,552 MUSD (450,634 MTHB)Total Electricity Revenue (2014)

• 6.46 times/customer/yearSAIFI

• 217.89 minutes/customer/year

SAIDI

• 5.84 %Distribution Loss

Page 4: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

SPPsSPPsSPPsSPPs(10%)(10%)(10%)(10%)

EGATEGATEGATEGAT((((43434343%)%)%)%)GenerationGenerationGenerationGeneration

TransmissionTransmissionTransmissionTransmission

DistributionDistributionDistributionDistributionPEAPEAPEAPEA

((((66%66%66%66%))))MEAMEAMEAMEA((((32%32%32%32%))))

CustomerCustomerCustomerCustomer((((2%2%2%2%))))

CustomerCustomerCustomerCustomer CustomerCustomerCustomerCustomer

VSPPsVSPPsVSPPsVSPPs(3%)(3%)(3%)(3%)

National

Energy Policy

Committee

Energy

Regulatory

Commission

ImportImportImportImport(3%)(3%)(3%)(3%)

IPPsIPPsIPPsIPPs((((41414141%)%)%)%)

SOSOSOSOEGAT (100%)

Thailand Electricity Structure

Page 5: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

IPPIPPIPPIPP : Independent : Independent : Independent : Independent

Power Producer,Power Producer,Power Producer,Power Producer,

• Capacity > 90 MWCapacity > 90 MWCapacity > 90 MWCapacity > 90 MW

• (Power Purchased (Power Purchased (Power Purchased (Power Purchased

by Notice)by Notice)by Notice)by Notice)

IPPIPPIPPIPP : Independent : Independent : Independent : Independent

Power Producer,Power Producer,Power Producer,Power Producer,

• Capacity > 90 MWCapacity > 90 MWCapacity > 90 MWCapacity > 90 MW

• (Power Purchased (Power Purchased (Power Purchased (Power Purchased

by Notice)by Notice)by Notice)by Notice)

SPPSPPSPPSPP : Small Power : Small Power : Small Power : Small Power

Producer, Capacity Producer, Capacity Producer, Capacity Producer, Capacity

<= 90 MW<= 90 MW<= 90 MW<= 90 MW

• Cogeneration, Firm Cogeneration, Firm Cogeneration, Firm Cogeneration, Firm

(Power Purchased by (Power Purchased by (Power Purchased by (Power Purchased by

Notice)Notice)Notice)Notice)

• Renewable Energy, Renewable Energy, Renewable Energy, Renewable Energy,

Firm , NonFirm , NonFirm , NonFirm , Non----firmfirmfirmfirm

SPPSPPSPPSPP : Small Power : Small Power : Small Power : Small Power

Producer, Capacity Producer, Capacity Producer, Capacity Producer, Capacity

<= 90 MW<= 90 MW<= 90 MW<= 90 MW

• Cogeneration, Firm Cogeneration, Firm Cogeneration, Firm Cogeneration, Firm

(Power Purchased by (Power Purchased by (Power Purchased by (Power Purchased by

Notice)Notice)Notice)Notice)

• Renewable Energy, Renewable Energy, Renewable Energy, Renewable Energy,

Firm , NonFirm , NonFirm , NonFirm , Non----firmfirmfirmfirm

VSPPVSPPVSPPVSPP : Very Small : Very Small : Very Small : Very Small

Power Producer, Power Producer, Power Producer, Power Producer,

Capacity Capacity Capacity Capacity

<= 10 MW<= 10 MW<= 10 MW<= 10 MW

• Cogeneration Cogeneration Cogeneration Cogeneration

• Renewable EnergyRenewable EnergyRenewable EnergyRenewable Energy

VSPPVSPPVSPPVSPP : Very Small : Very Small : Very Small : Very Small

Power Producer, Power Producer, Power Producer, Power Producer,

Capacity Capacity Capacity Capacity

<= 10 MW<= 10 MW<= 10 MW<= 10 MW

• Cogeneration Cogeneration Cogeneration Cogeneration

• Renewable EnergyRenewable EnergyRenewable EnergyRenewable Energy

The power purchase from Private Power Producer1. Thailand Electricity Structure

Page 6: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Ref: www.eppo.go.th

Thailand Power Generation by Fuel Type1. Thailand Electricity Structure

Page 7: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

RE Potential Area

7

Page 8: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

RE Potential Area

Cassava root bagasse Empty bunches of oil palm Corn maize

8Source : EPPO.

Page 9: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Committed to the development of low-carbon society

Government Funding On R & DActivities

Encouraging Private-Led Investment

Alternative Energy Development Plan (AEDP 2015)

Solar

6,000 MW

1,200 ktoe(Heat)

Big,Small + Mini Hydro

3,282.4 MW

Bio Energy

Biomass Biogas MSW

5,570 MW 3,602 MW 550 MW

22,100 ktoe (Heat)

1,283 ktoe(Heat)

495 ktoe(Heat)

Target 30 % of RE in Total Energy Consumption By 2036

Biofuels

• Ethanol

11.3 Million l/d

• Biodiesel

14 Million l/d

•Pyrolysis Oil

0.53 Million l/d

• CBG

4,800 Million l/d

Wind

3,002 MW

Others

• Geothermal

10 ktoe

• Bio-oil &

Hydrogen

10 ktoe

Thailand ‘s Alternative Energy Development Plan

Page 10: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Provincial Electricity Authority

Increasing the Supply of REIncreasing the Supply of RE

Some Technical Solution for RE ConnectionSome Technical Solution for RE Connection

Smart Grid System for Sustainable RE Smart Grid System for Sustainable RE

TopicTopic

Page 11: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

1992199219921992 2001200120012001 2002200220022002 2006200620062006 2007200720072007

EGAT issued EGAT issued EGAT issued EGAT issued

Requests for Requests for Requests for Requests for

Proposals from Proposals from Proposals from Proposals from

SPPsSPPsSPPsSPPs

Introduction of the Introduction of the Introduction of the Introduction of the

additional tariff for additional tariff for additional tariff for additional tariff for

SPPs using RE as fuel SPPs using RE as fuel SPPs using RE as fuel SPPs using RE as fuel

via competitive biddingvia competitive biddingvia competitive biddingvia competitive bidding

MEA and PEA issued MEA and PEA issued MEA and PEA issued MEA and PEA issued

Requests for Proposals Requests for Proposals Requests for Proposals Requests for Proposals

for power purchase from for power purchase from for power purchase from for power purchase from

VSPPs VSPPs VSPPs VSPPs ≤ 1 MW1 MW1 MW1 MW

MEA and PEA issued MEA and PEA issued MEA and PEA issued MEA and PEA issued

Requests for Proposals Requests for Proposals Requests for Proposals Requests for Proposals

for power purchase from for power purchase from for power purchase from for power purchase from

VSPPs VSPPs VSPPs VSPPs ≤ 10 MW10 MW10 MW10 MW

� MEA and PEA announced the fixedMEA and PEA announced the fixedMEA and PEA announced the fixedMEA and PEA announced the fixed----rate “Adders”, categorized by RE rate “Adders”, categorized by RE rate “Adders”, categorized by RE rate “Adders”, categorized by RE technologies and provided in addition technologies and provided in addition technologies and provided in addition technologies and provided in addition to the normal purchasing rate under to the normal purchasing rate under to the normal purchasing rate under to the normal purchasing rate under the Regulations for Power Purchase the Regulations for Power Purchase the Regulations for Power Purchase the Regulations for Power Purchase from VSPPsfrom VSPPsfrom VSPPsfrom VSPPs

� EGAT issued Requests for Proposals EGAT issued Requests for Proposals EGAT issued Requests for Proposals EGAT issued Requests for Proposals for power purchase from SPPs for power purchase from SPPs for power purchase from SPPs for power purchase from SPPs ≤ 90 MW90 MW90 MW90 MW

Promotion of Power Generation Using Renewable EnergyPromotion of Power Generation Using Renewable EnergyPromotion of Power Generation Using Renewable EnergyPromotion of Power Generation Using Renewable Energy

Page 12: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Background of VSPP Purchasing PolicyBackground of VSPP Purchasing PolicyBackground of VSPP Purchasing PolicyBackground of VSPP Purchasing Policy

20022006 2007

2010

PEA PEA PEA PEA announced announced announced announced

power power power power purchase purchase purchase purchase

from VSPP from VSPP from VSPP from VSPP ≤

1 MW1 MW1 MW1 MW

Increase Increase Increase Increase

Capacity Capacity Capacity Capacity

purchase purchase purchase purchase

from VSPPs from VSPPs from VSPPs from VSPPs

up to up to up to up to ≤ 10 10 10 10

MW) MW) MW) MW)

Announced Announced Announced Announced

the adders, the adders, the adders, the adders,

categorized by categorized by categorized by categorized by

RE RE RE RE

technologies, technologies, technologies, technologies,

in in in in addition to addition to addition to addition to

the the the the

purchasing purchasing purchasing purchasing

price under price under price under price under

the the the the VSPP VSPP VSPP VSPP

Regulations Regulations Regulations Regulations

PEA PEA PEA PEA announced announced announced announced

the new the new the new the new adders adders adders adders

2015

AnnouncedAnnouncedAnnouncedAnnouncedFeed in Feed in Feed in Feed in

Tariff Tariff Tariff Tariff PrograPrograPrograProgrammmm

Page 13: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Solar

Jan 2, 2007 Sep 20, 2010 Jan 30, 2015

Wind

Biomass

VSPP Program

2007

Increasing the Supply of RE

2010 2015 2015

Nov 1-10, 2015

Waste

Biogas

Sep 29, 2014

20142014

Sep,

2014

Solar Farm Solar Roof Solar for Government and Cooperation

Page 14: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Fixed Adder Rates in 2007Fixed Adder Rates in 2007Fixed Adder Rates in 2007Fixed Adder Rates in 2007

Type of FuelsAdder

(Baht/kWh)Period(Year)

1. Biomass

- Installed Capacity <= 1 MW 0.50 7

- Installed Capacity >1 MW 0.30 7

2. Biogas

- Installed Capacity <= 1 MW 0.50 7

- Installed Capacity >1 MW 0.30 7

3. MSW

- Landfill Gas 2.50 7

- Thermal Process 3.50 7

4. Wind

- Installed Capacity <= 50 kW 4.50 10

- Installed Capacity > 50 kW 3.50 10

5. Mini Hydro

- Installed Capacity 50 kW - <200 kW 0.80 7

- Installed Capacity <50 kW 1.50 7

6. Solar 8.00 10

Page 15: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Fixed Adder Rates in 2010Fixed Adder Rates in 2010Fixed Adder Rates in 2010Fixed Adder Rates in 2010

Type of FuelsAdder

(Baht/kWh)Period(Year)

1. Biomass

- Installed Capacity <= 1 MW 0.50 7

- Installed Capacity >1 MW 0.30 7

2. Biogas

- Installed Capacity <= 1 MW 0.50 7

- Installed Capacity >1 MW 0.30 7

3. MSW

- Landfill Gas 2.50 7

- Thermal Process 3.50 7

4. Wind

- Installed Capacity <= 50 kW 4.50 10

- Installed Capacity > 50 kW 3.50 10

5. Mini Hydro

- Installed Capacity 50 kW - <200 kW 0.80 7

- Installed Capacity <50 kW 1.50 7

6. Solar 6.50 10

Page 16: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

TypeInstalled Capacity

(kW)

FiT

(Baht/kWh)

Total Installed

Capacity (MW)

Residential 0-10 6.96 100

Small General Service >10-250 6.55

100Medium-Large General Service

/Industrial

>250-1,000 6.16

16

Feed in tariff (FiT) rate for 25 years Solar PV Rooftop By 2013

Page 17: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Feed in Tariffs in 2015

Page 18: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Status of Renewable Project on May 2015 compared with the target

in Alternative Energy Development Plan (AEDP) of 30%

for 20 years as following

2. Status of Renewable Power Generation

Type of Fuel

CODTarget

AEDPInstalled

Capacity

(MW) (MW)

Solar Farm 1111,502,502,502,5026,0006,0006,0006,000

Solar Rooftop 53535353

Wind 216216216216 3,0023,0023,0023,002

Hydro 15151515 3,2823,2823,2823,282

Biomass 2222,,,,429429429429 5555,,,,570570570570

MSW 113113113113 555555550000

Biogas 235235235235 3,6023,6023,6023,602

Total 4,563 22,006

Source : Draft Minutes of the Executive Committee of measures to promote electricity generation from renewable sources No.2/2558 (No. 5) on 24 March 2015

Page 19: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Increasing of RE

Install Capacity(MW)

Year0

500

1000

1500

2000

2500

2007 2008 2009 2010 2011 2012 2013 2014 2015

Solar

Biomass

Wind

Biogas

Waste

Page 20: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Type of Fuels StatusProjectsAmount

Capacity of Power

Purchased (MW)

Biomass & MSW COD 25 577.523

Solar COD 4 265

Wind COD 2 180

Total 22 1,022.523

Status of RE SPP

Status for RE SPP

Page 21: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Mungcharoen Biomas (15.5 MW)

Located : Surin ProvinceCOD : September 2012

Example for SPP (Rice Husk Power Plant)

Page 22: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

EA SOLAR (90 MW)

Example for SPP Solar

Located : Lampang ProvinceCOD : Dec 2013

Page 23: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

First Khorat Wind (90 MW)

Located : Nakhonratchasima ProvinceCOD : Apirl 2012

Example for SPP Wind Farm

Page 24: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Status of RE VSPP

Status for RE VSPP

Type of Fuel COD PPA LOI Submitted Total

Projects (MW) Projects (MW) Projects (MW) Projects (MW) Projects (MW)

Biomass 121 748.91 54 294.55 42 208.46 15 72.167 232 1,324.087

Biogas 119 210.13 54 91.76 24 42.51 9 23.665 206 368.065

Solar 249 921.77 9 21.02 171 943.93 429 1,886.72

- PV 248 916.77 4 10.02 171 943.93

- Parabolic Trough 1 5.00 5 11.0

Mass Solid Waste 18 43.21 9 30.10 14 82.65 2 8.8 43 164.76

Wind 5 9.6 9 49.87 14 59.47

Micro Hydro 6 1.2 8 13.48 14 14.6

Total 518 1,934.82 143 500.78 251 1,277.55 27 104.632 938 3,817.702

Page 25: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Erawan Power(Sugar cane Power Plant )

8 MW Nongbualumpoo Province

Page 26: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

7.5 MW Supanburi Province

Decha Biogreen (Rice husk )

Page 27: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Saraf bioenergy (Palm Empty Fruits Bunch)

8.5 MW Krabi Province

Page 28: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Ubon Biogas (cassava) flour)

2 MW Ubonratchathani Province

Page 29: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Bangkok Solar Power

1.2 MW Ang Thong 1.5 MW Phetchaburi

Bangkok Solar Power COD 11 Projects

Ban Pho Chachoengsao 1.3 MW

Mueang Udon Thani 0.24 MW

Phen Udon Thani 1.5 MW

Cha um Phetchaburi 2.125 MW

Phatthana Nikhom Lopburi 2.0 MW

Banphot Phisai Nakhon Sawan 0.53 MW

Mueang Ang Thong 1.2 MW

Bua Yai Nakhon Ratchasima 1.125 MW

Hua-Hin Prachuap Khiri Khan 1.75 MW

Sirintorn 4.5 MW

Phatthana Nikhom Lopburi 4.0 MW

Page 30: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Thai Solar Energy

Kanchannaburi

5 MW

Page 31: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Thai Biogas Energy(palm wasted water) water)

2.8 MW Located SurathaniProvince

Page 32: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Technology biogas from landfill (Gas to Energy)

Mass Solid Waste Power Plant

Zenit Green 8 MW Located KampangsarnNakornpratom Province

Page 33: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Electricity using heat from thermal process (Incineration)

6.5 MW Located Phuket Province

Mass Solid Waste Power Plant

Page 34: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

34

Some Technical Solution for RE Connection

1. Reverse Power Flows 2. Voltage Control in Distribution Grid 3. Protection Coordination in Distribution Grid

Page 35: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Impact of RE Connection

1. Reverse Power Flows

Page 36: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

2. Voltage control in distribution grid

Advanced voltage control for HV/MV transformer

Impact of RE Connection

Page 37: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

37

Impact of RE connection

3. Protection Coordination in distribution grid

Breaker-breaker Miscoordination

Page 38: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

38

Recloser-fuse Miscoordination

102

103

104

10-2

10-1

100

101

102

Current (Amps)

Tim

e (

se

conds)

Maximum Current

Minimum Current

Recloser F

Recloser S

Fuse TC

Fuse MM

RecloserCurrent

Fuse Current

MARGIN

(I fuse margin)

Breaker Recloser

Fault

Fuse

IF,Sub

Substation

IF,DG

DG

current through recloser current through fuse

Impact of RE connection

3. Protection Coordination in distribution grid

Page 39: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

PEA Smart Grid Roadmap

39

2012-2016 Year

Smart Level

30

100

70

Stage 1

Planning &

Pilot Project

Stage 2

Large ScaleExpansion

Stage 3

Optimal Stage

2017-2021 2022-2026

� Pattaya SG Pilot Project (1,069 MTHB)

� Mae Sariang Micro Grid (265 MTHB)

� Kood & Mak Island Micro

Grid (392 MTHB)

Total 1,781 MTHB (55.65 MUSD)

� AMI Expansion to Major Cities� SA/DA/FA Full Area Expansion� SPP/VSPP Management System Expansion� Micro Grid & Energy Storage Expansion� Demand Response (DR)/Demand Side

Management System (DSM)� Intelligent EV Charging System

-AMI Full area Expansion

-Self-healing enabled-Virtual Power Plants -Real time pricing (2-way)-V2G enabled

Provincial Electricity Authority 39

Page 40: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

40

PEA Smart Grid

( 9 Focused Areas and Key Elements)

Grid OperationsGrid Operations Customer OperationsCustomer Operations IT OperationsIT Operations

2. Power Grid Operation

5. Data Analytics to Support Decision

3. Empower Energy Customers

1. Sustainable Generation

4. Integrated Technology

Platform

7. Energy Efficiency & Green Buildings

8. Smart Grid Standard

Development

9. Smart Grid Comm.& Security

6. Enabling Electric Vehicle

Renewable energy management

Distribution Management (SCADA/EMS/DMS/OMS/

DA/Transformer)

AdvancedMetering Infrastructure

Customer Appliances(HAN/IHD/HEMS)

Demand response

ElectricVehicle (EV)

EV Charging Station

Grid impacts

Energy Efficiency Approaches

Green Building Technologies

Building Energy Management

Systems (BEMS)

Data Management Grid Operation

Analytics

Asset Analytics

SG Standards Alignment

Last Mile Network

Meter Back Haul Network

Network Operation Centers

Customer Analytics

Cyber Security

Micro Grid & DG/ES integration

IT Architecture

Meter-to-Cash Process

Page 41: Renewable Energy Projects in Thailand · Mini Hydro - Installed Capacity 50 kW -

Provincial Electricity Authority

Think the Environment First, Save the Earth

THANK YOUTHANK YOUTHANK YOUTHANK YOU

Question & Answer

Mr. Payomsarit Sripattananon

Deputy Director of Alternative Energy Encouragement and Efficiency Department

[email protected]@hotmail.com