iTATION:iurat
PROJECT REF / P.O.NO.
REPORT NO:rNsp/gurNSpEcTroN/su Rv Ey I 2304201s/01
)ATE:23/O4120L5
CUSTOMER NAME VIIS. GAIL INDIA LIMITED
CONSULTANT NAME VIIS. MECON LTDMANUFACTURERS / SUPPLIER NAME VIIS. SURYA GLOBAL STEEL TUBES LTD.PROJECT/ PO No. iArL/NOTDA/C&p/pROJ./CAUVE Ry/pr pE / !4-031/ 06s
)ATED.13.03.2015ITEM / MATERAL 1.5"(114.3)X7.10mm Gr. X42M PSL-2, ryPE-ERW(Bare Pipe)BATCH NO. / SR. NO. \S PER ANNEXURE V TO TC NO.SGSTL/QA/2OL5/0077SPECIFICATIONS / DRAWI NGS \Pt 5L GR.X42Ml1290M PSL-2CODES/STANDARDS ;GSTL/ERWQA/QAP/APt/009 & 010 Rev.01 dated 08.04.201sDATE(S)OF TNSPECTTON t3.04.20Ls
The following items/materials are lnspected and reviewed as per QAP/POIDRAWING byinternational certification services in accordance with the project technicalnational/international codes and other inspection & testing requirement
TTEMS / MATERTALS / EQUTPMENTS:
INTERNATIONAL CERTIFICATION SERVICES
T - INSPECTION RELEASE NOTE
REFERENCES: lnspection Report, Witness Report & Test Certificates
the undersigned surveyor ofspecifications, applicable
Name of Surveyor : Rajesh Kumar SinghContact No. : 09375360599E-mail : rajeshkumar.singh @icsasian.com
For ICS:
Signature with Stamp
This I -
Inspection Release note is issued without prejudice for thq ends and purpose for which it was assigned. This is an I-Inspection ReleaseNote only; Release Note shall be prepared after review by Inspection Cell. Subject to review by ICS Inspection Cell changes if any shatl beincorporated. Otherterms applicable as per ICS General Terms & Conditions / Procedures.Page_l
_ot_l_d
Sr.No.
POSr.No.
Description POQtv.Actual
PO Qty.OpeningBalance
PO Qty.lnspected
PO Qty.Released
PO Qty.Rejected
PO Qty.ClosingBalance
1 A L5"(114.3)X7.10mn Gr. X42 M,PSL-2,ryPE-ERWBare Pipe)
r6650VITR.
16650MTR.
7237.20VITR.
7237.20VITR. Nil t9412.8