Upload
socotec-belgium-sprl-bvba
View
198
Download
1
Embed Size (px)
Citation preview
THE SPRING
Design review and site inspectionPhysical and Fire safety Performance of technical systems
Renovation & Construction the Shopping Center “The Spring” in Leidsenhage, NL
Services Provided:
Project description:
Construction of the NATO HQ
Design review and site inspection for the decennial insurance
Physical and Fire safety Performance of technical systemsAcoustic performanceBLAST Resistance
Construction of the NATO Headquarters - 250,000 m² / Evere
Services Provided:
Project description:
RIVE GAUCHE
Design review and site inspection for the decennial insurancePhysical and Fire safety Performance of technical systems
Realisation of a Commercial Gallery 35.000m², Parking, Passage la Bourse, Apartments & Hostel in Charleroi
Services Provided:
Project description:
PARKBRUG
Design review and site inspectionStability & durability
Construction of pedestrian bridge in Antwerp
Services Provided:
Project description:
SPI - 31 TOWNS
Quick-ScansEnvironmental impact & Budget estimationsRedaction of technical tender specifications
Audits & consulting in energy performance of several buildings in 31 towns
Services Provided:
Project description:
HOSPITAL JULES BORDET
Design review and site inspection for the decennial insurancePhysical and Fire safety Performance of technical systemsAcoustic performance
Construction of the cancer center - Jules Bordet on the site ANDERLECHT (ERASMUS)
Services Provided:
Project description:
Completed Missions:Design review and site
inspectionElaboration of tender
specifications for technical maintenanceCondition Monitoring Technical Due Diligence
Project description:Rehabilitation and extension
of the Palace of Fine ArtsArchitecture Victor Horta
BOZAR
Missions:Property Condition
AssessmentLife Cycle Cost Analysis
Project description:Audits of the patrimony in 4
sites – Evergreen, Pôle Montparnasse, Ile de France, Saint Quentin en Yvelines - 277.234m²
PATRIMONY CREDIT AGRICOLE
Completed Missions:HQE-BREEAM Certification Assistance Pre-assessment, design stage & final
review
Project description:High environmental
performance office buildingArea: 70.000 m²
POLE STARConstruction GDF-Suez Headquarters - Brussels
Missions:
Assistance to Property Management
More than 500.000 m²More than a dozen buildings
Preparation of action plans based on audits on the existing property assets.Quality works monitoring
Cross disciplinariy approach to environmental monitoring.
Project description:
EUROPEAN PARLIAMENT
Completed Missions:Design phase review and inspection on site within the framework of Decennial Liability Insurance.Testing & Commissioning Audit
Project description:Building renovation in
2 phases40.000m² for the 2°
phase 200M€
VIVIUM
Completed Missions:
Renovation, transformation and extension
Design review and site inspection for the decennial insurance.
Project description:
BRUSSELS EXPOPalais 12
Missions:Maintenance quality controlTechnical Inspection ServicesComfort measurements
Project description:
Aquatic Parc Turbine & Power Splash
attractions
WALIBIAqualibi – Turbine – Power Splash
Completed Missions:
Design review and site inspection for the decennial insurance.
Project description:Construction of public
swimming pool in Ekeren - Antwerp
DE SCHINDE SWIMMING POOL
Missions:Maintenance Quality AuditsEnergy Performance AuditTechnical expertisesComfort measurements campaignes
Project description:
WIJNEGEM SHOPPING CENTER
Area: 30.000 m²Building Type: Shopping center
Location: Antwerp
Missions:Condition Monitoring
Life Cycle Cost Analysis - Strategic asset management assessments based on actual asset conditionMaintenance quality controlMaintenance Management auditsTechnical expertises
Sites description:Area: 400,000m² Building types: Office and
laboratoriesLocations: Netherlands – Italy –
Spain –Germany – France – Belgium
THE EUROPEAN SPACE AGENCY
Missions:Maintenance quality controlComfort auditsFeasibility studiesEnergy auditEnergy Performance Certification (EPB)
Building description:
Area: 32,730 m²Location: BrusselsBuilding type: Office and retail
ALA
BASTION TOWER
SHOPPING CENTER GRAND BAZAR
Missions:
Area: 20.000 m²Situation:
Groenplaats in Antwerp
Maintenance Quality Control
Feasibility studies
Project description:
??
Completed Missions:Maintenance quality
controlEnergy auditPre-assessment BREEAM
Elaboration of tender specification for technical maintenance
Energy Performance Certification Feasibility studies
Project description:Building type: Office + retailLocation: Brussels Area: 20.000 m²
IT TOWER
Completed Missions: Technical Assessment Maintenance Quality Controls
Building description: Area: 120.000 m² Location: Laakdal Building type: Wharehouse
/Logistics & offices
NIKE LAAKDAL
WWW.SOCOTEC.COM