I Legend/Notes Drawing Number Scale(s) Drawing Number Revision of Project Status Rev Date Description of Revisions Drawn Designed Drawing Title Contractor(s) Date Drawn Checked Approved Chkd Appr Date Date Date ELR & Mileage Alternative Reference Signed Signed Signed Signed Sheet Tel: Fax: +44 (0)121 483 5000 +44 (0)121 483 6333 The Axis 10 Holliday Street Birmingham West Midlands B1 1TF 124130-EMF-DRG-ATK-910004 A03 FOR APPROVAL THE NETWORK RAIL (NORTON BRIDGE AREA IMPROVEMENTS) ORDER J. MARSH 16/04/2012 P. DARBY 20/04/2012 J. HAYES 20/04/2012 N. HARDWICK 20/04/2012 1:2500 @ A1 3 4 124130-EMF-DRG-ATK-910004 A03 DO NOT SCALE COUNTY OF STAFFORDSHIRE BOROUGH OF STAFFORD MEECE BROOK B5026 STONE ROAD WEST COAST MAINLINE 124130-EMF-DRG-ATK-910003 124130-EMF-DRG-ATK-910005 EARTHWORKS MITIGATION BUND EARTHWORKS MITIGATION BUND EARTHWORKS MITIGATION BUND OVERBRIDGE 10A DRAINAGE ATTENUATION POND DRAINAGE ATTENUATION POND DOWN SLOW LINE LOWER HEAMIES FARM HEAMIES BRIDGE PERMANENT RIVER DIVERSION UNDERBRIDGE 11 INTERSECTION BRIDGE 5 DRAINAGE ATTENUATION POND PERMANENT RIVER DIVERSION OVERBRIDGE 5A NEW B5026 STONE ROAD ALIGNMENT EARTHWORKS MITIGATION BUND NORTON BRIDGE B5026 STONE ROAD DOWN AND UP NORTON BRIDGE LINES EXISTING SLURRY PIT TO BE REMOVED AND BACKFILLED EARTHWORKS MITIGATION BUND EARTHWORKS MITIGATION BUND DOWN SLOW LINE SEARCHLIGHT LANE JUNCTION MAINTENANCE COMPOUND EXISTING B5026 STONE ROAD TO BE STOPPED UP 7.3m WIDE CARRIAGEWAY (KERBED) WITH VERGE P04 01.06.12 CONSULTATION PD JH NH A01 23.11.12 CONSULTATION GP JH NH A02 29.08.13 FOR APPROVAL GA JH NH A03 16.09.13 FOR APPROVAL SJR SJR MD DRAINAGE ATTENUATION POND 100 50 0 150 200 250m SCALE 1:2500 U 910118 U 910118 V 910118 V 910118 W 910119 W 910119 X 910119 X 910119 Y 910119 Y 910119 Z 910119 Z 910119 N 910117 N 910117 PLANNING ACT 2008 INFRASTRUCTURE PLANNING THE INFRASTRUCTURE PLANNING (APPLICATIONS: PRESCRIBED FORMS AND PROCEDURE) REGULATIONS 2009 THE NETWORK RAIL (NORTON BRIDGE AREA IMPROVEMENTS) ORDER PLANNING INSPECTORATE (NATIONAL PLANNING DIRECTORATE) REF NO. TR040004 REFERENCE DRAWINGS DRAWING TO BE READ IN CONJUNCTION WITH: 124130-EMF-DRG-ATK-910001 KEY PLAN FOR WORKS 124130-EMF-DRG-ATK-910117 EARTHWORKS CROSS SECTIONS 124130-EMF-DRG-ATK-910118 EARTHWORKS CROSS SECTIONS 124130-EMF-DRG-ATK-910119 EARTHWORKS CROSS SECTIONS NOTES: KEY: EXISTING DWELLING EXISTING RIVER PROPOSED RIVER DIVERSION PROPOSED TRACK PROPOSED DRAINAGE PERMANENT NETWORK RAIL LAND BOUNDARY PERMANENT HIGHWAY LAND BOUNDARY EXISTING HIGHWAY TO BE STOPPED UP NETWORK RAIL ACCESS RIGHTS PROPOSED FOOTPATH DIVERSION EXISTING FOOTPATH CROSS SECTION (REFER TO DRAWING 124130-EMF-DRG-ATK-910xxx) X 910xxx X 910xxx UNDERBRIDGES 6 & 6A OVERBRIDGE 7 STATION ROAD

REFERENCE DRAWINGS DRAWING TO BE READ IN … · procedure) regulations 2009 the network rail (norton bridge area improvements) order planning inspectorate (national planning directorate)

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REFERENCE DRAWINGS DRAWING TO BE READ IN … · procedure) regulations 2009 the network rail (norton bridge area improvements) order planning inspectorate (national planning directorate)

I

Legend/Notes

Dra

win

g N

um

be

r

Scale(s)

Drawing Number Revision

of

Project

Status

Rev Date Description of Revisions Drawn

Designed

Drawing Title

Contractor(s)

Date

Drawn

Checked

Approved

Chkd Appr

Date

Date

Date

ELR & Mileage

Alternative Reference

Signed

Signed

Signed

Signed

Sheet

Tel:

Fax:

+44 (0)121 483 5000

+44 (0)121 483 6333

The Axis

10 Holliday Street

Birmingham

West Midlands

B1 1TF

124130-EMF-DRG-ATK-910004A03

FOR APPROVAL

THE NETWORK RAIL

(NORTON BRIDGE

AREA IMPROVEMENTS)

ORDER

J. MARSH

16/04/2012

P. DARBY

20/04/2012

J. HAYES

20/04/2012

N. HARDWICK

20/04/2012

1:2500 @ A1

3 4

12

41

30

-E

MF

-D

RG

-A

TK

-9

10

00

4A

03

DO NOT SCALE

COUNTY OF STAFFORDSHIRE

BOROUGH OF STAFFORD

MEECE BROOK

B

5

0

2

6

S

T

O

N

E

R

O

A

D

W

E

S

T

C

O

A

S

T

M

A

I

N

L

I

N

E

124130-E

MF

-D

RG

-A

TK

-910003

1

2

4

1

3

0

-

E

M

F

-

D

R

G

-

A

T

K

-

9

1

0

0

0

5

EARTHWORKS

MITIGATION BUND

EARTHWORKS

MITIGATION BUND

EARTHWORKS

MITIGATION BUND

OVERBRIDGE 10A

DRAINAGE

ATTENUATION

POND

DRAINAGE

ATTENUATION

POND

DOWN

SLOW LINE

LOWER

HEAMIES FARM

HEAMIES

BRIDGE

PERMANENT

RIVER DIVERSION

UNDERBRIDGE 11

INTERSECTION

BRIDGE 5

DRAINAGE ATTENUATION

POND

PERMANENT RIVER

DIVERSION

OVERBRIDGE 5A

NEW B5026 STONE

ROAD ALIGNMENT

EARTHWORKS

MITIGATION BUND

NORTON BRIDGE

B

5

0

2

6

S

T

O

N

E

R

O

A

D

DOWN AND UP

NORTON BRIDGE LINES

EXISTING SLURRY PIT TO BE

REMOVED AND BACKFILLED

EARTHWORKS

MITIGATION BUND

EARTHWORKS

MITIGATION BUND

DOWN

SLOW LINE

SEARCHLIGHT LANE

JUNCTION

MAINTENANCE

COMPOUND

EXISTING B5026 STONE

ROAD TO BE STOPPED UP

7.3m WIDE CARRIAGEWAY

(KERBED) WITH VERGE

P04 01.06.12 CONSULTATION PD JH NH

A01 23.11.12 CONSULTATION GP JH NH

A02 29.08.13 FOR APPROVAL GA JH NH

A03 16.09.13 FOR APPROVAL SJR SJR MD

DRAINAGE ATTENUATION

POND

100500 150 200 250m

SCALE 1:2500

U

9

1

0

1

1

8

U

9

1

0

1

1

8

V

9

1

0

1

1

8

V

9

1

0

1

1

8

W

910119

W

910119

X

9

1

0

1

1

9

X

9

1

0

1

1

9

Y

9

1

0

1

1

9

Y

9

1

0

1

1

9

Z

9

1

0

1

1

9

Z

9

1

0

1

1

9

N

9

1

0

1

1

7

N

9

1

0

1

1

7

PLANNING ACT 2008

INFRASTRUCTURE PLANNING

THE INFRASTRUCTURE PLANNING

(APPLICATIONS: PRESCRIBED FORMS AND

PROCEDURE) REGULATIONS 2009

THE NETWORK RAIL (NORTON BRIDGE AREA

IMPROVEMENTS) ORDER

PLANNING INSPECTORATE (NATIONAL

PLANNING DIRECTORATE)

REF NO. TR040004

REFERENCE DRAWINGS

DRAWING TO BE READ IN CONJUNCTION WITH:

124130-EMF-DRG-ATK-910001 KEY PLAN FOR WORKS

124130-EMF-DRG-ATK-910117 EARTHWORKS CROSS SECTIONS

124130-EMF-DRG-ATK-910118 EARTHWORKS CROSS SECTIONS

124130-EMF-DRG-ATK-910119 EARTHWORKS CROSS SECTIONS

NOTES:

KEY:

EXISTING DWELLING

EXISTING RIVER

PROPOSED RIVER DIVERSION

PROPOSED TRACK

PROPOSED DRAINAGE

PERMANENT NETWORK RAIL LAND BOUNDARY

PERMANENT HIGHWAY LAND BOUNDARY

EXISTING HIGHWAY TO BE STOPPED UP

NETWORK RAIL ACCESS RIGHTS

PROPOSED FOOTPATH DIVERSION

EXISTING FOOTPATH

CROSS SECTION (REFER TO DRAWING

124130-EMF-DRG-ATK-910xxx)

X

910xxx

X

910xxx

UNDERBRIDGES 6 & 6A

OVERBRIDGE 7

S

T

A

T

I

O

N

R

O

A

D