Citec Oy Ab Head office P.O. Box 109 FI-65101 Vaasa, Finland Tel. +358 6 3240 700 www.citec.com CASE IN BRIEF Project Management of document and material deliverables for Altamira power station conversion Location Power station in Mexico. Project stakeholders spread over six countries on three contintents. Customer Alstom Boiler France Year 2014-2016 CITECDOT IN A NUTSHELL CitecDot is a project lifecycle management solution that enables you to efficiently manage your deliverables, cut down costs, risks and delays - via a single platform. Altamira information managed with CitecDot Project description n  Alstom and Isolux are converting two units at the Altamira thermoelectric power station in Mexico to run on petroleum coke. The conversion project is aligned with the Mexican energy strategy as it will decrease 90 percent of the power station’s sulfur dioxide emissions. Citec scope n  Citec’s scope included management of document and material deliverables of the project with focus on the main and secondary structures of the boiler islands. Elements were identified with 2D barcode labels for easy tracking. 11/2016 Citec solution n  Alstom selected Citec as supplier largely because of project lifecycle management solution CitecDot - to secure traceability and quality control. With the help of CitecDot, engineering documents were checked and approved by the design team in Italy and Estonia, doc control took place in India, approval for manufacturing was done in France, fabrication was spread over several factories in China, whereas the construction site is in Mexico. A Citec representative was employed in China to support document management, quality control, labelling items, progress follow-up and expediting of steel structure elements. The progress and status of quality controls were animated in 3D. CUSTOMER FEEDBACK “In addition to the efficient way we can manage documents with CitecDot, we value the fact that we can follow the status of material items visually in a 3D model. It helps us to keep the project on track with good control of the engineering and manufacturing processes.” - Alain Pouliguen, project manager, Alstom Boiler France REF Card CITEC CUSTOMER REFERENCE Project metrics Documents 106 000 Structural elements 50 000 (18 000 different types) Total weight of elements 6 000 tons (largest parts up to 32 tons) Packages dispatched to site so far 1 439 Shipments from the factories 24

RefCard_Altamira CitecDot_11-2016_EN

Embed Size (px)

Citation preview

Page 1: RefCard_Altamira CitecDot_11-2016_EN

Citec Oy AbHead officeP.O. Box 109FI-65101 Vaasa, FinlandTel. +358 6 3240 700 www.citec.com

CASE IN BRIEF

Project Management of document and material deliverables for Altamira power station conversion

Location •Power station in Mexico. •Project stakeholders spread over six

countries on three contintents.

Customer Alstom Boiler France

Year 2014-2016

CITECDOT IN A NUTSHELL

CitecDot is a project lifecycle management solution that enables you to efficiently manage your deliverables, cut down costs, risks and delays - via a single platform.

Altamira information managed with CitecDot

Project descriptionn  Alstom and Isolux are converting two units at the Altamira thermoelectric power station in Mexico to run on petroleum coke. The conversion project is aligned with the Mexican energy strategy as it will decrease 90 percent of the power station’s sulfur dioxide emissions.

Citec scopen  Citec’s scope included management of document and material deliverables of the project with focus on the main and secondary structures of the boiler islands. Elements were identified with 2D barcode labels for easy tracking.

11

/2016

Citec solution n  Alstom selected Citec as supplier largely because of project lifecycle management solution CitecDot - to secure traceability and quality control.

With the help of CitecDot, engineering documents were checked and approved by the design team in Italy and Estonia, doc control took place in India, approval for manufacturing was done in France, fabrication was spread over several factories in China, whereas the construction site is in Mexico.

A Citec representative was employed in China to support document management, quality control, labelling items, progress follow-up and expediting of steel structure elements. The progress and status of quality controls were animated in 3D.

CUSTOMER FEEDBACK

“In addition to the efficient way we can manage documents with CitecDot, we value the fact that we can follow the status of material items visually in a 3D model. It helps us to keep the project on track with good control of the engineering and manufacturing processes.”

- Alain Pouliguen, project manager, Alstom Boiler France

REF CardCITEC CUSTOMER REFERENCE

Project metrics

Documents 106 000

Structural elements 50 000 (18 000 different types)

Total weight of elements 6 000 tons (largest parts up to 32 tons)

Packages dispatched to site so far 1 439

Shipments from the factories 24