Page 1 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
ANNUAL SUMMARY REPORT 2015
FOR THE NAVIGATIONAL AID
OF
KING FAHD INDUSTRIAL PORT, YANBU SAUDI SEAPORTS AUTHORITY
SUBMITTED BY:
RED SEA MARINE SERVICES CO. LTD. KING FAHD INDUSTRIAL PORT, YANBU
Page 2 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF JANUARY 2015 NOS. NAMES DATE REMARKS
1 Buoy #4 JAN. 5, 2015 Replaced the Light, Battery, Solar Panel, Radar Reflector, and Top Mark.
2
Buoy #8R JAN. 22, 2015 Replaced the old Buoy by a brand new set of Buoy, complete with Brand new set of Light, Brand new Set of Chain, Sinker, Swivel and Shackles.
3 Buoy #3 JAN. 27, 2015 Repainted the Structure, Aligned the Top Mark,
Radar Reflector, Change the Battery and Light, model # (GS/LS-C-6)
1) Buoy # 4 2) Buoy # 8R 3) Buoy # 3
Page 3 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF FEBRUARY 2015 NOS. NAMES DATE REMARKS
4
Maharish South FEB. 18, 2015 Sand Blasted the old Buoy from K.F.I.P., Buoy. Fabricated new Structure, with Radar Reflector, Top Mark, Set of Mooring Chain, Swivel, Shackle and 3 tons Sinker.
5 Duba FEB. 18, 2015 Fabricated new Structure, with Radar
Reflector, Top Mark, set of Mooring Chain, Swivel, Shackle and Sinker. New set of Light.
6 RUT FEB.18, 2015 Fabricated new Structure with Radar Reflector.
And Top Mark, New set of Light, New set of Mooring Chain, Swivel, Shackles and Sinker.
7 2C FEB. 26, 2015 Fabricated new Top Mark Structure 6) Buoy # Maharish South 7) Buoy # DUBA 8) Buoy # RUT 9) Buoy # 2C
Page 4 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF MARCH 2015 NOS. NAMES DATE REMARKS
9
Maharish South MARCH 2015 Sand Blasted the old Buoy from K.F.I.P., Buoy. Fabricated new Structure, with Radar Reflector, Top Mark, Set of Mooring Chain, Swivel, Shackle and 3 tons Sinker.
10 Duba MARCH 2015 Fabricated new Structure, with Radar
Reflector, Top Mark, set of Mooring Chain, Swivel, Shackle and Sinker. New set of Light.
11 RUT MARCH 2015 Fabricated new Structure with Radar Reflector.
And Top Mark, New set of Light, New set of Mooring Chain, Swivel, Shackles and Sinker.
12 2C MARCH 2015 Fabricated new Top Mark Structure 9) Buoy # Maharish South 10) Buoy # DUBA 11) Buoy # RUT 12) Buoy # 2C
Page 5 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF APRIL 2015 TO MAY 2015
17 MAHARISH EAST EAST CARDINAL COMPLETE NEW SET OF BUOY
Beacon 1 Beacon 2 Beacon 3
Page 6 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU Beacon 4 Beacon 5 Beacon 6
Sila Island Beacon Maharish South Duba Bouy
Rut Approach Sila Shoal
Weather AL Wajj Starboard Al Wajj Port Maharish East
Page 7 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF JUNE 2015
NOS. NAMES DATE REMARKS
30 CZC JUNE 24, 2015 (AIS) Automatic Identification System been Installed on 24 JUNE 2015.
31 1C JUNE 2015 Water blasted and Retouch the paints Clean Solar Panel and Light cover
32 10 JUNE 2015 Lifted up the old buoy and dropped the new Complete set of buoy.
33 S4 JUNE 28, 2015 Installed the (AIS) Automatic Identification System.
34
S3 JUNE 26, 2016 Water Blasted the entire Structure, applied 2 Coats of epoxy primer and 2 coats of top coat Signal Green. Installed (AIS) Automatic Identification System
35
2C JUNE 22, 2015 Replace the top Structure by smaller Pipe, Repainted the Structure Steel Pile. And Fabricated a new Structure at the yard and will install by September 2015
CZC 1C 10 S4 S3 2C
Page 8 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF JULY 2015
NOS. NAMES DATE REMARKS
36 S1 JULY 9, 2015 Lifted up the old buoy and dropped the new
set of buoy, with (AIS) Automatic Identification System.
37 S2 JULY 9, 2015 Lifted up the old buoy and dropped the new
set of buoy, with (AIS) Automatic Identification System.
S1 S2
Page 9 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF AUGUST 2015
NOS. NAMES DATE REMARKS
38 9 AUG. 23, 2015 Lifted up the old buoy and dropped a new Complete set of buoy.
39 7 AUG. 20, 2015 Lifted up the old buoy and dropped a new Complete set of buoy.
40 Beacon 28 AUG. 5, 2015 Installed the Brand New Set of Light
Model- GS/LS-C-3 (3 NM RANGE) And re-painted with required color.
9 7 Beacon 28
Page 10 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF SEPTEMBER 2015
NOS. NAMES DATE REMARKS
41 Range Beacon 38 SEPT. 03, 2015 Water Blasted the Structure, Applied 2 Coats of
Epoxy Primer Grey and 2 coats of Top Coat White.
42 21C SEPT. 03, 2015 Water Blasted the whole structure and Replaced new Battery.
43
19C SEPT. 05, 2015 Water blasted the whole structure, Chipped, scraped rusted part of the Beacon, Applied 2 coats of primer and repainted with Signal Green.
44 12 SEPT. 06, 2015 Replaced the old buoy by a new set of buoy,
new structure, new set of mooring system, Chain. Shackles, swivel and sinker.
45 2C SEPT. 7-17, 2015 Fabricated the Top Mark Structure,
With ladder and installed at the site. Repainted the Structure and the Steel Pile.
46 13C SEPT. 26, 2015 Chipped, scraped rusted part of the Beacon,
Applied 2 coats of primer and repainted with Signal Green. Replaced BATTERY
47
23C SEPT. 25, 2015 Chipped and Repainted the Structure of the Beacon. Applied 2 coats of epoxy primer and 2 Coats of Top Coat Epoxy as per color Requirements.
48 5C SEPT. 27, 2015 Water Blasted the Buoy, Applied Primer to the
rusted part and Installed brand new set of Light.
49
3C SEPT. 27, 2015 27 August 2015Chipped, Scraped the rusted part of the beacon, Applied 2 coats of epoxy primer grey and applied 2 coats of Top coat Green.
Page 11 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU Range Beacon 38 21C 19C
12 2C 13C
23C 5C 3C
Page 12 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF OCTOBER 2015
NOS. NAMES DATE REMARKS 50 3C OCT. 1, 2015 Repainted the structure and replaced battery.
51 S8 OCT. 3, 2015 Repainted the buoy body and structure. Installed Automatic Identification system.
52 18 OCT. 3, 2015 Repainted and replace the battery.
53 12 OCT. 12, 2015 Replaced the Lighting system, with Solar Panel And battery box.
54 07 OCT. 12, 2015 Installed new self contained marine lantern And installed Automatic Identification System.
55 16 OCT. 5, 2015 Lifted the buoy and brought to KFIP Service
Harbour and rehabilitated the Buoy and Structure.
56 2R OCT. 5, 2015 Replaced brand new set of marine Lantern.
57
Schermo Reef OCT. 21, 2015 Lifted the buoy and brought to Yanbu Commercial Port for rehabilitation, Water Blasted, Applied 4 coats of Epoxy Primer Grey and Red and 2 coats of Top coat epoxy Black And Yellow. AIS been installed (working)
58
East Reef OCT. 25, 2015 Lifted the buoy for rehabilitation, Water Blasted, Applied 4 coats of Epoxy Primer Grey and Red and 2 coats of Top coat epoxy Black And Yellow. AIS been installed (working)
59
West Reef OCT. 25, 2015 Lifted the buoy and brought to Yanbu Commercial Port for rehabilitation, Water Blasted, Applied 4 coats of Epoxy Primer Grey and Red and 2 coats of Top coat epoxy Black And Yellow.
60 Beacon 26 OCT. 27, 2015 Installed New Set of Light and repainted the whole structure
61 Beacon 24 OCT. 28, 2015 Installed New Set of Light and repainted the whole Structure
62 Beacon 23 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure
63 Beacon 22 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure
64 Beacon 19 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure
65 Beacon 20 OCT. 28, 2015 Installed New Set of Light and repainted the whole structure
66 Beacon 21 OCT. 29, 2015 Installed New Set of Light and repainted the whole structure
Page 13 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
3C S8 18
12 7 16
2R SCHERMO REEF East Reef
Page 14 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU West Reef Beacon26 Beacon24
Beacon 23 Beacon 22 Beacon19
Beacon 20 Beacon 21
Page 15 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF NOVEMBER 2014
NOS. NAMES DATE REMARKS
66 YCP 3 NOV. 8, 2015
Lifted up the buoy on deck and brought Ashore to rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat green
67 YCP 4 NOV. 8, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Red
68 YCP 5 NOV. 3, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Green
69 YCP 6 NOV. 4, 2015 Scrapped and Chipped the parted paints and applied 1 coats of epoxy primer and one coat of Topcoat Red
70 YCP 7 NOV. 5, 2015
Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Green
71 YCP 8 NOV. 5, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Red
72 YCP 9 NOV. 1, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Green
73 1A NOV. 1, 2015 Lifted up the buoy on deck and brought ashore To rehabilitate. Scrapped and Chipped the rusted part, applied 4 coats of epoxy primer and two coats of Topcoat Red
74 N1 NOV. 14, 2015 Replaced the battery, Cleaned the Solar Panel And retouch paint.
75 BEACON 14 NOV. 15, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint and replaced name plate
76 BEACON 16 NOV. 16, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint
Page 16 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
77 BEACON 18 NOV. 15, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint
78 BEACON 17 NOV. 16, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint
79 BEACON 20 NOV. 15, 2015 Replaced Battery, Clean the Solar Panel and Repaint the Beacon with required Paint
80 BEACON 15 NOV. 16, 2015 Replaced Name Plate, Replaced battery, Cleaned the Solar Panel and Retouch Paint with required color
81 BEACON 27 NOV. 6, 2015 Replaced Name Plate, Replaced battery, Cleaned the Solar Panel and Retouch Paint with required color
YCP3 YCP4 YCP5
YCP6 YCP7 YCP8
Page 17 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU YCP9 1A N1
Beacon14 Beacon16 Beacon18
Beacon17 Beacon20 Beacon15
Page 18 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
Beacon27
Page 19 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
MONTH OF DECEMBER 2014
NOS. NAMES DATE REMARKS
82 YCP 1 DEC. 22, 2015 Replaced Battery, Cleaned Solar Panel and repainted with color signal green
83 YCP 2 DEC. 12, 2015 Replaced Battery, Cleaned Solar Panel and repainted with color signal red
84 BEACON 4 DEC. 15, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green.
85 BEACON 5 DEC. 15, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red.
86 BUOY 3 DEC. 01, 2015 Replaced Battery, Clean the Solar Panel and Retouch Paint with color Signal Green
87 BEACON 1 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
88 BEACON 2 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red
89 BEACON 3 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
90 BEACON 4 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red
91 BEACON 5 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
92 BEACON 6 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red
93 BEACON 7 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
94 BEACON 8 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red
95 BEACON 9 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
96 BEACON 10 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Red
97 BEACON 11 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
98 BEACON 13 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
99 BEACON 15 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
100 BEACON 17 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
101 BEACON 19 DEC. 16, 2015 Replaced battery, Cleaned the Solar Panel and Retouch Paint with color Signal Green
102 BEACON 12 DEC. 16, 2015 Build a New Beacon
Page 20 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU YCP Beacon 1 YCP Beacon 2 Beacon 4
Beacon5 Buoy 3 Beacon1
Beacon2 Beacon3 Beacon4
Page 21 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
Beacon5 Beacon6 Beacon7
Beacon 8 Beacon 9 Beacon 10
Page 22 Capt. R. G. Morrison D.H.M. / Nav-Aid Expert
AIDS TO NAVIGATION REPORT RED SEA MARINE SERVICES CO. LTD.
KING FAHD INDUSTRIAL PORT, YANBU
Beacon 11 Beacon 13 Beacon 15
Beacon 17 Beacon 19 Beacon 12