Red Hawk Ridge Elementary School Playground Improvements
Spencer Fane LLP | spencerfane.com
Terms of the Three Page IGA between
PJMD and CCSD
Parties: PJMD and the Cherry Creek School Dist. No. 5 (the party is CCSD, NOT RHRES) Date: December 9, 2013 Legal Authority: CCSD can build school playgrounds PJMD can build park and rec, 32-1-1004(2)(d)
Spencer Fane LLP | spencerfane.com
Cooperation: • Colo. Const. Art. XIV, Sec. 18(2)(a) and
C.R.S. 29-1-203: “The governments can contract to provide facilities lawfully authorized to each of the contracting parties.”
1531794 4
Spencer Fane LLP | spencerfane.com
Covenants (Promises):
• 1. CCSD provides access to PJMD to plan and engineer the playground.
• 2. PJMD submits plans and engineer’s estimate of probable costs to CCSD.
• 3. CCSD Executive Director of Educational Support Services approves plans.
• PJMD deposits 120% of probable costs with CCSD.
1531794 5
Spencer Fane LLP | spencerfane.com
• 4. CCSD uses the deposit to put project to bid. • CCSD, consulting with PJMD, selects bidder,
enters construction contract.
• 5. CCSD draws on the account to pay costs. • CCSD consults with PJMD on change orders. • Improvements were to be done by Summer, 2014.
1531794 6
Spencer Fane LLP | spencerfane.com
• 6. If there is money left, CCSD is to return it to PJMD.
• 7. If there is an overrun, CCSD and PJMD meet;
either cut the scope or PJMD adds more money.
1531794 7
Spencer Fane LLP | spencerfane.com
• 8. When done (and warranty is done) CCSD owns, operates, repairs, replaces, and maintains the Improvements for CCSD and PJMD’s benefit.
1531794 8
Spencer Fane LLP | spencerfane.com
• 9. CCSD allows PJMD constituents to use the Improvements if use will not “unreasonably interfere” with CCSD.
• Use by RHRES has priority. “Organized and
scheduled” use by PJMD constituents has second priority, others, third.
• CCSD is in charge of scheduling.
1531794 9
Spencer Fane LLP | spencerfane.com
• 10. CCSD will install a recognition plaque or sign (at PJMD cost).
• 11. All financial obligations are subject to annual appropriation.
• 12-15. Unremarkable boilerplate provisions.
1531794 10
Spencer Fane LLP | spencerfane.com
• Notes on dealing with the School District
1. It will take time. 2. They don’t want to spend any money.
a. They really want assurance they won’t spend any money.
b. Really.
3. They want control over construction.
1531794 11
Spencer Fane LLP | spencerfane.com
• More Notes: • 4. They are very protective of the use
and scheduling of the facility. • 5. So, it’s similar to any other IGA.
1531794 12
Spencer Fane LLP | spencerfane.com
• Legal Notes on Implementation
1. Contracting and completion appeared smooth. 2. Getting the extra deposit back was a problem,
but what remedy can you use? a. No lien. b. Sue for breach? c. Should we have had an interest or liquidated
damages clause?
1531794 13
Spencer Fane LLP | spencerfane.com
• Questions, Comments, Great Thoughts?
14 1531794
Perspectives of a Board Member: Bill Lamberton, PJMD President
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
Investment advisory services are offered through CliftonLarsonAllen Wealth Advisors, LLC, an SEC-registered investment advisor. | ©2016 CliftonLarsonAllen LLP
Management Information Bob Blodgett, CliftonLarsonAllen
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
Parker Jordan Metropolitan District • Organized in 1984 • Arapahoe Road (N), Parker Road (E), Arapahoe/Douglas County Line
(S), Jordan Road (W), bisected by Cherry Creek • Within Unincorporated Arapahoe County and City of Centennial • 2015 Population Estimate: 6,500 • 2016 Mill Levy: 20.633 Mills • 2016 Assessed Value: 70,000,000 plus 41,000,000 CornerStar
Shopping Center (excluded in 2006) • Notable Project: 2010-12 Cherry Creek Stream Reclamation and
Amenities - $6 Million, Funding Partners COC, AC, SEMSWA, UDFCD, GoCO
• PJMD and COC jointly own the 107 acre PJCOS • RHRES located on East side of Cherry Creek, the only school within
PJMD
17
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
18
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING 19
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
RHRES Playground Improvements Financing
• $661,000 Landscape Architect’s Estimate • $486,504 DesignScapes Low Bid Approved –
September 2014
• $583,804 Required 120% Deposit with CCSD • $500,000 Actual Cost • $83,804 Returned to PJMD
• Note: “Soft” costs were $109,000
20
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
Before the Improvements
21
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
Improved Drainage
22
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
December 2014
23
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
January 2015
24
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
April 2015
25
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
April 2015 (cont.)
26
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING 27
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
28
©20
16 C
lifto
nLar
sonA
llen
LLP
WEALTH ADVISORY | OUTSOURCING | AUDIT, TAX, AND CONSULTING
June 2015
29