Product‐Capacity: Cotton yarn, polyester yarn and melange yarn ‐ (From: 10,000‐spindles To: 16,000‐spindles) Equipment Supplier: Lakshmi Machine Works Limited Current Status: As of March 2012, the project is in planning stage. The project is coming up in the existing building. The project is planned for completion in 3 months from zero date. Contact: Sri Sivajothi Spinning Mills Private Limited, Registered Office: S.F.No: 172, Coimbatore Main Road, Polavampalayam, Nambiyur, Erode 638468, Tamil Nadu, India. Tel: 91‐4285‐267356/ 267428. Fax: 91‐4285‐269971. Plant Add: Sri Sivajothi Spinning Mills Private Limited, Unit 2, S.F. No.104, Kavilipalayam Road, Nambiyur, Erode 638458, Tamil Nadu, India. Tel: 91‐4285‐268306. Equipment Supplier: Lakshmi Machine Works Limited, Registered Office: Periyanaickenpalayam, SRK Vidyalaya Post, Coimbatore 641020, Tamil Nadu, India. Tel: 91‐422‐2692371/ 2692372/ 2692373/ 2692374/ 2692375/ 2692376. Fax: 91‐422‐2692541/ 2692704. Website: www.lakshmimach.com

Bulk / Basic Drugs Chemsynth Laboratories is planning a synthetic organic chemicals manufacturing project in dist. Nellore, Andhra Pradesh. Promoter: Chemsynth Laboratories Private Limited Project Name: Synthetic organic chemicals manufacturing project in Nellore Project Type: New Unit Status: Planning Stage District: Nellore Location: Menakuru, Naidupet Mandal Land: 50 Acres Acquired Product‐Capacity: Bulk drugs and intermediates Cost: Rs.200‐Million Clearance Pending: Pollution

Projects In Planning Stage

Profile Greenply Industries planning capacity expansion of its resin manufacturing unit in Gujarat. Introduction: Greenply Industries is planning to expand the manufacturing capacity of its resin from 64 TPM to 500 TPM at GIDC Estate, Bamanbore, dist. Surendranagar, Gujarat. Resins include urea formaldehyde resin, phenol formaldehyde resin and melamine urea formaldehyde resin. The project has been submitted in the Gujarat SEIAA meeting held on 20th March, 2012. History: Greenply Industries Limited (GIL) is India’s largest interior infrastructure company with a whopping turnover of Rs. 1420

crore. We stand at top when it comes to plywood, decorative veneers and particle boards. We account for almost 25 percent of the organized plywood and 15 percent of the organized laminate market in India. With a strong retail network, 32 branches across India, and presence in over 300 cities, Greenply Industries Limited is committed to provide international quality products to its customers. Contact: Corporate office: Greenply Industries Limited, 1501‐1505 Narain Manzil, 23 Barakhamba Road, New Delhi 110001, Delhi, India. Tel: 91‐11‐42791300. Email: [email protected] Website: www.greenply.com

2

Automotive Components Polyplastics Industries (India) is planning an automotive components manufacturing project in dist. Rewari, Haryana. Promoter: Polyplastics Industries (India) Private Limited Project Name: Automotive components manufacturing project in Rewari Project Type: New Unit Status: Planning Stage District: Rewari Location: Bawal Land: Acquired Product‐Capacity: Front grills, emblems, etc. Civil Work: Yet to Start Current Status: As of April 2012, architectural designing work is in progress. Land has been acquired. The project is planned for completion in Q1 2013. Contact: Polyplastics Industries (India) Private Limited, Plant Add: O‐15, Industrial Area, Yamunanagar 135001, Haryana, India. Tel: 91‐1732‐291000. Fax: 91‐1732‐251530. Email: [email protected] Website: www.polyplasticsindia.com

Basic Textiles Manufacturing Sri Sivajothi Spinning Mills is planning an expansion of its cotton yarn, polyester yarn and melange yarn spinning project in dist. Erode, TN. Promoter: Sri Sivajothi Spinning Mills Private Limited Project Name: Expansion of cotton yarn, polyester yarn and melange yarn spinning project in Erode Project Type: Expansion Status: Planning Stage District: Erode Location: Nambiyur

Page 3: Recorder of New Projects Premium Weekly 1-7 April 2012

Civil Work: Yet to Start Current Status: As of March 2012, the project is waiting for pollution clearance. Land has been acquired. Civil work is expected to commence in May 2012 and the project is planned for completion in 2013. Contact: Chemsynth Laboratories Private Limited, Registered Office: H.No. 1‐4‐94/502, Sneha Nagar, # 8, Lokeswari Residency, Habsiguda, Hyderabad 500007, Andhra Pradesh, India. Tel: 91‐40‐40165397. Website: www.chemsynthlabs.com Mr. M. Vijender, Managing Director Plant Add: Chemsynth Laboratories Private Limited, S.No. 41 (P), 243 (P), 247 (P), 248 (P), 249 (P), 251 (P), 253 (P), 255 (P), 256 (P), APIIC Industrial Park, Menakuru, Naidupet Mandal, Nellore 524421, Andhra Pradesh, India. Website: www.chemsynthlabs.com

Hotels & Motels Ramee Group of Hotels is planning to construct a 5-star hotel in dist. Nagpur, Maharashtra. Promoter: Ramee Group Of Hotels Project Name: 5‐star hotel in Nagpur Project Type: New Unit Status: Planning Stage District: Nagpur Product‐Capacity: 5‐star hotel ‐ (100‐200‐rooms) Civil Work: Yet to Start Current Status: As of March 2012, the project is in planning stage. The project is planned for completion in 4 years from zero date. Contact: Ramee Group Of Hotels, Corporate Office: 462, A.B. Nair Road, Juhu, Mumbai City 400049, Maharashtra, India. Tel: 91‐22‐67159200. Fax: 91‐22‐26703344. Email: [email protected] Website:

www.rameehotels.com Mr. Varadaraj Shetty, Managing Director

Ramee Group of Hotels is planning to construct a 5-star hotel in dist. Vadodara, Gujarat. Promoter: Ramee Group Of Hotels Project Name: 5‐star hotel in Vadodara Project Type: New Unit Status: Planning Stage District: Vadodara Product‐Capacity: 5‐star hotel ‐ (100‐200‐rooms) Civil Work: Yet to Start Current Status: As of March 2012, the project is in planning stage. The project is planned for completion in 4 years from zero date. Contact: Ramee Group Of Hotels, Corporate Office: 462, A.B. Nair Road, Juhu, Mumbai City 400049, Maharashtra, India. Tel: 91‐22‐67159200. Fax: 91‐22‐26703344. Email: [email protected] Website: www.rameehotels.com Mr. Varadaraj Shetty, Managing Director

Liquor / Wine and Beer IPL Sugars & Allied Industries, a group company of Indian Potash, is planning a distillery in dist. Muzaffarpur, Bihar. Promoter: I P L Sugars & Allied Industries Limited Project Name: Distillery in Muzaffarpur Project Type: New Unit Status: Planning Stage District: Muzaffarpur State: Bihar Location: Village Motipur Land: 250||Acres Existing land

Projects In Planning Stage

3

Contractors

Chandra Engineers Mechanical Contractors Contact: Chandra Engineers, Chandra Bhawan, H.No.‐ 118‐A, Behind‐ St. Teresa School Khaletola, Khorabar, Gorakhpur, Uttar Pradesh, 273008. Tel: 9694942466. Email: [email protected]. Contact Person: Mr Sanjay Singh.

Abhishek Constructions Civil & Mechanical Contractors Contact: Abhishek Constructions, 300, Aratrika Appartment, Surya Sangha Club, Parnasree Palli Road, Parnasree Pally, Kolkata – 700060, West Bengal. Tel: 033 – 66343684. Contact Person: Mr. Abhishek Seth Email: [email protected]

Cemcon Infrastructure Co. Building Construction Contract Contact: Cemcon Infrastructure Co., 110. First Floor, Shivkrupa Building, Below Damanganga Times, N. H 8B, Nr. Sony Showroom, Vapi, Gujarat. Tel: 0260 – 2990562. Email: [email protected] . Contact Person: Mr.Haresh Patel. Website: http://www.cemconinfrastructure.com.

Chettinadu Structural & Engineering Limited Mechanical & Elelctrical contractors Contact: Chettinadu Structural & Engineering Limited, Kumararjah Muthiah Nagar, Puliyur CF, Karur 639114, Tamil Nadu. Tel: 04324 – 250286.

Page 4: Recorder of New Projects Premium Weekly 1-7 April 2012

Product‐Capacity: Extra neutral alcohol ‐ (45‐KLD) Civil Work: Yet to Start Current Status: As of March 2012, the project is in planning stage. The project is coming up in the existing land. The project is planned for completion in 1 year from zero date. Contact: I P L Sugars & Allied Industries Limited, Plant Add: C/o. Indian Potash Limited, Unit: Rohan Kalan, Muzaffarna‐gar 251202, Uttar Pradesh, India. Tel: 91‐131‐2485305/ 2485611. Email: [email protected] Website: www.indianpotash.org Mr. P.S. Gahlaut, MD Plant Add: I P L Sugars & Allied Industries Limited, Khata No.266, Plot No. 2‐4, 6, 12, 25, 27, 29, 34, 36, 38, 41, 45‐48 And 50‐52, Motipur, Muzaffarpur 843111, Bihar, India.

Non Conventional Energy Baldev Alloys is planning a rice husk and wood waste-based co-gen power project in dist. Bastar, Chhattisgarh. Promoter: Baldev Alloys Private Limited Project Name: Biomass‐based co‐gen power project in Bastar Project Type: New Unit Status: Planning Stage District: Bastar Product‐Capacity: Electricity (rice husk & wood waste‐based co‐gen power) ‐ (15‐MW) Cost: Rs.10,000 million Current Status: As of March 2012, pre‐feasibility report is under preparation. Land has been partially acquired and partially acquisition is in progress. The estimated cost of

the project is Rs. 10,000 million inclusive of cement project. The project completion date is yet to be finalised. Contact: Baldev Alloys Private Limited, Registered Office: Siltara Industrial Growth Center, Village Siltara, Phase‐II, 18th Milestone, Bilaspur Road, Raipur 493111, Chhattisgarh, India. Mr. Rajeev Kapoor, Managing Director Website: www.baldevalloys.in Corporate Office: Baldev Alloys Private Limited, 24, College Road, Choubey Colony, Raipur 492013, Chhattisgarh, India. Tel: 91‐771‐2224320. Fax: 91‐771‐2253384. Website: www.baldevalloys.in

Vasuki Power is planning an agricultural waste, cotton stack and chilly stack-based IPP in dist. Haveri, Karnataka. Promoter: Vasuki Power Private Limited Project Name: Agricultural waste, cotton stack and chilly stack‐based IPP in Haveri Project Type: New Unit Status: Planning Stage District: Haveri Location: Village Chillur Land: 3.2 Acres Product‐Capacity: Electricity (agricultural waste, cotton stack and chilly stack) ‐ (10‐MW) Cost: Rs.495.3‐Million Clearance Received: Environmental Civil Work: Yet to Start Current Status: As of March 2012, environmental clearance has been received. PPA has been signed. PPA has been signed with HESCOM (Hubli Electricity Supply Company) for

Projects In Planning Stage

4

Bids were invited for supply, installation, testing, commissioning with comprehensive AMC for four years after warranty towards implementation of Automatic Meter Data Reading (AMR) system at various locations of Eastern Region. Tender Name: Supply, installation, testing, commissioning with comprehensive AMC for four years after warranty towards implementation of Automatic Meter Data Reading (AMR) system at various locations of Eastern Region. Location: Kolkata, West Bengal. Promoter: Power Grid Corporation of India Limited. Contact Details: Chief Manager (CM), Power Grid Corporation of India Limited, J‐1‐15, Block EP, Sector V, Salt Lake City, Kolkata, 700091. Tel: 033 – 23572819. Tender Details: As of April 2012, last date for submission of bids: 3 May 2012. http://www.powergridindia.com/powergrid/applications/Tenders/01‐0002‐001.aspx

Bids were invited for Construction of Boundary wall for ISRO Lands, 473.50 acres at Ullarthikaval and 100 acres at Khudapura, Challakere taluk, Chitradurga District (Civil, PH & Internal Electrical works) Tender Name: Construction of Boundary wall for ISRO Lands, 473.50 acres at Ullarthikaval and 100 acres at Khudapura, Challakere taluk, Chitradurga District (Civil, PH & Internal Electri‐cal works) Location: Chitradurga, Karnataka. Promoter: ISRO Satellite Centre. Contact: Group Director (Construction & Maintenance), ISRO Satellite Centre, Department of Space, Vimanapura, Bangalore, 560 017. Tel: 080 – 25084192 / 90. Fax: 080 – 25084155. Tender Details: As of April 2012, last date for submission of bids: 4 May 2012. http://www.isro.org/Tender/Isac‐emd/ISAC‐C&MG‐12C‐2011‐12.pdf

Tenders

Page 5: Recorder of New Projects Premium Weekly 1-7 April 2012

5 MW and BESCOM (Bangalore Electricity Supply Company) for 5 MW. Equipment supplier is yet to be appointed. Work on the project is expected to commence in May 2012 and is planned for completion in 2014. Contact: Vasuki Power Private Limited, Registered Office: 51/22, 3rd Floor, 8th E Main, 4th Block, Jayanagar, Bangalore 560011, Karnataka, India. Tel: 91‐80‐41500547. Fax: 91‐80‐26651127. Website: www.vasuki.in Mr. Suresh Babu, Director

Plastics/ Polymers/ Fibers & Resins Patel Industries is planning a resin manufac-turing project in dist. Kheda, Gujarat. Promoter: Patel Industries Project Name: Resin manufacturing project in Kheda Project Type: New Unit Status: Planning Stage District: Kheda Location: GIDC Industrial Estate, Kapadwanj Product‐Capacity: Melamine formaldehyde resin ‐ (375‐TPM ), Phenol formaldehyde resin ‐ (500‐TPM ), Urea formaldehyde resin ‐ (1,200‐TPM ) Current Status: As of March 2012, the project has been submitted in Gujarat SEIAA meeting held on 20th March, 2012. Contact: Patel Industries, Plant Add: Plot No 5623/C, Phase II, GIDC Industrial Area, Vatva, Ahmedabad 382445, Gujarat, India. Tel: 91‐79‐25894651/ 25896545. Fax: 91‐79‐25895830. Email: [email protected] Website: www.patelindustries.co.in Mr. Bhupesh Patel, Managing Director Email: [email protected]

Processed / Packaged Foods Panchaganga Seeds is planning an expansion of its seed processing capacity in dist. Aurangabad, Maharashtra. Promoter: Panchaganga Seeds Private Limited Project Name: Expansion of seed processing unit Project Type: Expansion Status: Planning Stage District: Aurangabad Location: Waluj Product‐Capacity: Seed ‐ (From: 300‐TPA To: 600‐TPA) Cost: Rs.150‐Million Civil Work: Yet to Start Current Status: As of March 2012, the project is in planning stage. Equipment supplier is yet to be appointed. Work on the project is expected to commence in April 2012 and it is planned for completion in April 2013. Contact: Panchaganga Seeds Private Limited, Plant Add: F‐95, M.I.D.C. Area, Waluj, Aurangabad 431136, Maharashtra. Tel: 91‐240‐2553024. Fax: 91‐240‐2553455. Mr. Kalidass, General Manager

Sugar IPL Sugars & Allied Industries, a group company of Indian Potash, is planning an integrated sugar project in dist. Muzaffarpur, Bihar. Promoter: I P L Sugars & Allied Industries Limited Project Name: Integrated sugar project in Muzaffarpur Project Type: New Unit

Projects In Planning Stage

5

Tenders

Bids were invited for Construction of Four Nos. of Cross Drainage structures in between R.D. 84.50km to 89.50km of left bank canal. Tender Name: Construction of Four Nos. of Cross Drainage structures in between R.D. 84.50km to 89.50km of left bank canal. Location: Angul, Orissa. Promoter: Department of Water Resources, Orissa. Contact: Office of the Chief Engineer & Basin Manager, Brahmani Left Basin, Samal, At/PO Samal Barrage Township, District Angul, Orissa. Tel: 06760‐266333 /9438239656. Fax: 06760 – 266336. Email: [email protected]. Tender Details: As of April 2012, last date for submission of bids: 7 May 2012. http://www.odisha.gov.in/portal/Admin/detailstender1.aspx?tenderid=T7252&vchglinkid=GL008&vchplinkid=PL027

RFP were invited for construction of Ahmedabad-Dholera Expressway including new link to International Airport at Dholera in Gujarat. Tender Name: Construction of Ahmedabad ‐ Dholera Expressway including new link to International Airport at Dholera in the State of Gujarat. Location: Dholera, Gujarat. Promoter: Gujarat State Road Development Corporation Ltd. Contact Details: General Manager (Projects), Gujarat State Road Development Corporation Ltd, Ground Floor, Nirman Bhavan, Sector 10‐A, Gandhinagar, 382010, Gujarat. Tel: 079‐23252912 / 23252915. Fax: 079 – 23252090. Tender Details: As of April 2012, last date for submission of bids: 5 May 2012. http://2.imimg.com/data2/XI/LP/HTT‐882/882_2012‐03‐28_1332927124.jpg

Page 6: Recorder of New Projects Premium Weekly 1-7 April 2012

Status: Planning Stage District: Muzaffarpur Location: Village Motipur Land: 250 Acres Existing land Product‐Capacity: Sugar ‐ (3,500‐TCD), Extra neutral alco‐hol ‐ (45‐KLD ), Electricity (bagasse and rice husk‐based IPP) ‐ (20‐MW) Civil Work: Yet to Start Current Status: As of March 2012, the project is in planning stage. The existing plant will be demolished and the new plant will be constructed. The project is planned for completion in 1 year from zero date. Contact: I P L Sugars & Allied Industries Limited, Plant Add: C/o. Indian Potash Limited, Unit: Rohan Kalan, Muzaffarna‐gar 251202, Uttar Pradesh, India. Tel: 91‐131‐2485305/ 2485611. Email: [email protected] Website: www.indianpotash.org Mr. P.S. Gahlaut, MD Plant Add: I P L Sugars & Allied Industries Limited, Khata No.266, Plot No. 2‐4, 6, 12, 25, 27, 29, 34, 36, 38, 41, 45‐48 And 50‐52, Motipur, Muzaffarpur 843111, Bihar, India.

Commercial Complexes Palm Grove Beach Hotels is planning to expand its residential‐cum‐commercial complex at Ghatkopar, dist. Mumbai Suburban, Maharashtra. The cost of the project is Rs. 980 million. Mahabal Enviro Engineers is the consultant. The project comprises of 1 building. The expansion will add building 2 with stilt+8 floors in building 2, 2B+G+podium+20 upper floors in building 3 and stilt+7 floors in building 4. The project

has been submitted in the 51st Maharashtra SEAC meeting held on 2nd March, 2012. [Info as of: Mar. '12]

Palm Grove Beach Hotels Private Limited, Registered Office: Palm Grove Beach Hotel, Juhu Tara Road, Juhu, Mumbai 400049, Maharashtra, India. Tel: 91‐22‐26110710/ 26110898/ 26110504. Mr. Raheja Palm Grove Beach Hotels Private Limited, Site Office: Off Plot CTS No. 168A/B 168C/1 & 168G/2, Ghatkopar, Mumbai Suburban ‐ 400086, Maharashtra, India. Mahabal Enviro Engineers Private Limited, Consultant: Corporate Office: Plot No. F‐7, Road No. 21, MIDC Wagle Estate, Thane 400604, Maharashtra. Tel: 91‐22‐25820658/ 25823139/ 25823154. Fax: 91‐22‐25823543. Email: [email protected] / [email protected]; Website: www.mahabal.com

Sobha Developers is planning to construct the 'Sobha Global Mall', a commercial and residential apartment at Gopalapura, dist. Bangalore, Karnataka. The cost of the project is Rs. 2120 million. BS Envi‐Tech, Hyderbad is the consultant. The project will consist of one L‐shaped tower with residential and commercial wings. The residential wing will consist of 356 flats with 5B+G+34 upper floors. The commercial wing will consist of 5B+lower ground floor (LGF)+upper ground floor(UGF)+3 upper floors. The commercial complex will consist of a hyper market situated at LGF, 2 retail outlets in the UGF and 1st floor, a food court and family entertainment in the 2nd floor and a multiplex and club house in the 3rd floor. The basements are for parking facilities. The residential and commercial wings will be on the first floor. The project has been submitted in the 78th

Projects In Planning Stage

6

http://www.core.indianrailways.gov.in/TenderDetails.jsp?T_ID=605&lang=0&id=0,299

IFB were invited for Upgradation & Renovation of ESP Package for Talcher Thermal Power Station, Stage-II (2X110 MW) located at Talcher, District Angul, State of Orissa, India. Tender Name: Upgradation & Renovation of ESP Package for Talcher Thermal Power Station, Stage‐II (2X110 MW) located at Talcher, District Angul, State of Orissa, India. Location: Angul, Orissa. Promoter: NTPC Limited. Contact Details: DGM / Sr. Engineer (Contract Services‐III), NTPC Limited, 6th Floor, Engineering Office Complex, A‐8A, Sector‐24, Noida, Uttar Pradesh, 201301. Tel: 0120 ‐ 3316658 / 3318613. Fax: 0120 – 2410284 / 2410359. Tender Details: As of April 2012, last date for submission of bids: 4 May 2012. http://www.ntpctender.com/uploads/job_12254.html

Bids were invited for Provision of Tube Well (350/200) mm dia with Pumphouse, Pipe Line & Clorinator Plant for Staff Quarter at Chapra Jn, Si-wan Jn,& Bhatni Jn in BSB Division of N.E. Railway in Connection with Railway Electrification work of CI to GKP section of Group-141. Tender Name: Provision of Tube Well (350/200) mm dia with Pumphouse, Pipe Line & Clorinator Plant for Staff Quarter at Chapra Jn, Siwan Jn,& Bhatni Jn in BSB Division of N.E. Railway in Connection with Railway Electrification work of CI to GKP section of Group‐141. Location: Gorakhpur, Uttar Pradesh. Promoter: Central Organization for Railway Elelctrification. Contact Details: Chief Project Manager, (Besides CEE/N.E. Rly’s office), Railway Electrification, P.O.‐ Railway Colony, Gorakhpur 273012, Uttar Pradesh, India. Tel: 05512 – 205434. Email: [email protected]. Tender Details: As of April 2012, last date for submission of bids: 2 May 2012.

Tenders

Page 7: Recorder of New Projects Premium Weekly 1-7 April 2012

Karnataka SEAC meeting held on 6th & 7th January, 2012. [Info as of: Mar. '12]

Sobha Developers Limited, Registered Office: C/o Sobha Group, 'SOBHA' Sarjapur Marthahalli, Outer Ring Road, Devarabisanahalli, Bellandur Post, Bangalore ‐ 560103, Karnataka. Tel: 91‐80‐49320000. Fax: 91‐80‐49320444. Website: www.sobha.com Mr. J.C Sharma, Managing Director B S Envi ‐ Tech Private Limited, Consultant: Registered Office: 64/3, RT P. S. Nagar, Vijayanagar Colony, Hyderabad 500057, Andhra Pradesh, India. Tel: 91‐40‐23346806/ 66783061/ 66783062. Fax: 91‐40‐23341297. Email: [email protected]; Website: www.bsenvitech.com

Electronic Equipment & Components Rangsons Electronics is planning an expansion of its printed circuit board manufacturing project at Hebbal Industrial Area, dist. Mysore, Karnataka in the existing plant premises. [Info as of: Mar. '12]

Rangsons Electronics Private Limited, Plant Add: Plot No. 347, A D1 & D2, KIADB, Electronics City, Hebbal Industrial Area, Mysore 570016, Karnataka. Tel: 91‐821‐4280000. Fax: 91‐821‐4000369. Email: [email protected] Website: www.rangsons.com Mr. Pavan G Ranga, CEO

Hospitals Global Hospitals is planning to construct a 450 beds super specialty care and multi‐organ transplantation hospital in district Kolkata, West Bengal. Land has been acquired. The project completion date is yet to be finalised. [Info as of: Mar. ’12]

Global Hospitals Limited, Corporate Office: 6‐1‐1070, Near Dwaraka Hotel, Lakdi‐ka‐Pul, Hyderabad ‐ 500004, Andhra Pradesh, India. Tel: 91‐40‐23244444/ 30644444. Fax: 91‐40‐23244455. Website: www.globalhospitalsindia.com Mr. David, Manager

Lifespring Hospitals, a group company of HLL Lifecare, is planning 100 maternity hospitals across India. The project is planned for completion in 2017. The company is currently running 12 maternity hospitals in Hyderabad. [Info as of: Mar. '12]

Lifespring Hospitals Private Limited, Registered Office: C/o HLL Lifecare Limited, HLL Bhavan Mahilamandiram Road, Poojappura, Thiruvananthapuram ‐ 695012, Kerala, India. Tel: 91‐471‐2354949/ 2355125. Fax: 91‐471‐2355125. Website: www.lifespring.in Mr. Suresh Kumar K.K, Director

Hotels & Motels Appu Hotels, belonging to the PGP Group, is planning to construct a 4‐star hotel at Palani, dist. Dindigul, Tamil Nadu. Work on the project is expected to commence in Q2 2012 and the project is scheduled for completion in Q4 2013. [Info as of: Mar. '12]

Appu Hotels Limited, Administrative Office: C/o PGP Group, No 1, GST Road, St. Thomas Mount Guindy, Chennai 600016, Tamil Nadu, India. Tel: 91‐44‐22314343. Fax: 91‐44‐22314344. Website: www.pgpgroup.org Ms. Thara Rao, Marketing Director

Foodlink Services (India) is planning to construct a restaurant in dist. Bangalore, Karnataka. The project is planned for completion in 5 months from zero date. [Info as of: Mar. '12]

Projects In Planning Stage

7

Orders Bagged • Adani Power Maharashtra Ltd. for an Annual Contract for

Complete Operation and Maintenance of Coal Handling Plant ofr unit 1 & 2 and 2 Nos. of Bull Dozers for 5X660 MW thermal Power Project at Village Tiroda, Dist. Gondia Maharashtra) at a price of Rs. 5.7 Crores. The contractual completion period is 12 months.

• HPCL ‐ Mittal Energy Limited for Commissioning Assistance and operation & Maintenance for Coke Handling System for Guru Gobind Singh Refinery at Bhatinda at a price of Rs. 5.16 Crores. The contractual completion period is 12 months.

L&T Construction Bags Orders Valued Rs.1875 Crore BSE 30 Mar 2012 Larsen & Toubro Ltd. has informed BSE regarding a Press Release dated March 30, 2012, titled "L&T Construction Bags Orders Valued Rs. 1875 Crore".

Prism Informatics Ltd. awarded with the SAP Support Project for Lankem Ceylon Plc. Srilanka BSE 30 Mar 2012 Prism Informatics Ltd. has informed BSE regarding a Press Release dated March 30, 2012, titled "Prism Informatics Ltd. awarded with the SAP Support Project for Lankem Ceylon Plc. Srilanka".

Receipt of Orders BSE 28 Mar 2012 McNally Bharat Engineering Company Ltd. has informed BSE that the Company have received three Order from: • Ideal Energe Projects Ltd. for Turnkey O & M service

contract for CHP, AHP, FOPH, ESP and CMRH for 1X270 MW unit at IEPL Project near Bela, Distt. Nagpur at a price of Rs. 24.58 Crores. The contractual completion period is 36 months.

Page 8: Recorder of New Projects Premium Weekly 1-7 April 2012

Foodlink Services ( India ) Private Limited, Corporate Office: 301, Third Floor, Safal Pride, CTS No. 396/A/2. Sion Trombay Road, Deonar, Mumbai 400088, Maharashtra, India. Tel: 91‐22‐61189945. Website: www.foodlink.in Mr. Sanjay Vazirani, Managing Director

Foodlink Services (India) is planning to construct a restaurant in dist. Kolkata, West Bengal. The project is planned for completion in 5 months from zero date. [Info as of: Mar. '12]

Foodlink Services ( India ) Private Limited, Corporate Office: 301, Third Floor Safal Pride, CTS No. 396/A/2. Sion Trombay Road, Deonar, Mumbai City ‐ 400088, Maharashtra, India. Tel: 91‐22‐61189945. Website: www.foodlink.in Mr. Sanjay Vazirani, Managing Director

Non Metallic Minerals Mining NCL Industries, a flagship company of NCL Group, is planning a limestone mining project at Mattapalli Village, dist. Nalgonda, Andhra Pradesh. The project has been submitted in the 46th Andhra Pradesh SEAC meeting held on 7th March, 2012. The SEAC has requested the company to submit a copy of the memo issued by the Mines and Geology Department allocating the mining lease. [Info as of: Mar. ‘12]

N C L Industries Limited, Registered Office: C/o NCL Group, Raghava Ratna Towers, 7th Floor, Chiragali Lane, Abids, Hyderabad 500001, Andhra Pradesh. Tel: 91‐40‐23203637/ 23202548. Fax: 91‐40‐23202417/ 23202496. Email: [email protected] Website: www.nclind.com Mr. K. Ravi, Managing Director

Plastics/ Polymers/ Fibers & Resins Greenply Industries is planning to expand the manufacturing capacity of its resin from 64 TPM to 500 TPM at GIDC Estate, Bamanbore, dist. Surendranagar, Gujarat. Resins include urea

formaldehyde resin, phenol formaldehyde resin and melamine urea formaldehyde resin. The project has been submitted in the Gujarat SEIAA meeting held on 20th March, 2012. [Info as of: Mar. '12]

Greenply Industries Limited, Corporate Office: 1501‐ 1505, Narain Manzil, 23, Barakhamba Road, New Delhi ‐ 110001, Delhi, India. Tel: 91‐11‐42791300. Email: [email protected] ; Website: www.greenply.com Mr. Alex Joseph, Manager Greenply Industries Limited, Plant Add: Plot No. C‐1/B‐828/829/832 910‐913 1003‐1005, GIDC Estate, Bamanbore, Taluk Chotila, Surendranagar 363520, Gujarat, India. Tel: 91‐2751‐240355/ 240356. Email: [email protected]

Ports & Harbours Mumbai Metropolitan Region Development Authority is planning to construct 22 km trans‐harbour link from Sewri, Mumbai to Nhava in Navi Mumbai, Maharashtra. The link is 22 kms long with a 16.5 kms long bridge across Mumbai harbor and a 5.5 kms long viaduct on the Sewri and Nhava sides. The estimated cost of the project is Rs. 88,000 million and will be implemented through PPP (Public‐Private Partnership) on the design, build, finance, operate and transfer (DBFOT) basis. The following 18 companies have submitted six proposals for pre‐qualification bid: CINTRA ‐ SOMA ‐ SREI‐Consortium, Gammon Infrastructure Projects Ltd ‐ OHL Concessions ‐ G.S. Engineering Consortium, GMR Infrastructure Ltd ‐ L&T Limited ‐ Samsung C&T Corporation‐Consortium, IL & FS Transportation Networks Limited ‐ Unity Infrastructure Limited ‐Navayuga Engineering Company Limited ‐ Rizzani de Eccher S.p.A. IRB Infrastructure Developers Limited ‐ Hyundai Consortium, The Tata Realty and Infrastructure Limited ‐ Autostrade Indian Infrastructure Development Private Limited ‐ Vinci Concessions Development V Pte Ltd. Consortium. [Info as of: Mar. '12]

Projects In Planning Stage

8

design, build, finance, operate and transfer (DBFOT) on BOT (Toll) basis (the "Project").

L&T Construction bags Order Worth Rs. 1700 Cr BSE 27 Mar 2012 Larsen & Toubro Ltd. has informed BSE regarding a Press Release dated March 27, 2012 titled "L&T Construction bags Order Worth Rs. 1700 Cr."

CBM Blocks awarded in NELP IX BSE 27 Mar 2012 Deep Industries Ltd has informed BSE that the Deep Energy, LLC and Deep Natural Resources Ltd., subsidiaries of the Company have been the awarded New Exploration Licensing Policy (NELP ‐ IX) of Government of India.

Subex bags multi-million dollar Revenue Operation Centre (ROC) deal in APAC BSE 27 Mar 2012 Subex Ltd. has submitted to BSE a copy of Press Release dated March 27, 2012 titled "Subex bags multi‐million dollar Revenue Operation Centre (ROC) deal in APAC".

Letter of Award from NHAI for Birmitrapur-Barkote Section of NH-23 BSE 27 Mar 2012 Gammon Infrastructure Projects Ltd. has informed BSE that the Company has received the letter of award for the 'Rehabilitation and Upgradation of Birmitrapur to Barkote section of NH‐23 (km 211.200 to km 336.815) in the State of Orissa under NHDP IV on

Orders Bagged

Page 9: Recorder of New Projects Premium Weekly 1-7 April 2012

Appointments

Change in Directorate BSE 02 Apr 2012 Diamines & Chemicals Ltd. has informed BSE that Mr. G. G. Chendwankar, who was Non‐Executive Director on the Board of the Company till March 31, 2012, shall be designated as an Independent and Non‐Executive Director of the Company with effect from April 01, 2012.

Change in Directorate BSE 02 Apr 2012 Power Grid Corporation of India Ltd. has informed BSE that in pursuance of Office Order dt. February 22, 2012 of Ministry of Power, Shri. R. P. Singh has assumed the post of Director (Personnel), POWERGRID with effect from Apr 01, 2012 (F/N).

Change in Directorate BSE 02 Apr 2012 Bharat Heavy Electricals Ltd. has informed BSE that consequent upon the superannuation of Shri. Anil Sachdev on March 31, 2012, Shri. R. Krishnan has assumed charge of post of Director (HR) in the forenoon of April 01, 2012.

Outcome of Board Meeting BSE 30 Mar 2012 Trident Ltd. has informed BSE that the Board of Directors of the Company at its meeting held on March 30, 2012, has transacted the following: 1. Mr. Abhishek Gupta has been appointed as Additional Director of the Company.

Mumbai Metropolitan Region Development Authority, Administrative Office: C‐14/ 15, Bandra‐Kurla Complex, Bandra East, Mumbai Suburban ‐ 400051, Maharashtra, India. Tel: 91‐22‐26590001/ 26590002/ 26590003/ 26590004/ 26594000. Fax: 91‐22‐26591264. Website: www.mmrdamumbai.org Mr. Rahul Asthana, Metropolitan Commissioner

Real Estate / Housing GR Constructions is planning to construct the 'GR Sagar Nivas', a residential apartment‐cum‐commercial complex at village Naganadhapura, Begur Hobli, dist. Bangalore, Karnataka, at an estimated cost of Rs. 353.9 million. Total built up area is 39,362.29 sq.mtrs. The project will consist of 242 residen‐tial flats in 2 blocks with B+G+11UF each and commercial facilities with B+G+5UF. It will also include parking facilities for 326 cars and additional facilities like swimming pool, children's play area, club house, etc. [Info as of: Mar. '12]

G R Cons0tructions, Head Office: No. 161/A, 7th Cross, 1st Stage, Teachers Colony, Kumaraswamy Layout, Bangalore 560078, Karnataka, India. Tel: 91‐80‐26660456/ 26667273/ 41751554. Fax: 91‐80‐26667273. Email: i n f o @ g r c o n s t r u c t i o n s . c o . i n ; W e b s i t e : www.grconstructions.co.in

Kiyana Properties, belonging to the Kalpataru Group, is planning to construct the 'Kalpataru Crest', a 2 & 3 BHK residential apartment at Bhandup West, dist. Mumbai City, Maharashtra. The project will consist of 2 multi‐storied towers, pool & toddlers pool, garden, children's play area, clubhouse with gymnasium, squash and half‐basketball courts, etc. The project is planned for completion in Q4 2014. [Info as of: Mar. '12]

Kiyana Properties Private Limited, Registered Office: C/o. Kalpataru Group, 101 Kalpataru Synergy, Opposite Grand

Hyatt Santacruz (E), Mumbai 400055, Maharashtra, India. Tel: 91‐22‐30643065/ 30645000. Fax: 91‐22‐30643131. Email: [email protected] / [email protected]; Website: www.kalpataru.com

Mantri Developers is planning to construct the 'Mantri Varthur 2', a 255 units G+1UF each villas at Villages Amani Bellandur Khane, Varthur and Kahne Kandaya, dist. Bangalore, Karnataka on 141,728.48 sq.mtrs. The estimated cost of the project is Rs. 4800 million. The project has been submitted in the 48th Karnataka SEIAA meeting held on 6th February, 2012. [Info as of: Mar. '12]

Mantri Developers Private Limited, Registered Office: Man‐tri House, No.41, Vittal Mallya Road, Bangalore 560001, Karnataka. Tel: 91‐80‐41300000. Fax: 91‐80‐41325000. Email: [email protected]; Website: www.mantri.in Mrs. Snehal Mantri, Director

Radhika Infraestate, belonging to the RIPL Group, is planning to construct a group residential project at Badwai, dist. Bhopal, Madhya Pradesh. The project has been submitted in the 82nd Madhya Pradesh SEIAA meeting held on 3rd February, 2012. [Info as of: Mar. '12]

Radhika Infraestate Private Limited, Corporate Office: C/o RIPL Group, Near RGPV University, Aiport Bypass Road, Bhopal 462038, Madhya Pradesh. Tel: 91‐755‐2809051. Website: www.riplmapletree.com

Smart Value Homes, belonging to the Tata Housing group, is planning to construct the 'Corniche AL‐Latheef', an integrated township at Sheshagirirao Palya Village, Dasanpura Hobli, Nelamangala Taluk, dist. Bangalore, Karnataka. The cost of the project is Rs. 3740 million and it will consist of 2695 units ‐ ‘Shubh Griha’ (G+9UF) with 890 units, ‘New Haven’ (2B+G+14, G+12, G+10 upper floors) with 1348 units, ‘Assisted Living’ (2B+G+12 upper floors) with 192 flats, ‘Trinity

Projects In Planning Stage

9

Page 10: Recorder of New Projects Premium Weekly 1-7 April 2012

Square’ (2B+ G+22 upper floors) with 265 flats and ‘Amenities Tower’ with 2B+G+9 upper floors and terrace floors. The project has been submitted in the 77th Karnataka SEAC meeting held on 2nd and 3rd December 2011. [Info as of: Mar. '12]

Smart Value Homes Private Limited, Registered Office: C/o Tata Housing Group, 12th Floor, Times Tower Kamala Mills Compound, Senapati Bapat Marg, Lower Parel, Mumbai City ‐ 400013, Maharashtra, India. Tel: 91‐22‐66614444. Fax: 91‐22‐66614452. Website: www.tatahousing.com Mr. Brotin Banerjee, Managing Director

Real Estate / Housing Soham Builders, belonging to the Soham Group, is planning to construct the 'Soham Pruksa Ville', a residential apartment at Pimpalner, dist. Thane, Maharashtra. The project has been submitted in the 52nd Maharashtra SEAC meeting held on 12th March, 2012. [Info as of: Mar. '12]

Soham Builders Limited, Corporate Office: C/o Soham Group, Soham House, Hari Om Nagar, Off. Eastern Express Highway Mulund East, Mumbai Suburban ‐ 400081, Maharashtra, India. Tel: 91‐22‐25981000/ 25982020. Email: [email protected]; Website: www.sohamworld.com Mr. Chaitanya Parekh, Managing Director

Resorts Appu Hotels, belonging to the PGP Group, is planning to construct a 107 rooms beach resort at Mahabalipuram, dist. Kanchipuram, Tamil Nadu. Work on the project is expected to commence in Q2 2012 and the project is scheduled for completion in Q4 2013. [Info as of: Mar. '12]

Appu Hotels Limited, Administrative Office: C/o PGP Group No 1, GST Road, St. Thomas Mount Guindy, Chennai ‐ 600016, Tamil Nadu, India. Tel: 91‐44‐22314343. Fax: 91‐44‐22314344. Website: www.pgpgroup.org Ms. Thara Rao, Marketing Director

Roads & Highways National Highways Authority of India is planning 4‐laning of the Gomati ka Chauraha‐Udaipur section of NH‐8 in Rajasthan. Sadbhav Engineering, Ahmedabad has been awarded a Rs. 12,800 million contract on design, build, finance, operate and transfer (DBFOT) (toll) basis for a concession period of 27 years. The scope includes 4‐laning from Km 177/000 to Km 260/100.[Info as of: Mar. '12]

National Highways Authority Of India, Corporate Office Address: G 5&6, Sector‐10, Dwarka, New Delhi ‐ 110075, Delhi, India. Tel: 91‐11‐25074100/ 25074200. Fax: 91‐11‐25093507/ 25093514. Website: www.nhai.org Mr. B. N. Singh, Projects Sadbhav Engineering Limited, Contractor: Registered Office: Sudbhav House Opp. Law Garden Police Chowki, Ellisbridge, Ahmedabad ‐ 380006, Gujarat, India. Tel: 91‐79‐26463384. Fax: 91‐79‐26400210. Email: [email protected]; Website: www.sadbhaveng.com

Thermal Power Generation Cosmic Urja is planning an 80 (2x40) MW coal‐based IPP at Village Chatardih, dist. Seraikela, Jharkhand on 40 acres of land. The estimated cost of the project is Rs. 4400 million. PPA has been signed with the Jharkhand government. The project is planned for completion in 2014. [Info as of: Mar. '12]

Projects In Planning Stage

10

Change in Directorate BSE 29 Mar 2012 Pharma Com India Ltd. has informed BSE that Anil Agrawal is appointed as Chairman cum Managing Director w.e.f March 05, 2012 to hold the office for the period of 5 years.

Appointment of Director BSE 29 Mar 2012 Spectacle Infotek Ltd. has informed BSE that the Board of Directors of the Company at its meeting held on Mar 28, 2012, appointed Mr. Mathuria Tushar Vamanray as an Additional Director of the Company with immediate effect.

Appointment of CFO BSE 30 Mar 2012 Bank of India has informed BSE that the Bank has appointed Shri. Gauri Shankar, General Manager as Chief Financial Officer of the Bank w.e.f. April 01, 2012.

Abstract of appointment of Executive Director BSE 29 Mar 2012 Suprajit Engineering Ltd has submitted to BSE a copy of an Ab‐stract of Terms and Conditions of Appointment of Executive Director of the Company.

Appointment of Director BSE 29 Mar 2012 Varun Industries Ltd. has informed BSE that Shri Raaja Jain was appointed as an Additional Director of the Company to hold office up to the date of the ensuing Annual General Meeting.

Re-appointment of Whole-time Director BSE 31 Mar 2012 Maruti Suzuki India Ltd. has informed BSE that the board has re‐appointed Mr. Shuji Oishi as Whole ‐ time director designated as Director & Managing Executive Officer (Marketing & Sales) for a further period of 3 (three) years with effect from April 13, 2012.

Appointments

Page 11: Recorder of New Projects Premium Weekly 1-7 April 2012

Appointments

Smartlink Network Systems Ltd. appoints Mr. Bimal Raj as the CEO BSE 02 Apr 2012 Smartlink Network Systems Ltd. has informed BSE regarding a Press Release dated April 02, 2012, titled "Smartlink Net‐work Systems Ltd. appoints Mr. Bimal Raj as the CEO".

Change in Directorate BSE 02 Apr 2012 Easun Reyrolle Ltd. has informed BSE that: 1. Directors of the Company appointed Mr. Raj H. Eswaran as Managing Director of the Company effective from April 01, 2012 for a period of five years. Mr. Raj H. Eswaran has been on the Board as Director of the Company for nearly 12 years.

Change in Directorate BSE 02 Apr 2012 Bodal Chemicals Ltd. has informed BSE that: Ms. Divya Nair, Asst. Company Secretary has been appointed as compliance officer of the Company w.e.f. March 31, 2012.

Change in Nominee Director of Clearwater Capital Partners BSE 02 Apr 2012 Diamond Power Infrastructure Ltd. has informed BSE that the Company have been advised by Clearwater Capital Partners (CCP), that their Nominee Director Mr. Ashwini Sahoo will be replaced by Mr. Karthik Athreya in the Board of Directors of the Company.

Cosmic Urja Limited, Corporate Office Address: Drevin House, Club Road, Ranchi ‐ 834001, Jharkhand, India. Tel: 91‐651‐2331860.

Thermal Power Generation Creative Thermolite Power is planning a 600 MW coal‐based IPP at Village Murka, dist. Chitrakoot, Uttar Pradesh on 450‐500 acres of land. The estimated cost of the project is Rs.

32,000 million. PPA has been signed with the Uttar Pradesh government. Land acquisition is in progress and the project is scheduled for completion in 2015. [Info as of: Mar. '12]

Creative Thermolite Power Private Limited, Corporate Office: 155, Somdutt Chambers II, 9, Bhikaji Cama Place, New Delhi ‐ 110066, Delhi, India. Tel: 91‐11‐46150845/ 46150846/ 46150847. Fax: 91‐11‐46150830. Website: www.creativethermolite.com

Projects In Planning Stage

11

Automotive Components Polyplastics Industries (India) is implementing an expansion of its front grill and emblem manufacturing project at Industrial Area, dist. Yamunanagar, Haryana. The estimated cost of the project is Rs. 100 million. Civil work is in progress, machinery is being erected and the project is scheduled for completion in Q1 2013. [Info as of: Mar. '12]

Polyplastics Industries (India) Private Limited, Plant Add: O‐15, Industrial Area, Yamunanagar‐ 135001, Haryana, India. Tel: 91‐1732‐291000. Fax: 91‐1732‐251530. Email : inf o@polyp last icsindia.com Website : www.polyplasticsindia.com

Educational Infrastructure Kerala State Industrial Development Corporation is constructing an oceanarium with research facility at Kochi, dist. Ernakulam, Kerala. The project cost is estimated to be Rs. 3500 million. State Fisheries Resource Management Society (FIRMA), Thiruvananthapuram is the nodal agency. Civil work is

in progress and the project is scheduled for completion in March 2013. [Info as of: Mar. '12]

Kerala State Industrial Development Corporation Limited, Registered Office: T.C. 11 / 266 Keston Road, Kowdiar, Thi‐ruvananthapuram ‐ 695003, Kerala, India. Tel: 91‐471‐2318922. Fax: 91‐471‐2315893. Email: [email protected] /[email protected]; Website: www.ksidc.org Mr. T.A. Krish‐namoorthy, GM State Fisheries Resource Management Society, Nodal Agency Address: Head Office: Directorate Of Fisheries, 4th Floor Vikas Bhavan, Thiruvananthapuram ‐ 695033, Kerala, India. Tel: 91‐471‐2304348. Website: www.fishnetkerala.gov.in

Hotels & Motels Minerva Grand Hotels is implementing a 4‐star hotel at Kondapur, dist. Rangareddy, Andhra Pradesh. The hotel will consist of 44 rooms approximately. Civil work is in progress and the project is scheduled for completion in 2012. [Info as of: Mar. '12]

Projects Under Implementation

Page 12: Recorder of New Projects Premium Weekly 1-7 April 2012

Minerva Grand Hotels Private Limited, Administrative Of‐fice: Secunderabad SD Road, Opp To Taj 5‐star, Hyderabad 500003, Andhra Pradesh, India. Tel: 91‐40‐66117373. Website: www.minervagrand.com Mr. Ramkrishna Reddy Minerva Grand Hotels Private Limited, Site Office: Beside Google Office, Kondapur, Rangareddy 500084, Andhra Pradesh, India.

Hotels & Motels Rao Travels is constructing a 100 deluxe rooms hotel at Tirupati, dist. Chittoor, Andhra Pradesh. The estimated cost of the project is Rs. 100 million. Civil work is in progress and the project is scheduled for completion in 2013. [Info as of: Mar. '12]

Rao Travels, Administrative Office: 17 Vasant Enclave Market, Vasant Vihar, New Delhi ‐ 110057, Delhi, India. Tel: 91‐11‐26144545/ 32554099/ 32554099/ 46131313. Fax: 91‐11‐26144433/ 26164499. Email: [email protected]; Website: www.raotravels.com Mr. Srinivas Rao, Email: [email protected].

Processed / Packaged Foods Godrej Agrovet is implementing a poultry feed production project at Khanna, dist. Ludhiana, Punjab. Civil work is in progress. [Info as of: Mar. '12]

Godrej Agrovet Limited, Registered Office: Pirojsha Nagar, Eastern Express Highway, Vikhroli (E), Mumbai 400079,

Maharashtra. Tel: 91‐22‐25188010/ 25188020/ 25188030. Fax: 91‐22‐25188485. Email: [email protected] Website: www.godrejagrovet.com Mr. Balram Yadav, Managing Director

Godrej Agrovet is implementing a cattle feed production project at Nanjai Uttukuli, dist. Erode, TN. Civil work is in progress and the project is scheduled for completion in June 2012. [Info as of: Mar. '12]

Godrej Agrovet Limited, Registered Office: Pirojsha Nagar, Eastern Express Highway, Vikhroli (E), Mumbai Suburban ‐ 400079, Maharashtra. Tel: 91‐22‐25188010/ 25188020/ 25188030. Fax: 91‐22‐25188485. Email: g a v l h o @ g o d r e j a g r o v e t . c o m ; W e b s i t e : www.godrejagrovet.com Mr. Balram Yadav, MD Godrej Agrovet Limited, Plant Add: R.S. No. 269/1, Nanjai Uttukuli, Erode 638104, Tamil Nadu, India.

Specialized Stores GKB Lens is implementing a company owned optical store at Bhubaneswar, dist. Khorda, Orissa. Work on the project is in progress and the project is scheduled for completion in April 2012. [Info as of: Mar. '12]

G K B Lens Private Limited, Registered Office Address: P46 Kasba Industrial Area, Phase ‐ II, Kolkata‐ 700107, West Bengal, India. Tel: 91‐33‐24429397/ 24431731. Fax: 91‐33‐24431730. Email: [email protected]; Website: www.gkboptical.com

Projects Under Implementation

12

CLP puts 660 MW of Jhajjar plant online HBL 28 Mar 2012 CLP India said the first unit of its 1,320‐MW Jhajjar power plant in Haryana has become commercially operational.

GSPL mulls expansion of natural gas business ET 29 Mar 2012 GSPC Group‐promoted Gujarat State Petronet (GSPL) is firming up plans to expand its presence in the natural gas business, and is exploring investment opportunities in LNG projects and city gas distribution business.

GMR's power zone plan blocked by gas shortage BS 29 Mar 2012 GMR Infra's plans to have a power zone at its 11,000‐acre SEZ in Andhra’s Kakinada have taken a back seat, due to drop in gas production at the Krishna‐Godavari basin.

Hinduja ties up with German power co HBL 29 Mar 2012 Hinduja Energy India has formed a JV with Steag Energy Ser‐vices (India) for operation and maintenance of power projects.

GAIL to supply gas to Bangalore IT park BS 28 Mar 2012 State‐owned gas utility GAIL India said it has signed an agree‐ment to supply natural gas to Information Technology Park, Bangalore.

ACC to invest Rs.3,330-cr on expansion plan by 2015

BS 28 Mar 2012 ACC announced an investment of Rs. 3,300 crore by 2015 to set up three grinding units and a clinker facility.

Danish telco TDC signs IT deal with TCS BS 28 Mar 2012 Danish telecoms operator TDC said it had entered a deal with Indian group Tata Consultancy Services to replace US company CSC as its IT services provider.

Ashok Leyland to enter aerospace BS 30 Mar 2012 Hinduja Group firm Ashok Leyland has initiated talks with foreign players for technological partnerships to foray into the aerospace business.

Snippets

Page 13: Recorder of New Projects Premium Weekly 1-7 April 2012

Snippets

MRPL refining capacity goes up by 25% HBL 30 Mar 2012 The refining capacity of Mangalore Refinery and Petrochemi‐cals Ltd. (MRPL), a subsidiary of ONGC, has gone up by nearly 25 per cent with effect from March 29.

NTPC adds 1,000-MW capacity in 36 hours HBL 30 Mar 2012 For a power‐starved country, nothing could be a greater news than adding 1,000 MW of generation capacity in less than 36 hours. More so if one of the states, where part of the capacity comes up, witnesses almost 10 hours of power cut a day.

TN speeds up work on power projects HBL 29 Mar 2012 The Tamil Nadu Government has decided to set up a 660 MW supercritical power plant at Ennore at a cost of Rs. 3,960 crore, announced the Chief Minister, Ms. J. Jayalalithaa in the Assembly.

APCO gets Rs. 10 cr for revival of handloom sector HBL 29 Mar 2012 The National Bank for Agriculture and Rural Development (Nabard) has released Rs. 10 crore to APCOB (Andhra Pradesh Cooperative Bank) for revival of handloom sectors.

Other Engineering Products Nes JBT Greentech Equipments & Services has commissioned a water‐purifying equipment manufacturing and assembling unit at SIDCO Industrial Estate, dist. Thiruvananthapuram, Kerala on 0.5 acres. The estimated cost of the project is Rs. 15 million. The project stands commissioned since December 2011. [Info as of Mar. '12]

J B T Greentech Equipments & Services Private Limited, Plant Add: SIDCO Industrial Estate, Pappanamcode, Thiruvananthapuram 695019, Kerala. Tel: 91‐471‐2490464/ 2490822/ 2490828. Fax: 91‐471‐2490826. Website: www.jbtgreentech.com Mr. Kiran. V, Manager

Specialized Stores Hindware Home Retail, a subsidiary of HSIL, belonging to the Somany Group, recently inaugurated a company owned 'EVOK Mega Home Store' (12,000 SQFT) at Malhar Mega Mall, dist. Indore, Madhya Pradesh. The store offers soft furnishings, home decor, modular kitchens, etc. [Info as of: Mar. '12]

Hindware Home Retail Private Limited, Outlet: 1st Floor, Malhar Mega Mall, A.B. Road, Indore ‐ 452010, Madhya Pradesh, India. Tel: 91‐731‐4282880/ 4282881/ 4282882. Website: www.hindwarehomes.com, www.evok.in Mr. Sathish

Promart Retail India inaugurated a company owned store (2,150 SQFT) at Seven Seas Mall, Fatehgunj, dist. Vadodara, Gujarat on 7th February, 2012. The store offers garments for ladies, gents, accessories, etc. [Info as of: Mar. '12]

Promart Retail India Private Limited, Registered Office: Krishna Complex, Flat No 15/16 A Wing, Subhash Road, A Vile Parle (East), Mumbai City ‐ 400057, Maharashtra, In‐dia. Tel: 91‐22‐26841653/ 40307600. Fax: 91‐22‐26841790. E m ai l : in f o @p ro m a rt re ta i l . c om ; We bs i te : www.promartretail.com Mr. Chandan Jaha, Marketing Manager

Promart Retail India Private Limited, Outlet: Shop No. 31 & 32, 2nd Floor, Near IPCL Circle, Fatehgunj, Vadodara ‐ 390002, Gujarat, India. Tel: 91‐265‐3089332.

Little Shop inaugurated a company owned store at Avani River‐side Mall, dist. Howrah, West Bengal in November 2011. The estimated built up area is 3400 SQFT. The store offers kids' wear, accessories, footwear, etc. [Info as of: Mar. '12]

Little Shop, Outlet: 32 Avani Riverside Mall, Jagat Banerjee Ghat Road, Shibpur, Howrah ‐ 711102, West Bengal, India. Tel: 91‐33‐26785600. Website: www.little‐shop.com Mr. Jasbir Singh, Store Manager

Promart Retail India inaugurated a company owned store (5,100 SQFT) at Aditya Birla More Mall, Manjalpur, dist. Vadodara, Gujarat on 22nd February 2012. The store offers garments for ladies, gents, accessories, etc. [Info as of: Mar. '12]

Promart Retail India Private Limited, Registered Office: Krishna Complex, Flat No 15/16 A Wing, Subhash Road, A Vile Parle (East), Mumbai City ‐ 400057, Maharashtra. Tel: 91‐22‐26841653/ 40307600. Fax: 91‐22‐26841790. Email: [email protected]; Website: www.promartretail.com Mr. Chandan Jaha, Marketing Manager Promart Retail India Private Limited, Outlet: Plot No. 151, T.P. Scheme No. 19, Padma Tex Compound, Aditya Birla, More Mall, Near Lal Bag Crossing, Manjalpur, Vadodara ‐ 390011, Gujarat, India. Tel: 91‐265‐3089332.

Reliancedigital Retail inaugurated a company owned store at Acme Mall, dist. Mumbai City, Maharashtra on 17th March, 2012. The estimated built up area is 10,387 SQFT. The store offers consumer electronics, home appliances, etc. [Info as of: Mar. '12]

Reliancedigital Retail Limited, Outlet: 2nd Floor, Acme Mall Khira Nagar, SV Road, Santacruz West, Mumbai City ‐ 400054, Maharashtra, India. Tel: 91‐22‐26619100. Website: www.reliancedigital.in

Projects Recently Commissioned

13

Page 14: Recorder of New Projects Premium Weekly 1-7 April 2012

Hotels & Motels Bhagwati Banquets & Hotels, belonging to the Bhagwati Group, completed construction of a restaurant and banquet hall in dist. Mumbai City, Maharashtra. Interior work has been com‐pleted and the project is scheduled for completion in 2013. [Info as of: Mar. '12]

Bhagwati Banquets & Hotels Limited, Corporate Office: C/o Bhagwati Group, No. 301, Circle P, Prahalad Nagar, Garden Road, S.G. Road, Ahmedabad ‐ 380051, Gujarat, India. Tel: 91‐79‐26937800/ 26937900. Fax: 91‐79‐26937800. Email: [email protected]. Hemant Somani, Executive Director Website: www.thegrandbhagwati.com

Textiles Nes Filatex India has completed a 750 TPD man‐made fiber manu‐facturing project at Dahej, dist. Bharuch, Gujarat. Trial produc‐tion is in progress and the project will be commissioned in April 2012. [Info as of: Mar. '12]

Filatex India Limited, Corporate Office: 43, Community Centre, New Friends Colony, New Delhi ‐ 110025, Delhi, India. Tel: 91‐11‐26312503/ 26848633/ 26848644. Fax: 91‐11‐26849915. Email: [email protected] ; Website: www.filatex.com Mr. Sanjay Bhatnayak, CEO Filatex India Ltd, Plant Add: Plot No. D‐2 / 6 & D‐2 / 7 Part, GIDC Estate, Dahej‐2, Vagra (TK), Bharuch 392130, Gujarat.

Projects Recently Commissioned

14

NTPC commissions 500-MW Simhadri unit BS 31 Mar 2012 The country’s largest power producer, NTPC Limited, stated that it has commissioned the fourth 500‐MW unit of its Simha‐dri Super Thermal Power Project.

Malabar Gold to invest Rs. 3,500 cr for expansion HBL 31 Mar 2012 Gold and diamond jewellery retailer Malabar Gold has an‐nounced a four‐year expansion plan to raise its retail network to 220 outlets from 64 with an investment of Rs. 3,500 crore.

Reliance Commissions India's Largest Solar Power Plant BSE 31 Mar 2012 Reliance Power Ltd. has informed BSE regarding a Press Release dated March 31, 2012, titled "Reliance Commissions India's Largest Solar Power Plant".

Paras invests Rs. 30 cr in UP dairy plant BS 31 Mar 2012 Milk product company, Paras, has invested about Rs. 30 crore in its dairy processing unit at Hardoi dist. in central Uttar Pradesh.

Snippets

Primary Steel Production Anindita Trades & Investments has put on hold an integrated steel project in dist. Hazaribagh, Jharkhand. Promoter: Anindita Trades & Investments Limited Project Name: Integrated steel project in Hazaribagh Project Type: New Unit Status: Delayed/Put‐on‐Hold District: Hazaribagh Location: Village Senegarha Product‐Capacity: Steel ‐ (100,000‐TPA) & Electricity (WHR & FBC‐based CPP) ‐ (24(2x12)‐MW) Current Status: As of April 2012, the project has been put on hold due to non‐availability of land. Contact: Anindita Trades & Investments Limited, Corporate Office: Vikas Bhawan, Bariatu Road, Ranchi 834008, Jharkhand. Tel: 91‐651‐3295100. Fax: 91‐651‐2207557. Mr. S. Nath, General Manager

Cosmic Ferro Alloys, belonging to the Cosmic Group of Industries, has abandoned the cold rolled formed sections manufacturing project in dist. Hooghly, West Bengal. Promoter: Cosmic Ferro Alloys Limited Project Name: Cold rolled formed sections manufacturing project in Hooghly Project Type: New Unit Status: Abandoned District: Hooghly Product‐Capacity: Cold rolled formed sections Current Status: As of March 2012, the project has been abandoned. Contact: Cosmic Ferro Alloys Limited, Registered Office: C/o Cosmic Group Of Industries, Sikkim Commerce House, 4/ 1, Middleton Street, 4th Floor, Kolkata 700071, West Bengal, India. Tel: 91‐33‐22836551/ 22836552. Fax: 91‐33‐22836553. Email: [email protected] Website: www.cosmicferro.com Mr. Ravi Kumar Birla, Director

Projects On Hold

Page 15: Recorder of New Projects Premium Weekly 1-7 April 2012

ONGC to decide on stake sale in CBM blocks by month-end BS 02 Apr 2012 ONGC is to shortly sell stake in its four coal‐bed methane (CBM) blocks to companies which have bid for this.

RWF achieves record production BS 02 Apr 2012 The Rail Wheel Factory (RWF) has said its wheel shop had met the target of 200,000 wheels.

Nathpa Jhakri project clocks record power genera-tion BS 02 Apr 2012 Nathpa Jhakri, the country’s largest hydroelectric project located in Himachal Pradesh, has established a new milestone of 7,610 million units (MU) electricity generation during the last financial year, which ended recently.

Shortfall in natural gas to put Rs. 870 crore burden on Andhra Pradesh BS 02 Apr 2012 Andhra Pradesh would incur an additional financial burden of Rs. 870 crore due to decline in generation from gas‐based power plants during the new financial year.

Land search for 25 MW solar park BS 02 Apr 2012 The Orissa government is in the process of identifying 50 hectares of land in Nuapada district for establishment of a solar park with capacity of 25 MW.

Coal pitfall for Jindal in Orissa BS 02 Apr 2012 Ten years after announcing the project, Jindal Steel and Power is still waiting to start digging for coal to fuel its $3.1 billion steel and power complex in Orissa.

R-Power plans over Rs. 6,000 cr investment in Rajasthan BS 01 Apr 2012 Reliance Power plans to invest more than Rs. 6,000 cr for solar power generation projects in Rajasthan in the next two years.

Eon Electric demerges power generation, energy meter businesses HBL 02 Apr 2012 Eon Electric, formerly known as Indo Asian Fusegear, has demerged its power generation and energy meter businesses into a separate company named Advance Metering Technology Ltd.

Commissioning of 6.3 Mega Watt Wind Mills BSE 02 Apr 2012 Diamond Power Infrastructure Ltd. has informed BSE about successfully commissioning of 6.3 MW Windmills, purchased from SUZLON Energy, on March 29, 2012 at Jamanwada, Kutch.

Sree Sakthi Paper commissions Rs. 30 Cr. project BSE 02 Apr 2012 Sree Sakthi Paper Mills Ltd. has informed BSE regarding a Press Release titled "Sree Sakthi Paper commissions Rs.30 Cr project.

Jagran Prakashan acquires Suvi Info Management (Indore) Private Limited BSE 02 Apr 2012 Jagran Prakashan Ltd. has informed BSE regarding a Press Release dated April 02, 2012 titled "Jagran Prakashan acquires Suvi Info Management (Indore) Private Limited".

Godrej Properties partners with private equity firm ASK Group BSE 02 Apr 2012 Godrej Properties Ltd. has informed BSE regarding a Press Release dated March 31, 2012 titled, "Godrej Properties partners with private equity firm ASK Group"

Final 300 MW Unit of Reliance Power's Rosa TPP Commissioned BSE 02 Apr 2012 Reliance Power Ltd. has informed BSE regarding a Media Re‐lease dated April 02, 2012 titled "Final 300 MW Unit of Reli‐ance Power's Rosa TPP Commissioned".

UCO Bank opens 100th branch in TN circle HBL 31 Mar 2012 UCO Bank opened its 100th branch in Tamil Nadu circle, which includes Tamil Nadu, Puducherry and Port Blair.

Tilaknagar Industries to step up focus on AP BS 31 Mar 2012 Tilaknagar Industries Ltd (TIL), is planning to step up its market presence in Andhra Pradesh, and accordingly expand the ca‐pacity of its Rajahmundry plant at a cost of about Rs. 80 crore.

HPCL-Mittal Energy commissions $4 bn Bathinda refinery BS 29 Mar 2012 HPCL‐Mittal Energy (HMEL), a joint venture of Hindustan Petroleum Corproaand steel czar Lakshmi Mittal, announced commissioning of $4 billion refinery at Bathinda in Punjab.

17 top public sector units to invest Rs 1.76 lakh crore in FY13 HBL 29 Mar 2012 Investments to the tune of Rs. 1.76 lakh crore is expected in 2012‐13 from 17 top Central Public Sector Enterprises (CPSEs) in their domestic business, as well as overseas assets.

ICICI Bank to get $100-m credit line from ADB for energy projects HBL 30 Mar 2012 The Asian Development Bank plans to provide a $100 million credit line to ICICI Bank. This is to fund renewable energy and energy efficiency projects in India.

Snippets

15

Page 16: Recorder of New Projects Premium Weekly 1-7 April 2012

Sub Industry: Non-Ferrous Minerals Mining Company Name: Victoria Ferro Alloys (P) Ltd Projects Details: Victoria Ferro Alloys has proposed ferro alloys manufacturing Unit & Manganese Ore Sinter Plant at Plot No. 256/B and 257/B, APHC Growth Centre, Bobbili (Village & Mandal), Vizianagaram District, Andra Pradesh.

Sub Industry: Non Metallic Minerals Mining Company Name: New Hills Mines & Minerals Projects Details: New Hills Mines & Minerals has proposed a Soapstone Mine on 10.215 ha of land at village KidaiKhwasi, Tehsil Bageshwar, District Bageshwar, Uttarakhand.

Sub Industry: Non Metallic Minerals Mining Company Name: Chaubata‐Era Soapstone Mine Projects Details: Chaubata‐Era Soapstone Mine has pro‐posed Chaubata‐Era Soapstone mine on 20.44 ha of land at Village Chaubata Era, District Bageshwar, Uttrakhand.

Sub Industry: Liquor, Wine and Beer Company Name: Bhopal Breweries And Distilleries Private Limited Projects Details: Bhopal Breweries And Distilleries has proposed an Industrial alcohol unit in Sehore district of Madhya Pradesh.

Sub Industry: Dairy Products Company Name: Valley Fresh Projects Details: Valley Fresh has proposed to set up a cold storage for fruits, vegetables and dairy products at Pulwama district of Jammu and Kashmir. Contact: Valley Fresh, 02‐Muncipal Building, Lal Chowk, Srinagar, Jammu And Kashmir‐190001

Sub Industry: Dairy Products Company Name: Lauren Engineers and Constructors India Private Limited Projects Details: Lauren Engineers and Constructors India has proposed construction and maintenance of power projects except hydroelectric projects in Jaisalmer district of Rajasthan. Contact: Lauren Engineers And Constructors India Pvt. Ltd, Plot No.B06, Valecha Chambers, 6th Flr,New I, Link Road, Oshiwara, Andheri(West) Mumbai, Maharashtra‐400053

Sub Industry: Other Engineering Products NES Company Name: Someshwar Ispat Private Limited Projects Details: Someshwar Ispat has proposed expansion of production capacity of TMT Bars at the existing indus‐trial unit at Plot No: 248, Vill. Baliyasan, Tal. & Dist. Mehsana. SEIAA has awarded the environmental clearance to above project under the provisions of EIA.

Sub Industry: Non Metallic Minerals Mining Company Name: Kiroli Soapstone Mine Projects Details: Kiroli Soapstone Mine has proposed Kirai Soapstone Mine on 10.007 ha of land at Village Kirai, Tehsil & District Bageshwar, Uttarakhand .

Sub Industry: Sugar Company Name: Indocon Developers Private Limited Projects Details: Indocon Developers has proposed a sugar manufacturing unit in Ahmednagar district of Maharashtra. Contact: Indocon Developers Pvt. Ltd., Rashin, Tal‐Karjat Dist. Ahemednagar, Maharashtra 414403

Sub Industry: Processed / Packaged Foods Company Name: Ganpati Agrofoods Private Limited Projects Details: Ganpati Agrofoods has proposed basmati rice , parboiled rice , non basmati rice , rice barn and cereals processing unit in Karnal district of Haryana. Contact: Ganpati Agro Foods Pvt.Ltd, Nissing, Karnal, Haryana‐132024

Sub Industry: Plastic Products Company Name: Axiom Propack Private Limited Projects Details: Axiom Propack has proposed a plastic closures manufacturing unit in Dharwas district of Karnataka. Contact: Axiom Propack Pvt.Ltd., 2701, B‐Wing, Avaion, Hikanandani Gardens, Powai, Kurla, Mumbai 400 076, Maharashtra

Sub Industry: Organic, Inorganic & Specialty Chemicals Company Name: Alumina Refinery Pvt. Ltd Projects Details: Alumina Refinery has proposed to set up Speciality Alumina Chemicals manufacturing unit at Survey No. 94/1, 94/2 of Vill. Kukma & Survey No. 100/1, 101/1, 105/4, 106, 107 & 110/2 of Vill. Reladi Moti, Near Akashwani, Bhuj ‐ Anjar Highway, Tal. Bhuj, Dist. Kutch. In Gujarat.

Sub Industry: Cement & Concrete Products Company Name: Vishnu Maya Cements (P) Limited Projects Details: Vishnu Maya Cements has proposed a grinding unit of Cement of 200 TPD at Sy. No. 181/1, Village Peradam, Sathyavedu Mandal, Distt. Chittoor, Andhra Pradesh.

Sub Industry: Real Estate / Housing Company Name: Sri Sainath Enterprise Projects Details: Sri Sainath Enterprise has proposed to construct “Karnavati Klassic Residency” residential project at S. No. 361, 371/P of Draft T.P.S. No. 67, F.P. No.72 + 83/2, village Hansol, Dist: Ahmedabad, Gujarat.

Projects Unconfirmed

13

Page 17: Recorder of New Projects Premium Weekly 1-7 April 2012

Floating windmills in Japan to help wind down nuclear power BS 31 Mar 2012 Japan is preparing to bolt turbines onto barges and build the world’s largest commercial power plant using floating windmills, tackling the engineering challenges of an unproven technology to cut its reliance on atomic energy. Marubeni Corp, Mitsubishi Heavy Industries Ltd. and Nippon Steel Corp are among developers erecting a 16‐megawatt (MW) pilot plant off the coast of Fukushima, site of the nuclear accident that pushed the government to pursue cleaner energy. The project may be expanded to 1,000 MW, the trade ministry said, bigger than any wind farm fixed to the seabed or on land.

Post-IPO, NBCC draws up big expansion plans BS 02 Apr 2012 The government‐owned National Buildings Construction Corporation (NBCC), after a recently concluded Initial Public Offer that was 4.93 times subscribed, is ready to kick off expansion plans for the next two years.

Bilfinger Berger to invest 100 mn euros in India HBL 02 Apr 2012 Leading German engineering and services company Bilfinger Berger said it plans to invest more than 100 million euros in India in the next couple of years. The recent acquisition of the Surat‐based Neo Structo Con‐struction Ltd. and Spetech Plant Equipments Private Ltd. repre‐sents an initial milestone in the German company’s objective of strengthening its commitment in Asia. Bilfinger Berger has a financial scope of more than €1 billion for investment in the next 2 years globally in the expansion of the services business.

Starbucks eyes China market www.prokerala.com 03 Apr 2012 Starbucks Corp expects China to become its second‐biggest retail market measured by the number of its stores by 2014, following just behind the US.

Japan to provide Rs. 8,300-cr loan for funding two projects BS 29 Mar 2012 Japan will provide credit worth Rs. 8,303.01 crore for funding two projects in India. The loan will fund Delhi Mass Rapid Transport Project Phase III and West Bengal Forest and Biodiversity Conservation Project, an official release said.

Indian exploration in Vietnam oil blocks within norms: Vietnam ET 30 Mar 2012 Asserting that China's opposition to India undertaking oil exploration in Vietnamese blocks was not in accordance with UN norms, Vietnam said the blocks are well within its sovereign territory.

Exxon Mobil to restart work at Papua New Guinea LNG project after land dispute resolved ET 29 Mar 2012 US oil giant Exxon Mobil intends to resume work at its $15.7 billion liquefied natural gas (LNG) project in Papua New Guinea after a dispute with residents over land was resolved, the company said.

Shanghai Electric to set up plant in India ET 28 Mar 2012 Chinese power equipment major Shanghai Electric Corp plans to set up a manufacturing plant in India, which has a huge demand for its products, but the company is concerned about clarity of policies in the country, a top company executive said.

Nihilent partners with Tanzanian firm BS 02 Apr 2012 Global consulting and solutions integration company, Nihilent has announced a strategic partnership with Tanzania's Equip Governance, Risk and Compliance (GRC), an advisory firm that provides governance, risk management and internal audit transformation solutions.

International News

14

4th Upper Havel Fair Date: 5 – 6 May 2012. Venue: Oberhavel Farmers Market. Organizer: Messe Consult Dankert. Contact: Meraner Str.31, D‐16341 Panketal, Eberswalde, Germany. Tel: +49‐30‐94879750.

International Property Show Date: 1 – 3 May 2012. Venue: Dubai International Convention & Exhibition Centre.

Organizer: Strategic Marketing & Exhibitions. Contact: Office # 102, Golf Park, Al Garhoud, United Arab Emirates. Tel: +971‐4‐2829299. Fax: +971‐4‐2828767. Contact Person: Mr. Walid Farghal.

BuildingsNY Date: 2 – 3 May 2012. Venue: Jacob K. Javits Convention Center. Organizer: Reed Exhibitions. Contact: 383 Main Avenue, Norwalk, United States Of America. Tel: +1‐203‐8404800. Fax: +1‐203‐8404801.

Exhibitions / Seminar

Page 18: Recorder of New Projects Premium Weekly 1-7 April 2012

1st Baghdad Oil & Gas Conference & Exhibition Date: 1 – May 2012. Venue: Baghdad International Fairground. Organizer: Expotim International Fair Organizations, Inc. Contact: Fulya Mah. Vefa Bay R, Sok No.9, 34394 Sisli, Istanbul, Turkey. Tel: +90‐212‐3560056. Fax: +90‐212‐3560096. Contact Person: Mr. Engin Yoruk.

2nd Renewables Indonesia Date: 2 – 5 May 2012. Venue: Jakarta International Expo (JIExpo). Organizer: Messe Munchen Gmbh. Contact: Messegelaende, Muenchen, Germany. Tel: +49‐89‐94920720. Fax: +49‐89‐94920119. Contact Person: Ms. Denise Jones. Tel: +65‐62360988.

35th YAPI - TURKEYBUILD Date: 2 – 6 May 2012. Venue: Tuyap Fair Convention & Congress Center. Organizer: YEM FUARCILIK A.S. Contact: Fulya Mah. Yesilcimen Sok. No: 12‐430 Fulya, Istanbul, Turkey. Tel: +90‐212‐2667070. Contact Person: Mr. Agop Niksarlioglu.

15th Buildexpo Date: 5 – 7 May 2012. Venue: Kenyatta International Conference Centre (KICC). Organizer: Kenyatta International Conference Centre . Contact: Level 25, Monarch Office Tower, P.0. Box‐ 333840, One Sheikh Zayed Road, Dubai, United Arab Emirates. Tel: +971‐4‐3721421. Fax: +971‐4‐3721422. Contact Person: Mr. Neville Trindade.

4th Glass World Exhibiton Date: 3 – 5 May 2012. Venue: Cairo International Convention & Exhibition centre (CICC). Organizer: Nile Trade Fairs. Contact: 16 Samir Abd El Rauf, Cairo, Egypt. Tel: +20‐2‐22737495. Fax: +20‐2‐26712287. Contact Person: Ms. Fatma Ali.

Luxury Homes & Decor Date: 5 – 6 May 2012. Venue: Hotel JW Marriott, Chandigarh. Organizer: Trendz Un Limited. Contact: Sco 2423, Sector 22C, Chandigarh, India. Tel: +91‐9815910006. Contact Person: Mr. Aditi Mahajan.

Interiors UAE Date: 7 – 9 May 2012. Venue: Abu Dhabi International Exhibition Centre. Organizer: Channels Exhibitions. Contact: P. O. Box, Dubai, United Arab Emirates. Tel: +971‐4‐2824737. Fax: +971‐4‐2825757. Contact Person: Mr. Maria Parry. Tel: +44‐207‐9553721.

Waste Expo Date: 1 – 3 May 2012. Venue: Las Vegas Convention Center. Organizer: Penton Business Media, Inc. Contact: 11 River Bend South Stamford, Stamford, United States Of America. Tel: +1‐203‐3589900. Contact Person: Mr. Marion Howard. Tel: +1‐203‐3584314.

17th IFAT ENTSORGA Date: 7 – 11 May 2012. Venue: New Munich Trade Fair Centre. Organizer: Messe Munchen Gmbh. Contact: Messegelaende, Muenchen, Germany. Tel: +49‐89‐94920720. Fax: +49‐89‐94920119. Contact Person: Mr. Georg Moller. Tel: +49‐89‐94920285.

8th Deutsche GRI Date: 2 – 3 May 2012. Venue: The Westin Grand Hotel. Organizer: Global Real Estate Institute. Contact: Frankfurt, Germany. Tel: +44.20 7121 5084. Contact Person: Mr. Olga Giles. Tel: +44‐20‐7121 5067.

Building Exhibition Rovaniemi (Rakentajamessut) Date: 5 – 6 May 2012. Venue: Lappi Areena, Rovaniemi. Organizer: POHJOIS‐SUOMEN MESSUT. Contact: Ojakatu 2, Finland. Tel: +358‐10‐8320000. Contact Person: Mr. Aila Jaaski. Tel: +358‐10‐8320001.

Atlantic Region Energy Expo Date: 1 – 3 May 2012. Venue: Atlantic City Convention Center. Organizer: Atlantic Region Energy Expo. Contact: 66 Morris Avenue, Suite 1B, PO Box 477, Spring‐field, NJ 07081, Atlantic City, United States Of America. Tel: +1‐973‐4671400. Contact Person: Mr. Manager.

Cymru Conference and Exhibition Date: 2 May 2012. Venue: Mercure Cardiff Holland House Hotel and Spa. Organizer: RenewableUK. Contact: Greencoat House, Francis Street, London, United Kingdom. Tel: +44‐20‐79013000. Contact Person: Mr. Ve‐ronika Sucha. Tel: +44‐20‐79013015.

6th electro, automation, energie & renouvelables Date: 7 – 10 May 2012. Venue: Palais des Exposition dAlger Organizer: Fairtrade Messe und Ausstellungs GmbH & Co. KG Contact: Kurfursten Anlage, Heidelberg, Germany. Tel: +49‐6221‐45650. Fax: +49‐6221‐456525. Contact Person: Mr. Jana Hofmann. Tel: +49‐6221‐456521.

Exhibitions / Seminar

15

Page 19: Recorder of New Projects Premium Weekly 1-7 April 2012

Bakery Products & Confectionery Status: Planning Stage Project Details: Saj Industries is planning a bakery products and biscuits manufacturing project in dist. Bangalore, Karnataka. Project Details: [Info as of: Feb. '11] Saj Industries was planning a bakery products and biscuit manufacturing project in dist. Bangalore, Karnataka. Land was being acquired and the project was planned for completion in 18 months from zero date.

UPDATE: [Info as of: Mar. '12] Saj Industries is planning a bakery products and biscuits manufacturing project in dist. Bangalore, Karnataka. 8.5 acres of land has been acquired. Equipment supplier is yet to be appointed. The project proposal preparation is in progress. Work on the project is expected to commence in April 2012 and the project is planned for completion in 2014. Contact: Saj Food Products Private Limited, Registered Office: 5/1, Acharya Jagadish Chandra Bose Road, 5th Floor, Kolkata 700020, West Bengal. Tel: 91‐33‐22818219/22818369. Fax: 91‐33‐22833510. Website: www.biskfarm.com Mr. Vijay Kumar Singh, Manager

Cement & Concrete Products Status: Planning Stage Projects Summary: Baldev Alloys is planning a cement manufactur‐ing project in dist. Bastar, Chhattisgarh. Project Details: [Info as of: Apr. '10] Baldev Alloys was planning a cement manufacturing project in dist. Bastar, Chhattisgarh.

UPDATE [Info as of: Mar. '12] Baldev Alloys is planning a cement manufacturing project in dist. Bastar, Chhattisgarh. The estimated cost of the project is Rs. 10,000 million including power project. Pre‐feasibility report is under preparation. Land has been acquired partially and acquisition is in progress partially. The project completion date is yet to be finalized.

Contact: Baldev Alloys Private Limited, Registered Office: Siltara Industrial Growth Center, Village Siltara, Phase‐II, 18th Milestone, Bilaspur Road, Raipur ‐ 493111, Chhattisgarh, India. Website: www.baldevalloys.in Mr. Rajeev Kapoor, Managing Director Baldev Alloys Private Limited, Corporate Office: 24 College Road, Choubey Colony, Raipur 492013, Chhattisgarh. Tel: 91‐771‐2224320 Fax: 91‐771‐2253384. Website: www.baldevalloys.in

Hotels & Motels Status: Planning Stage Project Summary: Duet India Hotels is planning to construct a business hotel in dist. Bangalore, Karnataka. Project Details: [Info as of: Feb. '11] Duet India Hotels was planning to construct a business class hotel in dist. Bangalore, Karnataka. Civil work was yet to start and the project was planned for completion in 30 months from zero date.

UPDATE [Info as of: Mar. '12] Duet India Hotels belonging to the Duet Group, is planning to construct a 150‐200 rooms business hotel in dist. Bangalore, Karna‐taka. Civil work will commence in Q2 2012 and the project is sched‐uled for completion in 2014.

Contact: Duet India Hotels Private Limited, Corporate Office: C/o Duet Group 801 802 Time Towers, 8th Floor MG Road, Gurgaon ‐ 122002, Haryana, India. Tel: 91‐124‐4528777. Fax: 91‐124‐4205512. Website: www.duetgroup.net

Hotels & Motels Status: Planning Stage Project Summary: Wadhawan Group is planning to construct a 5‐star hotel in dist. Varanasi, Uttar Pradesh. Project Details: [Info as of: Feb. '11] Wadhawan Group was planning to construct a 50‐60 rooms 5‐star hotel in dist. Varanasi, UP. The hotel was to be operated by Minor International, Thailand and was planned for completion in 2016.

UPDATE [Info as of: Mar. '12] Wadhawan Group is planning to construct a 50‐60 rooms 5‐star hotel in dist. Varanasi, Uttar Pradesh. The hotel will be operated by Minor International, Thailand. Architect is yet to be appointed. Land has been acquired and the project is planned for completion in 4 years from zero date.

Contact: Wadhawan Group, Head Office: HDIL Towers 4th Floor Anant Kanekar Marg, Bandra (E), Mumbai Suburban ‐ 400051, Maharashtra, India. Tel: 91‐22‐67748000. Fax: 91‐22‐67748272. Website: www.wadhawangroup.in Mr. Manish Joshi, Marketing Manager

Hotels & Motels Status: Planning Stage Project Summary: Wadhawan Group is planning to construct a 5‐star hotel in dist. Udaipur, Rajasthan. Project Details: [Info as of: Feb. '11] Wadhawan Group was planning a 72 rooms hotel in dist. Udaipur, Rajasthan. The project was in conceptual stage and was scheduled for completion in 2013.

UPDATE [Info as of: Mar. '12] Wadhawan Group is planning to construct a 72 rooms 5‐star hotel in dist. Udaipur, Rajasthan. Architect is yet to be appointed. Land has been acquired and the project is planned for completion in 4 years from zero date.

Contact: Wadhawan Group, Head Office: HDIL Towers 4th Floor Anant Kanekar Marg, Bandra (E), Mumbai Suburban ‐ 400051, Maharashtra, India. Tel: 91‐22‐67748000. Fax: 91‐22‐67748272. Website: www.wadhawangroup.in Mr. Manish Joshi, Marketing Manager

16

Page 20: Recorder of New Projects Premium Weekly 1-7 April 2012

Ferrous Minerals Mining Status: Planning Stage Projects Summary: Jayaswal Neco Industries is planning the 'Lain Dongri', an iron ore mining project in dist. Kanker, Chhattisgarh. Project Details: [Info as of: Dec. '09] Jayaswal Neco Industries was planning 'The Lain Dongri' a 0.06 MTPA iron ore mining production project at Barbaspur, dist. Kanker, Chhattisgarh on 14 hectare. The project was waiting for environmental clearances.

UPDATE [Info as of: Mar. '12] Jayaswal Neco Industries, belonging to the NECO Group of Industries, is planning the 'Lain Dongri' a 0.06 MTPA iron ore mining project at Village Barbaspur, dist. Kanker, Chhattisgarh on 14.40 hectares. The project has received environmental clearance. The project has been submitted in the 20th Chhattisgarh SEIAA meeting held on 31st December, 2011.

Contact: Jayaswal Neco Industries Limited, Registered Office: C/o NECO Group Of Industries, F‐8, MIDC Industrial Area, Hingna Road, Nagpur ‐ 440016, Maharashtra, India. Tel: 91‐7104‐237276/ 237471. Fax: 91‐7104‐236255/ 237583. Emai l : [email protected] Website: www.necoindia.com Mr. D L Choudhary, President

Liquor/ Wine And Beer Status: Planning Stage Projects Summary: Sri Sarvaraya Sugars is planning an expansion of its molasses and grain‐based distillery in dist. East Godavari, Andhra Pradesh. Project Details: [Info as of: Sept. '11] Sri Sarvaraya Sugars was planning to exoand the capacity of its grain‐based distillery expansion to produce extra neutral alcohol from 52.5 KLD to 82.5 KLD at Rajahmundry, dist. East Godavari, Andhra Pradesh. The project was waiting for financial closure and was planned for completion in 1 year from zero date.

UPDATE [Info as of: Mar. 12'] Sri Sarvaraya Sugars is planning an expand the capacity of its molasses and grain‐based distillery from 52.5 KLD to 60 KLD to produce rectified spirit, ethanol and extra neutral alcohol, at Rajahmundry, dist. East Godavari, Andhra Pradesh, on 150 acres of existing land. The estimated cost of the project is Rs. 500 million. The project is waiting for government license and is planned for completion in 2 years from zero date.

Contact: Sri Sarvaraya Sugars Limited, Plant Add: Bottling Unit, Vemagiri, Rajahmundry, East Godavari 533125, Andhra Pradesh, India. Tel: 91‐883‐2417405/ 2417450. Fax: 91‐883‐2417307. Mr. Ramana Rao, Distillery Manager

Primary Steel Production Status: Planning Stage Projects Summary: VAK Infrastructure is planning a silico manganese production project in dist. Balaghat, Madhya Pradesh. Project Details: [Info as of: May '11] VAK Infrastructure was planning a silico manganese production project in dist. Balaghat, Madhya Pradesh. Capacity was yet to be finalized. The project was in conceptual stage and was planned for completion in 6 months from zero date.

UPDATE [Info as of: Apr. '12] VAK Infrastructure is planning a silico manganese production project in dist. Balaghat, Madhya Pradesh. The project is waiting for government approval. Work on the project is expected to commence in 2013.

Contact: V A K Infrastructure Private Limited, Registered Office: 103, Pavani Homes, Journalist Colony, Jubilee Hills, Hyderabad 500033, Andhra Pradesh, India. Email: [email protected]

Steel Wires & Ropes Status: Planning Stage Projects Summary: Bharat Wire Ropes is planning an expansion of its wire manufacturing capacity in dist. Thane, Maharashtra. Project Details: [Info as of: Jul. '11] Bharat Wire Ropes was planning to expand the manufacturing capacity of wire from 6000 TPA to 18000 TPA at Atgaon, dist. Thane, Maharashtra. Civil work was yet to start. The project was planned for completion in 2 years from zero date.

UPDATE [Info as of: Mar. '12] Bharat Wire Ropes is planning to expand its wire manufacturing capacity at Atgaon Industrial Complex, dist. Thane, Maharashtra on 70‐80 acres of existing land. The capacity is to be expanded from 6,000 TPA to 18,000 TPA (estimated). Civil work is expected to com‐mence in Q2 2012 and the project is planned for completion in 2014.

Contact: Bharat Wire Ropes Limited, Registered Office: 524/525, The Corporate Centre, Nirmal Lifestyle, L.B.S. Marg, Mulund West, Mumbai City ‐ 400080, Maharashtra, India. Tel: 91‐22‐25619960/ 25619961/ 25619962. Fax: 91‐22‐25619964. Email: [email protected] / [email protected] Website: www.bharatwireropes.com

Plant Add: Bharat Wire Ropes Limited, Plot No. 1&4 Atgaon Industrial Complex, Mumbai‐Nasik Highway, Atgaon (East), Taluk Shahapur, Thane 421301, Maharashtra, India. Tel: 91‐2527‐240123/ 240124. Fax: 91‐2527‐240196. Website: www.bharatwireropes.com Mr. Anurag Pandey, Manager

17

Page 21: Recorder of New Projects Premium Weekly 1-7 April 2012

Resorts Status: Planning Stage Project Summary: Wadhawan Group is planning to construct the 'Anantara', a 5‐star resort resort & spa in dist. Kanchipuram, TN. Project Details: [Info as of: Feb. '11] Wadhawan Group was planning to construct the 'Anantara', a 110 rooms resort and spa at Mahabalipuram, dist. Kanchipuram, TN. The hotel was to be operated by Minor International, Thailand. The project was planned for completion in 2012.

UPDATE [Info as of: Mar. '12] Wadhawan Group is planning to construct the 'Anantara', a 110 rooms 5‐star resort and spa at Mahabalipuram, dist. Kanchipuram, TN. The hotel is to be operated by Minor International, Thailand. Architect has been appointed and land has been acquired. The project is planned for completion in 4 years from zero date.

Contact: Wadhawan Group, Head Office: HDIL Towers 4th Floor Anant Kanekar Marg, Bandra (E), Mumbai 400051, Maharashtra, India. Tel: 91‐22‐67748000. Fax: 91‐22‐67748272. Website: www.wadhawangroup.in Mr. Manish Joshi, Marketing Manager

Cement & Concrete Products Status: Under Implementation Projects Summary: Ashtech (India) is implementing a cement production project in dist. Raichur, Karnataka. Project Details: [Info as of: Apr. '10] Ashtech (India) was implement‐ing a 1500 TPD cement production project at Raichur Growth Centre, dist. Raichur, Karnataka. Negotiations were under way with equipment suppliers. Construction was in progress and the project was scheduled for completion in December 2010.

[Info as of: Apr. '11] Ashtech (India) was implementing a 1500 TPD cement production project at Raichur Growth Centre, dist. Raichur, Karnataka. Civil work was in progress and the project was scheduled for completion in September 2011.

UPDATE [Info as of: Mar. '12] Ashtech (India) is implementing a 1500 TPD cement production project at Raichur Growth Centre, dist. Raichur, Karnataka. Civil work has been completed, machinery erection is in progress and the project is scheduled for completion in May 2012.

Contact: Ashtech (India) Private Limited, Registered Office: 30, Kasturi Building, 1st Floor, Popatwadi Kalbadevi Road, Mumbai City ‐ 400002, Maharashtra, India. Tel: 91‐22‐22190200/ 22190240. Fax: 91‐22‐22062211. Email: [email protected] Website: www.ashtechindia.net

Plant Add: Ashtech (India) Private Limited, Raichur Growth Centre, KIADB Industrial Area, Chicksuur Hobli, Kasaba Taluk, Raichur ‐ 584134, Karnataka, India. Website: www.ashtechindia.net

Liquor / Wine And Beer Status: Under Implementation Projects Summary: Shambhu Mahadev Sugar & Allied Industries is planning a molasses‐based distillery in Osmanabad, Maharashtra. Project Details: [Info as Jan. '11] Shambhu Mahadev Sugar & Allied was planning a 30 KLD molasses‐based distillery at Village Havar‐gaon, dist. Osmanabad, Maharashtra. The completion date was yet to be decided.

UPDATE [Info as of: Sep. '11] Shambhu Mahadev Sugar & Allied Industries is planning a 30 KLD molasses‐based distillery at Village Havargaon, dist. Osmanabad, Maharashtra. The project is estimated to cost Rs. 254.6 million. Civil work is expected to commence in February 2012 and the project is planned for completion in June 2012.

Contact: Shambhu Mahadev Sugar & Allied Industries Limited, Plant Add: At Post Havargaon, Taluk Kallam, Osmanabad 413507, Maharashtra, India. Tel: 91‐2473‐269100. Fax: 91‐2473‐269119. Mr. Dileep Rao Apte, Manager

Primary Steel Production Status: Under Implementation Projects Summary: Bhushan Steel is expanding its integrated steel plant in dist. Dhenkanal, Orissa. Project Details: [Info as of: Feb. '11] Bhushan Steel was planning to expand the capacity of its integrated steel plant from 3 MTPA to 9 MTPA to manufacture hot rolled coils, billets and steel & strips at Meramandali, dist. Dhenkanal, Orissa . Land acquisition was in progress.

UPDATE [Info as of: Mar. '12] Bhushan Steel, belonging to the Bhushan Group, is expanding its integrated steel plant at Meramandali, dist. Dhenkanal, Orissa from 3 MTPA to 9 MTPA. Civil work and machinery erection is in pro‐gress. The project is scheduled for completion in 2013.

Contact: Bhushan Steel Ltd, Plant Add: C/o Bhushan Group, Naren‐dra Pur, P.O. Shibapur, Meramandali, Dhenkanal ‐ 759121, Orissa. Tel: 91‐6762‐300000. Email: [email protected] Website: www.bhushan‐group.org Mr. Atul Varma

Thermal Power Generation Status: Under Implementation Projects Summary: Indian Metals & Ferro Alloys is implementing a coal‐based CPP in dist. Cuttack, Orissa. Project Details: [Info as of: Oct. '10] Indian Metals & Ferro Alloys was implementing a 120 (60x2) MW coal‐based CPP at Chowdwar, dist. Cuttack, Orissa. Thermax, Pune was the EPC contractor. Civil work was in progress and machinery was being erected. The project was scheduled for completion in 2012.

18

Page 22: Recorder of New Projects Premium Weekly 1-7 April 2012

UPDATE [Info as of: Mar. '12] Indian Metals & Ferro Alloys is implementing a 120 (60x2) MW coal‐based CPP at Chowdwar, dist. Cuttack, Orissa on 60 acres. The estimated cost of the project is Rs. 5000 million. Thermax, Pune is the EPC contractor. Civil work has been completed and machinery erection is in progress. The project is scheduled for completion in July 2012.

Contact: Indian Metals & Ferro Alloys Limited, Plant Add: Po. Kapaleshwar, Chowdwar, Cuttack 754071, Orissa, India. Tel: 91‐671‐2494241/ 2494242/ 2494243/ 2494244/ 2494245. Fax: 91‐671‐2494314. Website: www.imfa.in

EPC Contractor: Thermax Limited, Corporate Office: 14, Thermax House, Mumbai‐Pune Road, Wakdewadi, Pune 411003, Maharash‐tra, India. Tel: 91‐20‐25542122/ 66051200. Fax: 91‐20‐25542242. Email: [email protected] / [email protected] Website: www.thermaxindia.com

Non Conventional Energy Status: Commissioned Projects Summary: Lokmangal Sugar Ethanol & Co‐Generation Industries has commissioned an expansion of its biomass‐based co‐gen power project in dist. Solapur, Maharashtra. Project Details: [Info as of: Dec. '11] Lokmangal Sugar Ethanol & Co‐Generation Industries, belonging to the Lokmangal Group, was expanding its biomass‐based co‐gen power project from 15 MW to 31.5 MW at Bhandarkavathe, dist. Solapur, Maharashtra. Civil work was in progress and the project was scheduled for completion in April 2012.

UPDATE [Info as of: Apr. '12] Lokmangal Sugar Ethanol & Co‐Generation Industries, belonging to the Lokmangal Group, has commissioned an expansion of its biomass‐based co‐gen power project from 15 MW to 31.5 MW at Village Bhandarkavathe, dist. Solapur, Maharashtra. The estimated land area was 100 hectares inclusive of sugar project and the estimated cost of the project was Rs. 1713.1 million inclusive of the sugar project. Avant‐Garde Engineers & Consultants, Chennai was the technical consultant. The project has been commissioned in March 2012.

Contact: Lokmangal Sugar Ethanol & Company ‐ Generation Industries Limited, Registered Office: C/o Lokmangal Group, 8536 A/11, Murarji Peth, Near Old Pune Naka, Solapur ‐ 413001, Maharashtra. Tel: 91‐217‐2735517/ 2735518. Fax: 91‐217‐2735619. Email: [email protected] Website: www.lokmangal.com Mr. Mahesh Konapure, Manager

Plant Add: Lokmangal Sugar Ethanol & Company ‐ Generation Industries Limited, Plot No. 588‐590 592 & 645, Bhandarkavathe, Tehsil South Solapur, Solapur 413221, Maharashtra, India.

Technical Consultant: Avant ‐ Garde Engineers & Consultants Private Limited, Registered Office: No. 68A, Porur Kundrathur High Road, Porur, Chennai ‐ 600116, Tamil Nadu, India. Tel: 91‐44‐24827843/ 24828532/ 24828717. Fax: 91‐44‐24828531. Email: [email protected] ; Website: www.avantgarde‐india.com

Motion Pictures Status: Completed Projects Summary: Satyam Cineplexes has completed 4‐screen multiplex in dist. Mysore, Karnataka. Project Details: [Info as of: Nov. '10] Satyam Cineplexes was implementing a 1000 seats, 4‐screen multiplex construction in dist. Mysore, Karnataka. Civil work was in progress and the project was scheduled for completion in January 2011.

UPDATE: [Info as of: Mar. '12] Satyam Cineplexes has completed a 1009 seats, 4‐screen multiplex at Mall of Mysore, dist. Mysore, Karnataka. Civil work has been completed and the multiplex will be inaugurated in April 2012.

Contact: Satyam Cineplexes Limited, Corporate Office: 11th Floor, Building 8, Tower C, DLF Cyber City, Gurgaon ‐ 122002, Haryana, India. Tel: 91‐124‐4949999. Fax: 91‐124‐4949999. Email: [email protected] Website: www.satyamcineplexes.com Mr. Jayat Paul

Project Office: Satyam Cineplexes Limited, Mall Of Mysore, Plot No.C 1, 3rd Floor, Opposite To Mysore Golf Club, Indira Nagar Ex‐tension, Nazarbad Mohalla, MG Road, Mysore 570010, Karnataka.

Resorts Status: Completed Projects Summary: Wonderla Holidays has completed a luxury resort in dist. Bangalore, Karnataka. Project Details: [Info as of: Apr. '11] Wonderla Holidays was setting up a resort on Mysore road, Hejjala ( P.O), dist. Bangalore, Karnataka. Civil work was in progress and the project was scheduled for completion in December 2011.

UPDATE [Info as of: Mar. '12] Wonderla Holidays has completed an 84 rooms luxury resort at Hejjala P.O, dist. Bangalore, Karnataka. Civil work has been completed. The resort consists of 4 banquet halls, exclusive board meeting rooms, etc. The resort is scheduled for inauguration in April 2012.

Contact: Wonderla Holidays Private Limited, Site Office: 28th KM, Mysore Road, Hejjala P.O, Bangalore 562109, Karnataka, India. Tel: 91‐80‐22010333/ 33710333. Fax: 91‐80‐22010324. Email: [email protected] Website: www.wonderla.com Mr. Arun K. Chittilappilly

18

Page 23: Recorder of New Projects Premium Weekly 1-7 April 2012

Liquor/ Wine And Beer Status: Delayed/Put‐on‐Hold Projects Summary: Lokmangal Sugar Ethanol & Co‐Generation Industries has put on hold an expansion of its molasses‐based distillery in dist. Solapur, Maharashtra. Project Details: Info as of: May '11] Lokmangal Sugar Ethanol & Co‐Generation Industries was expanding its molasses and grain‐based distillery from 80 KLD to 160 KLD to produce extra neutral alcohol, ethanol and rectified spirit in dist. Solapur, Maharashtra. Civil work was in progress and the project was scheduled for completion in 2011. [Info as of: Dec. '11] Lokmangal Sugar Ethanol & Co‐Generation Industries, belonging to the Lokmangal Group, was expanding its molasses‐based distillery from 80 KLD to 160 KLD to produce extra neutral alcohol, ethanol and rectified spirit at Bhandarkavathe, dist. Solapur, Maharashtra. Civil work was in progress and the project was scheduled for completion in H2 2012.

UPDATE [Info as of: Apr. '12] Lokmangal Sugar Ethanol & Co‐Generation Industries, belonging to the Lokmangal Group, has put on hold an expansion of its molasses‐based distillery (from 80 KLD to 160 KLD) at Bhandarkavathe, dist. Solapur, Maharashtra. The unit was to produce ENA, ethanol and rectified spirit.

Contact: Lokmangal Sugar Ethanol & Company ‐ Generation Industries Limited, Registered Office: C/o Lokmangal Group, 8536 A/11, Murarji Peth, Near Old Pune Naka, Solapur ‐ 413001, Ma‐harashtra. Tel: 91‐217‐2735517/ 2735518. Fax: 91‐217‐2735619. Email: [email protected] Website: www.lokmangal.com Mr. Mahesh Konapure, Manager

Plant Add: Lokmangal Sugar Ethanol & Company ‐ Generation Industries Limited, Plot No.588‐590 592 & 645, Bhandarkavathe, Tehsil South Solapur, Solapur ‐ 413221, Maharashtra, India.

Non Conventional Energy Status: Delayed/Put‐on‐Hold Projects Summary: Davangere Sugar has put on hold an expansion of its co‐gen power generation capacity in dist. Davangere, Karnataka. Project Details: [Info as of: Aug. '10] Davangere Sugar was planning to expand its biomass‐based power generation capacity from 24 MW to 54 MW at Kukkuvada, dist. Davangere, Karnataka. The company was searching for partners for financial tie ups. The project was scheduled for completion in 2012.

UPDATE [Info as of: Mar. '12] Davangere Sugar has put on hold its co‐gen power generation capacity excpansion (from 24 MW to 54 MW) at Kukkuvada, dist. Davangere, Karnataka . The project has been put on hold due to market conditions.

Contact: Davangere Sugar Company Limited, Registered Office: 73/1, Shamanur Road, P.B. No: 312, Davangere 577004, Karnataka, India. Tel: 91‐8192‐222022/ 222027. Fax: 91‐8192‐222028. Mr. Venkatesh Shetty, Chief Finance Officer

Plant Add: Davangere Sugar Company Limited, Kukkuvada Davangere Taluk, Davangere ‐ 577525, Karnataka, India. Tel: 91‐8192‐201623/ 201624/ 201626. Fax: 91‐8192‐201627/ 201777.

Primary Steel Production Status: Delayed/Put‐on‐Hold Projects Summary: K Energy Company has put on hold a sponge iron manufacturing project in dist. Korba, Chhattisgarh. Project Details: [Info as of: Jun. '10] K Energy Company was p lanning a 210,000 TPA sponge iron manufacturing project in Urga, dist. Korba, Chhattisgarh. Consultants and equipment suppliers were to be decided. The project was planned for completion in 2 years from zero date. [Info as of: Feb. '11] K Energy Company had delayed the 210,000 TPA sponge iron manufacturing project at Urga, dist. Korba, Chhattisgarh. The project had been delayed due to problems in land acquisition.

UPDATE [Info as of: Mar. '12] K Energy Company has put on hold the 210,000 TPA sponge iron manufacturing project at Urga, dist. Korba, Chhattisgarh due to land problems. Work on the project is expected to commence in 2013.

Contact: K Energy Company Limited, Corporate Office: 3rd Floor, R. B. Tower, Samta Colony 492001, Chhattisgarh. Tel: 91‐771‐4099902 / 4099903/ 4099904/ 4099905. Fax: 91‐771‐4025166. Email: [email protected] ; Website: www.kenergy.in Mr. Prem Upvamshi, Project Incharge

Primary Steel Production Status: Delayed/Put‐on‐Hold Projects Summary: K Energy Company has put on hold an integrated steel project in dist. Janjgir‐Champa, Chhattisgarh. Project Details: [Info as of: Feb. '11] K Energy Company had delayed implementation of an integrated steel plant in dist. Janjgir‐Champa, Chhattisgarh. The project was to include a 1.92 MTPA induction furnace (ingots and billets), a 1.80 MTPA rolling mill (TMT and CTD bars), a 60 MW coal‐based CPP and a 2.10 MTPA sponge iron plant. The project had been delayed due to problems in land acquisition.

UPDATE [Info as of: Mar. '12] K Energy Company has put on hold an integrated steel project in dist. Janjgir‐Champa, Chhattisgarh due to land problems. The project was to include a 1.92 MTPA ingots and billets production project, a 1.80 MTPA TMT and CTD bars production project, a 60 MW coal‐based CPP and a 2.10 MTPA sponge iron production project. Civil work is expected to commence in 2013.

18

Page 24: Recorder of New Projects Premium Weekly 1-7 April 2012

Contact: K Energy Company Limited, Corporate Office: 3rd Floor, R. B. Tower, Samta Colony 492001, Chhattisgarh. Tel: 91‐771‐4099902 / 4099903/ 4099904/ 4099905. Fax: 91‐771‐4025166. Email: [email protected] ; Website: www.kenergy.in Mr. Prem Upvamshi, Project Incharge

Thermal Power Generation Status: Delayed/Put‐on‐Hold Projects Summary: K Energy Company has put on hold a coal‐based CPP in dist. Janjgir‐Champa, Chhattisgarh. Project Details: [Info as of: Feb. '11] K Energy Company had delayed a 60 MW coal‐based captive power plant in dist. Janjgir‐Champa, Chhattisgarh. The project had been delayed due to problems in land acquisition.

UPDATE [Info as of: Mar. '12] K Energy Company has put on hold a 60 MW coal‐based CPP in dist. Janjgir‐Champa, Chhattisgarh due to land problems. Civil work is expected to commence in 2013. Contact: K Energy Company Limited, Corporate Office: 3rd Floor, R. B. Tower, Samta Colony 492001, Chhattisgarh. Tel: 91‐771‐4099902 / 4099903/ 4099904/ 4099905. Fax: 91‐771‐4025166. Email: [email protected] ; Website: www.kenergy.in Mr. Prem Upvamshi, Project Incharge

Thermal Power Generation Status: Delayed/Put‐on‐Hold Projects Summary: K Energy Company has put on hold a coal‐based CPP in dist. Korba, Chhattisgarh. Project Details: [Info as of: May '10] K Energy Company was plan‐ning a 90 MW coal‐based power project at Urga, dist. Korba, Chhat‐tisgarh. Equipment suppliers were to be finalized. Land acquisition was in progress and the project was planned for completion in 18 months from zero date. [Info as of: Feb. '11] K Energy Company had delayed the 90 MW coal‐based CPP at Urga, dist. Korba, Chhattisgarh. The project had been delayed due to problems in land acquisition.

UPDATE [Info as of: Mar. '12] K Energy Company has put on hold a 90 MW coal‐based CPP at Urga, dist. Korba, Chhattisgarh due to land problems. Civil work is expected to commence in 2013.

Contact: K Energy Company Limited, Corporate Office: 3rd Floor, R. B. Tower, Samta Colony 492001, Chhattisgarh, India. Tel: 91‐771‐4099902/ 4099903/ 4099904/ 4099905. Fax: 91‐771‐4025166. Email: [email protected] ; Website: www.kenergy.in Mr. Prem Upvamshi, Project Incharge

Primary Steel Production Status: Abandoned Projects Summary: Cosmic Ferro Alloys has abandoned the silico and ferro manganese production expansion in dist. Bankura, WB. Project Details: [Info as of: Jul. '09] Cosmic Ferro Alloys was implementing a silico and ferro manganese production capacity expansion at Mouza Ghutgoria, dist. Bankura, WB. The expansion entailed an increase in the capacity from 70,000 TPA to 150,000 TPA by installing 4 furnaces (2 for silico and 2 for ferro manganese) with the capacity of 9 MVA each. Technical consultancy was to be rendered by Rg CON Services, Visakapatnam. Major equipment suppliers were appointed. Land has been acquired and the company was waiting for clearances. Civil work was expected to begin in the month of Sep 2009. The project was scheduled for completion by 2nd half of 2010. [Info as of: Feb. '11] Cosmic Ferro Alloys was expanding the production capacity of silico and ferro manganese from 70,000 TPA to 150,000 TPA at Mouza Ghutgoria, dist. Bankura, WB . Rg CON Services, Visakhapatnam was the technical consultant. Civil work was in progress and the project was scheduled for completion in September 2011.

UPDATE [Info as of: Mar. '12] Cosmic Ferro Alloys, belonging to the Cosmic Group of Indus‐tries, has abandoned its silico and ferro manganese production capacity expansion (from 70,000 TPA to 150,000 TPA) at Mouza Ghutgoria, dist. Bankura, WB.

Contact: Cosmic Ferro Alloys Limited, Registered Office: C/o Cosmic Group Of Industries, Sikkim Commerce House, 4/ 1, Middle‐ton Street, 4th Floor, Kolkata‐ 700071, West Bengal, India. Tel: 91‐33‐22836551/ 22836552. Fax: 91‐33‐22836553. Email: [email protected] ; Website: www.cosmicferro.com Mr. Ravi Kumar Birla, Director

Plant Add: Cosmic Ferro Alloys Limited, Village Mouza, Ghutgoria P.O. Barjora, Bankura ‐ 722168, West Bengal, India.