Recommended Preferred Route Option Report Bolivia Hill Upgrade Assessment of Route Options August 2013 Cardno Bolivia Hill Upgrade - Assessment of Route Options APPENDIX C PRELIMINARY HYDROLOGY / HYDRAULICS REPORT

Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Recommended Preferred Route Option Report Bolivia Hill Upgrade – Assessment of Route Options

August 2013 Cardno

Bolivia Hill Upgrade - Assessment of Route Options

APPENDIX C PRELIMINARY HYDROLOGY / HYDRAULICS REPORT

Page 2: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report

Bolivia Hill Upgrade – Assessment of Route Options NA89913018

Prepared for Roads and Maritime Services July 2013

Preliminary Hydrology and Hydraulics Report

Bolivia Hill Upgrade – Assessment of Route Options NA89913018

Page 3: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno ii

Document Information Prepared for Roads and Maritime Services Project Name Bolivia Hill Upgrade – Assessment of Route Options File Reference BH_HydrologyHydraulics_Report_V1.docx Job Reference NA89913018 Date July 2013

Contact Information Cardno (NSW/ACT) Pty Ltd ABN 95 001 145 035 Level 9, The Forum 203 Pacific Highway St. Leonards NSW 2065 Australia Telephone: (02) 9496 7700 Facsimile: (02) 9439 5170 International: +612 9496 7700 [email protected] www.cardno.com.au

Document Control Version Date Author Author

Initials Reviewer Reviewer

Initials

Draft 17 June 2013 Kieran Geraghty KG Dr Brett Phillips BCP

Final 26 July 2013 Kieran Geraghty KG Dr Brett Phillips BCP

This document is produced by Cardno solely for the benefit and use by the client in accordance with the terms of the engagement. Cardno does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document.

Page 4: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno iii

Table of Contents 1 Introduction 4

1.1 Background 4 1.2 Objectives 4

2 Existing Conditions 5 2.1 Surface Water Hydrology 5 2.2 Groundwater Hydrology 6

3 Hydrologic & Hydraulic Modelling 7 3.1 Peak Flow Determination 7 3.2 Existing Conditions Flood Levels and Extent Determination 7

4 Conclusions 8 4.1 Surface Water Impacts 8 4.2 Groundwater Impacts 8

Appendices Appendix A Figures Appendix B Groundwater Assessment

Page 5: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno 4

1 Introduction

1.1 Background Cardno was engaged by Roads and Maritime Services (RMS) in September 2012 to carry out an options and route assessment study and preliminary environmental assessment for upgrading approximately two kilometres of the New England Highway at Bolivia Hill between Glen Innes and Tenterfield.

The New England Highway passes through the Bolivia Range about 55km north of Glen Innes in NSW. The Bolivia Range runs east west and connects with the Great Dividing Range to the east and Deepwater River passes around the range to the west. Bolivia Hill (1225m) and Little Bolivia (1100m) are hills within the Range. Both the New England Highway (1025m) and the Great Northern Railway line (disused) pass through gaps in the range just to the west of Bolivia Hill. An aerial view of the study area is shown in Figure 1-1.

Figure 1-1 Study Area

1.2 Objectives The objectives of this preliminary hydrology and hydraulics assessment include the following:

Undertake a desktop review of the study area including catchment analysis;

Identify local groundwater resources within the study area;

Develop hydrological model for the study area; and

Develop hydraulic model for the study area.

Results of this assessment will assist with constraint mapping and provide input to preliminary route options.

Page 6: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno 5

2 Existing Conditions

2.1 Surface Water Hydrology The main surface drainage lines in the vicinity of the study area are shown in Figure 2-1 and the study area lies at the headwaters of the Deepwater River, a tributary of the MacIntyre River.

Figure 2-1 Geology, Soils and Drainage Characteristics within Study Area

The main watercourse in the study area is a first order stream that is unnamed and flows in a north-easterly direction roughly parallel to the NEH on the western side. The headwaters of this watercourse lie at an elevation of approximately RL940 metres at the southern end of the study area and falls to about RL820 metres towards the base of Bolivia Hill. It then meanders across flat lying terrain forming a local floodplain and crosses Pyes Creek Road about 400 metres west of the highway. The unnamed watercourse has an approximate catchment of 533 hectares and comprises forested and vegetated land.

The watercourse has gouged a deep (approximately 20 metres) steep sided gorge exposing fresh granite outcrop, approximately 200 metres west of the current road alignment.

The main unnamed watercourse has a minor tributary in the upper part of its catchment which runs sub-parallel to the main gully and occurs close to the western side of the NEH and is separated from the main gully by a small ridge line. This drainage line joins the main gully about 150 metres west of the highway and is indicated on the existing conditions flood extents included in Figure 3 in Appendix A.

At the northern end of the study area is Brickyard Creek, which is primarily a fourth order stream within the study area. Brickyard Creek has a catchment area of approximately 1,700ha upstream of the NEH.

Topographical information indicates generally steep gradients within the catchment ranging up to approximately 20 per cent and existing gradients reduce considerably to form a floodplain in the north-east of

Page 7: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno 6

the study area. Figure 2 in Appendix A highlights the variability of the topography within portions of the study area.

No river flow gauges are located within the study area or on Brickyard Creek. The nearest river flow gauging station is located on Deepwater River approximately 5km downstream of the study area.

Several minor overland flow paths convey runoff from the two main ridgelines within the study area and connect with the main unnamed watercourse. At the time of inspection (September 2012) all overland flow paths running off the ridgelines were dry with only minor ponded water observed in some areas.

Given the distance of the existing road from the unnamed watercourse and its floodplain, no instances of flooding of the existing road are known and no local flooding issues were identified during the consultation period.

2.2 Groundwater Hydrology Groundwater resources are defined and recognised by State and Territory agencies as Groundwater Management Units (GMUs) or Unincorporated Areas.

A GMU is a hydraulically connected groundwater system that is recognised as a major aquifer with high production and high usage. The Australian Natural Resources Data Library states that “this definition allows for management of the groundwater resource at an appropriate scale at which resources issues and intensity of use can be incorporated into groundwater management practices”. GMUs may be grouped into provinces with respect to state or geological boundaries

Unincorporated Areas are defined as those areas not included as a GMU.

The study area is located within an Unincorporated Area indicating limited groundwater resources.

The locations of existing groundwater bores are shown in Appendix B and are sourced from the NSW Groundwater Database. There are no registered groundwater bores within the study area. A review of three boreholes northeast of the study area indicates only one recording a very low yield of 0.37 L/s. This suggests very limited groundwater resources in the region.

The desktop groundwater assessment was undertaken by Pells Consulting on behalf of Cardno and preliminary findings are included in Appendix B.

Page 8: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno 7

3 Hydrologic & Hydraulic Modelling

3.1 Peak Flow Determination Using topographical survey, available geographic information system (GIS) information and information collected during a site inspection in September 2012, local catchment delineation through the study area was undertaken. Catchment delineation and overland flow path identification is shown in Figure 1 in Appendix A.

Hydrological modelling for the study area was undertaken using the software xp-rafts (version 2009, XP Software). The hydrological model combines rainfall information with local catchment characteristics to estimate a runoff hydrograph.

Design rainfall depths and temporal patterns for the 100 year Average Recurrence Interval (ARI) event were developed using standard techniques provided in Australian Rainfall and Runoff (AR&R) (Engineers Australia, 1999). Based on the catchment type, available information and recommendations in AR&R (Engineers Australia 1999), rainfall losses were incorporated into the model.

No data was available for the calibration of the model and parameters in the model were used based on experience and standard practice for similar catchment types.

3.2 Existing Conditions Flood Levels and Extent Determination A hydraulic model converts runoff calculated using the hydrological model into water levels and velocities throughout the major creek systems and gullies in the study area. The model simulates the hydraulic behaviour of the water within the study area by accounting for flow in potential flow paths. It relies on boundary conditions, which include the runoff hydrographs produced by the hydrologic model and downstream conditions (commonly a water level or the characteristics of a hydraulic ‘control’ such as a bridge or weir).

Two dimensional (2D) hydraulic modelling was carried out to estimate the overland flow behaviour and the Tuflow 1D/2D modelling package (version Sept 2011, BMT WBM) was used for this study.

Two dimensional (2D) modelling requires a hydraulic roughness map that characterises ground surface roughness based on land use. In this assessment, surface roughness was characterised as bushland, open space and road land types based on aerial photography and information collected during the site visit.

No data was available for the calibration of the model and parameters in the model were used based on experience and standard practice for similar floodplain types.

The hydrology and hydraulic model was run for the 100 year Average Recurrence Interval (ARI) storm event in order to estimate the extent of flooding within the catchment.

Figure 3 in Appendix A shows the results of the existing conditions modelling for the 100 year ARI flood extent.

Results indicate that the 100 year ARI flood extent is well defined within the gully adjacent to the existing road and gradually extends into floodplain as the terrain flattens out and the gully joins Brickyard Creek.

It is noted that the results are preliminary at this stage to provide an indication of the expected flood extents during a 1 in 100 year ARI event. The results may be refined based on the following:

Including information on hydraulic structures in the model, such as the bridge over Brickyard Creek; and

Sensitivity to model parameters including rainfall losses and catchment roughness.

Page 9: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno 8

4 Conclusions

4.1 Surface Water Impacts The proposed shortlisted routes will cross several watercourses. This provides an opportunity to control the flow during flood events with the provision of drainage structures (such as culverts and bridges) within the road embankment to ensure upstream water levels (afflux) are mitigated to acceptable levels. For some minor tributaries, there may be opportunity to mitigate downstream water levels by redirection of the tributary.

Where the route options preliminary designs crossed watercourses, bridge lengths were conservatively based on the 100 year ARI flood extent (ie to ensure clear passage of flood flows up to the 100 year ARI flood with no impediments such as bridge piers).

In the next stage of development, the proposed bridge extents will be refined and assessed in the hydraulic model to determine potential impacts on flows. Culverts will be sized for cross drainage with waterway opening requirements identified. The redirection of any tributaries and associated flow conveyance will also be assessed.

4.2 Groundwater Impacts The potential impacts to groundwater resources from construction of a new road alignment through the study area are considered minor or negligible.

As the road is a linear feature, it does not cover a large area and is not considered to provide a risk to altering the recharge or water balance of an aquifer system. In addition, in the case of this site, there are no such significant aquifer systems. Specifically:

Deep cuttings associated with the road alignment, if required, are still not expected to intercept any aquifer

There are expected to be insignificant impacts to groundwater flow systems and aquifer water balances. Consequently:

Impacts to groundwater dependent ecosystems (GDEs) are expected to be small to negligible

Impacts to groundwater users will be negligible

There is anticipated to be neutral effect on the beneficial usage category of aquifers

There is expected to be no requirement for substantial dewatering. Any dewatering required is likely to be superficial, associated with management of local and recent rainfall at the worksite.

Page 10: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno 9

Bolivia Hill Upgrade – Assessment of Route Options

APPENDIX A FIGURES

Page 11: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July
Page 12: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

New Englan

d Hwy

Pyes C

reek Rd

Existing CatchmentTopography

HW9 BOLIVIA HILL UPGRADE

Map Produced by Cardno NSW/ACT Pty Ltd (2812)Date: 15 February 2013

Coordinate System: Zone 56 MGA/GDA 94Project: NA89913018-04

Figure2-2D Boundary.wor 01

0.5 1.0

Kilometres

0

1:16,000 Scale at A3

LEGENDELEVATION (m AHD)

790

810

825

1120

890

Elevation (mAHD)

Legend:

Page 13: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July
Page 14: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July
Page 15: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options

July 2013 Cardno 10

Bolivia Hill Upgrade – Assessment of Route Options

APPENDIX B GROUNDWATER ASSESSMENT

Page 16: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

1

The upgrroutefacto

RMS

Cardreviegrou

1.1

The Figu

The ToR1.5 k

INTRODU

New South rade a sectioe and develoors, commun

S have enga

dno have, in ew of the groundwater rela

1. Undertagroundw

2. Examine

3. Provide systems

The Proj

study area iure 1).

Project ServR. The study km wide by 3

“The seRange “Boliviathe nortfalls analignmedeep rothe nortcarved wetland

CTION

Wales Roadon of the Newopment of a cnity consultat

ged Cardno

turn, engageoundwater coated aspects

ke a bore sewater resourc

e groundwate

comment ons.

ject Area

s located in

vices study aarea defined

3 km long. T

ection of theis approxim

a Hill” is the thern granitd narrow roent and steeockfill embathern escarout a granit

d areas and

ds and Maritimw England Hconcept destion and env

to undertake

ed Pells Cononstraints rels stated in the

earch of the Sces and aqui

er impacts in

n the current

north easter

area is shownd in the recta

The region is

e New Englamately 9 km

section of tte escarpmeoad corridorep rock fill enkment was

rpment. Thete ridge line

d rock pools

2

me ServicesHighway at Bo

ign is based ironmental c

e an assessm

nsulting to prlevant to roue Terms of R

Study area toifers, and;

n and near th

and historic

n New South

n in Figure 2angular area described in

and Highwalong but th

the highwayent of the rars with hard embankmens constructee steep dow

e that is locas are located

(RMS) are iolivia Hill. Thon consider

constraints.

ment of the o

ovide this rete selection.

Reference (T

o determine t

he Study area

al characteri

h Wales, nea

2, which has shown on th

n the ToR as

ay that passe length of y that desceange. This

d rock cuttingnts to the wed in the stewnslope batal known asd in the drai

nvestigating he selection ation of a ran

options for th

port, compris This report oR) provided

the location o

a

stics of local

ar the town o

been reprodhis figure is as follows:

ses throughroad locally

ends 100m alignment hg to the easest. In the 1eep gully hatter and gors the centrainage lines”

L12125/1

options to of a proposenge of techn

he highway ro

sing a desktoaddresses t

d by RMS:

of local

l groundwate

of Bolivia (see

uced from thapproximatel

h the Boliviay known as over 2 kmshas steep cst of the 1950s a 35malfway downrge have

al ridge. Som”.

1025 10/2012

ed ical

oute.

op the

er

e

he y

a

s on cross

m n

me DRAFT

Page 17: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Figu

2

2.1 Top Thesite as swes Thethe featportThewate

ure 1 – The S

GROUNDW

Topograpographical

e study areais just to th

such, is locastwards to th

e topographexisting Hig

tures a unnation of the s

e watercoursercourses o

Study Area

WATER RE

aphical Settfeatures of

a is located he west of thated in the uhe Murray-D

ical data shghway followamed tribut

site, the toposes within ton the 250K

as defined b

ESOURCE

ting the site are

on relativelhe major waupper headDarling Bas

hows that, inws within a ary, runningography flathe study ar

K topograph

3

by RMS

CHARACT

e shown in

y high topoatershed divwaters of th

sin.

n the south gorge whic

g parallel tottens, formi

rea are all lihical sheet (

TERISATIO

Figure 2 to

graphy (820vide of the Ghe “Border”

western poch dips to tho the Highwng a floodpsted as a ‘m(Figure 2).

N

Figure 5 be

0 to 1020 mGreat Dividcatchment,

ortion of the he north easay. In the

plain to Brickminor, non-p

L12125/1

elow.

m AHD). Thing Range a, flowing

study areast. The gorgnorth easteklayers Creperennial’

1025 10/2012

he and,

a, ge

ern eek.

DRAFT

Page 18: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

FiguShe

Figu

ure 2 – Topoeet for Grafto

ure 3 – Topo

ographic Feon

ographic Fe

atures of th

atures of th

4

he Study Are

he Study Are

ea taken from

ea, from the

m the 250K

25k Topogr

L12125/1

Topograph

raphic Shee

1025 10/2012

ic

et

DRAFT

Page 19: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Figu

Figu

ure 4– Topo

ure 5 – 3D V

ographic Fea

View of the S

atures of the

Study Area

5

e Study Are

(2x vertical

a, from the

exaggeratio

25k Topogra

on)

L12125/1

raphic Sheet

1025 10/2012

t

DRAFT

Page 20: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

2.2

The

Exce7 anformcomelevplutoof ththis

It is area

It is exisnot f

Figu

Geologic

study area i

erpts from thnd Figure 8, rmations and tmprise a regiovation (north-onic intrusionhe study areaintrusive ma

clear from tha) that these

expected thating watercofeatured on t

ure 6 – Extra

cal Setting

s set within t

he 1.5 Millionrespectively.their descriptonal Permian-eastern) porn forms “Bolia. The topogass.

he cross-secformations a

at some shaourses in the the geologica

act from NS

the geologica

n, 500K and 2 Although thtions, the geon formation ortion of the sivia Hill” in th

graphic gorge

tion reproducare vertically

llow sedimenstudy area. al sheets rep

W 1.5M Sur

6

al region kno

250K geologhe sheets difological form

of Adamellite ite. A more r

he higher tope which the c

ced in Figureoriented and

nts (alluviumHowever, th

produced bel

rface Geolog

own as the N

gical sheets affer slightly in

mation near th– Porphyrite

recent (late Ppographic regcurrent Highw

e 8 (which crd extend to a

, colluvium) hese would blow.

gy Sheet (20

New England

are shown in n the mappedhe study areae, which comPermian or egions coverinway follows i

rosses near ta considerab

may be founbe of limited e

009)

L12125/1

Fold Belt.

Figure 6, Fid extents of a is shown to

mprises the loearly Triassicng the south is formed wit

to the study ble depth.

nd adjacent toextent, and a

1025 10/2012

gure

o ower c) west thin

o the are

DRAFT

Page 21: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Figuure 7 – Extraact from thee 500K Geolo

7

ogical Sheeet (1973)

L12125/1

1025 10/2012

DRAFT

Page 22: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Figu

ure 8 – Extraacts from thhe Grafton 2

8

250K Geologgical Sheet ((1976)

L12125/1

1025 10/2012

DRAFT

Page 23: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

2.3

GrouGrou

A Gthat Natumanissupracboun

Unin

The Provweb

The

Grou

Aquifer T

undwater resundwater Ma

roundwater Mis recognise

ural Resourcnagement oues and intectices”. GMndaries.

ncorporated A

site is locatevince” (see Fbsite:

“The newhich oGreat Abasins north-eand moconsidecentresCoffs HgroundwThe rocwater iffracturinlimited supply,

ANRA webs

undwater co

“There geologyEnglandthe grangroundw

Types and

sources are danagement U

Managemened as a majoces Data Librof the grounensity of useU’s may be g

Areas are de

ed within theFigure 9). A

ew Englandoccupies a rArtesian Basto the southast. The co

ountainous, erable area s including AHarbour … thwater develcks here aref they have ng and/or wto about 0.5and even t

site also lists

nditions regi

is little grouy is dominad Tablelandnite has wewater poten

Groundwa

defined and Units (GMU)

t Unit (GMUr aquifer withrary (ANRDL

ndwater resoe can be incgrouped into

efined as tho

GMU listed description o

d Fold Belt isroughly triansin to the wh-west, anduntry rangeand is mosof productiv

Armidale, Tahe unincorplopment bee intrinsicalldeveloped

weathering. 5 L/s, whichthis level of

depth to gro

onal to the s

undwater deted by the fds. Limited seathered, hontial” (pg 15)

9

ater Manag

recognised bor Unincorpo

) is a hydrauh high producL) states that ource at an corporated o provinces w

ose areas no

as “N05 – Uof this ground

s an area ongular area

west, the Sydd the Clarenes from substly of relativve farming

Tamworth, Inporated arecause of thly impermeasome degreYields to in

h is sufficienf success is

oundwater as

site are also d

evelopment fractured rosupplies caowever the )

gement Zon

by State andorated Areas

ulically connection and hig“this definitappropriateinto ground

with respect t

t included as

Unincorporatedwater unit is

f igneous aa in north-eadney/Gunne

nce/Morton sdued undulvely high eleland, and s

nverell, Tarea, has limitee characterable, and caee of secon

ndividual bornt for a smanot assured

s being gene

discussed in

t in the uppecks (mostly

an be obtainmore eleva

nes

Territory ags.

ected groundgh usage. Thtion allows fe scale at w

dwater manato state or ge

s a GMU.

ed Area – Nes provided on

nd metasedastern NSWedah/Oxleysedimentarylating farminevation. Theeveral majoee, Port Maed potentialristics of thean only storndary permeres is thus c

all stock or dd.”

erally 40 met

Green et al

er catchmeny granites) oned in the vated areas h

L12125/1

gencies as

dwater systemhe Australianfor

which resouagement eological

ew England n the ANRA

dimentary roW between thy sedimentary basin to thng land to here is a or urban acquarie andl for

e rock massre and transeability by commonly domestic

tres depth.

(2012):

nt where theof the New alleys wherhave poor

1025 10/2012

m

rces

ocks he

ary he

hilly

d

s. smit

e

re

DRAFT

Page 24: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Figu

2.4

The Grouindic

Of threcodeepno y

The desc

ure 9 – Grou

Groundw

locations of undwater Dacating low gr

he three boreords a yield, ap bore. GW9

yield.

available dacription of “lim

undwater Ma

water Usag

existing groatabase). Throundwater u

eholes to theand in this ca900619 was

ata from the Nmited ground

anagement

ge (Bore Da

undwater bohere are no reusage in the a

e north east oase only a smalso installe

NSW Bore Ddwater” given

10

Units

atabase Se

ores are showegistered groarea.

of the study amall yield of

ed in June 19

Database sean in the abov

earch)

wn in Figure oundwater b

area, only on0.37 L/s wer

997 to depth

arch thereforve cited refer

10 (from theores within th

ne (GW3008re reported foof 44.2 metr

re appear to srences.

L12125/1

e NSW he study are

898, June 199or the 62.5mres but record

support the

1025 10/2012

ea,

97)) m

ded

DRAFT

Page 25: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

Figu

ure 10 – Loccation of Registered Bo

11

ores

L12125/1

1025 10/2012

DRAFT

Page 26: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

3

3.1

In suveryare erockstrea

It is prolocuttiseepwouexpr

As ssite.strea

3.2

The thro

As ta risof th

The conssystperm

GROUNDW

Groundw

ummary, it isy limited grouexpected to

ks is expecteams are exp

possible thaonged wet pings. At a depages. Howe

uld be minor aressions of a

such, it is not Rather, it isams would c

Commen

potential imugh the stud

he road is a sk to altering his site, there

Deep cuintercep

There araquifer w

o

o

o

There isrequiredprecipitaflows wi

risk of a spilstruction plantems from sumeability of th

WATER IM

water Vulne

s anticipated,undwater resprovide minid to be wideected to be o

t, due to the eriods adjacesktop assesever, based oand are perh

a groundwate

t considered s anticipatedcover any req

ntary on Po

pacts to groudy area are c

linear featurthe recharge

e are no such

uttings assoct any signific

re expected water balanc

impacts to Gnegligible (aqualified eco

impacts to gfew groundw

there is anticthe aquifers ‘marginal’ sa

s expected tod is likely to bation at the wll occur towa

ll or contaminning and m

uch spills canhe rock form

PACTS

erability

, based on a ources in themal storage ly spaced anof very limite

steep relief, ent to the str

ssment level,on the regionhaps better aer system.

apprpriate to that any buf

quirement of

ossible Imp

undwater resonsidered to

e, it does noe or water bah significant a

ciated with rocant aquifer.

to be insignifces. Conseq

Groundwater although suchologists);

roundwater water users in

cipated to be(additionally

alinity).

o be no requibe superficialworksite. Basards the trenc

nation event anagement c

n still be desimations.

12

desktop stue site regionand transmi

nd with minimed extent.

regions of sream or at lo, it is not posnal geology, attributed as

o prepare a gffer zones bagroundwate

pacts

sources fromo be minor to

ot cover a largalance of an aquifer syste

oad alignmen

ficant impacquently:

Dependent h ecological

users will ben the region)

e neutral effey, the existing

irement for sl, associated

sed on the avching site wo

t occurring ducontrols. Thignated to be

dy of geolog. The plutonssion of wate

mal infilling.

seepage (eg ocations of clssible to mapit is expectesurface wate

groundwaterased on proter systems in

m constructiono non-existen

ge area and aquifer syste

ems. Specific

nt, if required

ts to groundw

Ecosystemsdeterminatio

e negligible (a)

ect on the beg aquifers ar

ubstantial ded with managvailable dataorks.

uring construe likelihood o

e low due to

ical conditionic and volcaer, and fractuAlluvium ass

springs) mayiff lines or ste

p specific locad that any suer throughflow

r vulnerabilityection of surfsuperficial a

n of a new rot.

is not considem. In additcally,

, are still not

water flow sy

are expecteons should be

additionally,

neficial usage understood

ewatering. Angement of loc, negligible g

uction shouldof impacts tothe anticipat

L12125/1

ns, that thereanic formationuring within tsociated with

y be found aeep road ations of sucuch seepagew rather than

y map for therface water alluvial units.

oad alignmen

dered to provtion, in the ca

t expected to

ystems and

ed to be smae undertaken

there are ve

ge category od to be of

ny dewaterincal and recengroundwater

d be subject o groundwateted low-

1025 10/2012

e are ns the h

fter

ch es n

e

nt

vide ase

o

ll to n by

ry

of

ng nt

to er

DRAFT

Page 27: Recommended Preferred Route Option Report - Appendix C … · 2014-07-10 · Preliminary Hydrology and Hydraulics Report Bolivia Hill Upgrade – Assessment of Route Options July

4

REFEREN

1. Branagaof Miner

2. Green DmanageIndustrie

3. New EnDocumehttp://wwbolivia.h

4. AustraliaWales [Whttp://wwengland

5. NSW Gohttp://wa

NCES

an, D.F and Pral Resource

D., Ali A., Petement overviees, Sydney

gland - Bolivent], 2012. . Uww.rta.nsw.ghtml

an Natural RWWW Documww.anra.gov-province.htm

overnment Gaterinfo.nsw.

Packham, G.s New South

trovic J., Burew: Border R

via Hill - RoadURL gov.au/roadp

Resource Atlament], 2012..au/topics/waml

Groundwater gov.au/gw/

13

.H. Field Geoh Wales, Syd

rrell M., MossRivers Catch

d Projects - R

rojects/proje

as (ANRA) W . URL ater/overview

works repor

ology of Newdney, Austra

s P. (2012) Wment, NSW

Roads and M

ects/north_ea

Water resourc

w/nsw/gmu-u

rts [WWW Do

w South Walelia.

Water resourcDepartment

Maritime Serv

astern_region

ces - Overvie

unincorporate

ocument]. UR

L12125/1

es. Departme

rce and of Primary

vices [WWW

n/new_engla

ew - New So

ed-area-new

RL

1025 10/2012

ent

W

and_

uth

w-

DRAFT