(Results-Framework Document)for
R F D
Ministry of Petroleum and Natural Gas
(2014-2015)
Government of India
18/03/2015 11.24 AMGenerated on
Confirmation mail of RFD Submission has been sent to the user's email Id: [email protected] andOrganisation's Email Id: (Does not exist)
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2014-2015)
Affordable and secure hydrocarbon energy for fuelling India's growth
Mission
1. To formulate conducive policies and provide effective regulatory framework for the growth of hydrocarbon
sector.2. To accelerate domestic Exploration & Production (E&P) of hydrocarbons as well as equity oil & gas
abroad.3. To develop the hydrocarbon sector through technology up-gradation and capacity building in
production, refining, transportation and marketing sectors.4. To develop supply and distribution infrastructure
for petroleum products, to serve the needs of the economy, including households.5. To enhance service
standards and to maximize customer satisfaction.6. Promote fuel conservation, clean & green fuels and
development of alternative sources of energy.
Objectives
1 Policy framework for growth of E&P sector
2 Increase in exploration Activities
3 Increasing Capital Investment in Oil & Gas Sector
4 Enhancing Domestic reserves & Production
5 Overseas crude oil & natural Gas production
6 Improvement of Refinery performance
7 Increasing Refinery capacity
8 Ensuring availability of petroleum products across the nation with respect to marketing and distribution
9 To encourage use of Natural Gas
10 To promote fuel conservation
11 Promoting cleaner and environment friendly fuels
12 Promotion of renewable and unconventional hydrocarbon resources to become carbon neutral for Oil Sector Companies
13 Research & Development for bringing in higher productivity in specific area of Oil and Gas exploration, storage, transportation by the Oil
sector companies.
14 Joint responsibility for power and fertilizer sector
15 Facilitating PSUs
Functions
Vision
18/03/2015 11.24 AMGenerated on
Page : 2 of 38
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2014-2015)
1.Exploration for, and exploitation of petroleum resources including natural gas and coal bed methane.1
2.Production, supply, distribution, marketing and pricing of petroleum including natural gas, coal bed mathane and petroleum products.2
3.Oil refineries, including Lube Plants.3
4.Additives for petroleum and petroleum products.4
5. Tube Blending and greases.5
5 A.(i) Blending and blending prescriptions for bio- fuels including laying down the standards for such blending; and (ii) marketing,
distribution and retailing of bio-fuels and its blended products.
6
6. Planning, development and control of, and assistance to, all industries dealt, with by the Ministry.7
7. Planning, development and regulation of oilfield services.8
8. Public sector projects falling under the subjects included in this list. Engineers India Limited and Indo-Burma Petroleum Company,
together with its subsidiaries, except such projects as are specifically allotted to any other Ministry / Department.
9
9. The Oilfields (Regulation and Development ) Act, 1948 (53 of 1948).10
10. The Oil and Natural Gas Commission (Tranfer of Undertaking and Repeal) Act, 1993 (65 of 1993.11
11. The Petroleum Pipelines [(Acquisition of Right of User in Land) Act, 1962 (50 of 1962)].12
12. The Esso [(Acquisition of Undertakings in India) Act, 1976 (2 of 1976)].13
13. The Oil Industry (Development) Act,1074 (47 of 1974).14
14. The Burmah-Shell [(Acquisition of Undertakings in India) Act, 1976 (2 of 1976)].15
15. The Caltex [(Acquisition of Shares of Caltex Oil Refining (India) LImited and of the Undertakings in India of the Caltex (India) LImited
Act, 1977 (17 of 1977)].
16
16. Administration of the Petroleum Act, 1934 (30 of 1934) and the rules made thereunder.17
17. Administration of Balmer Lawrie Investments Limited and Balmer Lawrie and Company Limited.''18
18/03/2015 11.24 AMGenerated on
Page : 3 of 38
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Policy framework for growth of E&P sector 8.00 Operation of UniformLicensing Policy
Offer of Oil/gas,CBM and shale gasblocks under thepolicy
number 45 35 3040504.80[1] [1.1] [1.1.1]
carving out CBM blocks foroffer under unified licencingpolicy
Number of blocksidentified
number 9 7 68103.20[1.2] [1.2.1]
Increase in exploration Activities 10.00 Operationalization ofNational Data Repository(NDR)
completion of sitepreparation andcommissioning ofhardware andsoftware
Date 06/01/2015 27/02/2015 15/03/201511/02/201515/12/20145.00[2] [2.1] [2.1.1]
operation of non-exclusivemulti- client geo scientificpolicy
inviting serviceprovider throughDGH website
Date 30/06/2014 31/10/2014 31/12/201429/08/201430/04/20145.00[2.2] [2.2.1]
Increasing Capital Investment in Oil & GasSector
2.00 Plan Investments throughinternal and externalbudgetary resources(IE&BR) of PSUs
% IE&BR outlayutilized
Rs. Cr. 72571.34 64507.86 60476.1268539.6076603.082.00[3] [3.1] [3.1.1]
Enhancing Domestic reserves & Production 12.00 Reserve replacement ratio(RRR) by PSUs
Adding morereserves
Number 1 0.8 0.70.91.12.00[4] [4.1] [4.1.1]
1.1 Accretion to thereserves (oil & gas)
MMT 51.51 31.16 22.8940.7063.62.00[4.1.2]
Natural gas production byPSUs
quantity of naturalgas
BCM 23.4 18.2 15.620.8262.00[4.2] [4.2.1]
National Gas Production byPrivate / JV Sector
Quantity of NaturalGas
BCM 8.64 6.72 5.767.689.62.00[4.3] [4.3.1]
crude oil production byPSUs
Quantity of crude oilproduced
MMT 24.3 18.9 16.221.6272.00[4.4] [4.4.1]
Crude oil production byPrivate / JV Sector
Quantity of CrudeOil produced
MMT 9.72 7.56 6.488.6410.802.00[4.5] [4.5.1]
18/03/2015 11.24 AMGenerated on
Page : 4 of 38
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Overseas crude oil & natural Gas production 2.00 Overseas production ofcrude oil
Overseas productionof crude oil
MMT 4.532 3.525 3.0214.0285.0351.00[5] [5.1] [5.1.1]
Overseas production ofNatural Gas.
Overseas productionof Natural Gas.
BCM 2.366 1.840 1.5772.1032.6291.00[5.2] [5.2.1]
Improvement of Refinery performance 7.00 Implementation of Phase IIIRBIP in the following 3refineries(i) HPCL, Mumbai(ii) BPCL mumbai(iii)MRPL, Mangalore
Approval of numberof projects forimplementation(PFI)
Number 7 5 4687.00[6] [6.1] [6.1.1]
Increasing Refinery capacity 7.00 facilitating commissioningof 15 MMTPA ParadipRefinery
commissioning of 15MMTPA ParadipRefinery
Date 18/03/2015 22/03/2015 31/03/201520/03/201515/03/20157.00[7] [7.1] [7.1.1]
Ensuring availability of petroleum productsacross the nation with respect to marketingand distribution
5.00 Ensure availability ofpetroleum products i.e.,LPG
Quantity of LPGmade available
MMT 14.94 11.62 9.9613.2816.61.00[8] [8.1] [8.1.1]
Quantity of dieselmade available
MMT 69.58 66.82 65.4868.18711.00[8.1.2]
quantity of petrolmade available
MMT 16.59 15.93 15.6116.2516.931.00[8.1.3]
Expanding the network ofDomestic LPG to ruralareas
Issuance of Letter ofIntent for RajivGandhi Gramin LPGVitarak Agencies
Number 923 718 61582010251.00[8.2] [8.2.1]
Review requirement of PDSkerosene for states / UTs inview of expansion of LPG
prepare a paper onrationalising PDSkerosene allocationto states/ UTs
Date 28/02/2015 22/03/2015 31/03/201515/03/201531/01/20151.00[8.3] [8.3.1]
18/03/2015 11.24 AMGenerated on
Page : 5 of 38
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
To encourage use of Natural Gas 5.00 framing of guidelines forgranting marketing rights ofCNG and setting up ofCNG stations
Submission ofcabinet note
Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9] [9.1] [9.1.1]
framing of uniformguidelines for utilisation ofdomestic gas
submission ofcabinet note
Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.2] [9.2.1]
amendments in PNGRBAct
submission ofcabinet note
Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.3] [9.3.1]
Pipeline tarriff policy Approval ofCompetent Authority
Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.4] [9.4.1]
Policy on EOI for newpipelines
Approval ofcompetent authority
Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.5] [9.5.1]
To promote fuel conservation 4.00 To launch standards andlabelling program for DGset
Send a proposal toBEE
Date 31/12/2014 28/02/2015 31/03/201531/01/201530/11/20144.00[10] [10.1] [10.1.1]
Promoting cleaner and environment friendlyfuels
8.00 Roll out BS-IV MS & HSDin 9 more identified cities
Availability of BS-IVMS & HSD in 9more identified cities
Numberof cities
16 12 1014184.80[11] [11.1] [11.1.1]
Ensuring adequateavailablity of domestic gasfor CNG (transport) andPNG (Domestic)
increase inconsumption ofNatural Gas forCNG and PNG
% 4 2 1353.20[11.2] [11.2.1]
Promotion of renewable and unconventionalhydrocarbon resources to become carbonneutral for Oil Sector Companies
4.00 Monitoring physicalprogress in workprogramme for developingenergy from renewable andunconventional sources byOil & Gas PSUs
MMTOE equivalentof renewable energy
MMTOE 0.0456 0.04056 0.03800.043010.04811.36[12] [12.1] [12.1.1]
18/03/2015 11.24 AMGenerated on
Page : 6 of 38
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Efficient Functioning of the RFD System 3.00 Timely submission of Draft RFDfor 2015-2016 for
On-time submission Date 06/03/2015 10/03/2015 11/03/201509/03/201505/03/20152.0*
* Mandatory Objective(s)
Framing of policy for shalegas exploration by privateoperators
Submission ofcabinet note
Date 15/02/2015 15/03/2015 31/03/201528/02/201531/01/20151.32[12.2] [12.2.1]
framing of policy forextraction of CBM from coalmining lease areas, held byprivate operators.
Submission ofcabinet note
Date 15/02/2015 15/03/2015 31/03/201528/02/201531/01/20151.32[12.3] [12.3.1]
Research & Development for bringing inhigher productivity in specific area of Oil andGas exploration, storage, transportation bythe Oil sector companies.
4.00 Number of Patents filed Patents filed Number 18 14 1216201.00[13] [13.1] [13.1.1]
Patents sanctioned Number 5 3 2461.00[13.1.2]
Monitoring investments ofOil sector companies inarea of R&D
Expenditure on R&Dto be incurred by OilPSUs
AmountRs. incrore
855 765 7208109002.00[13.2] [13.2.1]
Joint responsibility for power and fertilizersector
5.00 Targeted consumption ofGas in power and fertilizersector
consumption of gasby Power sectors
MMSCMD
28.5 18.5 13.523.533.53.00[14] [14.1] [14.1.1]
consumption of gasby Fertilizer sectors
MMSCMD
31 30 29.530.531.52.00[14.1.2]
Facilitating PSUs 2.00 Fulfilling obligations toPSUs under the MOUs
Fulfilling obligationsto PSUs under theMOUs
% 80 60 5070902.00[15] [15.1] [15.1.1]
18/03/2015 11.24 AMGenerated on
Page : 7 of 38
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Approval
Timely submission of Results for2013-2014
On-time submission Date 02/05/2014 06/05/2014 07/05/201403/05/201401/05/20141.0
Enhanced Transparency / Improved Servicedelivery of Ministry/Department
3.00 Rating from Independent Audit ofimplementation of Citizens’ /Clients’ Charter (CCC)
Degree of implementation ofcommitments in CCC
% 95 85 80901002.0*
Independent Audit ofimplementation of GrievanceRedress Management (GRM)system
Degree of success inimplementing GRM
% 95 85 80901001.0
Reforming Administration 8.00 Update departmental strategy toalign with revised priorities
Date Date 02/11/2014 04/11/2014 05/11/201403/11/201401/11/20142.0*
Implement agreed milestones ofapproved Mitigating Strategiesfor Reduction of potential risk ofcorruption (MSC).
% of Implementation % 90 70 60801001.0
Implement agreed milestones forimplementation of ISO 9001
% of implementation % 95 85 80901002.0
% of Responsibility Centres withRFD in RFMS
Responsibility Centrescovered
% 95 85 80901001.0
Implement agreed milestones ofapproved Innovation ActionPlans (IAPs).
% of implementation % 90 70 60801002.0
Improve compliance with the FinancialAccountability Framework
1.00 Timely submission of ATNs onAudit paras of C&AG
Percentage of ATNssubmitted within due date (4months) from
% 90 70 60801000.25*
* Mandatory Objective(s)
18/03/2015 11.24 AMGenerated on
Page : 8 of 38
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
date of presentation ofReport to Parliament byCAG during the year.
Timely submission of ATRs tothe PAC Sectt. on PAC Reports.
Percentage of ATRSsubmitted within due date (6months) from date ofpresentation of Report toParliament by PAC duringthe year.
% 90 70 60801000.25
Early disposal of pending ATNson Audit Paras of C&AG Reportspresented to Parliament before31.3.2014.
Percentage of outstandingATNs disposed off duringthe year.
% 90 70 60801000.25
Early disposal of pending ATRson PAC Reports presented toParliament before 31.3.2014
Percentage of outstandingATRS disposed off duringthe year.
% 90 70 60801000.25
* Mandatory Objective(s)
18/03/2015 11.24 AMGenerated on
Page : 9 of 38
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 12/13
Unit
FY 14/15FY 13/14 FY 15/16
Actual Valuefor
Actual Valuefor
FY 16/17
-- 45numberOffer of Oil/gas, CBMand shale gas blocksunder the policy
Policy framework for growth of E&Psector
Operation of UniformLicensing Policy
50 55 --[1] [1.1] [1.1.1]
-- 9numberNumber of blocksidentified
carving out CBM blocksfor offer under unifiedlicencing policy
10 11 --[1.2] [1.2.1]
-- 06/01/2015Datecompletion of sitepreparation andcommissioning ofhardware and software
Increase in exploration Activities Operationalization ofNational Data Repository(NDR)
-- -- --[2] [2.1] [2.1.1]
-- 30/06/2014Dateinviting serviceprovider through DGHwebsite
operation of non-exclusive multi- clientgeo scientific policy
-- -- --[2.2] [2.2.1]
96 95Rs. Cr.% IE&BR outlayutilized
Increasing Capital Investment in Oil &Gas Sector
Plan Investments throughinternal and externalbudgetary resources(IE&BR) of PSUs
95 --136.75[3] [3.1] [3.1.1]
1.1 1NumberAdding more reservesEnhancing Domestic reserves &Production
Reserve replacementratio (RRR) by PSUs
1 10[4] [4.1] [4.1.1]
93.04 51.51MMT1.1 Accretion to thereserves (oil & gas)
71.04 73.28 --[4.1.2]
40.62 27BCMquantity of natural gasNatural gas productionby PSUs
32.48 43.1235.34[4.2] [4.2.1]
14.38 8.64BCMQuantity of NaturalGas
National Gas Productionby Private / JV Sector
14 16.509.58[4.3] [4.3.1]
37.9 28.8MMTQuantity of crude oilproduced
crude oil production byPSUs
30.44 29.6537.69[4.4] [4.4.1]
18/03/2015 11.24 AMGenerated on
Page : 10 of 38
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 12/13
Unit
FY 14/15FY 13/14 FY 15/16
Actual Valuefor
Actual Valuefor
FY 16/17
11.64 9.72MMTQuantity of Crude Oilproduced
Crude oil production byPrivate / JV Sector
12.10 11.5012.05[4.5] [4.5.1]
4.341 5.035MMTOverseas production ofcrude oil
Overseas crude oil & natural Gasproduction
Overseas production ofcrude oil
6.658 7.3045.279[5] [5.1] [5.1.1]
2.919 2.629BCMOverseas production ofNatural Gas.
Overseas production ofNatural Gas.
3.414 3.2732.731[5.2] [5.2.1]
20 8NumberApproval of number ofprojects forimplementation (PFI)
Improvement of Refinery performance Implementation of PhaseII IRBIP in the following 3refineries(i) HPCL, Mumbai(ii) BPCL mumbai(iii)MRPL, Mangalore
-- --15[6] [6.1] [6.1.1]
-- 18/03/2015Datecommissioning of 15MMTPA ParadipRefinery
Increasing Refinery capacity facilitating commissioningof 15 MMTPA ParadipRefinery
-- -- --[7] [7.1] [7.1.1]
15.2 14.94MMTQuantity of LPG madeavailable
Ensuring availability of petroleumproducts across the nation withrespect to marketing and distribution
Ensure availability ofpetroleum products i.e.,LPG
18.86 19.9215.83[8] [8.1] [8.1.1]
69.2 69.58MMTQuantity of dieselmade available
76.90 81.6056.92[8.1.2]
15.7 16.59MMTquantity of petrol madeavailable
20.77 22.5914.26[8.1.3]
1052 923NumberIssuance of Letter ofIntent for Rajiv GandhiGramin LPG VitarakAgencies
Expanding the network ofDomestic LPG to ruralareas
900 8001328[8.2] [8.2.1]
18/03/2015 11.24 AMGenerated on
Page : 11 of 38
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 12/13
Unit
FY 14/15FY 13/14 FY 15/16
Actual Valuefor
Actual Valuefor
FY 16/17
-- 28/02/2015Dateprepare a paper onrationalising PDSkerosene allocation tostates/ UTs
Review requirement ofPDS kerosene for states/ UTs in view ofexpansion of LPG
-- -- --[8.3] [8.3.1]
-- 31/01/2015DateSubmission of cabinetnote
To encourage use of Natural Gas framing of guidelines forgranting marketing rightsof CNG and setting up ofCNG stations
-- -- --[9] [9.1] [9.1.1]
-- 31/01/2015Datesubmission of cabinetnote
framing of uniformguidelines for utilisationof domestic gas
-- -- --[9.2] [9.2.1]
-- 31/01/2015Datesubmission of cabinetnote
amendments in PNGRBAct
-- -- --[9.3] [9.3.1]
-- 31/01/2015DateApproval of CompetentAuthority
Pipeline tarriff policy -- -- --[9.4] [9.4.1]
-- 31/01/2015DateApproval of competentauthority
Policy on EOI for newpipelines
-- -- --[9.5] [9.5.1]
-- 31/12/2014DateSend a proposal toBEE
To promote fuel conservation To launch standards andlabelling program for DGset
-- -- --[10] [10.1] [10.1.1]
10 9Number ofcities
Availability of BS-IVMS & HSD in 9 moreidentified cities
Promoting cleaner and environmentfriendly fuels
Roll out BS-IV MS &HSD in 9 more identifiedcities
-- --9[11] [11.1] [11.1.1]
-- 85%increase inconsumption of NaturalGas for CNG and PNG
Ensuring adequateavailablity of domesticgas for CNG (transport)and PNG
-- -- --[11.2] [11.2.1]
18/03/2015 11.24 AMGenerated on
Page : 12 of 38
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 12/13
Unit
FY 14/15FY 13/14 FY 15/16
Actual Valuefor
Actual Valuefor
FY 16/17
(Domestic)
-- 0.0507MMTOEMMTOE equivalent ofrenewable energy
Promotion of renewable andunconventional hydrocarbonresources to become carbon neutralfor Oil Sector Companies
Monitoring physicalprogress in workprogramme fordeveloping energy fromrenewable andunconventional sourcesby Oil & Gas PSUs
-- --0.0786[12] [12.1] [12.1.1]
-- 15/02/2015DateSubmission of cabinetnote
Framing of policy forshale gas exploration byprivate operators
-- -- --[12.2] [12.2.1]
-- 15/02/2015DateSubmission of cabinetnote
framing of policy forextraction of CBM fromcoal mining lease areas,held by private operators.
-- -- --[12.3] [12.3.1]
52 20NumberPatents filedResearch & Development for bringingin higher productivity in specific areaof Oil and Gas exploration, storage,transportation by the Oil sectorcompanies.
Number of Patents filed 25 2531[13] [13.1] [13.1.1]
-- 6NumberPatents sanctioned 7 7 --[13.1.2]
-- 850AmountRs. incrore
Expenditure on R&D tobe incurred by OilPSUs
Monitoring investmentsof Oil sector companiesin area of R&D
-- --1117.45[13.2] [13.2.1]
37.5 28.5MMSCMDconsumption of gas byPower sectors
Joint responsibility for power andfertilizer sector
Targeted consumption ofGas in power andfertilizer sector
38.5 4028.3[14] [14.1] [14.1.1]
18/03/2015 11.24 AMGenerated on
Page : 13 of 38
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 12/13
Unit
FY 14/15FY 13/14 FY 15/16
Actual Valuefor
Actual Valuefor
FY 16/17
-- 06/03/2015DateOn-time submissionEfficient Functioning of the RFDSystem
Timely submission of DraftRFD for 2015-2016 forApproval
-- -- --*
-- 02/05/2014DateOn-time submissionTimely submission of Resultsfor 2013-2014
-- --01/05/2014
-- 95%Degree of implementation ofcommitments in CCC
Enhanced Transparency / ImprovedService delivery ofMinistry/Department
Rating from Independent Auditof implementation of Citizens’/ Clients’ Charter (CCC)
-- -- --*
-- 95%Degree of success inimplementing GRM
Independent Audit ofimplementation of GrievanceRedress Management (GRM)system
-- -- --
-- 02/11/2014DateDateReforming Administration Update departmental strategyto align with revised priorities
-- -- --*
-- 90%% of ImplementationImplement agreed milestonesof approved MitigatingStrategies for Reduction ofpotential risk of corruption(MSC).
-- -- --
-- 95%% of implementationImplement agreed milestonesfor implementation of ISO
-- -- --
* Mandatory Objective(s)
31.5 31MMSCMDconsumption of gas byFertilizer sectors
31.5 3530.4[14.1.2]
-- 80%Fulfilling obligations toPSUs under the MOUs
Facilitating PSUs Fulfilling obligations toPSUs under the MOUs
-- -- --[15] [15.1] [15.1.1]
18/03/2015 11.24 AMGenerated on
Page : 14 of 38
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 12/13
Unit
FY 14/15FY 13/14 FY 15/16
Actual Valuefor
Actual Valuefor
FY 16/17
9001
-- 95%Responsibility Centrescovered
% of Responsibility Centreswith RFD in RFMS
-- -- --
-- 90%% of implementationImplement agreed milestonesof approved Innovation ActionPlans (IAPs).
-- -- --
-- 90%Percentage of ATNssubmitted within due date (4months) from date ofpresentation of Report toParliament by CAG during theyear.
Improve compliance with the FinancialAccountability Framework
Timely submission of ATNs onAudit paras of C&AG
-- -- --*
-- 90%Percentage of ATRSsubmitted within due date (6months) from date ofpresentation of Report toParliament by PAC during theyear.
Timely submission of ATRs tothe PAC Sectt. on PACReports.
-- -- --
-- 90%Percentage of outstandingATNs disposed off during theyear.
Early disposal of pendingATNs on Audit Paras of C&AGReports presented toParliament before 31.3.2014.
-- -- --
-- 90%Percentage of outstandingATRS disposed off during theyear.
Early disposal of pendingATRs on PAC Reportspresented to Parliament before31.3.2014
-- -- --
* Mandatory Objective(s)
18/03/2015 11.24 AMGenerated on
Page : 15 of 38
Section 4:Acronym
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
AcronymSI.No Description
Billion cubic meter1 BCM
Bureau of Energy Efficiency2 BEE
Bureau of Indian Standards3 BIS
Bharat Petroleum Corporation Limited4 BPCL
Bharat Stage-IV5 BS-IV
Coal Bed Methane6 CBM
Page : 16 of 38
Section 4:Acronym
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
AcronymSI.No Description
Compressed Natural Gas7 CNG
Diesel Generator Sets8 DG Set
Hindustan Petroleum Corporation Limited9 HPCL
High Speed Diesel10 HSD
Indian Oil Corporation Limited11 IOCL
Integrated Refinery Business Improvement Programme12 IRBIP
Page : 17 of 38
Section 4:Acronym
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
AcronymSI.No Description
Liquefied Natural gas13 LNG
Liquafied Petroleum Gas14 LPG
Million Brtish Thermal Unit15 MMBTU
Million Standard Cubic Meter per day16 MMSCMD
Million Metric Ton17 MMT
Million Tonnes of Oil Equivalent18 MMTOE
Page : 18 of 38
Section 4:Acronym
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
AcronymSI.No Description
Million Metric Tonne Per Annum19 MMTPA
Ministry of Power20 MOP
Mangalore Refinery and Petrochemical Limited21 MRPL
Motor Spirit22 MS
Oil and Gas Conservation Fortnight23 OGCF
OIL India Limited24 OIL
Page : 19 of 38
Section 4:Acronym
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
AcronymSI.No Description
Oil Marketing Companies25 OMCs
Oil and Natural Gas Corporation26 ONGC
ONGC Videsh Limited27 OVL
Petroleum Conservation Research Association28 PCRA
Projects for implementation29 PFI
Power Load Factor30 PLF
Page : 20 of 38
Section 4:Acronym
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
AcronymSI.No Description
Piped Natural Gas31 PNG
Research and Development32 R and D
Page : 21 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
Offering new blocks underthe ULP.
New blocks will be offered underUniform Licensing Policy
1 NUMBER[1.1.1] Offer of Oil/gas, CBM and shale gas blocksunder the policy
draft ULP has been circulated toM/o Finance, Law, Coal and
Planning Commission. Commentsfrom Ministry of Coal and
Planning Commission have beenreceived but it is still awaited fromMinistry of Finance and Law. Tworeminders have already been sent
to these Ministries.
For additional production ofCBM
Carving out CBM blocks for offer2 Number[1.2.1] Number of blocks identified
An activity related with theNDR project.
This is an activity related with thecreation of National Data Repository
in the country.
3 date[2.1.1] completion of site preparation andcommissioning of hardware and software
First preparatory steptowards the implementation
of this policy.5.Period of Survey under the
agreement would be twoyears, with a provision for
one extension for maximum
This is an activity related withOperation of non-exclusive multi-
client Geo-scientific PolicySignificant Feature
1.Permission for conducting GEOScientific data Survey/Activities will
be granted by way of a Non ExclusiveMulti Client Survey Agreement.
4 DATE[2.2.1] inviting service provider through DGHwebsite
18/03/2015 11.24 AMGenerated on
Page : 22 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
one year.6.The Service Provider will
have exclusive rights tolicense data generated as a
result of the Survey tointerested parties for a periodof twelve years (including thesurvey period), Subject to the
provisions of thisAgreements.
7.Service provider assumesall operational and financialrisks, invests his funds and
resources for acquiringand/or procession and/orinterpreting geo-scientificdata and can license such
data to interested E&Pinvestors, subject to
provisions of this Agreement.8.The offer to undertake suchstudies through a multi-clientbusiness model will be openthroughout the year. Under
this model, the serviceprovider may make attempts
to recover
2.Government would retain the optionfor offering the same area to more
than one company, should an interestbe expressed by another data
company for any reason includinginduction of superior technology.3.This model replaces the earlier
fiscal term of profit Sharing after costrecovery with the payment of one
time project fee.4.One time project fee of US$10000and extension fee equal to 60% ofone time fee would be paid by the
Service Provider. An application feeof US$1000 would also be levied. In
addition, the service provider willhave to furnish a Data Delivery Bank
Guarantee of US$ 100,000.
4 DATE[2.2.1] inviting service provider through DGHwebsite
18/03/2015 11.24 AMGenerated on
Page : 23 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
the investments by seekingpre-commitment and pre-
funding from E&P companiesbefore the start of the survey
and/or by license of suchgeo-scientific data when
acquired and/or processedand/or interpreted, subject toprovisions of this Agreement.
9.This Model enablesgeneration of high quality
geo-scientific data in aspeedy manner with
Government ownership ofdata and also encourages
deployment ofadvanced/proprietary
technologies in upgrading thegeological models and
understanding the petroleumsystems in sedimentarybasins of India without
involving expenditure andrisk on the part of
Government of India.
Government of India
This is an activity related withOperation of non-exclusive multi-
client Geo-scientific PolicySignificant Feature
1.Permission for conducting GEOScientific data Survey/Activities will
be granted by way of a Non ExclusiveMulti Client Survey Agreement.
2.Government would retain the optionfor offering the same area to more
than one company, should an interestbe expressed by another data
company for any reason includinginduction of superior technology.3.This model replaces the earlier
fiscal term of profit Sharing after costrecovery with the payment of one
time project fee.4.One time project fee of US$10000and extension fee equal to 60% ofone time fee would be paid by the
Service Provider. An application feeof US$1000 would also be levied. In
addition, the service provider willhave to furnish a Data Delivery Bank
Guarantee of US$ 100,000.
4 DATE[2.2.1] inviting service provider through DGHwebsite
18/03/2015 11.24 AMGenerated on
Page : 24 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
reserves the right to rejectany application on rounds ofnational security, Govt. policy
or fraud committed by theapplicant.
10.Service provider and thelicensee shall use the data
solely for the purpose of E&Pactivities. Licensee will also
be subject to Indian laws andthe jurisdiction of Indian
Courts. Service Provider willmake provisions in thisregard in their contract
Agreement with licensees.
This is an activity related withOperation of non-exclusive multi-
client Geo-scientific PolicySignificant Feature
1.Permission for conducting GEOScientific data Survey/Activities will
be granted by way of a Non ExclusiveMulti Client Survey Agreement.
2.Government would retain the optionfor offering the same area to more
than one company, should an interestbe expressed by another data
company for any reason includinginduction of superior technology.3.This model replaces the earlier
fiscal term of profit Sharing after costrecovery with the payment of one
time project fee.4.One time project fee of US$10000and extension fee equal to 60% ofone time fee would be paid by the
Service Provider. An application feeof US$1000 would also be levied. In
addition, the service provider willhave to furnish a Data Delivery Bank
Guarantee of US$ 100,000.
4 DATE[2.2.1] inviting service provider through DGHwebsite
18/03/2015 11.24 AMGenerated on
Page : 25 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
Utilisation of budgetary outlayPlan Expenditure through Internal andExternal Resource by PSUs
5 Rs Crore[3.1.1] % IE&BR outlay utilized
Reserve Replacement Ratiois the ratio of hydrocarbon
reserve accretion in a year tothe crude oil and natural gasproduction made in that year.
This is an outcome of explorationcarried out in the blocks by which theadditional quantity of hydrocarbon is
discovered corresponding to thatproduced
6 number[4.1.1] Adding more reserves
Hydrocarbon reserves addedthrough domestic exploration
Addition to reserves in absolute termsquantified in MMTOE
7 MMTOE[4.1.2] 1.1 Accretion to the reserves (oil & gas)
Quantity of natural gasproduced in a year
This indicates the domesticproduction of natural gas by various
companies.
8 BCM[4.2.1] quantity of natural gas
The quantity of natural gasproduced by Private /JV
companies under Productsharing contract regime
The quantity of natural gas producedby Private operators /JV companies
9 BCM[4.3.1] Quantity of Natural Gas
18/03/2015 11.24 AMGenerated on
Page : 26 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
Quantity of crude oilproduced in a year
This indicates the domesticproduction of crude oil by various
companies.
10 MMT[4.4.1] Quantity of crude oil produced
Quantity of crude oilproduced by Private
operators/ JV companiesunder production sharing
contract regime
Quantity of crude oil produced byPrivate operators/ JV companies in
India
11 MMT[4.5.1] Quantity of Crude Oil produced
Quantity of crude Oilproduced from overseas oilfields by Indian companies.
Production of crude Oil, by Indiancompanies operating in foreign
countries
12 MMT[5.1.1] Overseas production of crude oil
Production of natural gas byPSU's from natural gas fields
acquired abroad
Production of natural gas by PSU'sfrom natural gas fields acquired
abroad
13 BCM[5.2.1] Overseas production of Natural Gas.
--To get the approval ofManagement to implementthe 8 projects for improving
the performance of refineries
To implement 8 projects in 3refineries for improving their
performance
14 Number[6.1.1] Approval of number of projects forimplementation (PFI)
18/03/2015 11.24 AMGenerated on
Page : 27 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
--Commissioning of ParadipRefinery with a capacity of 15
MMTPA in Odisha
To increase the domestic refiningcapacity in the country
15 Date[7.1.1] commissioning of 15 MMTPA ParadipRefinery
Quantity of Auto LPG, Non-Domestic and Domestic
cooking fuels to be madeavailable for cnsumption
Sufficient quantity of LPG to be madeavailable during the year
16 MMT[8.1.1] Quantity of LPG made available
Quantity of Auto and Industryfuels to be made available for
consumption
Sufficient quantity of Diesel to bemade available during the year
17 MMT[8.1.2] Quantity of diesel made available
Quantity of Auto and Industryfuels to be made available for
consumption
Sufficient quantity of petrol to bemade available during the year
18 MMT[8.1.3] quantity of petrol made available
Number of LOIs for RGGLVissued till 01.02.2014 is 2768
Issuance of number of Letterof Intents(LOI) under
RGGLVY
To expand the network of LPGdistributors in Rural and uncovered
areas
19 Number[8.2.1] Issuance of Letter of Intent for Rajiv GandhiGramin LPG Vitarak Agencies
18/03/2015 11.24 AMGenerated on
Page : 28 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
Ensure availability of PDSKerosene in accordance with
LPG expansion and otherfactors.
To rationalize PDS Keroseneallocation to different States & UTs.
20 Date[8.3.1] prepare a paper on rationalising PDSkerosene allocation to states/ UTs
To frame guidelines forgranting marketing rights ofCNG and setting up of CNG
stations
To Evolve suitable policy formarketing of CNG and setting up of
CNG stations in the country
21 Date[9.1.1] Submission of cabinet note
Framing of uniformguidelines for utilization of
domestic gas
To frame policy for utilization ofdomestic gas
22 Date[9.2.1] submission of cabinet note
Amendment in PNGRB ActRemoval of typographicalerrors/redundant provisions andinclusion/modification of other
relevant provisions to bring furtherclarity in the Act
23 Date[9.3.1] submission of cabinet note
Framing of Pipeline TariffPolicy
To rationalize transportation tariffacross the nation in order to removeregional imbalance in utilization of
natural gas
24 Date[9.4.1] Approval of Competent Authority
18/03/2015 11.24 AMGenerated on
Page : 29 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
Growth of E&P SectorTo expand gas pipeline network in thecountry
25 Date[9.5.1] Approval of competent authority
Assigning star labeling to DGSets on the pattern of starlabeling of other electrical
appliances such asRefrigerators, ACs etc. It will
save diesel for the nation.
The Notification of labeling norms byBEE/MoP would require the views of
various stakeholders includingmanufacturers of DG Set, TestingLaboratories, BIS etc. to be taken.
The acceptance of the views byBEE/MoP would be subject to the
provisions as contained in the EnergyConservation Act, 2001.
26 Date[10.1.1] Send a proposal to BEE
--To extend supply of BS-IVMS and HSD in 9 more
identified cities
To make available BS-IV MS andHSD in 9 more identified cities
27 Number[11.1.1] Availability of BS-IV MS & HSD in 9 moreidentified cities
Promoting use of CNG andPNG
Promoting cleaner and environmentfriendly fuels
28 %[11.2.1] increase in consumption of Natural Gas forCNG and PNG
18/03/2015 11.24 AMGenerated on
Page : 30 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
Production of green energyProduction of energy throughrenewable sources
29 MMTOE[12.1.1] MMTOE equivalent of renewable energy
To submit a cabinet note forconsideration of Policy forshale gas exploration by
private operations
To bring uniformity in shale gasexploration
30 Date[12.2.1] Submission of cabinet note
To submit a cabinet note forconsideration of Policy for
extraction of CBM
To bring clarity on policy for corporateacquisitions by PSU oil and gas
companies
31 Date[12.3.1] Submission of cabinet note
No of patents filed by PSUsNo of patents filed by PSUs32 number[13.1.1] Patents filed
--Number of patents filed byOMCs
Number of the patents to be filed byOMCs
33 Number[13.1.2] Patents sanctioned
18/03/2015 11.24 AMGenerated on
Page : 31 of 38
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Success indicator Description Definition MeasurementSI.No General Comments
Amount spent on R&D by OilPSUs
Expenditure incurred on R&D by OilPSUs
34 Rs Crore[13.2.1] Expenditure on R&D to be incurred by OilPSUs
supply of gas to power andsector
Make available gas from domesticsource and RLNG for power sector
35 MMSCMD[14.1.1] consumption of gas by Power sectors
supply of gas to fertilizersector
make availble gas domestic sourceand RLNG for fertilizer sector
36 MMSCMD[14.1.2] consumption of gas by Fertilizer sectors
Obligations of Ministry inachieving PSU MOU targets
have to be met
PSU targets in their MOUs haveobligations on the part of the Ministrywhich are critical to their achievement
37 percentage[15.1.1] Fulfilling obligations to PSUs under theMOUs
Page : 32 of 38
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Objective would not beacheived
Timely intimation ofdemand
[14.1.1] consumption ofgas by Power sectors
Allocation would be madebased on demand
CentralGovernment
Submission withinreasonable time
Department Of FertilizersDepartments
objective will not be metnecessary statutoryclearances
[12.1.1] MMTOEequivalent of renewableenergy
nodal ministry reasonable timeMinistry of New andRenewable Energy
Ministry
Objective will not beachieved
Approval for starlabelling program andTimely submission ofdemand
[10.1.1] Send aproposal to BEE
MOP is nodal ministry andAllocation is to be made based
on demand
Within reasonable timeMinistry of Power
Objective will not beachieved
Approval for starlabelling program andTimely submission ofdemand
[14.1.1] consumption ofgas by Power sectors
MOP is nodal ministry andAllocation is to be made based
on demand
Within reasonable time
Objective will not beachieved
Comments onproposals in CabinetNotes
[9.1.1] Submission ofcabinet note
Financial implications have tovetted by Ministry of Finance
Reasonable timeMinistry of Finance
Objective will not beachieved
Comments onproposals in CabinetNotes
[9.2.1] submission ofcabinet note
Financial implications have tovetted by Ministry of Finance
Reasonable time
Objective will not beachieved
Comments onproposals in CabinetNotes
[9.3.1] submission ofcabinet note
Financial implications have tovetted by Ministry of Finance
Reasonable time
Objective will not beachieved
Comments onproposals in CabinetNotes
[12.2.1] Submission ofcabinet note
Financial implications have tovetted by Ministry of Finance
Reasonable time
Objective will not beachieved
Comments onproposals in CabinetNotes
[12.3.1] Submission ofcabinet note
Financial implications have tovetted by Ministry of Finance
Reasonable time
18/03/2015 11.24 AMGenerated on
Page : 33 of 38
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Objective will not beachieved
Comments onproposals in CabinetNotes
[12.3.1] Submission ofcabinet note
Financial implications have tovetted by Ministry of Finance
Reasonable time
Objective will not beachieved
Comments onproposals in CabinetNotes
Submission of cabinetnote
Financial implications have tovetted by Ministry of Finance
Reasonable time
Objective would not beachieved
Comments andrequisite clearances
[1.1.1] Offer of Oil/gas,CBM and shale gasblocks under the policy
Environmental clearances areto be given by the M/Env.
& Forests
Reasonable timeMinistry of Environment andForests
Objective would not beachieved
Comments andrequisite clearances
[1.2.1] Number of blocksidentified
Environmental clearances areto be given by the M/Env.
& Forests
Reasonable time
Objective would not beachieved
Comments andrequisite clearances
[4.1.1] Adding morereserves
Environmental clearances areto be given by the M/Env.
& Forests
Reasonable time
Objective would not beachieved
Comments andrequisite clearances
[4.2.1] quantity ofnatural gas
Environmental clearances areto be given by the M/Env.
& Forests
Reasonable time
Objective would not beachieved
Comments andrequisite clearances
[4.4.1] Quantity of crudeoil produced
Environmental clearances areto be given by the M/Env.
& Forests
Reasonable time
Objective will not beachieved
Comments andrequisite clearances
[1.2.1] Number of blocksidentified
Requisite clearances for coalmining to be given by the
Ministry of Coal
Reasonable timeMinistry of Coal
objective will not be metclearances forexploration blocks
[1.1.1] Offer of Oil/gas,CBM and shale gasblocks under the policy
the cleared blocks would lead toenhanced Eand P activities in
the country
reasonable timeMinistry of Defence
18/03/2015 11.24 AMGenerated on
Page : 34 of 38
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
objective will not be metclearances forexploration blocks
[4.1.1] Adding morereserves
the cleared blocks would lead toenhanced Eand P activities in
the country
reasonable time
objective will not be metclearances forexploration blocks
[4.2.1] quantity ofnatural gas
the cleared blocks would lead toenhanced Eand P activities in
the country
reasonable time
objective will not be metclearances forexploration blocks
[4.4.1] Quantity of crudeoil produced
the cleared blocks would lead toenhanced Eand P activities in
the country
reasonable time
Page : 35 of 38
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 12/13 FY 14/15FY 13/14 FY 15/16 FY 16/17Unit
7.260 7.664Overseas oil and gasproduction
Overseas oil and gasproduction
OVL 10.072 10.5778.0101 MMToe
-- 15Commissioning of 15 MMTPAParadip Refinery
Increasing refining Capacity Oil refineries --2 MMTPA
52 20Patents filedResearch and development IOCL(R&D) 25 25313 Number
15.2 16.6Quantity of LPG madeavailable
Ensuring availability ofpetroleum products acrossthe nation with respect tomarketing and distribution
OMCs 18.86 19.9215.834 MMT
1052 1025Issuance of Letter of Intent forRajiv Gandhi Gramin LPGVitrak Agencies
900 8001328Number
69.2 71Quantity of diesel madeavailable
76.9 81.656.92MMT
15.7 16.93Quantity of petrol madeavailable
20.77 22.5914.26MMT
31/12/2014Take up with BEE and MoP forapproval
Promotion of fuelconservation in the country.
PCRA5 Date
31/01/2013 15/02/2015Conducting campaigns. 31/01/2016 31/01/201731/01/2014Date
22.5 23.5Production of Oil by PSUsEnhanced production ofdomestic oil and gas in thecountry for achieving selfsufficiency in the energyrequirement for the country
ONGC 26.2 24.422.26 MMT
18/03/2015 11.24 AMGenerated on
Page : 36 of 38
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 12/13 FY 14/15FY 13/14 FY 15/16 FY 16/17Unit
26.22 24.3Production of Oil by PSUsEnhanced production ofdomestic oil and gas in thecountry for achieving selfsufficiency in the energyrequirement for the country
OIL 30.44 29.6525.767 MMT
26.19 23.40Natural gas production byPSUs
32.48 43.1225.91BCM
14.38 8.64natural gas production byprivate/JV
14 16.509.58BCM
11.64 9.7Production of crude oil byprivate/JV
12.10 11.5012.05MMT
65supply of gas to power andfertilizer sector
Joint responsibility for powerand fertilizer sectors
Oil and Gas PSUsimporters of RLNG
70 758 MMSCMD
20Patents filedResearch and developmentfor bringing in higherproductivity in specific area ofOIL and Gas explorationstorage, transportation by theOil sector Companies
OMC's9 number
6Patents sanctioned number
15.2 47.63Quantity of LPG made availbleEnsuring availability ofpetroleum products acrossnation wth respect tomarketing and distribution
OMCs 66.49 86.4131.0310 MMT
18/03/2015 11.24 AMGenerated on
Page : 37 of 38
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 12/13 FY 14/15FY 13/14 FY 15/16 FY 16/17Unit
1052 3405issuance of Letter of Intent forRajiv Gandhi Gramin PG VitrakAgencies
4305 51052380Number
18/03/2015 11.24 AMGenerated on
Page : 38 of 38