38
(Results-Framework Document) for R F D Ministry of Petroleum and Natural Gas (2014-2015) Government of India 18/03/2015 11.24 AM Generated on Confirmation mail of RFD Submission has been sent to the user's email Id: [email protected] and Organisation's Email Id: (Does not exist)

R F D - Home | Ministry of Petroleum and Natural Gaspetroleum.nic.in/sites/default/files/rfd14-15.pdf · Gandhi Gramin LPG Vitarak Agencies [8.2] [8.2.1] Number 1.00 1025 923 820

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • (Results-Framework Document)for

    R F D

    Ministry of Petroleum and Natural Gas

    (2014-2015)

    Government of India

    18/03/2015 11.24 AMGenerated on

    Confirmation mail of RFD Submission has been sent to the user's email Id: [email protected] andOrganisation's Email Id: (Does not exist)

  • Section 1:Vision, Mission, Objectives and Functions

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2014-2015)

    Affordable and secure hydrocarbon energy for fuelling India's growth

    Mission

    1. To formulate conducive policies and provide effective regulatory framework for the growth of hydrocarbon

    sector.2. To accelerate domestic Exploration & Production (E&P) of hydrocarbons as well as equity oil & gas

    abroad.3. To develop the hydrocarbon sector through technology up-gradation and capacity building in

    production, refining, transportation and marketing sectors.4. To develop supply and distribution infrastructure

    for petroleum products, to serve the needs of the economy, including households.5. To enhance service

    standards and to maximize customer satisfaction.6. Promote fuel conservation, clean & green fuels and

    development of alternative sources of energy.

    Objectives

    1 Policy framework for growth of E&P sector

    2 Increase in exploration Activities

    3 Increasing Capital Investment in Oil & Gas Sector

    4 Enhancing Domestic reserves & Production

    5 Overseas crude oil & natural Gas production

    6 Improvement of Refinery performance

    7 Increasing Refinery capacity

    8 Ensuring availability of petroleum products across the nation with respect to marketing and distribution

    9 To encourage use of Natural Gas

    10 To promote fuel conservation

    11 Promoting cleaner and environment friendly fuels

    12 Promotion of renewable and unconventional hydrocarbon resources to become carbon neutral for Oil Sector Companies

    13 Research & Development for bringing in higher productivity in specific area of Oil and Gas exploration, storage, transportation by the Oil

    sector companies.

    14 Joint responsibility for power and fertilizer sector

    15 Facilitating PSUs

    Functions

    Vision

    18/03/2015 11.24 AMGenerated on

    Page : 2 of 38

  • Section 1:Vision, Mission, Objectives and Functions

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas-(2014-2015)

    1.Exploration for, and exploitation of petroleum resources including natural gas and coal bed methane.1

    2.Production, supply, distribution, marketing and pricing of petroleum including natural gas, coal bed mathane and petroleum products.2

    3.Oil refineries, including Lube Plants.3

    4.Additives for petroleum and petroleum products.4

    5. Tube Blending and greases.5

    5 A.(i) Blending and blending prescriptions for bio- fuels including laying down the standards for such blending; and (ii) marketing,

    distribution and retailing of bio-fuels and its blended products.

    6

    6. Planning, development and control of, and assistance to, all industries dealt, with by the Ministry.7

    7. Planning, development and regulation of oilfield services.8

    8. Public sector projects falling under the subjects included in this list. Engineers India Limited and Indo-Burma Petroleum Company,

    together with its subsidiaries, except such projects as are specifically allotted to any other Ministry / Department.

    9

    9. The Oilfields (Regulation and Development ) Act, 1948 (53 of 1948).10

    10. The Oil and Natural Gas Commission (Tranfer of Undertaking and Repeal) Act, 1993 (65 of 1993.11

    11. The Petroleum Pipelines [(Acquisition of Right of User in Land) Act, 1962 (50 of 1962)].12

    12. The Esso [(Acquisition of Undertakings in India) Act, 1976 (2 of 1976)].13

    13. The Oil Industry (Development) Act,1074 (47 of 1974).14

    14. The Burmah-Shell [(Acquisition of Undertakings in India) Act, 1976 (2 of 1976)].15

    15. The Caltex [(Acquisition of Shares of Caltex Oil Refining (India) LImited and of the Undertakings in India of the Caltex (India) LImited

    Act, 1977 (17 of 1977)].

    16

    16. Administration of the Petroleum Act, 1934 (30 of 1934) and the rules made thereunder.17

    17. Administration of Balmer Lawrie Investments Limited and Balmer Lawrie and Company Limited.''18

    18/03/2015 11.24 AMGenerated on

    Page : 3 of 38

  • Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccessIndicator

    Policy framework for growth of E&P sector 8.00 Operation of UniformLicensing Policy

    Offer of Oil/gas,CBM and shale gasblocks under thepolicy

    number 45 35 3040504.80[1] [1.1] [1.1.1]

    carving out CBM blocks foroffer under unified licencingpolicy

    Number of blocksidentified

    number 9 7 68103.20[1.2] [1.2.1]

    Increase in exploration Activities 10.00 Operationalization ofNational Data Repository(NDR)

    completion of sitepreparation andcommissioning ofhardware andsoftware

    Date 06/01/2015 27/02/2015 15/03/201511/02/201515/12/20145.00[2] [2.1] [2.1.1]

    operation of non-exclusivemulti- client geo scientificpolicy

    inviting serviceprovider throughDGH website

    Date 30/06/2014 31/10/2014 31/12/201429/08/201430/04/20145.00[2.2] [2.2.1]

    Increasing Capital Investment in Oil & GasSector

    2.00 Plan Investments throughinternal and externalbudgetary resources(IE&BR) of PSUs

    % IE&BR outlayutilized

    Rs. Cr. 72571.34 64507.86 60476.1268539.6076603.082.00[3] [3.1] [3.1.1]

    Enhancing Domestic reserves & Production 12.00 Reserve replacement ratio(RRR) by PSUs

    Adding morereserves

    Number 1 0.8 0.70.91.12.00[4] [4.1] [4.1.1]

    1.1 Accretion to thereserves (oil & gas)

    MMT 51.51 31.16 22.8940.7063.62.00[4.1.2]

    Natural gas production byPSUs

    quantity of naturalgas

    BCM 23.4 18.2 15.620.8262.00[4.2] [4.2.1]

    National Gas Production byPrivate / JV Sector

    Quantity of NaturalGas

    BCM 8.64 6.72 5.767.689.62.00[4.3] [4.3.1]

    crude oil production byPSUs

    Quantity of crude oilproduced

    MMT 24.3 18.9 16.221.6272.00[4.4] [4.4.1]

    Crude oil production byPrivate / JV Sector

    Quantity of CrudeOil produced

    MMT 9.72 7.56 6.488.6410.802.00[4.5] [4.5.1]

    18/03/2015 11.24 AMGenerated on

    Page : 4 of 38

  • Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccessIndicator

    Overseas crude oil & natural Gas production 2.00 Overseas production ofcrude oil

    Overseas productionof crude oil

    MMT 4.532 3.525 3.0214.0285.0351.00[5] [5.1] [5.1.1]

    Overseas production ofNatural Gas.

    Overseas productionof Natural Gas.

    BCM 2.366 1.840 1.5772.1032.6291.00[5.2] [5.2.1]

    Improvement of Refinery performance 7.00 Implementation of Phase IIIRBIP in the following 3refineries(i) HPCL, Mumbai(ii) BPCL mumbai(iii)MRPL, Mangalore

    Approval of numberof projects forimplementation(PFI)

    Number 7 5 4687.00[6] [6.1] [6.1.1]

    Increasing Refinery capacity 7.00 facilitating commissioningof 15 MMTPA ParadipRefinery

    commissioning of 15MMTPA ParadipRefinery

    Date 18/03/2015 22/03/2015 31/03/201520/03/201515/03/20157.00[7] [7.1] [7.1.1]

    Ensuring availability of petroleum productsacross the nation with respect to marketingand distribution

    5.00 Ensure availability ofpetroleum products i.e.,LPG

    Quantity of LPGmade available

    MMT 14.94 11.62 9.9613.2816.61.00[8] [8.1] [8.1.1]

    Quantity of dieselmade available

    MMT 69.58 66.82 65.4868.18711.00[8.1.2]

    quantity of petrolmade available

    MMT 16.59 15.93 15.6116.2516.931.00[8.1.3]

    Expanding the network ofDomestic LPG to ruralareas

    Issuance of Letter ofIntent for RajivGandhi Gramin LPGVitarak Agencies

    Number 923 718 61582010251.00[8.2] [8.2.1]

    Review requirement of PDSkerosene for states / UTs inview of expansion of LPG

    prepare a paper onrationalising PDSkerosene allocationto states/ UTs

    Date 28/02/2015 22/03/2015 31/03/201515/03/201531/01/20151.00[8.3] [8.3.1]

    18/03/2015 11.24 AMGenerated on

    Page : 5 of 38

  • Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccessIndicator

    To encourage use of Natural Gas 5.00 framing of guidelines forgranting marketing rights ofCNG and setting up ofCNG stations

    Submission ofcabinet note

    Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9] [9.1] [9.1.1]

    framing of uniformguidelines for utilisation ofdomestic gas

    submission ofcabinet note

    Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.2] [9.2.1]

    amendments in PNGRBAct

    submission ofcabinet note

    Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.3] [9.3.1]

    Pipeline tarriff policy Approval ofCompetent Authority

    Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.4] [9.4.1]

    Policy on EOI for newpipelines

    Approval ofcompetent authority

    Date 31/01/2015 15/03/2015 31/03/201528/02/201531/12/20141.00[9.5] [9.5.1]

    To promote fuel conservation 4.00 To launch standards andlabelling program for DGset

    Send a proposal toBEE

    Date 31/12/2014 28/02/2015 31/03/201531/01/201530/11/20144.00[10] [10.1] [10.1.1]

    Promoting cleaner and environment friendlyfuels

    8.00 Roll out BS-IV MS & HSDin 9 more identified cities

    Availability of BS-IVMS & HSD in 9more identified cities

    Numberof cities

    16 12 1014184.80[11] [11.1] [11.1.1]

    Ensuring adequateavailablity of domestic gasfor CNG (transport) andPNG (Domestic)

    increase inconsumption ofNatural Gas forCNG and PNG

    % 4 2 1353.20[11.2] [11.2.1]

    Promotion of renewable and unconventionalhydrocarbon resources to become carbonneutral for Oil Sector Companies

    4.00 Monitoring physicalprogress in workprogramme for developingenergy from renewable andunconventional sources byOil & Gas PSUs

    MMTOE equivalentof renewable energy

    MMTOE 0.0456 0.04056 0.03800.043010.04811.36[12] [12.1] [12.1.1]

    18/03/2015 11.24 AMGenerated on

    Page : 6 of 38

  • Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccessIndicator

    Efficient Functioning of the RFD System 3.00 Timely submission of Draft RFDfor 2015-2016 for

    On-time submission Date 06/03/2015 10/03/2015 11/03/201509/03/201505/03/20152.0*

    * Mandatory Objective(s)

    Framing of policy for shalegas exploration by privateoperators

    Submission ofcabinet note

    Date 15/02/2015 15/03/2015 31/03/201528/02/201531/01/20151.32[12.2] [12.2.1]

    framing of policy forextraction of CBM from coalmining lease areas, held byprivate operators.

    Submission ofcabinet note

    Date 15/02/2015 15/03/2015 31/03/201528/02/201531/01/20151.32[12.3] [12.3.1]

    Research & Development for bringing inhigher productivity in specific area of Oil andGas exploration, storage, transportation bythe Oil sector companies.

    4.00 Number of Patents filed Patents filed Number 18 14 1216201.00[13] [13.1] [13.1.1]

    Patents sanctioned Number 5 3 2461.00[13.1.2]

    Monitoring investments ofOil sector companies inarea of R&D

    Expenditure on R&Dto be incurred by OilPSUs

    AmountRs. incrore

    855 765 7208109002.00[13.2] [13.2.1]

    Joint responsibility for power and fertilizersector

    5.00 Targeted consumption ofGas in power and fertilizersector

    consumption of gasby Power sectors

    MMSCMD

    28.5 18.5 13.523.533.53.00[14] [14.1] [14.1.1]

    consumption of gasby Fertilizer sectors

    MMSCMD

    31 30 29.530.531.52.00[14.1.2]

    Facilitating PSUs 2.00 Fulfilling obligations toPSUs under the MOUs

    Fulfilling obligationsto PSUs under theMOUs

    % 80 60 5070902.00[15] [15.1] [15.1.1]

    18/03/2015 11.24 AMGenerated on

    Page : 7 of 38

  • Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccessIndicator

    Approval

    Timely submission of Results for2013-2014

    On-time submission Date 02/05/2014 06/05/2014 07/05/201403/05/201401/05/20141.0

    Enhanced Transparency / Improved Servicedelivery of Ministry/Department

    3.00 Rating from Independent Audit ofimplementation of Citizens’ /Clients’ Charter (CCC)

    Degree of implementation ofcommitments in CCC

    % 95 85 80901002.0*

    Independent Audit ofimplementation of GrievanceRedress Management (GRM)system

    Degree of success inimplementing GRM

    % 95 85 80901001.0

    Reforming Administration 8.00 Update departmental strategy toalign with revised priorities

    Date Date 02/11/2014 04/11/2014 05/11/201403/11/201401/11/20142.0*

    Implement agreed milestones ofapproved Mitigating Strategiesfor Reduction of potential risk ofcorruption (MSC).

    % of Implementation % 90 70 60801001.0

    Implement agreed milestones forimplementation of ISO 9001

    % of implementation % 95 85 80901002.0

    % of Responsibility Centres withRFD in RFMS

    Responsibility Centrescovered

    % 95 85 80901001.0

    Implement agreed milestones ofapproved Innovation ActionPlans (IAPs).

    % of implementation % 90 70 60801002.0

    Improve compliance with the FinancialAccountability Framework

    1.00 Timely submission of ATNs onAudit paras of C&AG

    Percentage of ATNssubmitted within due date (4months) from

    % 90 70 60801000.25*

    * Mandatory Objective(s)

    18/03/2015 11.24 AMGenerated on

    Page : 8 of 38

  • Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccessIndicator

    date of presentation ofReport to Parliament byCAG during the year.

    Timely submission of ATRs tothe PAC Sectt. on PAC Reports.

    Percentage of ATRSsubmitted within due date (6months) from date ofpresentation of Report toParliament by PAC duringthe year.

    % 90 70 60801000.25

    Early disposal of pending ATNson Audit Paras of C&AG Reportspresented to Parliament before31.3.2014.

    Percentage of outstandingATNs disposed off duringthe year.

    % 90 70 60801000.25

    Early disposal of pending ATRson PAC Reports presented toParliament before 31.3.2014

    Percentage of outstandingATRS disposed off duringthe year.

    % 90 70 60801000.25

    * Mandatory Objective(s)

    18/03/2015 11.24 AMGenerated on

    Page : 9 of 38

  • Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 12/13

    Unit

    FY 14/15FY 13/14 FY 15/16

    Actual Valuefor

    Actual Valuefor

    FY 16/17

    -- 45numberOffer of Oil/gas, CBMand shale gas blocksunder the policy

    Policy framework for growth of E&Psector

    Operation of UniformLicensing Policy

    50 55 --[1] [1.1] [1.1.1]

    -- 9numberNumber of blocksidentified

    carving out CBM blocksfor offer under unifiedlicencing policy

    10 11 --[1.2] [1.2.1]

    -- 06/01/2015Datecompletion of sitepreparation andcommissioning ofhardware and software

    Increase in exploration Activities Operationalization ofNational Data Repository(NDR)

    -- -- --[2] [2.1] [2.1.1]

    -- 30/06/2014Dateinviting serviceprovider through DGHwebsite

    operation of non-exclusive multi- clientgeo scientific policy

    -- -- --[2.2] [2.2.1]

    96 95Rs. Cr.% IE&BR outlayutilized

    Increasing Capital Investment in Oil &Gas Sector

    Plan Investments throughinternal and externalbudgetary resources(IE&BR) of PSUs

    95 --136.75[3] [3.1] [3.1.1]

    1.1 1NumberAdding more reservesEnhancing Domestic reserves &Production

    Reserve replacementratio (RRR) by PSUs

    1 10[4] [4.1] [4.1.1]

    93.04 51.51MMT1.1 Accretion to thereserves (oil & gas)

    71.04 73.28 --[4.1.2]

    40.62 27BCMquantity of natural gasNatural gas productionby PSUs

    32.48 43.1235.34[4.2] [4.2.1]

    14.38 8.64BCMQuantity of NaturalGas

    National Gas Productionby Private / JV Sector

    14 16.509.58[4.3] [4.3.1]

    37.9 28.8MMTQuantity of crude oilproduced

    crude oil production byPSUs

    30.44 29.6537.69[4.4] [4.4.1]

    18/03/2015 11.24 AMGenerated on

    Page : 10 of 38

  • Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 12/13

    Unit

    FY 14/15FY 13/14 FY 15/16

    Actual Valuefor

    Actual Valuefor

    FY 16/17

    11.64 9.72MMTQuantity of Crude Oilproduced

    Crude oil production byPrivate / JV Sector

    12.10 11.5012.05[4.5] [4.5.1]

    4.341 5.035MMTOverseas production ofcrude oil

    Overseas crude oil & natural Gasproduction

    Overseas production ofcrude oil

    6.658 7.3045.279[5] [5.1] [5.1.1]

    2.919 2.629BCMOverseas production ofNatural Gas.

    Overseas production ofNatural Gas.

    3.414 3.2732.731[5.2] [5.2.1]

    20 8NumberApproval of number ofprojects forimplementation (PFI)

    Improvement of Refinery performance Implementation of PhaseII IRBIP in the following 3refineries(i) HPCL, Mumbai(ii) BPCL mumbai(iii)MRPL, Mangalore

    -- --15[6] [6.1] [6.1.1]

    -- 18/03/2015Datecommissioning of 15MMTPA ParadipRefinery

    Increasing Refinery capacity facilitating commissioningof 15 MMTPA ParadipRefinery

    -- -- --[7] [7.1] [7.1.1]

    15.2 14.94MMTQuantity of LPG madeavailable

    Ensuring availability of petroleumproducts across the nation withrespect to marketing and distribution

    Ensure availability ofpetroleum products i.e.,LPG

    18.86 19.9215.83[8] [8.1] [8.1.1]

    69.2 69.58MMTQuantity of dieselmade available

    76.90 81.6056.92[8.1.2]

    15.7 16.59MMTquantity of petrol madeavailable

    20.77 22.5914.26[8.1.3]

    1052 923NumberIssuance of Letter ofIntent for Rajiv GandhiGramin LPG VitarakAgencies

    Expanding the network ofDomestic LPG to ruralareas

    900 8001328[8.2] [8.2.1]

    18/03/2015 11.24 AMGenerated on

    Page : 11 of 38

  • Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 12/13

    Unit

    FY 14/15FY 13/14 FY 15/16

    Actual Valuefor

    Actual Valuefor

    FY 16/17

    -- 28/02/2015Dateprepare a paper onrationalising PDSkerosene allocation tostates/ UTs

    Review requirement ofPDS kerosene for states/ UTs in view ofexpansion of LPG

    -- -- --[8.3] [8.3.1]

    -- 31/01/2015DateSubmission of cabinetnote

    To encourage use of Natural Gas framing of guidelines forgranting marketing rightsof CNG and setting up ofCNG stations

    -- -- --[9] [9.1] [9.1.1]

    -- 31/01/2015Datesubmission of cabinetnote

    framing of uniformguidelines for utilisationof domestic gas

    -- -- --[9.2] [9.2.1]

    -- 31/01/2015Datesubmission of cabinetnote

    amendments in PNGRBAct

    -- -- --[9.3] [9.3.1]

    -- 31/01/2015DateApproval of CompetentAuthority

    Pipeline tarriff policy -- -- --[9.4] [9.4.1]

    -- 31/01/2015DateApproval of competentauthority

    Policy on EOI for newpipelines

    -- -- --[9.5] [9.5.1]

    -- 31/12/2014DateSend a proposal toBEE

    To promote fuel conservation To launch standards andlabelling program for DGset

    -- -- --[10] [10.1] [10.1.1]

    10 9Number ofcities

    Availability of BS-IVMS & HSD in 9 moreidentified cities

    Promoting cleaner and environmentfriendly fuels

    Roll out BS-IV MS &HSD in 9 more identifiedcities

    -- --9[11] [11.1] [11.1.1]

    -- 85%increase inconsumption of NaturalGas for CNG and PNG

    Ensuring adequateavailablity of domesticgas for CNG (transport)and PNG

    -- -- --[11.2] [11.2.1]

    18/03/2015 11.24 AMGenerated on

    Page : 12 of 38

  • Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 12/13

    Unit

    FY 14/15FY 13/14 FY 15/16

    Actual Valuefor

    Actual Valuefor

    FY 16/17

    (Domestic)

    -- 0.0507MMTOEMMTOE equivalent ofrenewable energy

    Promotion of renewable andunconventional hydrocarbonresources to become carbon neutralfor Oil Sector Companies

    Monitoring physicalprogress in workprogramme fordeveloping energy fromrenewable andunconventional sourcesby Oil & Gas PSUs

    -- --0.0786[12] [12.1] [12.1.1]

    -- 15/02/2015DateSubmission of cabinetnote

    Framing of policy forshale gas exploration byprivate operators

    -- -- --[12.2] [12.2.1]

    -- 15/02/2015DateSubmission of cabinetnote

    framing of policy forextraction of CBM fromcoal mining lease areas,held by private operators.

    -- -- --[12.3] [12.3.1]

    52 20NumberPatents filedResearch & Development for bringingin higher productivity in specific areaof Oil and Gas exploration, storage,transportation by the Oil sectorcompanies.

    Number of Patents filed 25 2531[13] [13.1] [13.1.1]

    -- 6NumberPatents sanctioned 7 7 --[13.1.2]

    -- 850AmountRs. incrore

    Expenditure on R&D tobe incurred by OilPSUs

    Monitoring investmentsof Oil sector companiesin area of R&D

    -- --1117.45[13.2] [13.2.1]

    37.5 28.5MMSCMDconsumption of gas byPower sectors

    Joint responsibility for power andfertilizer sector

    Targeted consumption ofGas in power andfertilizer sector

    38.5 4028.3[14] [14.1] [14.1.1]

    18/03/2015 11.24 AMGenerated on

    Page : 13 of 38

  • Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 12/13

    Unit

    FY 14/15FY 13/14 FY 15/16

    Actual Valuefor

    Actual Valuefor

    FY 16/17

    -- 06/03/2015DateOn-time submissionEfficient Functioning of the RFDSystem

    Timely submission of DraftRFD for 2015-2016 forApproval

    -- -- --*

    -- 02/05/2014DateOn-time submissionTimely submission of Resultsfor 2013-2014

    -- --01/05/2014

    -- 95%Degree of implementation ofcommitments in CCC

    Enhanced Transparency / ImprovedService delivery ofMinistry/Department

    Rating from Independent Auditof implementation of Citizens’/ Clients’ Charter (CCC)

    -- -- --*

    -- 95%Degree of success inimplementing GRM

    Independent Audit ofimplementation of GrievanceRedress Management (GRM)system

    -- -- --

    -- 02/11/2014DateDateReforming Administration Update departmental strategyto align with revised priorities

    -- -- --*

    -- 90%% of ImplementationImplement agreed milestonesof approved MitigatingStrategies for Reduction ofpotential risk of corruption(MSC).

    -- -- --

    -- 95%% of implementationImplement agreed milestonesfor implementation of ISO

    -- -- --

    * Mandatory Objective(s)

    31.5 31MMSCMDconsumption of gas byFertilizer sectors

    31.5 3530.4[14.1.2]

    -- 80%Fulfilling obligations toPSUs under the MOUs

    Facilitating PSUs Fulfilling obligations toPSUs under the MOUs

    -- -- --[15] [15.1] [15.1.1]

    18/03/2015 11.24 AMGenerated on

    Page : 14 of 38

  • Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Target Valuefor

    ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 12/13

    Unit

    FY 14/15FY 13/14 FY 15/16

    Actual Valuefor

    Actual Valuefor

    FY 16/17

    9001

    -- 95%Responsibility Centrescovered

    % of Responsibility Centreswith RFD in RFMS

    -- -- --

    -- 90%% of implementationImplement agreed milestonesof approved Innovation ActionPlans (IAPs).

    -- -- --

    -- 90%Percentage of ATNssubmitted within due date (4months) from date ofpresentation of Report toParliament by CAG during theyear.

    Improve compliance with the FinancialAccountability Framework

    Timely submission of ATNs onAudit paras of C&AG

    -- -- --*

    -- 90%Percentage of ATRSsubmitted within due date (6months) from date ofpresentation of Report toParliament by PAC during theyear.

    Timely submission of ATRs tothe PAC Sectt. on PACReports.

    -- -- --

    -- 90%Percentage of outstandingATNs disposed off during theyear.

    Early disposal of pendingATNs on Audit Paras of C&AGReports presented toParliament before 31.3.2014.

    -- -- --

    -- 90%Percentage of outstandingATRS disposed off during theyear.

    Early disposal of pendingATRs on PAC Reportspresented to Parliament before31.3.2014

    -- -- --

    * Mandatory Objective(s)

    18/03/2015 11.24 AMGenerated on

    Page : 15 of 38

  • Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    AcronymSI.No Description

    Billion cubic meter1 BCM

    Bureau of Energy Efficiency2 BEE

    Bureau of Indian Standards3 BIS

    Bharat Petroleum Corporation Limited4 BPCL

    Bharat Stage-IV5 BS-IV

    Coal Bed Methane6 CBM

    Page : 16 of 38

  • Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    AcronymSI.No Description

    Compressed Natural Gas7 CNG

    Diesel Generator Sets8 DG Set

    Hindustan Petroleum Corporation Limited9 HPCL

    High Speed Diesel10 HSD

    Indian Oil Corporation Limited11 IOCL

    Integrated Refinery Business Improvement Programme12 IRBIP

    Page : 17 of 38

  • Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    AcronymSI.No Description

    Liquefied Natural gas13 LNG

    Liquafied Petroleum Gas14 LPG

    Million Brtish Thermal Unit15 MMBTU

    Million Standard Cubic Meter per day16 MMSCMD

    Million Metric Ton17 MMT

    Million Tonnes of Oil Equivalent18 MMTOE

    Page : 18 of 38

  • Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    AcronymSI.No Description

    Million Metric Tonne Per Annum19 MMTPA

    Ministry of Power20 MOP

    Mangalore Refinery and Petrochemical Limited21 MRPL

    Motor Spirit22 MS

    Oil and Gas Conservation Fortnight23 OGCF

    OIL India Limited24 OIL

    Page : 19 of 38

  • Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    AcronymSI.No Description

    Oil Marketing Companies25 OMCs

    Oil and Natural Gas Corporation26 ONGC

    ONGC Videsh Limited27 OVL

    Petroleum Conservation Research Association28 PCRA

    Projects for implementation29 PFI

    Power Load Factor30 PLF

    Page : 20 of 38

  • Section 4:Acronym

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    AcronymSI.No Description

    Piped Natural Gas31 PNG

    Research and Development32 R and D

    Page : 21 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    Offering new blocks underthe ULP.

    New blocks will be offered underUniform Licensing Policy

    1 NUMBER[1.1.1] Offer of Oil/gas, CBM and shale gas blocksunder the policy

    draft ULP has been circulated toM/o Finance, Law, Coal and

    Planning Commission. Commentsfrom Ministry of Coal and

    Planning Commission have beenreceived but it is still awaited fromMinistry of Finance and Law. Tworeminders have already been sent

    to these Ministries.

    For additional production ofCBM

    Carving out CBM blocks for offer2 Number[1.2.1] Number of blocks identified

    An activity related with theNDR project.

    This is an activity related with thecreation of National Data Repository

    in the country.

    3 date[2.1.1] completion of site preparation andcommissioning of hardware and software

    First preparatory steptowards the implementation

    of this policy.5.Period of Survey under the

    agreement would be twoyears, with a provision for

    one extension for maximum

    This is an activity related withOperation of non-exclusive multi-

    client Geo-scientific PolicySignificant Feature

    1.Permission for conducting GEOScientific data Survey/Activities will

    be granted by way of a Non ExclusiveMulti Client Survey Agreement.

    4 DATE[2.2.1] inviting service provider through DGHwebsite

    18/03/2015 11.24 AMGenerated on

    Page : 22 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    one year.6.The Service Provider will

    have exclusive rights tolicense data generated as a

    result of the Survey tointerested parties for a periodof twelve years (including thesurvey period), Subject to the

    provisions of thisAgreements.

    7.Service provider assumesall operational and financialrisks, invests his funds and

    resources for acquiringand/or procession and/orinterpreting geo-scientificdata and can license such

    data to interested E&Pinvestors, subject to

    provisions of this Agreement.8.The offer to undertake suchstudies through a multi-clientbusiness model will be openthroughout the year. Under

    this model, the serviceprovider may make attempts

    to recover

    2.Government would retain the optionfor offering the same area to more

    than one company, should an interestbe expressed by another data

    company for any reason includinginduction of superior technology.3.This model replaces the earlier

    fiscal term of profit Sharing after costrecovery with the payment of one

    time project fee.4.One time project fee of US$10000and extension fee equal to 60% ofone time fee would be paid by the

    Service Provider. An application feeof US$1000 would also be levied. In

    addition, the service provider willhave to furnish a Data Delivery Bank

    Guarantee of US$ 100,000.

    4 DATE[2.2.1] inviting service provider through DGHwebsite

    18/03/2015 11.24 AMGenerated on

    Page : 23 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    the investments by seekingpre-commitment and pre-

    funding from E&P companiesbefore the start of the survey

    and/or by license of suchgeo-scientific data when

    acquired and/or processedand/or interpreted, subject toprovisions of this Agreement.

    9.This Model enablesgeneration of high quality

    geo-scientific data in aspeedy manner with

    Government ownership ofdata and also encourages

    deployment ofadvanced/proprietary

    technologies in upgrading thegeological models and

    understanding the petroleumsystems in sedimentarybasins of India without

    involving expenditure andrisk on the part of

    Government of India.

    Government of India

    This is an activity related withOperation of non-exclusive multi-

    client Geo-scientific PolicySignificant Feature

    1.Permission for conducting GEOScientific data Survey/Activities will

    be granted by way of a Non ExclusiveMulti Client Survey Agreement.

    2.Government would retain the optionfor offering the same area to more

    than one company, should an interestbe expressed by another data

    company for any reason includinginduction of superior technology.3.This model replaces the earlier

    fiscal term of profit Sharing after costrecovery with the payment of one

    time project fee.4.One time project fee of US$10000and extension fee equal to 60% ofone time fee would be paid by the

    Service Provider. An application feeof US$1000 would also be levied. In

    addition, the service provider willhave to furnish a Data Delivery Bank

    Guarantee of US$ 100,000.

    4 DATE[2.2.1] inviting service provider through DGHwebsite

    18/03/2015 11.24 AMGenerated on

    Page : 24 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    reserves the right to rejectany application on rounds ofnational security, Govt. policy

    or fraud committed by theapplicant.

    10.Service provider and thelicensee shall use the data

    solely for the purpose of E&Pactivities. Licensee will also

    be subject to Indian laws andthe jurisdiction of Indian

    Courts. Service Provider willmake provisions in thisregard in their contract

    Agreement with licensees.

    This is an activity related withOperation of non-exclusive multi-

    client Geo-scientific PolicySignificant Feature

    1.Permission for conducting GEOScientific data Survey/Activities will

    be granted by way of a Non ExclusiveMulti Client Survey Agreement.

    2.Government would retain the optionfor offering the same area to more

    than one company, should an interestbe expressed by another data

    company for any reason includinginduction of superior technology.3.This model replaces the earlier

    fiscal term of profit Sharing after costrecovery with the payment of one

    time project fee.4.One time project fee of US$10000and extension fee equal to 60% ofone time fee would be paid by the

    Service Provider. An application feeof US$1000 would also be levied. In

    addition, the service provider willhave to furnish a Data Delivery Bank

    Guarantee of US$ 100,000.

    4 DATE[2.2.1] inviting service provider through DGHwebsite

    18/03/2015 11.24 AMGenerated on

    Page : 25 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    Utilisation of budgetary outlayPlan Expenditure through Internal andExternal Resource by PSUs

    5 Rs Crore[3.1.1] % IE&BR outlay utilized

    Reserve Replacement Ratiois the ratio of hydrocarbon

    reserve accretion in a year tothe crude oil and natural gasproduction made in that year.

    This is an outcome of explorationcarried out in the blocks by which theadditional quantity of hydrocarbon is

    discovered corresponding to thatproduced

    6 number[4.1.1] Adding more reserves

    Hydrocarbon reserves addedthrough domestic exploration

    Addition to reserves in absolute termsquantified in MMTOE

    7 MMTOE[4.1.2] 1.1 Accretion to the reserves (oil & gas)

    Quantity of natural gasproduced in a year

    This indicates the domesticproduction of natural gas by various

    companies.

    8 BCM[4.2.1] quantity of natural gas

    The quantity of natural gasproduced by Private /JV

    companies under Productsharing contract regime

    The quantity of natural gas producedby Private operators /JV companies

    9 BCM[4.3.1] Quantity of Natural Gas

    18/03/2015 11.24 AMGenerated on

    Page : 26 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    Quantity of crude oilproduced in a year

    This indicates the domesticproduction of crude oil by various

    companies.

    10 MMT[4.4.1] Quantity of crude oil produced

    Quantity of crude oilproduced by Private

    operators/ JV companiesunder production sharing

    contract regime

    Quantity of crude oil produced byPrivate operators/ JV companies in

    India

    11 MMT[4.5.1] Quantity of Crude Oil produced

    Quantity of crude Oilproduced from overseas oilfields by Indian companies.

    Production of crude Oil, by Indiancompanies operating in foreign

    countries

    12 MMT[5.1.1] Overseas production of crude oil

    Production of natural gas byPSU's from natural gas fields

    acquired abroad

    Production of natural gas by PSU'sfrom natural gas fields acquired

    abroad

    13 BCM[5.2.1] Overseas production of Natural Gas.

    --To get the approval ofManagement to implementthe 8 projects for improving

    the performance of refineries

    To implement 8 projects in 3refineries for improving their

    performance

    14 Number[6.1.1] Approval of number of projects forimplementation (PFI)

    18/03/2015 11.24 AMGenerated on

    Page : 27 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    --Commissioning of ParadipRefinery with a capacity of 15

    MMTPA in Odisha

    To increase the domestic refiningcapacity in the country

    15 Date[7.1.1] commissioning of 15 MMTPA ParadipRefinery

    Quantity of Auto LPG, Non-Domestic and Domestic

    cooking fuels to be madeavailable for cnsumption

    Sufficient quantity of LPG to be madeavailable during the year

    16 MMT[8.1.1] Quantity of LPG made available

    Quantity of Auto and Industryfuels to be made available for

    consumption

    Sufficient quantity of Diesel to bemade available during the year

    17 MMT[8.1.2] Quantity of diesel made available

    Quantity of Auto and Industryfuels to be made available for

    consumption

    Sufficient quantity of petrol to bemade available during the year

    18 MMT[8.1.3] quantity of petrol made available

    Number of LOIs for RGGLVissued till 01.02.2014 is 2768

    Issuance of number of Letterof Intents(LOI) under

    RGGLVY

    To expand the network of LPGdistributors in Rural and uncovered

    areas

    19 Number[8.2.1] Issuance of Letter of Intent for Rajiv GandhiGramin LPG Vitarak Agencies

    18/03/2015 11.24 AMGenerated on

    Page : 28 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    Ensure availability of PDSKerosene in accordance with

    LPG expansion and otherfactors.

    To rationalize PDS Keroseneallocation to different States & UTs.

    20 Date[8.3.1] prepare a paper on rationalising PDSkerosene allocation to states/ UTs

    To frame guidelines forgranting marketing rights ofCNG and setting up of CNG

    stations

    To Evolve suitable policy formarketing of CNG and setting up of

    CNG stations in the country

    21 Date[9.1.1] Submission of cabinet note

    Framing of uniformguidelines for utilization of

    domestic gas

    To frame policy for utilization ofdomestic gas

    22 Date[9.2.1] submission of cabinet note

    Amendment in PNGRB ActRemoval of typographicalerrors/redundant provisions andinclusion/modification of other

    relevant provisions to bring furtherclarity in the Act

    23 Date[9.3.1] submission of cabinet note

    Framing of Pipeline TariffPolicy

    To rationalize transportation tariffacross the nation in order to removeregional imbalance in utilization of

    natural gas

    24 Date[9.4.1] Approval of Competent Authority

    18/03/2015 11.24 AMGenerated on

    Page : 29 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    Growth of E&P SectorTo expand gas pipeline network in thecountry

    25 Date[9.5.1] Approval of competent authority

    Assigning star labeling to DGSets on the pattern of starlabeling of other electrical

    appliances such asRefrigerators, ACs etc. It will

    save diesel for the nation.

    The Notification of labeling norms byBEE/MoP would require the views of

    various stakeholders includingmanufacturers of DG Set, TestingLaboratories, BIS etc. to be taken.

    The acceptance of the views byBEE/MoP would be subject to the

    provisions as contained in the EnergyConservation Act, 2001.

    26 Date[10.1.1] Send a proposal to BEE

    --To extend supply of BS-IVMS and HSD in 9 more

    identified cities

    To make available BS-IV MS andHSD in 9 more identified cities

    27 Number[11.1.1] Availability of BS-IV MS & HSD in 9 moreidentified cities

    Promoting use of CNG andPNG

    Promoting cleaner and environmentfriendly fuels

    28 %[11.2.1] increase in consumption of Natural Gas forCNG and PNG

    18/03/2015 11.24 AMGenerated on

    Page : 30 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    Production of green energyProduction of energy throughrenewable sources

    29 MMTOE[12.1.1] MMTOE equivalent of renewable energy

    To submit a cabinet note forconsideration of Policy forshale gas exploration by

    private operations

    To bring uniformity in shale gasexploration

    30 Date[12.2.1] Submission of cabinet note

    To submit a cabinet note forconsideration of Policy for

    extraction of CBM

    To bring clarity on policy for corporateacquisitions by PSU oil and gas

    companies

    31 Date[12.3.1] Submission of cabinet note

    No of patents filed by PSUsNo of patents filed by PSUs32 number[13.1.1] Patents filed

    --Number of patents filed byOMCs

    Number of the patents to be filed byOMCs

    33 Number[13.1.2] Patents sanctioned

    18/03/2015 11.24 AMGenerated on

    Page : 31 of 38

  • Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Success indicator Description Definition MeasurementSI.No General Comments

    Amount spent on R&D by OilPSUs

    Expenditure incurred on R&D by OilPSUs

    34 Rs Crore[13.2.1] Expenditure on R&D to be incurred by OilPSUs

    supply of gas to power andsector

    Make available gas from domesticsource and RLNG for power sector

    35 MMSCMD[14.1.1] consumption of gas by Power sectors

    supply of gas to fertilizersector

    make availble gas domestic sourceand RLNG for fertilizer sector

    36 MMSCMD[14.1.2] consumption of gas by Fertilizer sectors

    Obligations of Ministry inachieving PSU MOU targets

    have to be met

    PSU targets in their MOUs haveobligations on the part of the Ministrywhich are critical to their achievement

    37 percentage[15.1.1] Fulfilling obligations to PSUs under theMOUs

    Page : 32 of 38

  • Section 5 :Specific Performance Requirements from other Departments

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Organisation TypeRelevant Success

    Indicator

    What is yourrequirement fromthis organisation

    Justification for thisrequirement

    LocationType

    Please quantify yourrequirement fromthis Organisation

    What happens ifyour requirement is

    not met.State Organisation Name

    Objective would not beacheived

    Timely intimation ofdemand

    [14.1.1] consumption ofgas by Power sectors

    Allocation would be madebased on demand

    CentralGovernment

    Submission withinreasonable time

    Department Of FertilizersDepartments

    objective will not be metnecessary statutoryclearances

    [12.1.1] MMTOEequivalent of renewableenergy

    nodal ministry reasonable timeMinistry of New andRenewable Energy

    Ministry

    Objective will not beachieved

    Approval for starlabelling program andTimely submission ofdemand

    [10.1.1] Send aproposal to BEE

    MOP is nodal ministry andAllocation is to be made based

    on demand

    Within reasonable timeMinistry of Power

    Objective will not beachieved

    Approval for starlabelling program andTimely submission ofdemand

    [14.1.1] consumption ofgas by Power sectors

    MOP is nodal ministry andAllocation is to be made based

    on demand

    Within reasonable time

    Objective will not beachieved

    Comments onproposals in CabinetNotes

    [9.1.1] Submission ofcabinet note

    Financial implications have tovetted by Ministry of Finance

    Reasonable timeMinistry of Finance

    Objective will not beachieved

    Comments onproposals in CabinetNotes

    [9.2.1] submission ofcabinet note

    Financial implications have tovetted by Ministry of Finance

    Reasonable time

    Objective will not beachieved

    Comments onproposals in CabinetNotes

    [9.3.1] submission ofcabinet note

    Financial implications have tovetted by Ministry of Finance

    Reasonable time

    Objective will not beachieved

    Comments onproposals in CabinetNotes

    [12.2.1] Submission ofcabinet note

    Financial implications have tovetted by Ministry of Finance

    Reasonable time

    Objective will not beachieved

    Comments onproposals in CabinetNotes

    [12.3.1] Submission ofcabinet note

    Financial implications have tovetted by Ministry of Finance

    Reasonable time

    18/03/2015 11.24 AMGenerated on

    Page : 33 of 38

  • Section 5 :Specific Performance Requirements from other Departments

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Organisation TypeRelevant Success

    Indicator

    What is yourrequirement fromthis organisation

    Justification for thisrequirement

    LocationType

    Please quantify yourrequirement fromthis Organisation

    What happens ifyour requirement is

    not met.State Organisation Name

    Objective will not beachieved

    Comments onproposals in CabinetNotes

    [12.3.1] Submission ofcabinet note

    Financial implications have tovetted by Ministry of Finance

    Reasonable time

    Objective will not beachieved

    Comments onproposals in CabinetNotes

    Submission of cabinetnote

    Financial implications have tovetted by Ministry of Finance

    Reasonable time

    Objective would not beachieved

    Comments andrequisite clearances

    [1.1.1] Offer of Oil/gas,CBM and shale gasblocks under the policy

    Environmental clearances areto be given by the M/Env.

    & Forests

    Reasonable timeMinistry of Environment andForests

    Objective would not beachieved

    Comments andrequisite clearances

    [1.2.1] Number of blocksidentified

    Environmental clearances areto be given by the M/Env.

    & Forests

    Reasonable time

    Objective would not beachieved

    Comments andrequisite clearances

    [4.1.1] Adding morereserves

    Environmental clearances areto be given by the M/Env.

    & Forests

    Reasonable time

    Objective would not beachieved

    Comments andrequisite clearances

    [4.2.1] quantity ofnatural gas

    Environmental clearances areto be given by the M/Env.

    & Forests

    Reasonable time

    Objective would not beachieved

    Comments andrequisite clearances

    [4.4.1] Quantity of crudeoil produced

    Environmental clearances areto be given by the M/Env.

    & Forests

    Reasonable time

    Objective will not beachieved

    Comments andrequisite clearances

    [1.2.1] Number of blocksidentified

    Requisite clearances for coalmining to be given by the

    Ministry of Coal

    Reasonable timeMinistry of Coal

    objective will not be metclearances forexploration blocks

    [1.1.1] Offer of Oil/gas,CBM and shale gasblocks under the policy

    the cleared blocks would lead toenhanced Eand P activities in

    the country

    reasonable timeMinistry of Defence

    18/03/2015 11.24 AMGenerated on

    Page : 34 of 38

  • Section 5 :Specific Performance Requirements from other Departments

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Organisation TypeRelevant Success

    Indicator

    What is yourrequirement fromthis organisation

    Justification for thisrequirement

    LocationType

    Please quantify yourrequirement fromthis Organisation

    What happens ifyour requirement is

    not met.State Organisation Name

    objective will not be metclearances forexploration blocks

    [4.1.1] Adding morereserves

    the cleared blocks would lead toenhanced Eand P activities in

    the country

    reasonable time

    objective will not be metclearances forexploration blocks

    [4.2.1] quantity ofnatural gas

    the cleared blocks would lead toenhanced Eand P activities in

    the country

    reasonable time

    objective will not be metclearances forexploration blocks

    [4.4.1] Quantity of crudeoil produced

    the cleared blocks would lead toenhanced Eand P activities in

    the country

    reasonable time

    Page : 35 of 38

  • Section 6:Outcome/Impact of Department/Ministry

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Outcome/Impact ofDepartment/Ministry

    Jointly responsible forinfluencing this outcome /impact with the following

    department (s) / ministry(ies)

    SuccessIndicator

    FY 12/13 FY 14/15FY 13/14 FY 15/16 FY 16/17Unit

    7.260 7.664Overseas oil and gasproduction

    Overseas oil and gasproduction

    OVL 10.072 10.5778.0101 MMToe

    -- 15Commissioning of 15 MMTPAParadip Refinery

    Increasing refining Capacity Oil refineries --2 MMTPA

    52 20Patents filedResearch and development IOCL(R&D) 25 25313 Number

    15.2 16.6Quantity of LPG madeavailable

    Ensuring availability ofpetroleum products acrossthe nation with respect tomarketing and distribution

    OMCs 18.86 19.9215.834 MMT

    1052 1025Issuance of Letter of Intent forRajiv Gandhi Gramin LPGVitrak Agencies

    900 8001328Number

    69.2 71Quantity of diesel madeavailable

    76.9 81.656.92MMT

    15.7 16.93Quantity of petrol madeavailable

    20.77 22.5914.26MMT

    31/12/2014Take up with BEE and MoP forapproval

    Promotion of fuelconservation in the country.

    PCRA5 Date

    31/01/2013 15/02/2015Conducting campaigns. 31/01/2016 31/01/201731/01/2014Date

    22.5 23.5Production of Oil by PSUsEnhanced production ofdomestic oil and gas in thecountry for achieving selfsufficiency in the energyrequirement for the country

    ONGC 26.2 24.422.26 MMT

    18/03/2015 11.24 AMGenerated on

    Page : 36 of 38

  • Section 6:Outcome/Impact of Department/Ministry

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Outcome/Impact ofDepartment/Ministry

    Jointly responsible forinfluencing this outcome /impact with the following

    department (s) / ministry(ies)

    SuccessIndicator

    FY 12/13 FY 14/15FY 13/14 FY 15/16 FY 16/17Unit

    26.22 24.3Production of Oil by PSUsEnhanced production ofdomestic oil and gas in thecountry for achieving selfsufficiency in the energyrequirement for the country

    OIL 30.44 29.6525.767 MMT

    26.19 23.40Natural gas production byPSUs

    32.48 43.1225.91BCM

    14.38 8.64natural gas production byprivate/JV

    14 16.509.58BCM

    11.64 9.7Production of crude oil byprivate/JV

    12.10 11.5012.05MMT

    65supply of gas to power andfertilizer sector

    Joint responsibility for powerand fertilizer sectors

    Oil and Gas PSUsimporters of RLNG

    70 758 MMSCMD

    20Patents filedResearch and developmentfor bringing in higherproductivity in specific area ofOIL and Gas explorationstorage, transportation by theOil sector Companies

    OMC's9 number

    6Patents sanctioned number

    15.2 47.63Quantity of LPG made availbleEnsuring availability ofpetroleum products acrossnation wth respect tomarketing and distribution

    OMCs 66.49 86.4131.0310 MMT

    18/03/2015 11.24 AMGenerated on

    Page : 37 of 38

  • Section 6:Outcome/Impact of Department/Ministry

    Results-Framework Document (RFD) for Ministry of Petroleum and Natural Gas -(2014-2015)

    Outcome/Impact ofDepartment/Ministry

    Jointly responsible forinfluencing this outcome /impact with the following

    department (s) / ministry(ies)

    SuccessIndicator

    FY 12/13 FY 14/15FY 13/14 FY 15/16 FY 16/17Unit

    1052 3405issuance of Letter of Intent forRajiv Gandhi Gramin PG VitrakAgencies

    4305 51052380Number