19
1 Surge Protect Discharge For Flexi Power Rectifier Quick Start Guide Emerson Network Power Co., Ltd. http://www. emersonnetworkpower.com.cn Manual Version: 01 Surge Protect Discharge for FPRA Quick Start Guide

Quick Start Guide for Spd

Embed Size (px)

Citation preview

Page 1: Quick Start Guide for Spd

1

Surge Protect Discharge For

Flexi Power Rectifier

Quick Start Guide

Emerson Network Power Co., Ltd. http://www. emersonnetworkpower.com.cn Manual Version: 01

Surge Protect Discharge for FPRA Quick Start Guide

Page 2: Quick Start Guide for Spd

2

Manual Number: 03370500100 Manual Issue: 1.0 Manual Status: Standard Release Date: Sep 2008

Copyright © 2008 Emerson Network Power Co., Ltd. All rights reserved Published in China This document, and the information it contains, are the property of Emerson Network Power Co., Ltd, and are protected by law. Both must be held in strictest confidence at all times. Emerson Network Power grants no license or right to copy, use or disclose either, expressly or by implication.

Disclaimer

This document and the information contained herein are provided on an "AS IS" basis. Emerson Network Power may make improvements or changes in this documentation, at any time and without notice and as it sees fit. The information in this documentation was prepared by Emerson Network Power with reasonable care and is believed to be accurate. However, Emerson Network Power shall not assume responsibility for losses or damages resulting from any omissions, inaccuracies, or errors contained herein.

Surge Protect Discharge for FPRA Quick Start Guide

Page 3: Quick Start Guide for Spd

History 3

History

Date Version Author Change Note No./Notes 02/09/2008 01 David Cao First release

Surge Protect Discharge for FPRA Installation Manual

Page 4: Quick Start Guide for Spd

Table of contents 4

Table of contents

History...................................................................................................................3 Table of contents ..................................................................................................4 List of figures ........................................................................................................4 List of tables..........................................................................................................4 List of terms ..........................................................................................................5 Preface .................................................................................................................7 SPD installation.....................................................................................................9 SPD replacement................................................................................................17 Appendix – Tools and Torques ...........................................................................19

List of figures

Figure 1 – PDA rear internal chassis layout ................................................................ 9 Figure 2 – Connecting the SPD – 3Y.......................................................................... 13 Figure 3 – Connecting the AC terminal block – 3Y................................................... 14 Figure 4 – AC connection with the SPD - 3Y............................................................. 15 Figure 5 – Removing the damaged OVP module from the SPD ............................ 17 Figure 6 – Fitting a new OVP module to the SPD .................................................... 18

List of tables

Table 1 – Reference documents.................................................................................... 7 Table 2 – Configurations of AC connection with the SPD ....................................... 10 Table 3 – Schematic diagram of AC connection with the SPD............................... 12 Table 4 – Tools and torques required for installation ............................................... 19

Surge Protect Discharge for FPRA Installation Manual

Page 5: Quick Start Guide for Spd

List of terms 5

List of terms

A Ampere

AC Alternative current

AWG American Wire Gauge

BAT Battery

BR Battery Return

BTS Base Transceiver Station

CB Circuit Breaker

CSA Cross Section Area

CU Control unit

DC Direct current

EMC Electromagnetic Compatibility

ESD Electrostatic Discharge

FPRA Flexi Power Rectifier

GND Ground

GUI Graphical User Interface

IE Internet Explorer

IP Ingress Protection

IP Internet Protocol

L Live cable from the AC mains

LAN Local Area Network

LED Light Emitting Diode

LVD Low Voltage Detection

MAC Media Access Control

MCB Micro Circuit Breaker

N Neutral cable from the AC mains

Surge Protect Discharge for FPRA Installation Manual

Page 6: Quick Start Guide for Spd

List of terms 6

PC Personal Computer

PCB Printed Circuit Board

PDA Power Distribution Assembly

PE Protective earth

PSU Power Supply Unit

SPD Surge Protect Discharge

V Volt

VPN Virtual Private Network

1Φ Single-phase AC type

3Y 3-phase star AC type

3∆ 3-phase delta AC type

Surge Protect Discharge for FPRA Installation Manual

Page 7: Quick Start Guide for Spd

Preface 7

Preface

About this guide This quick start guide is for quick installation or an overview of the SPD. Thus only the three-phase star AC connection with SPD is described in this guide. User shall refer to the main SPD user manual (Emerson file No. 03370500080) for more details about the other AC connections.

SPD Introduction The Flexi Power Rectifier (FPRA, Emerson part number AA25020L) is an up to 6kW output power AC rectifier package. The Surge Protect Discharge (SPD, Emerson part number AA25130L) is used to prevent the damages to the FPRA that caused by input over voltage or surge. The SPD consists of three same OVP modules that used between live cables and neutral cable from the AC mains; one OVP module that used between the neutral cable from the AC mains and the earth; and one remote signaling contact.

Reference documents The reference documents of the SPD contains:

Table 1 – Reference documents

Document Emerson Network Power File No.

Internal product specification – System / PDA 41970005110

Internal product specification – Rectifier 41970004980

Surge Protect Discharge for Flexi Power Rectifier – User Manual (main SPD user manual)

03370500080

- To be continued -

Surge Protect Discharge for FPRA Installation Manual

Page 8: Quick Start Guide for Spd

Preface 8

Table 1 – Reference documents

Flexi Power Rectifier - User Manual 03370500090

Flexi Power Rectifier- Installation Manual 03370500070

Surge Protect Discharge for Flexi Power Rectifier– Quick Start Guide (this manual) 03370500100

Flexi Power Rectifier– Quick Start Guide 03370500110

Surge Protect Discharge for FPRA Installation Manual

Page 9: Quick Start Guide for Spd

SPD installation 9

SPD installation Warning: The AC power supply must be switched off prior to any access of the AC cable. Note: The 3-phase star AC connection with SPD is for illustration herein. Refer to Appendix – Tools and Torques for each installation step.

Figure 1 shows the PDA rear internal chassis layout.

PDA rear cover

A

AC terminal block SPD DIN Rail

SPD ground clamp

AC ground clampPDA earth cable C

B

DE

SPD sensor connection

Strain-relief Rear cover retention cable

F

Figure 1 – PDA rear internal chassis layout

Surge Protect Discharge for FPRA Installation Manual

Page 10: Quick Start Guide for Spd

S

PD

inst

alla

tion

10

Tabl

e 2

– C

onfig

urat

ions

of A

C c

onne

ctio

n w

ith th

e SP

D

Term

inal

s co

nnec

tion

AC

type

AC

m

ains

SP

D

AC

ter

min

al

bloc

k C

hass

is (3

)

Sho

rt lin

k av

aila

ble

(1)

AC

term

inal

blo

ck

Con

figur

atio

n (2

)

SPD

co

nfig

urat

ion

N/A

L1

6

N/A

L1

for t

hree

-pha

se

L L2

5

N/A

L2

for t

hree

-pha

se

N/A

L3

4

N/A

L3

for t

hree

-pha

se

N

N

2 N

/A

N fo

r thr

ee-p

hase

sta

r

PE

N

/A

N/A

A

C g

roun

d cl

amp

N/A

N/A

N/A

S

PD

gro

und

clam

pS

PD

gro

und

link

Sho

rt te

rmin

als

1,2,

3 an

d 4,

5,6

resp

ectiv

ely

Sho

rt te

rmin

als

L1, L

2, L

3

L1

L1

5 N

/A

L1 fo

r thr

ee-p

hase

L2

L2

3 N

/A

L2 fo

r thr

ee-p

hase

L3

L3

1 N

/A

L3 fo

r thr

ee-p

hase

N/A

N

N

/A

SP

D g

roun

d cl

amp

SP

D g

roun

d lin

k

3∆

PE

N

/A

N/A

A

C g

roun

d cl

amp

N/A

Sho

rt te

rmin

als

1,2

and

3,4

and

4,5

resp

ectiv

ely

N/A

S

urge

Pro

tect

Dis

char

ge fo

r FP

RA

Inst

alla

tion

Man

ual

Page 11: Quick Start Guide for Spd

S

PD

inst

alla

tion

11

Tabl

e 2

– C

onfig

urat

ions

of A

C c

onne

ctio

n w

ith th

e SP

D

Term

inal

s co

nnec

tion

AC

type

AC

m

ains

SP

D

AC

ter

min

al

bloc

k C

hass

is (3

)

Sho

rt lin

k av

aila

ble (1

) A

C te

rmin

al b

lock

C

onfig

urat

ion

(2)

SPD

co

nfig

urat

ion

L1

L1

6 N

/A

L1 fo

r thr

ee-p

hase

L2

L2

5 N

/A

L2 fo

r thr

ee-p

hase

L3

L3

4 N

/A

L3 fo

r thr

ee-p

hase

N

N

2 N

/A

N fo

r thr

ee-p

hase

sta

r

PE

N

/A

N/A

A

C g

roun

d cl

amp

N/A

3Y

N/A

N/A

S

PD

gro

und

clam

pS

PD

gro

und

link

Sho

rt te

rmin

als

1,2,

3 N

/A

Not

e: (1

) The

sho

rt lin

k na

mes

list

ed h

erei

n ar

e in

acc

orda

nce

with

the

actu

al la

bels

on

the

shor

t lin

ks.

(2

) The

AC

term

inal

blo

ck s

houl

d be

con

figur

ed b

efor

e th

e A

C c

onne

ctio

n. U

ser s

hall

refe

r to

sect

ion

3.4

in F

lexi

Pow

er R

ectif

ier–

In

stal

latio

n M

anua

l (Em

erso

n fil

e N

o.03

3705

0007

0) fo

r mor

e de

tails

.

(3

) Ref

er to

Fig

ure

1 fo

r the

cor

resp

ondi

ng c

lam

ps.

S

urge

Pro

tect

Dis

char

ge fo

r FP

RA

Inst

alla

tion

Man

ual

Page 12: Quick Start Guide for Spd

SPD installation 12

Table 3 – Schematic diagram of AC connection with the SPD

AC Type

Schematic diagram Configuration of AC terminal block

3Y

L1 L2 L3 N

1 2 3 4 5 6SPD

AC Terminal Block

L1 L2PE

AC Mains

L3 N

Short terminals 1,2,3

L1 L2 L3 N 1 2 3 4 5 6

SPDAC Terminal Block

L NPE

AC mains

Short terminals 1,2,3; 4,5,6 respectively

3∆

L1 L2 L3 N

1 2 3 4 5 6SPD

AC Terminal Block

L1 L2PE

AC mains

L3

Short terminals 1,2; 3,4; 5,6 respectively

Surge Protect Discharge for FPRA Installation Manual

Page 13: Quick Start Guide for Spd

SPD installation 13

1.1 Detach the cable strain-relief from the chassis by loosening the screw ‘A’ in Figure 1.

1.2 Detach the AC ground clamp and SPD ground clamp from the chassis by loosening the screws ‘B’ and C‘ in Figure 1.

1.3 Fit the PE cable from the AC mains into the AC ground clamp. 1.4 Fit the live cables from the AC mains and the bare end of L line short

links into the terminals ‘L1’, ‘L2’ and ‘L3’ on the SPD respectively referring to the diagram of 3Y AC connection in Table 2 and Table 3 (see Figure 2).

1.5 Fit the neutral cable from the AC mains and the flat end of N short link into terminal ‘N’ on the SPD referring to the diagram of 3Y AC connection in Table 2 and Table 3 (see Figure 2).

N short link

N

L3

L2

L3 short link

L2 short link L1

L1 short link

Figure 2 – Connecting the SPD – 3Y

1.6 Fit the ground cable link into the SPD ground clamp, and the other end

into the SPD ground terminal on the SPD referring to the diagram of 3Y AC connection in Table 2 and Table 3.

Surge Protect Discharge for FPRA Installation Manual

Page 14: Quick Start Guide for Spd

SPD installation 14

1.7 Secure the AC ground clamp back into its position on the chassis,

tightening the screw ‘B’ (refer to Figure 1). 1.8 Secure the SPD ground clamp back into its position on the chassis,

tightening the screw ‘C’ in Figure 1. 1.9 If required, detach the AC terminal block from the chassis by loosening

screws ‘D’ and ‘E’ in Figure 1. This will provide a better view of the AC terminal block connections.

1.10 Connect the L1, L2 and L3 line short links to terminals ‘6’, ‘5’, ‘4’ on the AC terminal block respectively referring to the diagram of 3Y AC connection in Table 2 and Table 3 (see Figure 3).

1.11 Connect the N line short link to terminal ‘2’ on the AC terminal block referring to the diagram of 3Y AC connection in Table 2 and Table 3 (see Figure 3).

N short link

L3 short link

L2 short link

L1 short link

Figure 3 – Connecting the AC terminal block – 3Y

Surge Protect Discharge for FPRA Installation Manual

Page 15: Quick Start Guide for Spd

SPD installation 15

1.12 Connect the SPD sense cable to the SPD remote signaling contact. 1.13 Secure the SPD to the DIN Rail by locating the grounding side bottom

slot of the SPD onto the DIN Rail and pressing down on the SPD until it locks in position.

1.14 Refit AC terminal block if removed from chassis, tightening the screws ‘D’ and ‘E’ in Figure 1.

1.15 Connect the SPD sense cable to the PDA sense connection, and restrain the cable to position ‘F’ on the chassis in Figure 1.

1.16 Restrain the AC cable on the socket by fitting the Strain-relief, tightening the screw ‘A’ in Figure 1.

Figure 4 shows the PDA rear layout after completing the 3-phase star AC connection with the SPD.

SPD ground cable

PE of AC mains

L1

L3

L2

SPD sense cable

N short link

L3 short link

L2 short link

L1 short link

N

Figure 4 – AC connection with the SPD - 3Y

1.17 Replace the PDA rear cover referring to section 3.4 in ‘Flexi Power Rectifier– Installation Manual’ (Emerson File No. 03370500070).

Surge Protect Discharge for FPRA Installation Manual

Page 16: Quick Start Guide for Spd

SPD installation 16

CAUTION: After installation of the SPD kit has been completed, the installer should check the installation against the steps outlined within this document, supported by a multi-meter to check for wiring continuity. It’s strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.

Surge Protect Discharge for FPRA Installation Manual

Page 17: Quick Start Guide for Spd

SPD replacement 17

SPD replacement

Warning: The AC power supply must be switched off prior to any access of the SPD.

2.1 Hold the two sides of the damaged OVP module and pull it out from the SPD base (see Figure 5).

Figure 5 – Removing the damaged OVP module from the SPD

Surge Protect Discharge for FPRA Installation Manual

Page 18: Quick Start Guide for Spd

SPD replacement 18

2.2 Fit the new module into its position on the SPD base (see Figure 6).

Figure 6 – Fitting a new OVP module to the SPD

Surge Protect Discharge for FPRA Installation Manual

Page 19: Quick Start Guide for Spd

Appendix 19

Appendix – Tools and Torques ******************************************************************** Refer to the table below for the tools and torques required for each installation step:

********************************************************************

Table 4 – Tools and torques required for installation

Step Tool Usage Torque (N.m)

1.1 TORX screwdriver (T25) Loosen screw --

1.2 TORX screwdriver (T25) Loosen screw --

1.3 Flat screwdriver Tighten screw 1.5

1.4 Cross screwdriver Tighten screw 4.5

1.5 Cross screwdriver Tighten screw 4.5

1.6 TORX screwdriver (T25) Tighten screw 4.5

1.7 TORX screwdriver (T25) Tighten screw 2.0

1.8 TORX screwdriver (T25) Tighten screw 2.0

1.9 TORX screwdriver (T25) Loosen screw --

1.10 Flat screwdriver Tighten screw 1.5

1.11 Flat screwdriver Tighten screw 1.5

1.12 Manual Connection Fit

1.13 Manual Install the SPD Fit

1.14 TORX screwdriver (T25) Tighten screw 2.0

1.15 Manual Connection Fit

1.16 TORX screwdriver (T25) Tighten screw 2.0

1.17 TORX screwdriver (T10) Tighten screw 0.8

2.1 Manual Remove the OVP --

2.2 Manual Install the OVP Fit

Surge Protect Discharge for FPRA Installation Manual