Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
Quality & innovation
CoMPany PRoFilE
Put together
Australian Piling Technology
Welcome to AustrAliAn Piling technology llc, sPeciAlist Piling
contrActor
introductionaustralian Piling technology l.l.C. is one of the leading and fast-growing Specialist Sub-Contractor in the field of Piling/ Foundation technology. the Company started and established its operations last april of 2005, in abu Dhabi, united arab Emirates. aPt is an ISO Certified Company for ISO 9001:2008, ISO 14001:2004and BS OHSAS 18001:2007 standards, by LMS Certification Pvt. And now, the organization has expanded branches to Dubai, al ain and abu Dhabi, uaE.
our missionour big aim to be the most preferred Piling Contractor in the Construction Industry by providing services that conforms to different Code Construction Authority and Clients specification while strictly adhering to safety guidelines.
our oBJectiVes
To provide the client an economical and high-quality foundation design that meets the requirements and principles on various Codes of Practice.
To make significant contributions to nation building through works in the field of infrastructure developments.
our core VAluesThese core values are part of every decision we make which drives our business. Our devotion to each of these core values will definitely build our customer’s trust, confidence, loyalty, and continuous patronage.
Safe and environment friendly operations.
Mutual respect and harmonious relationship among our employees.
Perpetual improvement for all leaders and employee.
Mutually beneficial relationships with our customers and business partners.
open communication lines with our customers, employees and other Business Plan.
Ethical business conduct that complies with all statutory and legal requirements.
Good Corporate and Social Responsibility
our ActiVitiesTo provide a solutions to Piling Foundation problems. Combining competitive pricing with our design experience and comprehensive range of Piling Foundation techniques, we offer Design and Construction of all types of pile foundations, Shoring System / Retaining Wall (H-Beams, Secant Piles, Contiguous Piles) and Marine Piling service to our valued customers.
We pride ourselves on the efficient delivery of every stage of the project from design to completion, on time and within budget.
hAVe glAnce on our ProJects
And giVes us honor to serVe
you At our Best.
Piling WorksContinuous Flight Auger (Cfa Method)
temporary Casing MethodBentonite Slurry Method
shoring WorksShoring H-Beam
Secant PilesSheet Piles
Contiguous Piles
micropilesAnchor Works
dewatering excavation
Pile head Breakdownsurveying Works
We offer design And construction
of All tyPes of Pile foundAtions, shoring
system / retAining WAll (h-BeAms, secAnt
Piles, contiguous Piles) And mArine
Piling serVice to our VAlued customers.
continuous flight Auger (cfA) method for Piling
Equipment And Working PlatformSetting out of PilesLateral Support Of Drilled Hole SidePile ExcavationConcretingDisposal Of Excavated MaterialsPlacing of Steel Reinforcement Cages
secAnt WAll method of Piling
Construction of Guide Wallinstallation of CasingAuger Drilling of Primary BoreholeConcreting of Primary BoreholeAuger Drilling of Secondary Boreholeinstallation of Steel CageConcreting of Secondary BoreholeRepetition of the Process
temPorAry cAsing method of Piling
Setting out of Pile lay-outPositioning EquipmentsDriving Temporary CasingBoringReinforcement Cage Preparation & installationConcretingExtracting Temporary Casing
sheet Pile instAllAtion method
Sheet Pile DrivingPlacing And DrivingCutting off and SplicingInspection Of Driven Piling
diAPhrAgm WAlls
A narrow trench excavated areasDeep basementsused in congested areasClose to existing structures
rotAry method (With Bentonite) for Piling
Surveying and Setting Outinstallation of temporary CasingDrilling with BentoniteFabrication and installation of Steel CageConcretingExtraction of Temporary Casing
loAd testing Procedure
Testing EquipmentsPile Selectiontime of testingapplication of test loadZero To Working LoadWorking Load To ZeroZero to test loadtest load to ZeroGraphsFailure of load test
our serVices
ProJect:Emirati Residential 2000 villas(Ain Al Fayda – Al Ain City)
mAin contrActor:trojan General Contracting Co. l.l.C.
client:abu Dhabi urban Planning Council
consultAnt:Pace
totAl contrAct Price:AED 52,144,100
scoPe of Work:installation of Piles using Continues Flight Auger (CFA) Method of execution for 31,225 No. of Piles.
ProJect:Construction works of 1,017 Residential Villas, West Yas Development on Yas island, abu Dhabi, uaE
mAin contrActor:arabtec Construction l.l.C.
client:al Dar Properties PJSC
consultAnt:Jla international Engineer l.l.C.
totAl contrAct Price:AED 38,438,100
scoPe of Work:installation of Piles using Continues Flight Auger (CFA) Method of execution.
ourProJects
ProJect:Kifaf Development Phase-1Plot 324-117, Sheikh Zayed Road, Dubai
mAin contrActor:australian Piling technology l.l.C.
client:Wasl Development
consultAnt:ARCHGROUP Planners Engineers Project Managers
totAl contrAct Price:aED 26,200,000
scoPe of Work:Enabling Works for Piling, Shoring and Earth Works
ProJect:Al Mafraq Shopping Mall – Al Mafraq Square Development in Abu Dhabi
mAin contrActor:australian Piling technology l.l.C.
client:Al Tawasoul Properties Investment
ProJect mAnAgement:Hill International
consultAnt:Mimar abu Dhabi Engineering Consultancy
totAl contrAct Price:AED 15,800,000
scoPe of Work:Enabling Works for Piling, Shoring and Earth Works
ProJect:Watani Residential Development – Khalifa City a, abu Dhabi
mAin contrActor:Construction General Contracting House
client:Sorouh Real Estate PJSC
consultAnt:ESP Middle East / Ewan Consultants
totAl contrAct Price:AED 15,263,000
scoPe of Work:Cast in situ Bored Piles Using Temporary Casing Method of execution
ProJect:Proposed Paper Machine Project (Phase 1 & 2), ICAD III
mAin contrActor:Associated Const. and Investment Co. ascon l.l.C.
client:al Dhafra Paper Manufacturing Company
consultAnt:Capital Engineering Consultancy
totAl contrAct Price:AED 8,839,800
scoPe of Work:Cast in situ Bored Piles Using Temporary Casing Method of execution
ourProJects
ProJect:R1047 Garhoud Four Star Hotel, Dubai
mAin contrActor:australian Piling technology l.l.C.
client:Al Wasl Development
consultAnt:Dewan architects
totAl contrAct Price:AED 4,705,560
scoPe of Work:Enabling Works for Piling, Shoring and Earth Works
ProJect:3B+G+ 9 Typical Floors Residential Building, Al Raha Beach
mAin contrActor:teejan trading & Contracting
client:Mr. Mohamed thaaloob al Derei
consultAnt:HERBERGER Engineers
totAl contrAct Price:AED 4,087,000
scoPe of Work:Piling and Shoring Works using Temporary Casing Method of execution
commerciAl license &iso certificAtes
Abu Dhabi (Head Office):Plot 28/1 at Sector M-32Mussafah industrial areaP.O. Box 48181, Abu Dhabi, UAE.Tel (02) 550 4222, Fax (02) 550 4221Email: [email protected]
www.australianpiling.com
dubai:Office 905, Damac Business Toweral ittihad StreetP.O. Box 80714, Dubai, UAE.Tel (04) 429 3638, Fax (04) 427 4098Email: [email protected]
Al Ain:Plot 11, Industrial AreaOffice 14, P.O. Box 48181al ain, uaE.Tel (02) 550 4222Fax (02) 5504221