35
Daniel Kuraspediani BPA Technical Operations PV TOOL / QV TOOL PW 19

PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Daniel Kuraspediani

BPA Technical Operations

PV TOOL / QV TOOLPW 19

Page 2: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

POWER WORLD SLIDES

Page 3: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

PV TOOL

Page 4: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Eliminates fictitious reactive reserve limitations

DO NOT WANT TO RAMP GEN = 100% loading

ECONOMIC DISPATCH

Page 5: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

No reactive reserve leads to “cliff effect” PV simulation

ECONOMIC DISPATCH

Page 6: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Create Economic Dispatch for gen Add column options in Model Explr

Specify “economic range” 60 – 80% loading works well

ECONOMIC DISPATCH

Page 7: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Need accurate gen reactive capability curves Fictitiously optimistic results otherwise

GEN REACTIVE CAPABILITY CURVES

Full reactive capability at 100% loading

Page 8: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

POWERFLOW SETTINGS

Page 9: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

CONTINGENCY SETTINGS

Do not use this option

Page 10: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Set up post contingency assumptions Example: NO POST CTG REACTIVE SWITCHING

CONTINGENCY SETTINGS

Page 11: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Specify SOURCE and SINK injection groups

Ramps SOURCE and SINK until unsolved contingency or base case

PV TOOL– SETUP – SOURCE/SINK

Page 12: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

PV TOOL – COMMON OPTIONS -

Set up Cont ingency Analys is Sett ings (post -cont ingency )

Set up Power F low Sett ings (pre-cont ingency )

Transfer Step s ize (how much to ramp) Stop within MW amount of unsolved soln Amount to reduce t ransfer s tep s ize by

Set up Cont ingency Analys is Sett ings (post -cont ingency )

Page 13: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

PV TOOL – INJ. GROUP RAMP OPTIONS -

“Use Economic” if Economic Range is specif ied

Page 14: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

PV TOOL – ADVANCED OPTIONS

Page 15: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Specify an interface to ramp instead of specif ic source/sink

Interface ramp constrained by user-defined OPF Options See PW HELP – “PV Curves setup: Interface Ramping Options”

PV TOOL – SETUP –INTERFACE RAMP

Page 16: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

1. Ramp interface X and interface Y2. Maintain relationship of X to Y by angle 𝜽𝜽𝜽3. *Optional*: Maintain inter face Z flow by Zsetpoint

PV TOOL– SETUP –RAMPING INTERFACES

EXAMPLES:0𝜽 = Ramp X only45𝜽 = Ramp X & Y equally9𝟎𝟎𝜽 = Ramp Y only

Diagram from Power World HELP document

Page 17: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

1. Ramp inter face X and inter face Y2. Maintain relat ionship of X to Y by angle 𝜽𝜽𝜽3. *O p tional* : Maintain inter face Z f low by Zsetpoint

PV TOOL– SETUP –RAMPING INTERFACES

3

1

2

Page 18: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Select elements to track during run Ex: Buses, Interfaces Elements can be plotted at the end of the PV run

PV TOOL– QUANTITIES TO TRACK

Page 19: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Def ine monitored elements in L I M IT M O NITORING S E TTINGS

Track bus voltage violat ions

STOP PV run when bus voltage l imit is violated

END PV run when buses set to monitor dv/dq are negat ive.

PV TOOL – LIMIT VIOLATIONS

Page 20: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

PV TOOL – RESULTS (PLOT)

Page 21: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

1. Save PV run results2. Save Base Cases at dif ferent states during ramp

PV TOOL – SAVE RESULTS

1

2

Page 22: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

RUN QV AT PV LIMIT

Page 23: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

QV TOOL

Page 24: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

QV TOOL: SPECIFY WHAT TO PLOT

Enter Values for plotting

Page 25: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Choose Equipment to monitor *BUS Voltage *BUS DVDQ

SPECIFY EQUIP TO MONITOR

Page 26: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

GENERAL OPTIONS / RUN

Power FlowSolution Options

Overrides Power FlowSolution Options

Page 27: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Sync Condenser: Aids in soln failures QV plotted from Fictious Sync Gen

OPTIONS – CTG’S

Page 28: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

OPTIONS - OUTPUTS

Page 29: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Power World QV Slide [22]

QV - RESULT LISTS

Page 30: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Power World QV slide [23]

QV – RESULT PLOTTING

Page 31: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

QV RESULT: (+) REACTIVE MARGIN

Page 32: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

QV RESULT: (-) REACTIVE MARGIN

Page 33: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

QV RESULT: LOW VOLTAGE SOLN STATE

LOW VOLTAGESOLUTION!!!!

Page 34: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

PV – Find transfer l imit Ramp source and sink until transfers exceed supplied system

reactive power - Voltage Collapse Find Vstab IROLs – NOSE point Find SOLs – apply margin to NOSE Save case states during ramp Indicates voltage collapse, but doesn’t pinpoint exact collapse point

QV – Determine reactive margins Uses fictious reactive power injection at a single bus to determine

how much reactive power is available to support bus voltage schedule Determine where to place new reactive equipment Determine what bus a voltage collapse occurs

QV .VS. PV

Page 35: PV Tool - pw18...PV – Find transfer limit Ramp source and sink until transfers exceed supplied system reactive power Voltage Collapse- Find Vstab IROLs – NOSE point Find SOLs –

Calculate pre- to post- contingency voltage deviation at monitored buses

Abil ity to define multiple SOURCE and SINK combinations Specify constraints for specific SOURCE/SINK pair

Revamp the Plot Designer Tool for scripting PV plots.

Add “nominal KV” column to PV Results\plot\Element Description