15
Purpose driven, uncompromised professional construction. CIVILS CORPORATE PROFILE A uniquely different experience.

Purpose driven, uncompromised professional construction. CIVILS PROFILE.pdf · Purpose driven, uncompromised professional construction. CIVILS CORPORATE PROFILE A uniquely different

Embed Size (px)

Citation preview

Purpose driven, uncompromised professional construction.

CIVILSCORPORATE PROFILE

A uniquely different experience.

It’s the challenge and satisfaction that comes from the successful completion of every civils project that drives us forward.

Probuild Construction Group. Purpose driven, uncompromised professional

construction. A unique, different experience. Civils Projects, inspired to be

Based on a construction heritage that stretches back to 1989, Probuild directors Michael Simmonds, Nicholas and Phillip Buck have determined that achieving the highest standards of quality consistently requires a holistic, integrated approach backed by a strong corporate culture.

While providing the management team with the leeway to achieve, the directors follow a ‘hands on’ approach through daily involvement in the running of the business.

An ethos based on the highest ethical standards permeates our entire, purpose-driven business. With well trained and experienced team members being the most valuable asset of the business, the directors believe that utilising the most advanced technological systems to achieve corporate and client goals provides a significant advantage in a highly competitive marketplace.

The drive to provide our client base with an integrated solution delivering end-to-end quality led to the directors establishing a Civils Division in 2011 that operates seamlessly within the Probuild Group. In keeping with company culture, the division is managed by experienced and motivated professionals focused on delivering ‘best of breed’ service, and has attained a CIDB grading of 8CE.

SETTING A QUALITY BENCHMARK

mission“To create value for all our stakeholders by offering top quality, cost effective civils services.”

“To be recognised as a highly significant and competitive player in the civils projects industry in South Africa.”

WE ENSURE OURLONG TERM FUTURE BY:

Serving the best interests of our clients and exceeding their expectations

Continuing the employment of a transformation process

Creating a safe civils working environment

Excellence of delivery in our Civils Division is achieved by adherence to the principles of value-based management and the implementation of management controls of the highest calibre. Our IT-based management systems, operating procedures and process controls deliver measurable and actionable results, integrated process management and precise administration of every civils project

UNCOMPROMISEDSERVICE DELIVERY

SERVICESOFFERED

The Civils Division offers high quality turnkey solutions as well as specialist civils work that includes: Road construction

Infrastructure services for new townships

Construction of bridges Reservoirs and tanks, sewerage holding tanks, storm water drainage, retention dams

In choosing to contract with our Civils Division, clients have the assurance that they are dealing with a highly experienced team of civils experts backed by an integrated organisation committed to the delivery of excellence on brief, on time and on budget. Our leadership maintains an open door policy to advance interface with clients to ensure that our client base enjoys peace of mind throughout the course of a project.

CHOOSING QUALITY

THE VALUESTRONG LEADERSHIP

OF

Kobus van der Westhuizen (Bsc (Bldg) UOFS - 1994), Director of the Civils Division, joined Probuild in 2002 and brings more than 15 years of experience in the building and civils industries.

Under his leadership within the realm of an integrated management environment, the Civils Division delivers an unparalleled service offering of the highest quality – on time, to specification and on budget.

Delivering on that promise consistently is no mean feat in a highly competitive marketplace. The fact that the division has been able to consistently meet its commitments without compromise and to total client satisfaction speaks to the dedication of the civils team, backed by a supportive corporate group.

The sustained growth of our civils business in a short period is a strong indication that we deliver unwaveringly on our promise

SAFETYIN CIVILS

A fundamental requirement of the Probuild business model is adherence to

the highest standards of safety in the execution of contracts. A safety mindset is constantly reinforced among all team members in the workplace and beyond.

On all civils projects and throughout our operations we adhere to:

Strict compliance with the Occupational Health and Safety Act,

industry regulations and codes of practice in order to maintain the highest

possible standards of safety

Our quality control and adherence to product, service and safety

levels are non-negotiable. Exceptional standards are demanded and delivered

We are committed to protecting our workforce by ensuring total

compliance with occupational health and safety protocols

Our policy is designed to fit site and

situation specifics.

OUREXPERTISEYOURADVANTAGE

1. Client track record in delivering on your promise

2. Qualifications and experience

3. Use of advanced IT systems to manage and control projects

4. Excellence in application of management systems

5. Integrated business group philosophy that ensures the advantages of the group permeate the activities of all divisions

6. Implementation of the highest possible standards of safety

7. Support for small and medium business enterprises

8. Provision of employment opportunities and training for local communities

The Probuild Civils Division is committed to all these criteria which, when taken holistically, give our clients a competitive advantage second to none.

COMPLETEDSELECTED PROJECTS

CONTRACT SITE LOCATION DESCRIPTION CONTRACTDURATION / COMPLETION

Raceway Park Phase 2 Bloemfontein Construction of complete township infrastructure, construction of outfall sewer line and upgrade of intersection for the Manguang Municipality

Mar 2015

Raceway Park Phase 1 Bloemfontein Construction of complete township infrastructure, construction of outfall sewer line and upgrade of intersection for the Manguang Municipality

Nov 2012 – June 2013

N8 Intersection Bloemfontein Intersection and Traffic Calming – National Road Intersection upgrade, all relevant stormwater drainage, traffic control and signalisation

Nov 2014

Nicolway Bryanston Bulk Earthworks and Lateral support Sept 2014

Founders Hill Modderfontein 6 Storey Concrete Structure Jan 2014 – Dec 2014

Massbuild Midrand Concrete Hardstand for heavy duty traffic, with all related earthworks and stormwater drainage

Dec 2014

Bath Rosebank Bulk Earthworks and Platforms Jan 2015

Centenary Way Modderfontein Construction of new dual carriageway for JRA, construction of complete township infrastructure, construction of internal roads, construction of water retention structures and sewer pipe bridge

Aug 2015

Bulk Water Pipe Bloemfontein Medium Pressure Pipe Line – 700 diameter steel pipeline with all relevant chambers and connections

May 2015

Cedar Road Steyn City, Cnr William Nicol & Zeven Road, Riverglen/Dainfern

All intersection circle upgrades with special pattern paving and Road Overlays with all relevant roadmarking and signage

Feb 2015

Vantage Rosebank Bulk Earthworks and Lateral Support

Sept 2014

4 Stan Road Sandton Bulk Earthworks Oct 2014

Basa School Soweto Bulk Earthworks, parking areas, all relevant stormwater drainage and council road upgrade

Dec 2014

Steyn City - SewerPump Station

Steyn City. Cnr William Nicol & Zeven Road, Riverglen/Dainfern

Sewer pump station, holding tanks and ancillary works for Jhb Water

April 2013 - July 2013

Glenway Nooitgedacht, Mamelodi 6 km gravity and pumped outfall sewer line , construction of concrete pipeline bridge , sewer pump station and all associated works for Tswane Municipality

May 2012 - March 2013

Glenway - Internal Services

Nooitgedacht, Mamelodi Construction of complete township infrastructure, construction of sewer holding tank and pump station , construction of all internal roads for Tswane Municipality

Jan 2013 - Oct 2013

Salfin Phase 2 Carnival City Construction of complete township infrastructure, construction of outfall sewer line and pipe jacking to Rand Water Boards main water line Ekurhuleni Municipality

Oct 2014

Salfin Phase 1 Carnival City Construction of complete township infrastructure, construction of outfall sewer line and pipe jacking to Rand Water Boards main water line Ekurhuleni Municipality

Nov 2012 - May 2013

Pinelands Antwerp RoadModderfontein / Edenvale

Construction of roads and buried services for Heartland Properties

May 2013 - Aug 2013

Glenway - External Roads

Nooitgedacht, Mamelodi Ugrade of provincial road and new intersection for Gautrans Roads Department

Aug 2012 - March 2013

Westlake New K113 RoadModderfontein / Edenvale

Construction of new dual carriageway for JRA , construction of complete township infrastructure , construction of internal roads , construction of water retention structures and sewer pipe bridge

Aug 2012 - May 2013

Longlake Ext 12 Linbro Park Construction of new dual carriageway for JRA and township development, construction of water retention dams and bulk earthworks

Oct 2013

Longlake Ext 1 Linbro Park Construction of new dual carriageway for JRA and township development, construction of water retention dams and bulk earthworks

2012 - 2013

COMPLETEDSELECTED PROJECTS

CONTRACTDURATION / COMPLETION

CONTRACT SITE LOCATION DESCRIPTION

Steyn City - Reservoir Steyn City. Cnr William Nicol & Zeven Road, Riverglen/Dainfern

30 million litre concrete water reservoir and ancillary works for Jhb Water

Feb 2013 - Mar 2014

Devland Resevoir Cnr. Evette & Jan de Necker 15 million litre concrete water reservoir and ancillary works for Jhb Water

Nov 2012 - Dec 2013

Douglasdale Dairy Douglasdale Construction of 18 metre high dry milk powder bottling plant

2012

Niven Road Douglasdale Complete township infrastructure, upgrade of council road , construction of low level bridge and construction of access route and retaining walls for JRA , construction

2011

Valley Road Thornhill Construction of multi-directional road and traffic circle upgrade for

2012

Orion Park Randfontein Complete township infrastructure and construction of internal roads for the Randfontein Municipality

2011 - 2012

Morena Manor Mafikeng Complete township infrastructure, construction of internal roads for Mafikeng Municipality

2011 - 2012

The Boundary Lonehill Complete township infrastructure, upgrade of council road for Johannesburg Roads Agency (JRA), and construction of internal roads

2012

The Link Rivonia Upgrade of council roads and intersections for JRA , construction of internal roads and paving

2011

Greenwich Village Paulshof Upgrade of council road for JRA , bulk earthworks

2012 - 2013

Oasis Manor Randfontein Complete township infrastructure and construction of internal roads for the Randfontein Municipality

2011 - 2012

Sunset Manor Roodepan, Kimberley Complete township infrastructure, construction of internal roads and construction of sewer pump station and ancillary works for Sol Plaatje Municipality

2011 - 2012

Kensington Place Ferndale Complete township infrastructure, upgrade of council road for JRA and bulk earthworks

2011

COMPLETEDSELECTED PROJECTS

CONTRACTDURATION / COMPLETION

CONTRACT SITE LOCATION DESCRIPTION

COMMITMENTTO SMALL BUSINESSES

As the Civils Division, we extend our investment in people to local small and medium enterprises by ensuring that:We liaise with local authorities and civic organisations to identify potential employees Sub-contractors and labour used on our projects are drawn from local communities whenever possible on-site training is provided to all S.M.E’s who require upgrading of skills Local entrepreneurs and sub-contractors are earmarked Providing employment to new recruits who show

Our site management team ensures that quality construction standards are strictly adhered to by local S.M.E’s

CHOOSE THE BESTWe have developed an ethos, a structure, management and control methodologies aimed out ensuring our client base receives the highest standards of excellence end-to-end throughout our projects. Our primary objective is to achieve total client satisfaction while meeting the stringent standards set by the Probuild Group

We will maintain our passion to deliver exceptional quality, on time and on budget for every project in which we are involved

OUR PROMISE

PROBUILD CIVILS DIVISIONProbuild Commercial Park, Unit 4, 347 James CrescentHalfway House, Midrand

Tel: +27 11 805 6223

Fax: +27 11 805 6228

Email: [email protected]

Web: www.probuild.co.za

Probuild Civils Division is available to tender on civil construction projects. Talk to us if you’re looking for a committed contractor.