232
MGT 634 Purchasing and Supply Management Dr Atul Kanyalkar

Purchasing and Supply Management

Embed Size (px)

DESCRIPTION

Purchasing Supply

Citation preview

Page 1: Purchasing and Supply Management

MGT 634Purchasing and Supply Management

Dr Atul Kanyalkar

Page 2: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

The Course Objective• To

– provide an overview of the Purchasing and Supply

Management (PSM) Function

– understand the processes, procedures and policies

followed in PSM

– provide a brief understanding about PSM functionalities in

ERP systems

– provide the information about the tools and trends in PSM.

Page 3: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

At the end of this course

You will be able to

• Appreciate the significance of PSM function in

an organization

• Appreciate relevance of various processes

followed in PSM function

• Understand relevance of ERP in PSM.

Page 4: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Procurement-Production-Distribution System

Manufactu-ring Plant

Selling Location 1

Selling Location 2

Selling Location 3

Port

Inbound logistic or Procurement Production Outbound logistic or

Distribution

Supplier 1

Supplier 2

Supplier 3

Page 5: Purchasing and Supply Management

5

Supply Chain

Own

Manufactu-ring Plant 1

LL

Manufactu-ring Plant 3

Selling Location 2

Selling

Location 3

Selling Location 4

Selling

Location 5

Selling Location 6

Selling Location 1

Port 1

Port 2

Supplier 1

Procurement Production Distribution

Supplier 2

TP Manufactu-ring Plant 2

HUB StockiestRetailer

Page 6: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

The syllabus

1. PSM Concepts2. Staging Policies and PSM3. Purchasing Process4. Make or buy decisions5. Purchase Negotiations6. Ethics in Purchasing7. Legal Aspect in Purchasing8. EDI and e-sourcing9. Vendor development and evaluation

Page 7: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

The syllabus10. Vendor Managed Inventory11. Vendor Performance Measurement12. Capital Equipment Purchasing13. Service Sourcing14. Multi-Location Procurement Problem15. Purchasing Functionality in ERP16. Business Planning17. Supplier Certification

Page 8: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

The syllabus18. Material Storage and Warehouse Activities19. Warehouse Utilization20. Safety and Security Aspect21. Obsolescence22. Disposal of scrap23. Material Handling24. ERP in Warehouse25. New Product Development

Page 9: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

References

1. Dobler D. W. and Burt D. N., Purchasing and supply management, Tata McGraw-Hill Publishing company, 1996.

2. Monczka R., Trent R. and Handfield R., Purchasing: An integrated supply chain approach, South-western Cengage Learning. 2005.

3. Coyle J.J., Bardi E.J. and Langley(Jr.) C.J., The management of business logistics, 7th ed., South-western Cengage Learning, 2003.

4. Tony Arnold J.R. and Chapman S.N., Introduction to Materials Management, 5th ed., Pearson Education, 2004.

5. Cases and papers provided time to time

Page 10: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Class Discipline• Attendance

• Class timings (attendance will be taken at the beginning)

• Audit – Attendance and minimum passing criterion

• Academic Dishonesty

Page 11: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Course Evaluation

1. Assignments (30%) Case Analysis / Paper Reviews (Group & Individual) :

[30%]

• Tests (70%)1. Mid-term test & class tests: [20%] *

2. End-term Test: [50%] *

* Closed Book

Page 12: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Teaching SequenceMon Tue Wed Thu Fri Sat Sun

1 23 4 5 6 7 8 9

10 11 12 13 14 15 1617 18 19 20 21 22 2324 25 26 27 28 29 301 2 3 4 5 6 78 9 10 11 12 13 14

15 16 17 18 19 20 2122 23 24 25 26 27 2829 30 31 1 2 3 4

Sep

Oct

Page 13: Purchasing and Supply Management

Introduction to Purchasing and Supply Management

Page 14: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing Supply Management : Terms

Marketing Manufact. & DistributionPurchasing

1st TierSupplier

2nd TierSupplier Customer

Value Chain Management

Demand Chain ManagementSupply Chain Management

Business Logistics

Physical DistributionPurchasing and Supply Management

Logistics Management

Page 15: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing and Supply Management : Definitions

• Supply Management• It is the process responsible for the development and

management of a firm’s total supply system for both internal and external components.

• Purchasing• The purchasing function comprises of the essential activities

associated with the acquisition of the materials, services, and equipments used in the operation of an organization.

Page 16: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Objectives• Support Production• Reduce Cost Of Materials• Ensure Consistent Quality• Reduce Inventory Investment• Improve Corporate Image – Supplier Relations• Maintenance of Records• Preserve and Conserve Materials in Stock• Improve Competitive Strength

Page 17: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing and Supply Management Activities

• Materials Planning and Scheduling• Make or Buy • Procurement (materials, equipments, tools,

supplies and services)• Transportation• Warehousing• Salvage and Scrap Disposal

Page 18: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Importance

• Cost• Quality• Sales• Profits• Product development

time

• Technologies and innovation

• Customer service• Competitive

advantage

Purchasing and Supply Management can have a major impact on organization success by influencing:

Page 19: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Why Purchasing is ImportantIndustry Materials/Sales RevenuePetroleum 76%Automobile 70%Wood Products 61%Textile Mills 59%Food Manufacturing 59%Machinery 50%Electrical Equipment 49%Computers and electronics 44%

Page 20: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Why Purchasing is Important

Purchasing as a profit producer

Profit = Revenues - Cost

Impact of Purchasing on Revenues

Impact of Purchasing on costs

Profit = Revenues - Cost

Page 21: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Why Purchasing is ImportantProfit-Leverage Effect• Assuming an 8% margin

• THEREFORE, in this example, the Profit-Leverage Effect is . . .

08.0

15.12

000,100

000,250,1

Profit (Rs 100,000) = Revenues - Cost (Rs

100,000)

Profit (Rs 100,000) = Revenues (Rs.1,250,000) -

Cost

Page 22: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Costs Involved • Basic Cost Of Materials• Government Levies And Taxes• Ordering Cost• Inventory Carrying Cost• Packaging And Packing Cost.• Material Handling Cost• Freight Cost• Insurance Cost• Wastage During Receipt , Storage etc….

Page 23: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Interdepartmental Relations Production Sales And Marketing Finance Research And Development Engineering Quality Control Planning Legal Security

Page 24: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing and Supply Management

• Procurement– Material– Source– Price– Quality– Quantity– Time– Place

Page 25: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing and Supply Management

• Storage– Receive– Store– Track

Page 26: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing and Supply Management

• Usage / Issue– Material– Sequence– Price– Quality– Quantity– Time– Place

Page 27: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing and Supply Management

• Procurement

• Storage

• Usage

Page 28: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Recap

• Introduction– Defn– Objectives– Activities– Importance– Costs

• Procurement / Storage / Usage

Page 29: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Classification Of Materials

• Large number of materials.

• Planning, Procurement, storage, accounting of so many materials is a Problem.

• Common procedures for Planning, Control, storage, issue, accounting for all materials

Page 30: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Basis Of Classification• Stage of conversion Process

– Direct (Raw materials / WIP etc)– Indirect

• Nature of Material– Finished goods – Semi-finished goods

• etc.

Page 31: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Staging Policies

Engineer to order No stock at all. The purchase and order of materials takes place based on the specific customer order. E.g. construction companies and shipyards.

Make to order Only raw materials and components are kept in stock. Every customer is a specific project. E.g. beer and lemonade cans, basic construction materials

Assemble to order Only systems elements, modules or subassemblies are in stock at the manufacturing center, whereas final assembly takes place based on a specific customer order. E.g. cars, computers.

Make to stock Finished products are kept in stock at the end of the production process and are from there shipped to geographically dispersed customers. E.g. dairy products.

Design Ship

Purchase Inventory Ship

Purchase Inventory Manufacture Inventory Ship

Purchase Inventory Assemble Inventory ShipMake to Stock

Assemble to Order

Make to Order

Assemble

Manufacture

Manufacture

Manufacture

Assemble

Assemble

Staging Policies

Engineer to OrderPurchase

Page 32: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Staging Policies

Engineer to order Procurement (?), Storage (?), Issue (?)

Make to order Procurement (?), Storage (?), Issue (?)

Assemble to order Procurement (?), Storage (?), Issue (?)

Make to stock Procurement (?), Storage (?), Issue (?)

Design Ship

Purchase Inventory Ship

Purchase Inventory Manufacture Inventory Ship

Purchase Inventory Assemble Inventory ShipMake to Stock

Assemble to Order

Make to Order

Assemble

Manufacture

Manufacture

Manufacture

Assemble

Assemble

Staging Policies

Engineer to OrderPurchase

Page 33: Purchasing and Supply Management

Procurement Process

Page 34: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

11. Non-acceptance:return to supplier

8. Incoming inspectionand quality control

9. Invoiceprocessing

10. Supplier evaluation

7. Order monitoring andexpediting

6. Order processing

5. Quotation

4. Supplier selection

3. Purchase requisitions

Article file

Supplier file

Contract file

Major elements of the purchasing system

2. Make or Buy

1. Need

Make

Page 35: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Staging Policies

Design Ship

Purchase Inventory Ship

Purchase Inventory Manufacture Inventory Ship

Purchase Inventory Assemble Inventory ShipMake to Stock

Assemble to Order

Make to Order

Assemble

Manufacture

Manufacture

Manufacture

Assemble

Assemble

Staging Policies

Engineer to OrderPurchase

ETO (for each materials)

• Requirement Generation• Receiving and analysing PR• Supplier selection• Right price• PO• Follow up• Receiving and accepting• Invoice approval and payment

Page 36: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Staging Policies

Design Ship

Purchase Inventory Ship

Purchase Inventory Manufacture Inventory Ship

Purchase Inventory Assemble Inventory ShipMake to Stock

Assemble to Order

Make to Order

Assemble

Manufacture

Manufacture

Manufacture

Assemble

Assemble

Staging Policies

Engineer to OrderPurchase

MTS (for most materials)

• Supplier selection• Right price• Requirement Generation• Receiving and analysing PR• PO• Follow up• Receiving and accepting• Invoice approval and payment

Page 37: Purchasing and Supply Management

1. Need

Page 38: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Need

Need

Reorder point (Office stationary)

• Lot size • Lead time

MPS / MRP (ETO, ATO, MTS)

• Lot Size • Lead time• Dependent• Independent

Optimization (ETO, ATO, MTS)

• Lot Size • Lead time• Dependent• Independent

Project Plan (ETO)

• Technical & Unique requirements

• Well defined timelines

Capacity Plans (Machines)

• Technical & Unique requirements

• Well defined timelines

Strategic Plans (Services)

• Long term decisions• Timelines can be

uncertain• Plan and mitigation

plan

Page 39: Purchasing and Supply Management

2. Make or Buy Decisions

Page 40: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Make or Buy

• Strategic decision.

• “Precisely what business do we

really want to be in, to maximize the

use of our core competencies as we

proceed into future.”

Page 41: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Make or Buy• Economics: It is not always economical for the

companies to make all the materials used in its manufacturing process.

• Abilities / Technical skills• Capacities• Quality• Design protection• Assured supply• •

Page 42: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Make / Buy ? ?Making

• Lower production cost• Unreliable or unsuitable

suppliers• Assure adequate supply

(Quantity)• Utilize surplus labor capacity• Obtain desired quality• Protect special design or

quality• Expected benefit in long

term

Buying• Lower acquisition cost• Inadequate capacity• Reduce inventory costs• Ensure alternative sources

of supply• Item is protected by a

patent or trade license

Page 43: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Make or Buy

• Choosing between making or buying an item is largely dependent on the Vertical Integration strategy of a company.

• Vertical integration - developing the ability to produce goods or services that are previously purchased

• It can take the form of forward or backward integration.

Page 44: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Forward / Backward Integration

Page 45: Purchasing and Supply Management

Planned Order

Page 46: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Planned Order

Lead Time

Opening Period

Purchase OrderSpecific Information

PurchaseRequisition Planned Order

General information

Planned order is used for visibility

??

??

Page 47: Purchasing and Supply Management

3. Purchase Requisitions

Page 48: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchase Requisition

• Formal communication • to Purchase department • to initiate procurement activities • and procure the material mentioned in the

requisition.

XXX Department

Purchase Department Supplier

WarehouseProduction

Page 49: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchase RequisitionThe PR Should contain following information

• Originator

• Material Specification

• Quantity and Unit of measure

• Delivery date and place

• Any other information

• Signed (approved)

• Account to be charged

Page 50: Purchasing and Supply Management

4. Supplier Selection

Page 51: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Strategic Sourcing Plan

• Discovery

• Evaluation

• Selection

• Development

• Management

Page 52: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Strategic Sourcing Plan

• Engineer to Order

• Make to Order

• Assemble to Order

• Make to Stock

Page 53: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Discovery

1. Supplies catalogue

2. Print media :Trade directories, trade journals, news papers, yellow pages

3. Salespersons

4. Trade exhibition, fairs, conferences

5. Colleagues in similar field

6. Internet

……..

Page 54: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Evaluation

• Background• Informed

– Surveys– Financial checks– Facility visits– Quality– Capacity– Management / Systems– IT Systems – --------

Page 55: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Supplier SelectionCheck the following

• Whether the items were purchased earlier ? (Straight rebuy)

• Any change since then ? (Modified rebuy / new buy)

• Are the items similar / related to any other item purchased ?

• Can we replace the item by any other item which we are currently purchasing ?

• Are the items standard ?

Page 56: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Supplier Selection

Bidding• Value of Purchase• Clear specifications• Number of sellers available• Vendors interested in order• Time

Negotiation• Situations when cost

estimates are difficult• Price is only the only

important factor• Supplier may have better

knowledge then the buyer

Bidding and then negotiation

Page 57: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Overview of Vendor Selection Criteria

Page 58: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Prioritization MatrixWeight Score Weighted

ScoreQuality

Reliability

Capability

Financial

Others

Final result

Page 59: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Supplier Development????????

-Alignment of systems-Alignment of expectations-Knowledge transfers- -------

Page 60: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Managing Suppliers•Feedbacks•Situation recheck•Corrective actions•Realignment•……………

Page 61: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Supplier Selection Issues

• Size Relationship• Usage of International Suppliers• Competitors as Suppliers• Countertrade Requirements• Social Objective

Page 62: Purchasing and Supply Management

Pricing

Page 63: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Sources of Price Information

Price

Commodity Markets• Exists for basic materials (grain, oil,

sugar etc.)• Demand and supply• Long term prices

Price Lists• For standard products• Vendors catalog• Quantity discounts

available

Price Quotations• For both Standard and

specialty items• Useful for promoting

competition• RFQ (Should contain the

manner in which supplier should submit offers)• Specifications• Quantity• Period

Negotiations• For long term relationships or for high cost items• Time consuming Process• Can lead to significant quality and price benefits

Page 64: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Total Cost of Ownership• Acquisition Costs

• Price• Planning costs• Duties• …………………..

• Ownership costs• Downtime costs• Risk • Cycle time• ………………….

• Post Ownership Costs• Warranty costs• Product Liability• …………………..

• Remember: As a purchasing Manager you should also focus on suppliers manufacturing cost

Page 65: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Paper Mill Case

• Purchased Fabric Belt • 12 FT X 60 FT (Circumference)• 25000 USD• Lasts for 40 days• Belts break on the machine• Replacement takes 8 Hrs (16 man hours @ 45 USD per hour)• Per day downtime cost of the plant 100,000 USD• 4 – 6 belts are kept in inventory• Industry average life of a belt is 60 days • Benchmark belt life span 470 days @ 500,000 USD• There are 20 plants across the world

Page 66: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Negotiations and e-Sourcing/Auctions

Purchase requisitions

Supplier Selection

Negotiations

E-Sourcing/Auctions

Negotiations / Discussion

RFQ / Quotations

Page 67: Purchasing and Supply Management

Learning Curve

Page 68: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Learning curve

• Improvement in output due to learning• The learning rate represents productivity improvement as

production doubles.• Improvement in

– Labour work style– Process modification– Product modification

• Applicable when– New product / process– Complex product– Labour intensive

Page 69: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Learning curveCumulative Units

(N)Total Labour Hrs

(A)Avg Labour Hrs per

unit(B)

Learning Rate (%)(C)

= (Bn-1-Bn)/Bn-1

1 20 20 -

2 34 17 15.0

4 58 14.5 14.7

8 100 12.5 14.8

16 168 10.5 16.0

32 288 9.0 14.3

64 493 7.7 14.4

Page 70: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Quantity Discounts

• Discounts on purchase of higher quantities• Tradeoff between

– Discounts– Inventory carrying costs– Storage costs– Obsolescence costs

• The order uncertainty getting transferred to the buyer.

Page 71: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Quantity Discount

• 1 Unit @ $ 85• 3 Units @ $ 80• 6 Units @ $ 70• 10 Units @ $ 69

• Find Incremental price and units for the order• Incremental price per units

Page 72: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Quantity Discount

• 1 – 5 Unit @ $ 10 Each• 6 – 10 Units @ $ 8 Each• 11- 20 Units @ $ 7.8 Each• 21- 100 Units @ $ 7.6 Each

• Find Incremental price (for max order) and units for the order.

• Incremental price per units.

Page 73: Purchasing and Supply Management

Negotiations

Page 74: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

What Is Negotiation?

A process of formal communication,

either face-to-face or via electronic means,

where two or more people come together

to seek mutual agreement about an issue

or issues.*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 75: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

What Is Negotiation?

Involves the

management of time,

information,

and power

between individuals and organizations who are

interdependent*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 76: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

When Negotiation Required?• Is bid process inadequate?• Are many non-price issues involved?• Is contract large?• Are technical requirements complex?• Does contract involve plant, equipment or/and

customization?• Does contract involve a partnership?• Will supplier perform value-adding activities?• Will there be high risk or uncertainty?*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 77: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Non-price NegotiationQuality

• Specification compliance

• Performance compliance

• Test criteria

• Rejection procedures

• Liability

• Reliability

• Design changes

Support

• Technical assistance

• Product research, development, and/or design

• Warranty

• Spare parts

• Training

• Tooling

• Packaging

• Data sharing, including technical dataSupply

• Lead times

• Delivery schedule

• Consignment stocks

• Expansion options

• Supplier inventories

• Cancellation options

Transportation

• FOB terms

• Carrier

• Commodity classification

• Freight allowance/equalization

• Multiple delivery points

* From Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin

Page 78: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Negotiation Strategy : Basic Steps

* From Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin

1. Develop the specific objectives (outcomes) desired from the negotiation

2. Gather pertinent data

3. Determine the facts of the situation

4. Determine the issues

5. Analyze the positions of strength for both (or all) parties

6. Set the buyer’s position on each issue, and estimate the seller’s position on each issue based on your research

7. Plan the negotiation strategy

8. Brief all persons on the negotiation team

9. Conduct a dress rehearsal (Devil’s Advocate)

10. Conduct the actual negotiations with an impersonal calmness

11. Record the process and outcome

Page 79: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Negotiation planning and execution

Page 80: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

“Game plan” for Negotiation

* From Leenders, Johnson, Flynn, and Fearon, Purchasing and Supply Management, Thirteenth Edition, McGraw Hill Irwin

Page 81: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

The “Zone of Negotiation”

The overlap between what theBuyer will pay and what theSeller will accept defines the

Zone of Negotiation

$220,000 $230,000 $240,000 $250,000 $260,000 $270,000 $280,000 $290,000 $300,000Buyer's Range

Seller's Range

Page 82: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

The “Zone of Negotiation”

There is a gap between what theBuyer will pay and what the Seller

will accept. There is NO DEALwithout Creativity or Compromise

$220,000 $230,000 $240,000 $250,000 $260,000 $270,000 $280,000 $290,000 $300,000Buyer's Range

Seller's Range

Page 83: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Sources of Negotiating Power

• Informational power Access to information to be used for persuasion using facts, data etc. (Only un/favorable is presented)

• Reward power One party can offer something of value expecting something in return. Give / Take.

• Coercive power One party can withdraw something of value.

• Legitimate power Position of the person

• Expert power Special form of informational power

• Referent power Personal qualities and attributes of individuals*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 84: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Being an Effective Negotiator• Willing to compromise or revise goals• View issues independently • Establish upper and lower ranges for each major

issue• Explore additional options• Build on common ground between parties• Avoid making irritating comments• Avoid argumentation by presenting too many reasons

(quickly)• Make fewer counterproposals*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 85: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Overcoming Tactics

• Modify tactics when they don’t work• Prepare for likely tactics to be used against

you• Tactics are more effective on you if you are

unprepared, stressed, under severe deadlines, inexperienced, fatigued, or disinterested

• Try not to react without thinking*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 86: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Influencing factors in Negotiations• Low ball / High ball • Honesty / Openness• Questions• Breaks• Trial Balloon• Price increase• Best and final offer• Silence• Planned concessions• Venue

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 87: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Win-Win Negotiation

• Win-lose – competitive or distributive bargaining

• Win-win – collaboration or integrative bargaining

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 88: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Win-Win Methods

• Expand the pie Ways to expand resources or value obtained

• Logroll Tradeoff of disagreeing issues

• Cost Cut Join hands in cutting costs and sharing benefits

• Bridge Involves inventing new options to satisfy both parties

• Non specific compensation One party achieves objective other gets something of value as reward

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 89: Purchasing and Supply Management

Ethical Issues

Page 90: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Ethics

• The set of moral principles or values guiding our behavior

• In business, ethical behavior is the use of recognized social principles involving justice and fairness

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 91: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Rules of Ethical Behavior• Buyers must commit their attention and energies

for the employer’s benefit rather than their own

• Buyers must act ethically towards suppliers and potential suppliers

• Buyers must uphold the ethical standards set forth by the profession

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 92: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Pressures Toward Unethical Behavior

• Purchasing has control over large sums of money.

• Incentives linked to cost reduction.

• Suppliers may have great pressure to meet aggressive sales goals, leading to questionable sales practices

• *Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 93: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Risks of Unethical Behavior

• The act may also be illegal• At a minimum, the buyer may lose his/her job

– Personal bankruptcy– Jail

• There is a risk to a buyer’s professional reputation

• Risk to the buying company’s reputation*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 94: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Types of Unethical Behavior

• Reciprocity – Preferential treatment to suppliers who are also customers to the organization.

• Personal buying – Purchasing for personal needs of the employees.

• Accepting supplier favors – Gifts and favors.• Sharp practices – Misrepresentation just short of fraud. • Financial conflicts of interest – investment in other

companies.

*Purchasing & Supply Chain Management, Monczka, Trent, Handfield

Page 95: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Reciprocity• Giving preferential treatment to suppliers who

are also customers• Restrain competition• Must rely on legitimate performance criteria

to evaluate supplier capability

Page 96: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Personal Buying• Purchasing department purchases materials or

goods for the personal needs of its employees• Subject to trade diversion laws• Some exceptions do exist• Often a gray area as to what to do

Page 97: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Accepting Supplier Favors

• Accepting gifts• May effect a buyer’s judgment• At what point does the gift represent showing

appreciation vs. and attempt to influence future buying behavior

• Gifts from potential suppliers are particularly questionable

Page 98: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Sharp Practices

• Willful use of misinformation• Exaggerating problems• Requesting bids from unqualified suppliers

solely to drive down prices from qualified suppliers

• Gaining information unfairly through deception

Page 99: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Sharp Practices

• Sharing information on competitive quotations

• Not compensating suppliers for design or other work

• Taking unfair advantage of a supplier’s financial situation

• Lying or misleading

Page 100: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Financial Conflicts of Interest

• Direct financial interest in a supplier company• Buying companies typically require disclosure

by buyers having significant personal financial interest

• Similar to insider knowledge in buying and selling stocks

Page 101: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Behaviors

Maintain highest standard.

No gifts / favors

Slow but steady

Remember: These are digital decisions in terms of actions and occurrences

Page 102: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Cases

• Gift delivered at home ?

• Equipment purchased higher then the normal price ?

• Unwanted equipment purchased ?

Page 103: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Cases

• You joined a new company and found that some of the employees are suppliers.

• Find other employees accepting / demanding gifts from suppliers

Page 104: Purchasing and Supply Management

Legal Aspects

Page 105: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms• Ex-works: In an ex-works contract, the purchaser

accepts full responsibility for arranging transportation from the supplier’s location.

• For Purchaser this involves: – Arranging transportation, insurance, and

documentation to move the goods to the required source port (air or sea)

– Have them loaded on to the mode of transport– Transported to, and unloaded at the destination port– Cleared through customs and transported to the

purchaser’s location.

Page 106: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms

• Free alongside (FAS): In this arrangement, the supplier agrees to deliver to the (source) port specified by the purchaser

• For Supplier this involves – Arranging transportation, insurance, and documentation to

move the goods to the required source port (air or sea)• For Purchaser this involves

– Have them loaded on to the mode of transport– Insured, transported to, and unloaded at the destination port– Cleared through customs and transported to the purchaser’s

location.

Page 107: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms• Free on board (FOB): Here the supplier pays for and

arranges loading on to the outward-bound transportation and thereafter the purchaser becomes responsible.

• For Supplier this involves – Arranging transportation, insurance, and documentation to

move the goods to the required source port (air or sea)– Have them loaded on to the mode of transport

• For Purchaser this involves– Insured, transported to, and unloaded at the destination port– Cleared through customs and transported to the purchaser’s

location.

Page 108: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms

• Cost and Freight (C&F): This is a split responsibility arrangement in that the supplier arranges and pays for transportation to an agreed point,

• For Supplier this involves – Arranging transportation, insurance, and documentation to move

the goods to the required source port (air or sea)– Have them loaded on to the mode of transport– Transported to, and unloaded at the destination port

• For Purchaser this involves– Pay insurance from when the goods are loaded on board.– Cleared through customs and transported to the purchaser’s

location.

Page 109: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms

• Cost, Insurance, and freight (CIF): This is similar to C&F But here the insurance during transportation is responsibility of the supplier.

• For Supplier this involves – Arranging transportation, insurance, and documentation to

move the goods to the required source port (air or sea)– Have them loaded on to the mode of transport– Insured, transported to, and unloaded at the destination port

• For Purchaser this involves– Cleared through customs and transported to the purchaser’s

location.

Page 110: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms

• Delivered: This is the opposite of ex-works in that the supplier has total responsibility for the goods, their transportation, insurance, and all documentation until they are delivered to the purchaser.

• For Supplier this involves – Arranging transportation, insurance, and documentation to

move the goods to the required source port (air or sea)– Have them loaded on to the mode of transport– Insured, transported to, and unloaded at the destination port– Cleared through customs and transported to the purchaser’s

location.

Page 111: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms

Page 112: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Contract Terms  Supplier Port Ship Transit Ship Port Purchaser

Ex Works

TransportSupplier              

Purchaser              

InsuranceSupplier              

Purchaser              

                   

Free Alongside

TransportSupplier              

Purchaser              

InsuranceSupplier              

Purchaser              

                   

Free On Board

TransportSupplier              

Purchaser              

InsuranceSupplier              

Purchaser              

                   

Cost and Freight

TransportSupplier              

Purchaser              

InsuranceSupplier              

Purchaser              

                   

Cost Insurance and Freight

TransportSupplier              

Purchaser              

InsuranceSupplier              

Purchaser              

                   

Delivered

TransportSupplier              

Purchaser              

InsuranceSupplier              

Purchaser              

Page 113: Purchasing and Supply Management

EDI and E-Sourcing

Page 114: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Groups and cases

• Metal craft (12 Oct)

• E Sourcing strategy (13 Oct)

• Bose (19 Oct)

• Multisite case (20 Oct)

Page 115: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Types of e-Procurement1. Web-based ERP (Electronic Resource Planning): Creating and

approving purchasing requisitions, placing purchase orders and receiving goods and services by using a software system based on Internet technology.

2. e-MRO (Maintenance, Repair and Operating): The same as web-based ERP except that the goods and services ordered are non-product related MRO supplies.

3. e-sourcing: Identifying new suppliers for a specific category of purchasing requirements using Internet technology.

4. e-tendering: Sending requests for information and prices to suppliers and receiving the responses of suppliers using Internet technology.

5. e-reverse auctioning: Using Internet technology to buy goods and services from a number of known or unknown suppliers.

6. e-informing: Gathering and distributing purchasing information both from and to internal and external parties using Internet technology.

Page 116: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Reverse Auctions• When possible ?

• Requirements ?

• Steps ?

Page 117: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Reverse Auctions

• Problems ?

Page 118: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Electronic Data Interchange

• The EDI (Electronic Data Interchange) enables

customers and suppliers to electronically exchange

transaction information such as PO, invoices, and

MRP.

• Simplifications: This eliminates time consuming

paperwork and facilitate easy communication

between buyer and supplier

Page 119: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Electronic Data Interchange• External Supplier

– RPM Supplier• E-mail to the supplier• Uploading the information on the portal

– Subcon / TPM• E-mail to the supplier• Uploading the information on the portal• Linkage through ERP system

• Internal Supplier– Intercompany

• E-mail to the supplier• Linkage through ERP system

Page 120: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Electronic Data Interchange• Purchaser: Requirement generation• Purchaser: Scheduled line is generated against blanket order /

Scheduling agreement and sent to the supplier and accounts electronically

• Supplier: receives and acknowledges the order.• Supplier: sends the shipping notification while dispatching the

material.• Purchaser: records the shipping notification in expected

receipt file.• Purchaser: on receipt of the material the entry is made

against expected receipt and the scheduling line and an intimation is sent to accounts payable.

• Purchaser: accounts payable dept electronically transfer the payment to the suppliers account.

• Purchaser: sends remittance advice to the supplier.

Page 121: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Electronic Procurement

• Disadvantages– Security of electronic messages– Lack of face-to-face contact– Other technological concerns

• Standard protocols• System reliability

Page 122: Purchasing and Supply Management

Purchasing

Page 123: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasers’ Duties

• Know the market for their commodities; ascertaining price

• Understand the laws (tax, contract, patent) … • Process purchase requisitions and quotation requests• Make supplier selections• Negotiate prices and conditions of sale• Place, follow-up, expedite purchase orders• Supplier relations• Maintain ethical behavior

• Do you see any problem

SOX

Page 124: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Strategic Sourcing and Planner Buyer

• Strategic Sourcing – Know the market for their commodities; ascertaining price– Understand the laws (tax, contract, patent) … – Make supplier selections– Supplier relations– Negotiate prices and conditions of sale– Maintain ethical behavior

• Planner Buyer– Determine material requirements– Generate purchase requisitions, PO and schedules.– Issue and controlling Shop orders for factory – Place, follow-up, expedite purchase orders– Maintain ethical behavior

Page 125: Purchasing and Supply Management

6. Order Processing

Page 126: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchase Order

• Significance

• Parts of PO

Page 127: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchase Order.

• The PO is a legal offer to purchase.• Once accepted by supplier it becomes a legal

contract for delivery of goods according to the terms and conditions specified in the purchase agreement.

Page 128: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Major Parts of a P.O.• Fixed prices and quantities (including taxes)• Buyer’s right of inspection and rejection• Right to make specification/design changes• Holding buyer harmless, patent infringement• Supplier’s right to assign contract to a third party• Instructions regarding risk of loss• Statement of credit and payment terms• Identification• Packing and preparation• Statements of warranty

Page 129: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Major Parts of a P.O.

• Shipment quantities, dates and place• Assignment of seller’s rights• Arbitration clause• Right to cancel unshipped portion• And other relevant information etc.

Page 130: Purchasing and Supply Management

7. Order Monitoring and Expediting

Page 131: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Order Monitoring and Expediting

• Significance

Page 132: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Follow-up (Including expedite and de-expediting)

• Supplier is responsible for delivery.• Purchase department is responsible for

ensuring the delivery.• Follow-up is required for

– Changes in the plans– IRA issues– QA issues in previous delivery– Product structure change – etc.

Page 133: Purchasing and Supply Management

8 Incoming Inspection and Quality Control

Page 134: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Incoming Inspection and Quality Control

• Significance

Page 135: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Receiving

• Warehouse is responsible for receiving the goods. They should confirm– Item– Quantity– Place– Absence of transit damage– Open Purchase Order– Delivery due date– Provide acknowledgement.

Page 136: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Receiving

• Mark the goods• Store the goods• Operate information system• Communicate to QA and other concerned

departments

Page 137: Purchasing and Supply Management

Self Certification

Page 138: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Self Certification

• Significance

• Where to use– Staging policies– Lot size and consumption– Stocking policies

Page 139: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Supplier Self Certification• Companies spend a large amount of money on

quality inspection of incoming material

• This is time consuming and complicated.

• Supplier self certification is therefore very useful.• In this supplier certifies and assures that the

quality of the material is as per the company standard.

• Cost implication ?

Page 140: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

• STEPS– Agreeing upon common Specs.– Process Parameter standardization.– Vendor audits and Inputs.– Trial Lots.– Roll out.

Supplier Self Certification

Page 141: Purchasing and Supply Management

9. Invoice Processing

Page 142: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Invoice Processing

• Significance

• Factors to be considered

Page 143: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Payment

• Accounts is responsible for payment (after QA release of the received material).

• Three way reconciliation– Suppliers invoice– PO– Received quantity

• To confirm– Conditions– Prices– Quantities

• The accounts should be very efficient and accurate

Page 144: Purchasing and Supply Management

10. Supplier Evaluation

Page 145: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Supplier evaluation• Why

– Better decision making– Better communication– Feedback– Motivate and direct behavior

• Problems – Too much data– Wrong measures– Conflicting measures– Drive wrong performance

Page 146: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Performance Measurement - Importance

• Systematizes organizational memory• Pool information across plants• Remove excuse for poor quality• Ensure consistent policies across supplier and

plants• To identify the supplier performance and

improvement opportunities.• Helps in decision making.• Negotiations• Resource allocations etc.

Page 147: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Performance Measurement

Characteristics of good performance measure• The measurement should be usable.• Without any scope for adjustment• Communicate / Agreed• Simple to measure

Page 148: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

• Strategically Significant• Driving “Right”

Behaviors• Balanced • Aligned• Owned• Linked to Compensation• Actionable• “Easy” to Collect

Measures Must Be ...

Measures

Page 149: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

BalanceBalance is Assessed and Viewed Across Three Specific Dimensions:

1. Financial v. Customer v. Process v. People2. Leading v. Lagging3. Efficiency v. Effectiveness

Why Does Balance In These Dimensions Matter?Why Does Balance In These Dimensions Matter?

1. Complete Business Perspective2. Causality3. Cost (Time, Resources, Investment) & Quality

Page 150: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Example Measure Set F-C-P-P [1]Leading v. Lagging

Effective v. Efficient

[1] Financial v. Customer v. Process v. People (from The Balanced Scorecard)

Percent Sales from New Products Financial Lagging Effectiveness

Net Trade Sales Total Growth Financial Lagging Effectiveness

NPV of NPD Pipeline (NPDC Data) Financial Leading Effectiveness

Market Share (TRx) Customer Lagging Effectiveness

Line Item Fill Rate Process Lagging Effectiveness

Percent Growth of Net Trade Sales from Existing Products

Financial Lagging Effectiveness

Manufacturing Compliance Index Process Lagging Effectiveness

Adverse Events/Product (Top 5 Products) Customer Lagging Effectiveness

S/G&A Productivity Process Leading Efficiency

R&D Productivity Process Leading Efficiency

Resource Alignment Index People Leading Effectiveness

Percent Critical Positions Filled People Leading Effectiveness

Acceptable/Satisfactory

Caution/Additional Work Req’d.

Unacceptable;Additional Work Req’d.

Balanced Measures

Page 151: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Balanced Process MeasuresSuppliers Inputs Process Outputs Customers

• S-1• S-2• S-3

• I-1• I-2• I-3

• O-1• O-2• O-3

• C-1

• C-2

• C-3

InputMeasures

ProcessMeasures

OutcomeMeasures

Leading

Lagging

Effectiveness

Efficiency

X X

X

X X X

X

Page 152: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

The Operational Definition• A Precise Description that communicates how to arrive at a value for

an objective.– Identifies Who, What, Where, When, How

• Who = Measure Owner• What = What to Measure (Clear, Specific, Objective)• Where = Where the Measure Data Resides• When = When Measured & Reported• How = How to Measure (Mathematical Formula) (Longer

Term)

Not all of the Measure Playbook attributes need to bedefined at the same time… it’s okay to let them mature as the

measure focus matures.

Not all of the Measure Playbook attributes need to bedefined at the same time… it’s okay to let them mature as the

measure focus matures.

Measure Playbook

Page 153: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

“A Well-Dressed Measure”

33

Data Legend and Chart and Data

Owner Information, Update Frequency

Description, Explanation, and

Action Plan

55

Quick Reference LegendI.E. “Trend Up = Good”

44

Clean Data Display, Control Limits, Mean, and Trend Line and Goal

22Title

11

Page 154: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Performance Measurement

SP = ∑Wi X Pi

– Wi – Weight attached to the performance characteristic i

– Pi – Performance of characteristic I

– It can be • Quality (material / documentation )• Delivery• Quantity • Flexibility• Technical Contribution etc.

• Or treat individual performance characteristic separately.

Page 155: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Measures Implementation• Drive down from OGSM• Develop specific measures• Identify the base line data• Finalize details• Communicate and implement• Measure and identify projects.

Page 156: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Measures• Engineer to order

• Make to order

• Assemble to order

• Make to stock

Page 157: Purchasing and Supply Management

11 Non Acceptance – Return to Supplier

Page 158: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Return to supplier• Based on the PO

• Local / Imported • Rework / Destroy • Credit note

Page 159: Purchasing and Supply Management

Others

Page 160: Purchasing and Supply Management

Multi-location problem

Page 161: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

MSPPDS: Multi-Site Procurement Production Distribution System

Manufactu-ring Plant 1

Manufactu-ring Plant 2

Selling Location 2

Selling

Location 3

Selling Location 4

Selling

Location 5

Selling Location 6

Selling Location 1

-Alternate sourcing for manufacturing and selling locations -Opportunities for reduction in costs and improved availability represented by solid and dotted lines.

Port 1

Port 2

Supplier

Inbound logistic or Procurement Production Outbound logistic or

Distribution

Page 162: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

MSPPDS: Multi-Site Procurement Production Distribution System

Manufactu-ring Plant 1

Manufactu-ring Plant 2

Selling Location 2

Selling

Location 3

Selling Location 4

Selling

Location 5

Selling Location 6

Selling Location 1

-Alternate sourcing for manufacturing and selling locations -Opportunities for reduction in costs and improved availability represented by solid and dotted lines.

Port 1

Port 2

Supplier

Inbound logistic or Procurement Production Outbound logistic or

Distribution

Page 163: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

EXTENT OF CONTROL

• Centralized v/s Decentralized Purchase– Centralized

- Ease Of Operation, buyer specialization, Less ordering cost, control.

- Consistency- Better Pricing, more clout, better continuity- Better Maintenance Of Records

Page 164: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

EXTENT OF CONTROL

• Decentralized - Better Time To React- Developing Local Vendors- Better Control On Local Vendors- Close Co-ordination with Plant

Page 165: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Optimization

• GLPK• Path command• Program file / Data file• Set / Param / Var / Min / Max / s.t. / end.

Page 166: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Simulation

• Random parameters interacting with each other.

• Arena

• Vensim / Stella

Page 167: Purchasing and Supply Management

Purchasing Functionality of ERP

Page 168: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

ERP - What is it?

– ERP is a generic term used to describe a comprehensive information system designed to

integrate all the business processes found in an enterprise.

– Efficiency and productivity are improved through the integration of information and the removal of duplicate information and processes.

Page 169: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

MRP OVERVIEW

Page 170: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

MRP RUN

Page 171: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

PLANNING FILE AND MRP

Page 172: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

PLANNING SEQUENCE

Page 173: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

BOM EXPLOSION

Page 174: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

MRP: NET REQUIREMENT CALCULATION

Page 175: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

LOT SIZING PROCEDURES

Page 176: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

MRP SCHEDULING

Page 177: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

STATIC LOT SIZING PROCEDURES

Page 178: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

PERIOD LOT SIZE PROCEDURE

Page 179: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Safety stock

• Fixed safety stock

• Range of coverage

• Safety days

Page 180: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing master Data

• Vendor master (at client level)– Information about the vendor.

• Source list (at Plant level)– The master which links a material to a vendor for a

period.• Purchase Info Record (at Plant level)

– The master containing pricing and other information of the material if sourced from a particular vendor (This data gets adapted while converting PR to PO)

Page 181: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Purchasing master data

• Outline agreement– The agreement against which scheduled lines are

generated.

Page 182: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Process

Purchase Requisition of a

material

Sourcelist Vendor

Purchase Info Record /

Scheduling Agreement

Follow-up

Receipt

PO/ Scheduled Line

Payment

Quality UD

Page 183: Purchasing and Supply Management

Business Planning in an ERP system

Page 184: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Business Planning in an ERP System

• Once a year activity• Based on the Business Plan for the next

periods.• To arrive at

– Annual production plans– Standard costs– Machine loadings– Annual Purchase volumes

Page 185: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Business Planning in an ERP System

• The output is used to – Arrive at the variances during the year.– Bargain with supplier– Decide on the focus cost improvement ideas

Page 186: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Business Planning in an ERP System

1. The business plan is uploaded in System in a scenario.

2. Master data is corrected in the scenario.3. MPS orders for the Business Plan are generated4. Machine loading is checked to make appropriate

corrections are made.5. MRP is generated for the entire period using

appropriate assumptions6. Total consumptions is checked.

Page 187: Purchasing and Supply Management

Material Storage

Page 188: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Why Storage is required ?

Material Storage

Inventory

Pilferage

SLOB

IRA

Material Handling

Page 189: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Is it only a storage facility?

• A warehouse is typically viewed as a place to store inventory.

• However, in many logistical system designs, the role of the warehouse is more properly viewed as a switching facility as contrasted to a storage facility.

• Value Addition?

Page 190: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Storage

• Objective – Minimize costs – Maximize customer service

• This is achieved by – Timely customer service– Keep track of the items– Minimize total physical efforts– Provide requisite communication

Page 191: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Storage Costs

• Costs– Capital costs

• Space• Material handling equipments• Etc.

– Operating costs• Labor costs• Etc.

Page 192: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Warehouse Activities• Receive goods

– Check the goods against order and Bill of lading– Check the quantities– Check for damage– Inspection if necessary

• Identify the goods• Dispatch to storage• Hold goods• Pick• Marshal shipment• Dispatch• Operate Information system

Page 193: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Benefits of Warehousing

• Consolidation• Break bulk• Processing• Postponement• Stockpiling

Page 194: Purchasing and Supply Management

Warehouse Location

Page 195: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Warehouse Location• Modeling the supply chain, J F Shapiro (pp 143)

Page 196: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Warehouse LocationObjective / Constraints

Modeling the supply chain, J F Shapiro (pp 143)

• Objective: Minimization of transportation cost and fixed and variable costs for warehouse

• Warehouse Capacity (Supply plan <= Operating Capacity)

• Transfer Quantity (Transferred quantity from warehouse <= operating capacity of warehouse)

• Demand Satisfaction (Transferred quantity to CFA >= Demand of CFA)

• Unique Channel Matrix (All product demands of a CFA to be satisfied by one warehouse)

Page 197: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Channel matrix definitionObjective / Constraints

• Objective: Minimization of transportation cost

• Manufacturing Capacity (Production plan <= Mfg Capacity)

• Transfer Quantity (Transferred quantity from plant <= Production plan at plant)

• Demand Satisfaction (Transferred quantity to CFA >= Demand of CFA)

• Unique Channel Matrix (All product demands of a CFA to be satisfied by one manufacturing plant)

Page 198: Purchasing and Supply Management

Warehouse Layout

Page 199: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Design Considerations in Warehousing

• General considerations– Quantity and character of goods must be known—

product profiling– Know the purpose to be served

• Storage• Distribution• Cross-docking

Page 200: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Warehousing Trade-offs• Fixed / variable slot locations for merchandise• Build out (horizontal) / build up (vertical)• Order-picking / stock-replenishing functions• Two-dock / single-dock layout• Labor-intensive / mechanization / automation• Space devoted to aisles / space devoted to

storage

Page 201: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Warehousing Trade-offs

• Paperless warehousing / traditional paper-oriented warehousing operations

• Virtual warehouse / real warehouse• Other space needs• Retail store rooms

Page 202: Purchasing and Supply Management

Warehouse

Page 203: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Pallet Positions (Refer Tony Arnold)

Number of pallet positions on ground required

1. Per pallet = 30 Cartons

2. For storing 13000 Cartons

3. Number of pallets required = 13000/30 = 433.33

= 434 Pallets

4. Three high placement

5. 434 / 3 = 144.67 = 145 pallet positions

Page 204: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Accessibility

Being able to get at the goods wanted with

minimum amount of work (directly)

1. Industry

2. Expiry periods

3. Fifo / Lifo etc

Page 205: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Cube utilization (Refer Tony Arnold)

Use of space horizontally and vertically

Number of pallets actually stored / Maximum

number of pallets can be stored

Accessibility vs. Cube utilization

Page 206: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Stock Location

• Functionally similar items together• Fast moving / slow moving• Physically similar items• Working stock and reserve stock

Page 207: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Stock Location

• Point of usage• Central storage

– Fixed location• Advantages / disadvantages

– Floating location• Advantages / disadvantages

Page 208: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Order picking

Picking

ZonePicker works in his zone

Multi orderSingle order

AreaThrough out the warehouse selecting items for one order

Page 209: Purchasing and Supply Management

Warehouse Safety

Page 210: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Warehouse Safety

• Safety– Guarding– Material safety data sheets– Employees safety

• Industrial hygiene– Ergonomics

• Environment– Spills / incidences– Disposals

Page 211: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Safety

Asp

ect

Page 212: Purchasing and Supply Management

Security of goods

Page 213: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Pilferage Protection• Shortage (IRA / loss)

• Brand name issues

• Etc.

Page 214: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Pilferage Protection• Theft: Protection against theft of merchandise has

become a major factor in warehouse operations. • No private automobiles• All normal precautions employed throughout the

enterprise should be strictly enforced at each warehouse.• Many are honest mistakes in order selection and

shipment, but the purpose of security is to restrict theft from all angles.

• Security begins at the fence. • As standard procedure, only authorized personnel should

be permitted into the facility and surrounding grounds and entry to the warehouse yard should be controlled through a single gate.

Page 215: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Pilferage Protection…

• Computerization– Computerized inventory control and order processing

systems help protect merchandise from being carried out of the warehouse doors.

– No items should be released from the warehouse unless accompanied by a computer release document.

– If samples are authorized for use by salespersons, the merchandise should be separate from other inventory.

Page 216: Purchasing and Supply Management

Scrap Disposal

Page 217: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

• Salvage and Scrap Disposal– Value of scrap may be income to the firm.– Disposal must adhere to environmental

regulations.– Ensure no possibility of misuse– The organizations interest

Page 218: Purchasing and Supply Management

Inventory Record Accuracy and Cycle count

Page 219: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

IRA and Cycle count

• Please refer to Tony, Arnold

Page 220: Purchasing and Supply Management

VMI

Page 221: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Stockless Purchasing

• The supplier maintains the inventory for the purchaser.

• The cost of stocking inventory has been temporarily transferred from the purchaser to the supplier.

Page 222: Purchasing and Supply Management

NPD

Page 223: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

NPD

• Timelines based on the understanding / experience

• Clear expectations beforehand• Involve suppliers early

Page 224: Purchasing and Supply Management

Standardization

Page 225: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Standardization • Rather than obtaining a variety of components

similar in labeling, coloring, packaging, etc. The purchasing agent should try to have those components standardized.

• For every component that is standardized, • There is one less invoice, one less item to be

inventoried, etc.

Page 226: Purchasing and Supply Management

Value Analysis

Page 227: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Value analysis• Process of examining all elements of

a component, assembly, end product, or service to make sure that it fulfils its intended function at the lowest cost throughout the intended life.

• Objective : Increase the value of the product at the lowest cost while maintaining quality.

• Value = function / cost

Page 228: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Value analysis

• Gather information• Study• Speculate• Analyse• Recommend• Summerize

Page 229: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Value analysis

• Separate the object in its component• Check the value addition by each component• Check the manufacturing process for each

component• Check the value addition by each process step• Apply creativity

Page 230: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Value analysis Team members

• Executive management• Suppliers• Purchaser• Design engineer• Marketing• Production• Industrial / process engineer• Quality control

Page 231: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

Team exercise

• Identify Object (and its function)• Separate the object in its component

(Understand the assembly process)• Understand the manufacturing process for each

component (and go on further exploding its BOM)

• Identify the value addition by each process and component

• Brainstorm

Page 232: Purchasing and Supply Management

MGT634 Purchasing and Supply Management

ThanksBest of luck