Published N
© Valmet
RebExecutRebuildinwith over and profit
Several cascreen bascompreheoperation
The enclodelivery reincludes: mtail threadcalender,
November 14, 20
buildstive Summng a paper ma
a hundred yetability.
ase studies illuskets, throughensive rebuild
ns at many mi
osed case studequirements, machine scre
ding, doctorinreel and coate
14
s – fromary achine is a dauears of machin
ustrate the advh medium rebds that stretchlls.
dies are reviewproject milesen baskets, ev
ng, water jet taers.
Rebuilds
om s
unting task, rene rebuilds ha
vantages of Vbuilds includi
h the entire len
wed in terms ostones and resvaporator heaail cutting, he
from Small to La
mall t
egardless of thas helped cou
Valmet expertiing evaporatongth of the m
of market demsults achievedating surfaceseadbox, formi
arge
to lar
he size of the untless mills im
ise. From smaors, drying an
machine line –
mands, mill nd. The scope o, vertical imping section, p
rge s
upgrade. Valmprove effici
all rebuilds sud blow boxes Valmet has i
eeds, rebuild of the differen
pingement drypress section, d
P
cope
lmet's experieiency, produc
uch as machin, to improved
scope, speciant projects ying, blow bodryer section
age | 1
ence ctivity
ne
al
xes, ,
Published N
© Valmet
Rebuilds cproven mamachine lto much m
Let's start
Nine dA recent mrunnabilitinland reg
The Lessecompletelcellulose a
worn out screens wThis meanidle one scby the use
With convguaranteerequire twLD (Lamiboundaryresult is h
The rebuibasket, waVedahl. "A
Figure 1. Vedahl (lOuti Kukkscreen redown and
November 14, 20
come in all shaanufacturer wline. This whitmore compreh
with example
ays withomachine screety. The Lessebgion of Småla
ebo Bruk in Swly focused on and energy.
and full of puere strainer tynt they had a creen and rebe of Valmet's N
ventional wede the accept puwo or more scinar Design) wy layer as well igh screening
ilt screen, withas started in MAfter two mo
Production Manleft) and Valmetkamäki are very
ebuild. Customerd quality is up.
14
apes and sizeswith 200 yearste paper will r
hensive machin
es of smaller r
out a breen rebuild in bo Mill is loca
and, southern
weden has a loforest based p
ulp spinnings ypes, equippetotal of four s
build the otheNimax LD we
dge wires andulp quality lea
creens in parawedge wire reas reducing f
g efficiency, re
h Nimax LD wMay 2013. "Nonths we have
nager Öistein t's (then Metso'sy happy with ther complaints are
Rebuilds
s, available fos of industrialreview recent ene line rebuild
rebuilds…
eak – macSweden achieated in a densSweden.
ong history oproducts, wit
When they haa solutour supWhen conditiwith Vsatisfiea thing
One sThe heand wh
(strings). Thied with two drscreen basket
er with just onedge wires in
d drilled hole bads to an incr
allel to achieveeduces the preflow resistanceduced string
wires in the oo problems hfewer breaks
s) e e
from Small to La
r any section experience, Vexamples of mds.
chine screeves incrediblsely forested a
of paper produh a modern p
Production Mad a screeningion, "Customperior white pwe opened upion, somethin
Valmet's screened with our qug of the past."
screen baseadbox approhen opened mis was definitrilled hole bass to replace. O
ne wedge wirethe screening
baskets, the nreased pressure the desired sessure drop be through the
ging or spinni
outer basket aave occurred than ever an
arge
of the fiber, bValmet is able machine rebui
een rebuile results witharea between
uction going bproduct mix o
Manager Öistg problem on
mers were compaper and thrp the headboxng had to be dning solutionuality, and br
ket replaceach used two
mill personneltely the cause skets (an outeOn advice froe screening bag basket.
narrow slot sizre drop over tscreening effi
by optimizing e slots and theng and excell
and a blind mewith screenind production
oard, paper oto improve an
ilds ranging fr
ild h paper qualitlarge shallow
back to 1693,of graphical p
ein Vedahl (Fn PM 2 he conmplaining of createning to cx and screensdone. I am han our custome
eaks due to p
es four machine screl could see thaof the qualityer basket and
om Valmet, thasket. This wa
ze or hole sizethe screen baiciency. The pthe flow at th
e following aclent runnabili
etal plate replng since start-
n is at record l
P
or tissue mill. Any section of y
rom small sect
ty and machinw lakes in the
, and today it apers, dissolv
Figure 1) realntacted Valmeolored fibers
change supplis and saw the appy to say thers are really oor screening
eens in parallat the basketsy problems. T
inner basket)he mill decideas made possi
e needed to sket and can
patented Nimhe screen ccept channelity.
lacing the inn-up," says Öislevels with no
age | 2
As a your tions
ne
is ving
lized et for in ers.
at
g are
el, s were
The ). d to ible
max
l. The
ner stein o
Published N
© Valmet
more coloachieved aother bask
For Outi Kkind of a rin terms ocustomers
In additioother savienergy savmaintenansecond scdown. Thwearing ponly one bfour."
Now for amedium sarea of evaand dryingparticularinstallatio
SmurfiheatinThe Smurheating suevaporatio
After analdamaged surfaces bbecame a
The Smurmade frombeen contStefan Lunthinking a
"Our evapthe conce
November 14, 20
ored spots in oa record run oket, now idle,
Kukkamäki, aresult in manof days, not ms, the quality
on to the qualiings will soonvings and lessnce, because treen can be shere are also fe
parts, as there basket instead
a few examplescale upgradesaporators, blog; let's start w
rly challengingon at a Swedis
it Kappa g surfacerfit Kappa Kraurfaces had beon capacity.
lysis and discuheating surfa
became dramarace against t
rfit Kappa Kram virgin fibertinually upgrandqvist, Manat the mill:
poration plantntrator heatin
14
our superior wof nine days wfor use in an
a screening spny mills," she smonths." Veda
is better than
ity improvemn be evident (Fs the hut ewer is now
d of
s of s, in the ow boxes,
with a g sh mill.
Kraftlinees aftliner paperegun to crack
ussions with saces with Valmatic: a 350-tontime.
aftliner mill hr and is used taded and expa
nager of the Ch
t had been wong surfaces. W
Rebuilds
white grade. Fwithout a singother position
pecialist from says. "For Lesahl is in agreemn before and w
ment and the sFigure 2): "In
er switche
r mill in Swedk, resulting in
several supplimet's TUBEL nne crane coll
has an annual to manufacturanded ever sinhemical Reco
orking well, bWe finally got
Figure 2. Imp
Paper madecreasedover threeaverage o
rebuild theydays w
After baheadbox
colored spothe superio
from Small to La
From having gle break. Wen."
Valmet, the rsebo Bruk I thment. "The m
we have fewer
substantial redn addition to b
es to Valm
den was havinunplanned ou
iers, Smurfit Kheating surfalapsed, and su
capacity of 7re containerbnce. Now the
overy Plant at
but we had stato the point t
prove cleanlines
achine breaks w significantly. E
e breaks per daover five years. y have run evewithout breaks
asket change thx was cleaner aots disappearedor white paper g
arge
two to three be are now thin
results are nohink we can c
main issue," her breaks."
duction in brbetter paper m
met techn
ng problems wutages, highe
Kappa Kraftliaces. But the iuddenly the s
700,000 tonneboard. The mi
time had comSmurfit Kapp
arted having sthat it was no
ss and save mon
were Earlier ay on After n nine .
he and d from grade.
breaks per danking of a sim
o surprise, "Wcount the retue adds, "is tha
eaks, Kukkammachine runn
nology –
with its evapoer costs and so
iner chose to installation ofstandard repla
es of kraftlinerill started up ime for the evapa Kraftliner
serious probleo longer possi
ney with lamina
No spinning in
One screen inswearing parts,
Energy savshutdown
Payback tim
P
ay, we recentlymilar rebuild o
We have seen thurn on investmat for our
mäki predicts nability, there
TUBEL
ration plant. ometimes low
replace the f the new heatacement job
r. Kraftliner iin 1962 and haporation planrelates the
ems with cracible to repair t
ar design wire.
n machine scre
stead of two > less maintena
vings due to theof one screen.
me of a few days
age | 3
y of the
his ment
that are
The wer
ting
s has nt.
cks in the
een.
less nce.
e
s.
Published N
© Valmet
heating susame desievaluation
Change Once the quickly aswhen a cr
"The heattonne crancomplicatcylinder oinset). Nowork and
"In ordercollapsed company,new partsalso begansave time but we hawith the ptheir positnot normchallenginthe time lofastest, cothink thatdialogue wmain reasas well as
Good coStefan Luncontinuesfinding wplans for tother peovery goodconcentra
November 14, 20
urface, we hadgn, but made
n of our optio
of plans choice of tech
s possible. Firrane collapsed
ting surfaces ane, both to geted than we hon the crane sobody was hu
change our p
r to minimize crane we, tog
, immediatelys, dismantle thn a range of oand minimiz
ad a very openpeople at Smutive attitude wally collapse,
ng. In the endost and the inmpared to ot
t the support wwe had with osons why the pthey did in th
ooperationndqvist at Sm
s the story: "Oays forward. Athe work chanple acted very
d. Despite the ator has been
14
d to replace ite from a materons, we chose
hnology was mst, the work a
d. Valmet's Pr
are very heavet the old heatad planned fouddenly bent
urt, but we hadplans."
the time lost gether with thy started scramhe crane and rther activities
ze delays. It wn, direct and purfit Kappa Krwas a great heso this site wo
d, we managednstallation wathers with thiswe got throug
our customer people on sitehis project."
n leads to rmurfit Kappa KOur job is to m
A big challennge as much ay professionalsetbacks, we working very
Rebuilds
t instead. Onerial that was mto switch to a
made, the effoat the site wenroject Manage
vy, so for this iting surfaces or. We began t (Figure 3, d to stop the
due to the he crane mbling to findrepair it. We s intended to as a hectic tim
positive dialograftliner, and elp. Cranes doork became vd to minimize
as one of our s kind of scopgh the positivwas one of th
e could perfor
results Kraftliner
make things wge in a case lias they did helly and made ended up wit
y well since it
from Small to La
e option was tmore suitablea heating surf
ort focused onnt according ter Charlotta C
installation wout and to inshoisting the o
d
me, gue
o very e
pe. I ve he rm
work well, andke this is to mere. The coopoutstanding c
th only a smalwas started in
Figheabenmin
arge
to switch to a e for our condface from Val
n getting the nto plan, but thCederström d
we were compstall the new old heating su
d when we runmake sure thinperation with Vcontributionsll delay. I shon autumn 201
gure 3. A 350 tonating surfaces. Tnt, requiring expinimize delays.
new heating ditions. After lmet."
new heating she situation sudescribes what
pletely dependones. Things urface, but th
n into problemngs remain saValmet works. All in all, thuld also add t
13."
nne crane was uThe main hydrapert project ma
P
surface of theanalysis and
surface installuddenly chant happened:
dent on a big 3got more
he main hydra
ms, we focus oafe, even whenked well, and mhe end result wthat our
used replace theaulic cylinder (insanagement to
age | 4
e
led as nged
350-
aulic
on n the many was
e set)
Published N
© Valmet
TUBEL In kraft putakes placValmet, d
"To date, wthe worldIn the confeature a dstable mecis that thecapacity a
The instalconsumptreally hapfrom upgr
The next r
HambuThe Hambaimed to ayear after medium. maximum
In 2013, ppossibilitythe press t
An additiohad a feat
ExcellenHamburgtheir targenew solut
The mill spossibilityefficiency
The HiRuThe test ruThe guara
November 14, 20
for highestulp mills, blac
ce in large evadescribes Valm
we have comp, gaining lots
ncentrator pardesign where chanical com
e heating surfaand avoids the
llation at Smution when the
ppy about the rades of existi
rebuild involv
urger Hunburger Hungachieve betteryear. First staIt has an ann
m production
pre-dryer secty of improvinto the dryer. T
onal aim was ure that wore
nt runnabilger Hungaria bets and has alion with pass
set strict requy of a future sand a longer
un P system (Fun met all theantee for the s
14
t availabilick liquor is ev
aporators thatmet's experien
pleted more tof experiencert of the evapthe black liquponents, andace can be ease costs of hyd
urfit Kappa Keir leaking heavery good exping plants and
ves improving
ngaria boaria mill, locar results and harted up in 20ual capacity ospeed of 1,40
ion runnabiling runnabilityThis would be
to save on coe out the seali
lity and lowbecame intereso proven its
sive drilled bo
irements for tpeed increaselifetime for t
Figure 4, nexte requirementsealing lifetim
Rebuilds
ity vaporated beft are heated wnce with evapo
than 400 big ee. We have seoration train,uor is evapora this gives ousily washed cl
droblasting.
Kraftliner also ating surfacesperiences ourd in new plan
productivity a
oosts effiated in Dunaúhas been able 009, the machof approximat00 m/min.
ity became a by in the first de the next step
osts in the spang material ra
w draw ested in Valmcapabilities in
ottom rolls for
the delivery. Te up to 1,500 mhe blow box s
t page) was suts for a stable
me was also fu
from Small to La
fore it is burnwith steam. An
orator installa
evaporation averal differen, we usually reated on the our evaporatorslean during o
made it possis were exchanr customers h
nts."
and cost savin
ciency wiújváros, Hungto improve th
hine producestely 470,000 t
bottleneck forryer group, wp in improvin
are part sealinather quickly
met's HiRun bln numerous rr improved ru
They includedm/min), lowesealings.
uccessfully stae web run, fewulfilled.
arge
ed in the reconders Wernqvations:
and condensatnt technologieecommend outside of hot ts a very long lperation. Thi
ible for our cunged for our thave had with
ngs with new
ith HiRungary, 70 km sohe productivi
s 100% recycletonnes, a widt
r PM 7. The mwhich would cng production
ngs of the blowy, resulting in
low box technreference caseunnability.
d a stable weber press-to-dr
arted up at thwer breaks in t
overy boiler. Tvist from evap
te treatment pes for evaporaur TUBEL evtubes. The tublife time. Anois ensures a hi
ustomer to lotube-based tec the TUBEL t
blow boxes…
n P blow outh of Budapity and efficieed brown lineth of 7.8 m an
mill decided tconsequently n line efficien
w boxes. The high annual o
nology, whiches in recent ye
b run at 1,400ryer draw, hig
he beginning othe first group
P
The evaporatiporator sales
projects arounating black liqvaporators. Thbes are robus
other big advaigh evaporati
ower their steachnology. I'mtechnology, b
boxes pest, has alwa
ency of its PMer and corrugnd an original
o investigate reduce draw
ncy.
existing concoperating cos
h addresses boears. HiRun P
0 m/min (withgher time
of January 20p and lower d
age | 5
ion at
nd quor. hey st and antage on
am m
oth
ays M 7 gated l
the from
cept sts.
oth P is a
h the
14. draw.
Published N
© Valmet
Hungariawere one
The next r
OptiDrAt the Wowas expersupply capheating ga
The 4.7-mare three w
Figure 4. Hamburgstable webreaks an
Figure 6.
November 14, 20
, "Any action step forward
rebuild involv
ry Verticaolsan Haman riencing prodpacity. The mave them just
meter web widways to solve
The new HiRunger Hungaria proeb run, reducingnd draw.
Three ways to s
14
that reduces in our develo
ves Valmet an
al improvmill, part of Duction capaci
mill was seekinthat.
dth machine hdrying capac
P at ovided a g both
solve drying cap
Rebuilds
"It was an easus to select His known as tstandard techterms of dryesays György SProduction MHamburger H(Figure 5). "Ipleased with competent apattitude; Valmmachine line
According tocosts and imp
opment proce
d a board mil
es produDong Il Papeity limitationsng greater flex
had a speed limcity limitation
pacity limitation
from Small to La
sy decision foHiRun, since itthe industry hnology in er runnabilitySzilas,
Manager at Hungaria I am very Valmet's
pproach and met people hee competitiven
o Attila Bencsproves efficiess. Valmet m
ll solving prod
ction capr, South Kores, especially dxibility for dry
mitation due n problems (F
n problems.
arge
or t
y,"
elped and woness and prod
s, Mill Manageency is import
made this a ple
duction obstac
pacity at Wea, the testlineduring the colying and the O
to lack of dryFigure 6). One
Figu(leftManresu
rked with us ductivity."
er (Figure 5) tant. The HiR
easant and sm
cles together…
Wolsan Her and flutingld season due OptiDry Vert
ying capacity.e solution is m
ure 5. Attila Bent) and György Sznager (right) areults of the HiRun
P
to improve
at HamburgeRun P blow bo
mooth project.
…
Haman g machine PM
to irregular stical with gas
. In general, thmore drying
ncs, Mill Managezilas, Productione pleased with tn P installation.
age | 6
er oxes "
M 1 steam
here
er n the
Published N
© Valmet
cylinders finally, a stwo cylindshutdown
solutions OptiDry Vcontrol.
Installatioenhances while the cases Optand there need to finconstructi
OptiDry VproductioOptiDry Vproduct q
Great reThe targetout proceday shutd1,050 m/m
Finally, wLWC mill
Stora EPM 5 in Sof high-qu
Figure 7.
November 14, 20
with a 3-levelshort drying sder drying capn times; they a
offering diffeVertical for dr
on of an OptiDdrying, but cdry content iiDry Verticalis no extra sp
nd space for eion work and
Vertical offerson capacity inVertical technquality and it s
esults at tht of the rebuilss conditions
down, the rebumin to 1,200 m
we'll look at larl…
Enso VeitStora Enso's Vuality LWC p
OptiDry imping
14
l drying sectiosection with Vpacity solutioalso require m
erent benefits rying capacity
Dry Vertical ian also allow s raised, thus is the only po
pace in the maextra drying c
d a shorter shu
s increased drcrease with o
nology it is posuits different
he Wolsan ld was to incrduring the co
uilt machine wm/min with 1
rger scope rebu
tsiluoto imVeitsiluoto mipaper per day.
gement drying p
Rebuilds
on; another isValmet's Options are expensmore steam ca
for papermaky increase, esp
impingementthe steam preimproving th
ossible way ofachine room.cylinders and utdown time.
rying capacityne dryer is ar
ossible to dry t drying layou
mill rease the dryinold season, anwas started up80 g/m2 end p
uilds, starting
mproves ll in Kemi, no In 2011, the
principle
from Small to La
s more dryingDry Vertical sive and requ
apacity, which
kers. OptiDrypecially in reb
t dryer at the bessures of thehe drying effef increasing p The dryer wito relocate th
y without addround 15%, giall paper and uts.
ng capacity bynd to get morp in May 2012product.
g with a comp
runnabilorthern Finlancompany dec
arge
g cylinders wiair dryers wit
uire a lot of coh was not avai
Vaim(Frepcydrhigcreretthth
y Twin for drybuilds, and O
beginning of e cylinders to ect of the currproduction if ill be located
he dry end equ
ding machine iving the pote board grades
y 14%, to impre flexibility fo2. The machi
rehensive pro
ity and efnd, is able to cided to inves
ith a longer drth several hea
onstruction woilable at the W
almet's revolumpingement dFigure 7) has b
place and impylinder dryingrying, hot air igh speed agaieate high dryturning air is e evaporated ree impingemying capacity ptiDry Horiz
the dryer sectbe increased
rent equipmenthe machine in the basemeuipment. Thi
length. The aential for a sps without cha
prove the runor drying. Aftine speed was
oduction effici
fficiency produce mor
st in improvin
P
rying section;ating options. ork and long
Wolsan mill.
utionary Optidrying technobeen developprove traditio
g. In impingemis impinged ainst the web t
ying capacity. used to carrywater. Valme
ment drying and bulk sav
zontal for curl
tion not only without sticknt as well. In mis drying-liment so there isis means less
average eed increase.
anging the end
nnability, to evter the short ss increased fro
ency upgrade
re than 700 tong the line's
age | 7
; or, The
iDry ology
ed to onal ment at to The
y out et has
vings, l
yking many ited s no
With d
ven seven-om
at an
onnes
Published N
© Valmet
runnabilitresult, the
Stora Enspapers froAt the samline. It has
At the endproductiobut prelim
"We wantbreaks anthe reel. Amodel wasays Mark
From the was obvioimprovembe accomptricks, butimprovemthroughou(Figure 8was choseupgrades.
UpgradmachineFrom the operators significanduring thethreadingwhereby twere addeThe upgra
"In this prproject frothe first uValmet ofMatilaine
November 14, 20
ty and produce number of p
o's Veitsiluotoom mechanicame time, Veitss the capacity
d of 2011, Veion efficiency. minary survey
ted to improvd shortening
At the same timas sought for tkku Åman, Pr
start of the prous that the ments sought cplished with jt technologica
ments were requt the produc). In April 20
en to carry ou
es throughe line point of viewof PM 5, the
nt change impe project conc
g of the paper two tail threaded to the presades made wo
roject, the scoom start to finpgraded comffers for the pn, Global Tec
14
ction efficiencproduction br
o mill is an inal pulp and sasiluoto's PM 5
y to produce m
itsiluoto madThe previous
ys into new de
ve the paper mthe break timme, we had othe LWC paperoduction Ma
roject it
could not just a few al quired ction line 12, Valmet
ut the
hout the
w of the most lemented cerned tail web, ding units s section. ork easier at th
ope of the impnish; from the
mponent, the Paper grade. U
chnology Man
Rebuilds
cy. With Valmreaks and the
ntegrated prodawn products5 has the honmore than 700
de the decision major chang
evelopment o
machine's efficme. One object
ur own efficieer machine to
anager of the p
he press secti
plementation e press sectionPressForce. ThUsually, the upnager at Valm
Figure 8.
TwinRunRoll geomthe paper cylinders w
HiRun 20A runnabilfast paper
PressFoTail threadin press se
DoubleJWater jet ctail on cylidraw or ag
from Small to La
met's help, PMamount of br
duction facilits. It is the fournor of being th0 tonnes of hi
n to invest in ges to the prodptions for PM
ciency over timtive was to alsency developmo enable operaprinting pape
on.
was exception to the reel. Ahe line now upgrades conce
met, who parti
Key technologie
nmetry used in dou
web in the openwith the help of T
000lity box designedr machines.
rceding unit picks anection open draw
etcutting device, cnder surface, atgainst the dryer
arge
M 5 was upgraroke were sign
ty manufacturth largest paphe world's norigh quality No
improving PMduction line w
M 5 had been
me by decreaso decrease thment project ating the proder mill.
nal in that it wAs soon as th
uses nearly eveern smaller suicipated in pla
es of the Veitsilu
uble-fabric groun draw between TwinRun runnab
d for UAs
TLpc
nd carries tail ws.
cuts t open fabric.
aded to increanificantly dec
uring office paper and boardrthernmost povaPress LW
M 5's runnabwere made in made since 2
asing the numhe amount of in progress: aduction with
was a complehe tail threadinery tail threadubsections," sanning the pr
uoto PM5 projec
ps to support top and bottom
bility boxes.
UnoRollA bottom cylindesingle-fabric area
VacRollA groovedcylinder in
Tail threadingLow-friction Blowplates between dcalender. FoilFor
P
ase efficiencycreased.
apers, coated d mill in Euro
paper productC every day.
ility and the mid-1990000.
mber of producf broke createda new operatifewer person
ete tail threading starts, we rding unit thatays Pekka roject.
ct
m
DoublDoctor surface
er in the dryer sea with a grooved
d and perforatedn the single-fabr
in calender-rwForce tail threadryer section anrce tail threading
age | 8
y. As a
ope. tion
0s,
ction d at ng
nnel,"
ing reach t
eDoctorkeeps roll
e clean.
ection d surface.
d bottom ric area.
reel areaading d g units.
Published N
© Valmet
The dryeralso upgrarunnabilitupgraded
"Before thtypical prosomewherdrying stasituation wrunnabilitalso madechanges, w
Some of thpotential cupgraded factor conbeen work
ReducinSeveral dimeasure w
"Reel areatechnologÅman.
Throughoatypical soin the reelbreak. Whthere is le
Åman conthree kilomthat there
The amouenergy is w
The tail thwhich wermonitored
November 14, 20
r section's runaded during tty boxes locatto use the lat
he upgrade, woblem where re interruptedage. We soughwith new Vacty boxes by dee to eliminate we also reache
he technologicauses of breaduring the m
ntributing to bking superbly
ng the amoifferent technowas the most
a tail threadingy chosen star
out, well-testeolution used wl-calender arehen threadingss broke."
nfirms the obmeters of bro is nearly 2.5
unt of broke iwasted as it is
hreading warrre reached. Ad. Performan
14
nnability packthe project. Thted at its starttest technolog
we suffered froa minor fault
d the process ht to improvecRolls and ecreasing papan edge flutt
ed our targets
ies were choseaks were cons
modification wbreaks causedy.
ount of broological imprsignificant?
g was the toprted to work f
ed technologywith PM 5 waea: "This solutg takes place i
servation: "Eaoke per parentkilometers le
s also decreass not used for
ranty tests incAccording to Å
ce and efficie
Rebuilds
kage was he were
gy.
om a t at the
e the
per web breaker problem ins," Markku Åm
en only after sidered and itwork. It was ind by precipitat
oke rovements we
pic that we hadfrom the first
y was employeas the middle tion was empin the middle
arlier, when tht roll during ass broke per b
sed by the factr producing th
cluded preciseÅman, the valency have rem
from Small to La
ks. The solution the double-fman says.
the sales projt was decided ncluded in thetion. Accordi
ere implement
d to consider tail threading
ed in the projthreading anloyed to decr, roll bottom
hreading tooka break. Now break."
t that there arhe extra broke
ely defined telues defined fo
mained within
Figure 9. Vei
arge
on proved sucfabric area (T
ect had alreadthat the 3rd pe package becing to Åman,
ted during th
most carefullg and has bee
ect. Pekka Mnd spreading trease the amouformation is
k place at the the figure is 5
re fewer breake.
est values for tfor the projectn the target va
itsiluoto PM5 in
ccessful. CertaTwinRun), and
dy been startepress doctorincause poor dothe new doub
he project, but
ly in advancen reliable eve
atilainen thinto both directunt of broke fine after just
edge, there w500–600 mete
ks. And with
tail threadingt are constant
alues.
n Kemi, Finland
P
ain changes wd with these
ed. At Veitsilung should be octoring is onble doctor has
t which techn
. However, ther since," says
nks that the mtions implemecreated durint a few rounds
was approximers. This mea
fewer breaks,
g run-throughtly being
age | 9
were
uoto,
ne s
nical
he
most ented
ng a s, and
mately ans
, less
hs,
Published N
© Valmet
From paStora Ensmajor instshutdownrequired cAccording
"The impexperiencto become
The projeoperating
"I can honincluded tcourse, thvariety to the job of process. Timproving
"Thanks tapproximrunnabilitthe way topropositio
The final c
ProjectSappi is omatter horaft of oth
At this cruof cut, cutbolder app
"The existWiersum.more than
"Our existcontinuesusing lots
November 14, 20
aper to papo and Valmettallation work
n of a week. Prcareful plannig to Åman, th
plementation fced team bothe obvious tha
ect's business b it produces m
nestly say thatthe impact on
his requires extheir work," Å
f operating theThe focus of fug the quality o
o the upgrademately four cen
ty boxes. If weo the customeon on this has
case study is f
t Leopardne of the wor
ow good thoseher electronic
ucial crossroat and cut somproach was ta
ting PM 2 at A. "And a graphn paying their
ting specialty s Wiersum, "O
of plastic to u
14
per in eight signed an agk was carried reparation woing and doinghe work was c
from paper toh from us and t we had mad
benefits and pmarketable LW
t we have reacn personnel. Wxtensive experÅman says. Ae rereeler, as turther develoof the finished
es implementntimeters wide could cut aner. This woulds already been
for a specialty
d at Sapprld's largest pre products aremedia device
ads, Sappi coume more. How
aken; to signif
Alfeld was loshic paper macr way in speci
papers' custoOne that couldusing lots of p
Rebuilds
t days greement on t
out during work had alreadg as much as pcompleted wit
o paper durinfrom Valmet
de the right ch
payback perioWC as efficien
ched the mainWe can now ortise from the
A third employthe PM 5 coatpment is currd product.
ted at PM 5 inder than beforn equally wided require somn made," says
paper machin
pi Alfeldroducers of hie, the introdues have put a l
uld easily havewever in the ca
ficantly expan
sing us a lot ochine sitting iialties made n
omers were ted cope with lapaper instead
from Small to La
the Veitsiluotweek 42 of thedy been startepossible in adthin the sched
ng the shutdowt participated hoice about th
od are based ontly as possib
n objectives seoperate the mem, but at the yee is locatedter is not direrently on the
n 2012, we canre. This is large web at the c
me additional iMarkku Åma
ne comprehen
igh quality, coction of the iPlarge dent in
e introduced ase of Sappi Fnd into the lu
f money", sayin the middle
no sense at all.
lling us that targer orders, a– a growing t
arge
to PM 5 upgrae same year, wed by then. Th
dvance, beforedule.
wn took eightd in the installhe technology
on the improvble.
et for the projmachine with j
same time, itd at the dry enectly connectefinal part of t
n now get a wgely thanks tocutter, we couinvestments oan.
nsive rebuild…
oated graphicPad, the Samsgraphic pape
the unimaginFine Paper Euucrative marke
ys Sappi Fine e of four other."
they liked theand one that trend in Euro
ade work in Awith a schedulhe success of e the actual sh
t days. A highlations. At thay."
ved efficiency
ject. The efficust two profet brings morend of the proded to the prevthe productio
web out of theo the VacRollsuld bring the mon the coating
…
c papers. Unfosung Galaxy, r demand.
native managerope's Alfeld et for specialt
Paper Europer paper mach
e idea of a 'bigcould ease th
ope."
Pag
April 2012. Thled maintenanthe project
hutdown.
hly competentat stage, it star
y. When the li
ciency objectiessionals. Of e interest and duction line wvious parts of on process, in
e machine thas and the newmaterial beneg machine. A
ortunately, nothe Kindle, a
ement philosomill, a much
ty papers.
e CEO, Berry ines which w
g' machine," he transition fr
ge | 10
he nce
t, rted
ine is
ives
with the
at is w efit all
o and a
ophy
were
from
Published N
© Valmet
Let ProjThe histormill itself.Sappi's cu
One of this directorunusual siwell in a gdeclining a year, anddue to lac
"We thouaround," cconvincedwhich is mwith the b
The concemm that c1,200 m/ma specialtygrade cha
It was a clspecialties
In May 20Brussels ththat will in
Karrer deplan for P
Another 1Leopard c
Figure 11
November 14, 20
ject Leopary of the idea . The name ca
ustomer calen
ose people inr at the Alfeldituation at Al
growing markmarket. The d the graphick of orders. W
ght about havcontinues Kard we could demuch faster thbold plan of g
ept for the necould handle min. This wouy machine to nges.
lear plan froms.
011, the Alfeldhe ambitious ncrease our sp
scribes the mPM 2 was put
14 months latcommenced, a
1. Sappi Alfred P
14
rd commenfor what was
ame from an adars – a perfe
strumental ind mill, Dr. Steplfeld, four speket and one grfour specialty paper machi
We had to do
ving a minor rrer, "But spe
eliver the qualhan a 'normaloing the who
w PM 2 was fintricate grad
uld mean that20 tonnes per
m the start tha
d team includplan to rebui
pecialties by 1
management teforward, whi
ter, in July 201and Valmet w
PM2 includes a n
Rebuilds
nce! s to become kaction photo ect illustration
n the idea of thphan Karrer (
ecialty machinraphic machiny machines weine was subjecsomething.
rebuild, and tcialties is ourlity, particularl' specialty male way and do
for a world-cldes of basis wet production wr hour. The m
at PM 2 was g
ding Karrer prild PM 2 (Fig135,000 tonne
eam at the prech was then b
12, and after awas appointed
new headbox wi
from Small to La
nown at Sappof a Leopard
n of the plan f
he transforma(Figure 10). "nes that were ne that was stere running 2ct to commer
tackling specir business, andrly at the speeachine. Then oing a comple
lass, prototypeight range 40would leap fr
machine would
going to becom
resented to Saure 11) into wes/yr."
esentation as broken by CE
a lot of serioud as the main
ith forming, pre
arge
pi as Project Lleaping from
for PM 2.
ation of PM 2"We had an doing really
truggling in a24/7, 365 daysrcial standstill
ialties that wad we were noted of PM 2, we came up ete rebuild."
e specialty m0-180 g/m² anom the five od also have to
me a star pape
appi's Europewhat he descr
going compleEO Wiersum,
us studies, dissupplier for t
ess, dryer, calend
Leopard startem one rock to a
2
a s ls
ay t
achine with and run at a pr
or six tonnes po cope with nu
er machine in
ean managemribed as "som
etely silent aftuttering "Wo
scussions and the project.
FigurKarreproje
der, reel and coa
Pag
ed at the Alfelanother on on
a width of 5,15roduction speper hour normumerous, com
n the world of
ment team in ething fantast
fter the ambitiow!"
site visits, Pr
re 10. Dr. Stefaner has lived withect from its ince
ating sections re
ge | 11
ld ne of
50 eed of m for mplex
f
tic
ious
roject
n h the
eption.
ebuilt.
Published N
© Valmet
Sappi AValmet's sheadbox wingredienmachine amultinip csupplied a
Mauri Lau"From theone – a tointerestinbeing proobtain the
"We trialecalenderinthat the Sathey alway
A carnivWim DevLeopard'ssuppliers,as the facia gut feelichoice of
With the oteam, the steering cSappi andwell as theof the mas
The journnot so muthe mill wauthority villages anover 120 t
When theonly one obiggest en
November 14, 20
Alfeld: a descope of suppwith dilution ts in the rebualso has a comcalender rebualso included
urikainen, Vae beginning wotally online cg challenges aduced on a we base paper s
ed many of thng demands wappi Alfeld mys came at us
val atmospvens, the comp leader from t and in the enilities for the cng among thesupplier."
order in placemill team, anommittee ma
d Valmet - to ee guarantees ossive Yankee
ney itself fromuch of a problwas full of chal
approvals to nd over bridgtrees had to h
e Yankee finalof the most ex
ngineering pro
14
manding cply was a comp
circulation, fouild is a brandmpletely new cuild with exist
a DNA qualit
almet's senior when the conc
oncept with fare the wide b
wide machine surface quality
he grades at ouwould work a
mill was a demwith their ide
phere pany's managthe Sappi sidend it came oucasting of thee team at Sapp
e, it was then nd the supplieade up of the sensure the deof quality. Bucylinder to ar
m Sweden to Glem, but the rllenges, says Dallow the Yanes to the mill.
have branches
lly arrived in xciting projecoject going on
Rebuilds
customer plex and all-e
forming, pressd new solid cacoating sectioting Nipco rolty control sys
paper technocept was first pfinished prodbasis weight rat speed. They.
ur pilot plantscross the grad
manding custoeas in a coope
ger of central te, he says: "Wt that Valmet
e Yankee cylinpi that Valme
left to Deveners – which wesenior manag
eadline for timut first, there wrrange.
Germany by boad trip fromDevens: "It tonkee to pass th. Street lightinsawn off – 10
Alfeld, it was cts the town on in the whole
from Small to La
encompassings and dryer sesting 6.4 m di
on with air drlls, a reel rebu
stem and mac
ology managepresented, it wucts coming oange and the
e Yankee cylin
s in Finland mdes needed," c
omer for this perative fashio
technology anWe went throug
t had the expender. There wet was the righ
s and the proere all oversee
gement of botming was met,was transporta
boat and bargem the river por
ok over 100 lhrough townng had to be d0 trees had to
to somethingof Alfeld had se of Germany
arge
g one; the newections rebuiliameter Yank
ryers plus twouild and brokchine control
er for paper mwas clear thisoff the end ofdiffering spec
nder of course
making sure tcontinues Lauproject, but thn."
nd engineeringh the whole erience and kn
was also ht
oject en by a th , as ation
e was rt to ocal s and dismantled, h
o come down
g of a carnivaseen for somey which was b
w PM 2 has a t. One of the
kee cylinder wo ValCoat coake collection. T
PCS7.
mills says of ths was going tof the machinecialty grades, e was an abso
that the coatinurikainen. "Thhey knew wha
ng (Figure 12process with
now-how in s
high voltage cacompletely.
al atmospheree time, but it wbeing hit by th
Figure 12. Wimtrust in Valme
Pag
completely nessential
with hood. Thating stations,The automati
he PM 2 projeo be an unusue. Added,
at the same tolute must to
ngs and here is no douat they wante
2) was Projectthe main
specialties, as
ables lifted an
e as this was nwas also the he economic
m Devens has gret's performance
ge | 12
ew
he a ion
ect: ual
time
ubt d and
t
well
nd
not
reat e.
Published N
© Valmet
On the 17reels. "It wto go out t
Since thenquality grwhat is neoptimizatahead of icoater, wiexpectatio
Devens cofrom Valm
"BiggesPerhaps thStephan Kproject rebeen tirinworking o
SummRegardlesout your pwoodyardValmet lo
Figure 13diameterdeliver.
November 14, 20
7th October, awas part of theto our special
n, by the first ades required
ext? Devens saion stage, and
it; we are expeithout coater, on we have."
oncludes: "Wemet whenever
st experienhe most impo
Karrer who orally has been
ng for everyboon what is goi
ary ss of the rebuiproject from sd all the way tooks forward t
3. The impressivr Yankee was a c
14
and again abse agreement wlty customers
half of 2014 md for its demaays: "Well, thed we are ironiecting it to doone side, two
e are really har we have nee
nce of my liortant person riginally camethe biggest ex
ody, but it making to be such
ild size, Valmstart to finisho finished rolto accomplish
e 6.4 meter challenge to
Rebuilds
turndthe wthe stbarbewoodvisito
TheOn ththe seavailarebui
Valmand owas sDeve
olutely accordwith Valmet ts," adds Deven
more progresnding, discere work doesning out the pro all grades froo sides, all tho
appy all in all eded it during
ife" to finally ask
e up with the xperience of mkes me so pro
h a remarkabl
et has the exp. Our capabillls leaving thehing demandi
from Small to La
down. Devenswhole county treets, and hoecues and pardyard, and onors came to se
race is onhe 30th of Auerious race toable for the inild.
met gave the aon October 12stock on the wens.
ding to plan, that we had tons.
s had been mning custome
n't end for us uroblems that gom 50 to 180 ose different p
with how it hg the installati
k about the suconcept: "Ap
my life. The laoud that the we machine wh
pertise and prities extend fr
e mill. Special ing projects w
arge
s said, "Whenhad turned o
ouses alongsidrties. We had n the first weeee the huge Y
ugust 2013 theo the finish benstallation of
assurance that2th 2013, exawire. "We cou
Alfeld produco have two jum
made and PM 2ers to its own until the end go with that. Tg/m² with ca
parameters, an
has gone and ion and start-
uccess of the Part from the bast few monthwhole PM 2 tehen it is fully
roven track rerom the point delivery requ
with our mill p
n the Yankee ut to watch, p
de the route wa small viewi
ekend somethankee."
e 'old' PM 2 wegan, there wethe Yankee (F
t the project wactly accordinuldn't quite be
ced the first tmbo reels full
2 could produquality benchof July. We arThis machine
alender, withond all at high
we have had up phase."
PM 2 project ibirth of my twhs optimizingeam are still sup to speed."
ecord to safelyt that logs comuirements arepartners.
Pag
arrived, it wapeople were owere hosting ing area in th
hing like 1,500
was shut downere only 39 daFigure 13) an
would take 39g to plan, theelieve it," says
two saleable jul of saleable p
uce all of the hmark Q1. Sore now in thee has quite a tout calender, w
speed. It is a
splendid supp
is mill directowo children, tg the start-up o delighted to
y and reliablyme into the e not a proble
ge | 13
as as if out on
e 0
n and ays nd the
9 days, re
s
umbo paper
top o e task with high
port
or, Dr. this have
o be
y carry
m, as
Published N
© Valmet
This white papers.
Valmet proand power fabrics. Ouservices.
We are com
November 14, 20
paper combine
ovides competitr professionals ur offering and e
mmitted to mov
14
es technical inf
tive technologiespecialize in prexperience cov
ving our custom
Rebuilds
formation obtai
es and servicerocesses, macver the entire p
mers' performa
from Small to La
ined from Valm
s to the pulp, echinery, equipmprocess life cyc
nce forward.
arge
met personnel a
energy and papment, services, cle including ne
and published V
per industries. paper machine
ew production li
Pag
Valmet articles
Valmet's pulp, e clothing and lines, rebuilds a
ge | 14
s and
paper filter and