27
Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by: Jason Bulluck and Berny Ilgner Presented by: Berny Ilgner

Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Embed Size (px)

Citation preview

Page 1: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Public Meeting Presentation

The Coal Creek Watershed Brownfields Project Anderson County, Tennessee

Lake City, TennesseeNovember 30, 2006

Prepared by:

Jason Bulluck and Berny Ilgner

Presented by:

Berny Ilgner

Page 2: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Team/Acknowledgements

• Beverly Williams – EPA Region 4

• Allan Comp, PhD – Office of Surface Mining

• Andy Shivas – State of Tennessee

• Alan Neal – National Resources Conversation Service

• Brian Jenks/Rex Lynch – Anderson County

• Buck Wilson – Lake City

• Barry Thacker / Carol Moore – Coal Creek Watershed Foundation

2

Page 3: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Brownfields

• Urban definition – a real property, the expansion, redevelopment, or reuse of which may be complicated by the presence of a pollutant

• Includes real or perceived

• Mine-scarred lands

3

Page 4: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• MSL added to Small Business Liability Relief and Brownfields Revitalization Act of 2002

• MSL includes lands, associated waters, and surrounding watershed where extraction, beneficiation or processing of ores and minerals (including coal) has occurred

• MSL considered Brownfields even if chemical contaminants are not primary barriers to revitalization

4

Brownfields Meet Mine-Scarred Lands (MSL)

Page 5: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Aquatic ecosystems degraded by Acid Mine Drainage (AMD) and increased erosion

• Visual and chemical impacts of spoil piles and washing operations

• Sedimentation of waterways

• Limited infrastructure and level land to redevelop

• Limited land access

5

Characteristics of MSL Watersheds

Page 6: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• 36 square miles

• Communities built on coal, now in decline

• Abandoned mine lands

• Potential adverse impact to local environment/ water quality

• Coal Creek 303d listed as partially impaired

Coal Creek Watershed

6

Page 7: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• How can these environmental impacts be quantified over such a large area?

• How can Brownfields be applied to non-point sources, and still be a catalyst for economic recovery?

• How do you stimulate interest by large landholders to develop properties for redevelopment?

7

Challenges

Page 8: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Heritage

Coal Creek Watershed Assessment Assets

8

Page 9: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Coal Creek Watershed Assessment Assets

Ecology

9

Golden-winged warbler

Diana fritillaryAmerican elk

Page 10: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Local Activism Coal Creek Watershed Foundation (CCWF)

• Stream bank stabilization projects

• Dead wood removal events

• River clean-ups

• Annual Coal Creek Health Day

• Annual CCWF Scholarship Fund

• Annual Coal Creek Miners Festival

10

Page 11: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Initial watershed assessment

• Geodatabase construction

• Integrated Pollutant Source Inventory (IPSI)-Sediment Loading Model (SLM)

• Data gaps/data collection

• Geodatabase update

• Site identification

• Phase I/Phase II Environmental Assessments

• Actively engage community members in the process

CCW Assessment Approach/Objectives

11

Page 12: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Cultural

• Historical

• Water quality

• Hydrological

• Geological

• Ecological

• Socio-economic

• Landownership12

Initial Assessment – Historical Data

Page 13: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Mines– Strip

– Deep

• Water quality– Chemical

– Physical

• Biological– Fish

– Benthicinvertebrates

• Data distribution

13

Environmental Data

Map deleted. Contact project coordinators to view.

Page 14: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Strip benches and deep mine portals throughout watershed (numerous non-point sources)

• Some flooding corrected (removed from 303d listing due to siltation)

• Water chemistry (pH, TSS, alkalinity) indicates generally acceptable water quality (24 samples collected seasonally)

• Coal Creek listed as partially impaired based on pathogens (must reduce by 56%)

• Terrestrial and aquatic habitats degraded throughout watershed

14

Environmental Conditions

Page 15: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Geodatabase Construction

• Populated with all existing data/ information

• Interlinked with base layers– USGS topographic maps

– Roads, political boundaries

– Hydrology, land cover

• Integrated geodatabase for modeling, analysis– Guide for this assessment

– Tool for future redevelopment efforts

15

Page 16: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Recent aerial photography

• Photointerpretation

• Land use/land cover classification

• sub-watershed delineations

• Sediment contributions via Revised Universal Soil Loss Equation (RUSLE)

• Identification of data gaps

• Geodatabase integration

• Target properties selection16

Sediment Loading Model

Page 17: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Aerial Photography and Photointerpretation

17

Map deleted. Contact project coordinators to view.

Page 18: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Landuse/Landcover Classification

18

Map deleted. Contact project coordinators to view.

Page 19: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Sub-Watershed Delineations

19

Map deleted. Contact project coordinators to view.

Page 20: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Example of the Sediment Contribution Model Output Data

20

Model Outputs

Project Watershed

Soil Loss, tons/acre/year

Total Tons/Year

110 111 112 115 117

01 0.45 294.54 0.000 0.000 20.050 0.000 0.00002 0.94 585.97 0.000 2.915 30.339 0.000 0.000

201 0.26 54.60 0.000 0.000 6.410 0.000 0.00003 0.62 385.98 4.996 8.107 22.901 2.014 1.372

0301 0.74 701.35 0.000 0.000 49.341 0.000 1.80504 0.66 100.82 0.532 1.462 7.249 0.000 1.284

0401 0.44 376.85 0.000 0.000 41.182 0.000 0.00005 1.28 194.48 0.000 1.687 5.613 0.000 0.000

0501 0.55 540.24 0.000 5.543 31.806 0.000 0.0000502 0.45 834.62 0.000 0.000 54.977 0.000 0.000

050201 0.39 373.75 0.000 0.840 48.818 0.000 0.00006 0.84 2305.74 0.000 0.000 52.092 0.000 0.000

0601 0.60 602.71 0.000 0.000 9.307 0.000 0.0000602 0.42 1400.24 0.000 0.000 2.622 0.000 0.000

060201 0.35 655.18 0.000 0.000 4.478 0.000 0.00007 0.37 721.04 0.000 0.000 11.702 0.000 0.000

0701 0.82 1917.62 0.000 0.000 6.339 0.000 0.00008 0.32 307.19 0.000 0.000 6.961 0.000 0.000

0801 0.38 498.66 0.000 0.000 0.107 0.000 0.000Total 12851.58 5.528 20.554 412.295 2.014 4.461

Tons/Year = R*K*LS*C*PTons/Acre/Year = (R*K*LS*C*P)/sub-watershed acres

Map deleted. Contact project coordinators to view.

Page 21: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Sub-Watershed Sediment Loading Prioritization

21

Page 22: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Base Flow Data Results

• Water quality similar to historic sites

• Slightly abnormal conditions in two sub-watersheds where past mining took place

• Perception more of a “contaminant” than constituents

• Aquatic habitat quality lower than other streams in the region

• Healthier aquatic communities in headwaters and tributaries of Coal Creek than in Coal Creek

• Seeds for improvement22

Page 23: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Target Property Selection:Priority Site Screening Criteria

A property may be chosen if it…

• is a source of Acid Mine Drainage

• has visual or chemical impact

• contributes to erosion or siltation

• has historically/culturally important features

• has potential to build tourism infrastructure

• has ecological important features

23

Page 24: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

24

Target Property –Old Block Factory Site

Map deleted. Contact project coordinators to view.

Page 25: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Phase I Environmental Assessment

• Phase II Environmental Assessment– Focus on soil and groundwater sampling

25

Phase I and Phase II Environmental Assessments

Page 26: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

• Pursuit of current economic development strategy

• Focused volunteer clean-up efforts

• Stream bank stabilization grants from TDEC and OSM

• Additional assessment/clean-up funding opportunities via Brownfields Program

26

Coal Creek Watershed Outlook

Page 27: Public Meeting Presentation The Coal Creek Watershed Brownfields Project Anderson County, Tennessee Lake City, Tennessee November 30, 2006 Prepared by:

Questions

27