PT. DAHLIA BIRU

BUSINESS ADDRESS : JL PANGLIMA SUDIRMAN 55, SURABAYA 60271, EAST JAVA, INDONESIA

TELEPHONE : +62 31 5481 666, +62 31 7001 7652

FAX : +62 31 5481 555

EMAIL : [email protected]

COAL MINING

PT DAHLIA BIRU, established in 1990 owns a coal mining

lease located within the administrative jurisdiction of

South Barito Regency in Central Kalimantan Province.

PT. DAHLIA BIRU currently holds an exploitation permit as

well as a coal hauling and selling permit.

Vision Statement

To be a world class coal mining company .

Mission Statement

To provide most economical fuel for power generation namely steam coal

for the domestic and international market by deploying most efficient

and best mining practices by utilizing latest technologies available in the

industry.

Values

The JORC resources of PT. Dahlia Biru approximately 108 million tonnes

of coal.

The optimized reserves of the Dahlia Biru’s coal project at

approximately 85.6 million tonnes with the average stripping ratio of

3.07.

Growth Strategy

PT. DAHLIA BIRU continually seek new resources for sustainable growth

and its affiliated company owns a coal mining lease of 5,000 Ha.

Coal quality :

1. Total Moisture : 62% (ar)

2. Inherent Moisture : 14% (adb)

3. Ash : 6% (adb)

4. Volatile Matter : 44% (adb)

5. Fixed Carbon : 36% (adb)

6. Total Sulphur : 0.2% (adb)

7. GCV : 5270 kcal/kg (adb)

JORC Code Coal Resources from surface down to elevation – 50m on explored 1,105 Ha

area :

Coal Reserves :

85,600,000 Tonnes

Units Measured Indicated Inferred Subtotal

Tonnage Million tonnes 57.3 50.7 48 108

PLANNED COAL UP GRADING

Upgraded TM_20%

Upgraded TM_20%

Upgraded TM_20%

WIRTGEN 2200 SM Surface Miner

PRODUCTIVITY:

- Per Hour : 500 tonnes

- Per Day : 20 hours X 500 MT = 10,000 tonnes

- Per Year : 340 days X 10,000 MT = 3,400,000 tonnes

Note: Per Hour = 384.6 MT X 1.3 = 500 tonnes

Surface Miners 2200 SM

The Wirtgen 2200 SM is the “all-rounder”

for soft and medium hard rock. The cut

material is either loaded to the front via a

large conveyor system consisting of primary

and discharge conveyor or is windrowed

behind the machine. With an operating

weight of almost 53 short tons, the Surface

Miner 2200 SM can achieve a cutting depth

of 11 inches over a total width of 7.2 feet

in soft to medium hard rock

Mercedes Benz (Actros 4054 S/33)

Specification :

Engine Power : 395 kW (537 HP)

Wheelbase : 3300 mm

Gross Vehicle Combination : 200 ton

PRODUCTIVITY (8 Units):

Hauling distance : 26 Km

Average speed loaded : 30 Km/hr

Average speed return : 40 Km/hr

Average speed : 35 Km/hr

Total cycle time : 1.49 hr

Loading & unloading time : 1 hr

Total cycle time : 2.49 hr

Operating hours per day : 20 hr

Cycles per day : 8.05 days

Average to : 8 trips

Productivity per days:

8 trips X (91 MT X 2 Tandems) X 8 Units = 11,648 MT

Location : Tamparak village, Dusun Utara

sub district, Barito Selatan

Regency, Central Kalimantan

Province.

Area of concession : 5,000 Ha

Hauling road (Mines to jetty) :

Distance : ± 26 Km

Width : 40 m

Stockpile and jetty area: ± 40 Ha

The coal will be trasported via Barito river

towards Taboneo Anchorage, distance

380 Km (205 nautical miles)

Keputusan Bupati Barito Selatan No. 527 Tahun 2009 tentang PersetujuanKuasa Pertambangan Eksploitasi menjadi Izin Usaha Pertambangan OperasiProduksi kepada PT. Dahlia Biru (Production Operation Permit) for 19years.

Keputusan Bupati Barito Selatan No. 316 Tahun 2011 tentang PemberianPerpanjangan Izin Lokasi kepada PT. Dahlia Biru untuk Lokasi TerminalKhusus Batubara, Sarana Penunjang dan Infrastruktur Tambang besertaJalan Tambang Batubara (Location, Hauling Road and Stockpile Permit).

Izin Prinsip MenHut No. S.491/Menhut-VII/2012 Tanggal: 18 Oktober 2012Persetujuan Prinsip Penggunaan Kawasan Hutan untuk Kegiatan OperasiProduksi Batubara dan Sarana Penunjangnya Pada Kawasan Hutan ProduksiTetap dan Kawasan Hutan yang dapat dikonversi a/n PT. Dahlia Biru diKab. Barito Selatan Prop. Kalimantan Tengah.

ORGANIZATIONAL STRUCTURE

GENERAL MEETING OF SHAREHOLDERS

BOARD OF COMMISIONERS

Alim Markus (President Commissioner)Iuneke Anggraini (Commissioner)

Henry J GunawanPRESIDENT DIRECTOR

David GunawanDIRECTOR 2

Bambang Raya SaputraDIRECTOR 1

Agus S TjiptowardojoDIRECTOR 3

SHAREHOLDERS

PT. Permata Sumber Investindo

PT. Permata Murni

PT. Bintang Harapan Desa

Alim Markus

PT. DAHLIA BIRU

15 %

65 %

10 %

10 %

To date some 1,105 Ha at the south eastern portion of this lease had been the

subject of exploration activities involving outcrop mapping, borehole drilling,

quality sampling. Data collected was validated, encoded for computer-aided

design and processing, and correlated to come up with a seam geometry and

quality model. The volume and quality of the data are found to be sufficient

to allow a resources estimation compliant with the requirements of the JORC

Code and the Australian Guidelines for Reporting and estimating Inventory

Coal, Coal Resources and Coal Reserves.

PT. DAHLIA BIRU has completed land acquisition for stockpile and jetty

measuring 40 Ha and 98 Ha for hauling road.

AFFIRMATIVE ACTION INITIATIVES