Oracle Production Scheduling
Feasible on-time schedules with improved throughput and utilization
8/10/2019 PS Training Document
2/30
Why PS:
Sequence orders to best use your production resources.
Offload production to alternate resources.
Minimize the effect of unplanned production and down time.
Evaluate the impact of a supply shortage on fill rates.
Support revenue growth using existing production assets.
Feasible schedules that respect manufacturing constraints.
Reduced work in process inventories
Secure and integrated system
8/10/2019 PS Training Document
3/30
Flexible and easy to workwith scheduling UI
Advanced analytical views
Sequence dependentchangeover minimization
Alerts with root cause
Automatic floatingbottleneck detection
Representation of allrouting precedencerelationships
KPI to determine the bestschedule.
8/10/2019 PS Training Document
4/30
Scope of PS & ASCP
8/10/2019 PS Training Document
5/30
Two implementation modes of PS:
Running PS Standalone
Running PS with reference to
an ASCP Plan
Schedule work orders only Schedule work orders and planned orders
Forecast demands specified via Demandschedules
Forecast demands come in via thereferenced ASCP plan
Inter-org demands included only viainternal sales orders
Inter-org demands also include plannedorder demands from the ASCP plan
Items to be included in PS specified viaspecification of category sets / categories
Items to be included in PS derived from theitems in the ASCP plan
No Forecast consumption Forecast consumption performed in ASCP
is retained within PS
8/10/2019 PS Training Document
6/30
Production Scheduling- No Link to ASCP
Sch
eduler
System Collect Data from
EBS/ LegacyRun PS Snapshot
Download PS
snapshot to local
client
Run PS solver
Review and adjust
Production
Schedule
Repair PS
Accept
Production
Schedule
Approve PS
No
Publish PS to
Source
Reschedules Work
Orders start date
and end dates on
the source
Yes
8/10/2019 PS Training Document
7/30
Production Scheduling- Link to ASCP
Planner
Schedu
ler
System Run Data
Collection
Run ASCP Plan
linked to PS
Run PS snapshot
linked to ASCP
plan
Review ASCP
Plan
Release Planned
Orders to create
work orders
Create New Work
Orders
Download PS
snapshot to local
client
Run PS solver
Review and adjust
the schedule
manually
Repair the
Schedule
PS schedule
accepted?
No
Approve PS
Publish Firm PLO
to ASCP
Select Work
Orders to
Reschedules
Publish WO to
source
Reschedules the
Work Order start
and end dates
Yes
8/10/2019 PS Training Document
8/30
Production scheduler responsibility to create production schedules.
Show the different tabs of Schedule options in screen.
8/10/2019 PS Training Document
9/30
No of Days forwhich schedule
to be created.
The number of days forwhich Schedule results are sentback to the planning serverand ERP source
8/10/2019 PS Training Document
10/30
The ASCP plan from whichProduction Scheduling reads independent and independentdemands as well as plannedorders.
The category set to be usedto filter the items for consideration.
8/10/2019 PS Training Document
11/30
8/10/2019 PS Training Document
12/30
List of Schedules createdfor the selected organization
8/10/2019 PS Training Document
13/30
Collect the latest E-Business Suite data andASCP planned orders for scheduling inProduction Scheduling. If this is the firsttime you are running this schedule, this isthe only option available to you.
When E-Business Suite data has previouslybeen collected to the planning server, thisoption creates the production schedulebased on that data.
Start Production Scheduling with the lastmodel saved on the client computer.
8/10/2019 PS Training Document
14/30
8/10/2019 PS Training Document
15/30
Understanding Models and Data Editors
8/10/2019 PS Training Document
16/30
Demand Centric view enables you to visually display the start
times, end times and duration for each demand, along with its
associated line items and routings.
Makespan Bars:
Solid black bar- 100 % order fill, based on unit fill
Solid yellow bar- 66% to 100%
Solid orange bar- 33% to 66%Solid red bar- Less than 33%
Demand Centric View
8/10/2019 PS Training Document
17/30
8/10/2019 PS Training Document
18/30
Work Order centric view enables you to visually display the start
times, end times and duration for each work order , along with its
associated operations and any pegged work orders
Solid black bar- Line item schedule to be manufactured on-time
Black and Red bar- Line item schedule to be available after the
requested date
Black and green bar- to be available before the requested
Solid red bar- item after requested date
Solid green bar- Line item schedule early
Green diamond- Line item is procured from a supplier and ready
to be used in routing
Work Order Centric view
8/10/2019 PS Training Document
19/30
8/10/2019 PS Training Document
20/30
Different Alerts
8/10/2019 PS Training Document
21/30
DefiningResources
8/10/2019 PS Training Document
22/30
DefiningOperations
8/10/2019 PS Training Document
23/30
DefiningRoutings
8/10/2019 PS Training Document
24/30
Working with Data Editors
8/10/2019 PS Training Document
25/30
Setting Up Models
8/10/2019 PS Training Document
26/30
Solving and Viewing Schedules
8/10/2019 PS Training Document
27/30
Evaluating and Adjusting Schedules
Manually one can drag and drop theOperations to change the scheduling
8/10/2019 PS Training Document
28/30
8/10/2019 PS Training Document
29/30
Publishing Schedules
8/10/2019 PS Training Document
30/30
Production Scheduling Published Reports Overview
We can publish data from Production Scheduling in any of the following formats: CSV HTML XML
CSV File ReportsCSV files can be read into an ETL tool of your choice for transformation in preparationfor import into other systems. When you publish in .csv file format, you can generateone or more of the following reports. Operations Report, Resource Schedule, Demand Fulfillment,Key Performance Indicators (KPIs)
HTML Dispatch ReportHTML file format generates an HTML Dispatch Report that can be published directly to the shopfloor.
XML File ReportsThe standard XML files, which are exported out of Production Scheduling, are: ProductionSchedule.xml
PurchaseOrderRecommendations.xml WorkOrderSchedule.xmlXML files can be compressed when publishing, which reduces the size of the filescreated.