    Oracle Production Scheduling

    Feasible on-time schedules with improved throughput and utilization

  • 8/10/2019 PS Training Document

    2/30

    Why PS:

    Sequence orders to best use your production resources.

    Offload production to alternate resources.

    Minimize the effect of unplanned production and down time.

    Evaluate the impact of a supply shortage on fill rates.

    Support revenue growth using existing production assets.

    Feasible schedules that respect manufacturing constraints.

    Reduced work in process inventories

    Secure and integrated system

  • 8/10/2019 PS Training Document

    3/30

    Flexible and easy to workwith scheduling UI

    Advanced analytical views

    Sequence dependentchangeover minimization

    Alerts with root cause

    Automatic floatingbottleneck detection

    Representation of allrouting precedencerelationships

    KPI to determine the bestschedule.

  • 8/10/2019 PS Training Document

    4/30

    Scope of PS & ASCP

  • 8/10/2019 PS Training Document

    5/30

    Two implementation modes of PS:

    Running PS Standalone

    Running PS with reference to

    an ASCP Plan

    Schedule work orders only Schedule work orders and planned orders

    Forecast demands specified via Demandschedules

    Forecast demands come in via thereferenced ASCP plan

    Inter-org demands included only viainternal sales orders

    Inter-org demands also include plannedorder demands from the ASCP plan

    Items to be included in PS specified viaspecification of category sets / categories

    Items to be included in PS derived from theitems in the ASCP plan

    No Forecast consumption Forecast consumption performed in ASCP

    is retained within PS

  • 8/10/2019 PS Training Document

    6/30

    Production Scheduling- No Link to ASCP

    Sch

    eduler

    System Collect Data from

    EBS/ LegacyRun PS Snapshot

    Download PS

    snapshot to local

    client

    Run PS solver

    Review and adjust

    Production

    Schedule

    Repair PS

    Accept

    Production

    Schedule

    Approve PS

    No

    Publish PS to

    Source

    Reschedules Work

    Orders start date

    and end dates on

    the source

    Yes

  • 8/10/2019 PS Training Document

    7/30

    Production Scheduling- Link to ASCP

    Planner

    Schedu

    ler

    System Run Data

    Collection

    Run ASCP Plan

    linked to PS

    Run PS snapshot

    linked to ASCP

    plan

    Review ASCP

    Plan

    Release Planned

    Orders to create

    work orders

    Create New Work

    Orders

    Download PS

    snapshot to local

    client

    Run PS solver

    Review and adjust

    the schedule

    manually

    Repair the

    Schedule

    PS schedule

    accepted?

    No

    Approve PS

    Publish Firm PLO

    to ASCP

    Select Work

    Orders to

    Reschedules

    Publish WO to

    source

    Reschedules the

    Work Order start

    and end dates

    Yes

  • 8/10/2019 PS Training Document

    8/30

    Production scheduler responsibility to create production schedules.

    Show the different tabs of Schedule options in screen.

  • 8/10/2019 PS Training Document

    9/30

    No of Days forwhich schedule

    to be created.

    The number of days forwhich Schedule results are sentback to the planning serverand ERP source

  • 8/10/2019 PS Training Document

    10/30

    The ASCP plan from whichProduction Scheduling reads independent and independentdemands as well as plannedorders.

    The category set to be usedto filter the items for consideration.

  • 8/10/2019 PS Training Document

    11/30

  • 8/10/2019 PS Training Document

    12/30

    List of Schedules createdfor the selected organization

  • 8/10/2019 PS Training Document

    13/30

    Collect the latest E-Business Suite data andASCP planned orders for scheduling inProduction Scheduling. If this is the firsttime you are running this schedule, this isthe only option available to you.

    When E-Business Suite data has previouslybeen collected to the planning server, thisoption creates the production schedulebased on that data.

    Start Production Scheduling with the lastmodel saved on the client computer.

  • 8/10/2019 PS Training Document

    14/30

  • 8/10/2019 PS Training Document

    15/30

    Understanding Models and Data Editors

  • 8/10/2019 PS Training Document

    16/30

    Demand Centric view enables you to visually display the start

    times, end times and duration for each demand, along with its

    associated line items and routings.

    Makespan Bars:

    Solid black bar- 100 % order fill, based on unit fill

    Solid yellow bar- 66% to 100%

    Solid orange bar- 33% to 66%Solid red bar- Less than 33%

    Demand Centric View

  • 8/10/2019 PS Training Document

    17/30

  • 8/10/2019 PS Training Document

    18/30

    Work Order centric view enables you to visually display the start

    times, end times and duration for each work order , along with its

    associated operations and any pegged work orders

    Solid black bar- Line item schedule to be manufactured on-time

    Black and Red bar- Line item schedule to be available after the

    requested date

    Black and green bar- to be available before the requested

    Solid red bar- item after requested date

    Solid green bar- Line item schedule early

    Green diamond- Line item is procured from a supplier and ready

    to be used in routing

    Work Order Centric view

  • 8/10/2019 PS Training Document

    19/30

  • 8/10/2019 PS Training Document

    20/30

    Different Alerts

  • 8/10/2019 PS Training Document

    21/30

    DefiningResources

  • 8/10/2019 PS Training Document

    22/30

    DefiningOperations

  • 8/10/2019 PS Training Document

    23/30

    DefiningRoutings

  • 8/10/2019 PS Training Document

    24/30

    Working with Data Editors

  • 8/10/2019 PS Training Document

    25/30

    Setting Up Models

  • 8/10/2019 PS Training Document

    26/30

    Solving and Viewing Schedules

  • 8/10/2019 PS Training Document

    27/30

    Evaluating and Adjusting Schedules

    Manually one can drag and drop theOperations to change the scheduling

  • 8/10/2019 PS Training Document

    28/30

  • 8/10/2019 PS Training Document

    29/30

    Publishing Schedules

  • 8/10/2019 PS Training Document

    30/30

    Production Scheduling Published Reports Overview

    We can publish data from Production Scheduling in any of the following formats: CSV HTML XML

    CSV File ReportsCSV files can be read into an ETL tool of your choice for transformation in preparationfor import into other systems. When you publish in .csv file format, you can generateone or more of the following reports. Operations Report, Resource Schedule, Demand Fulfillment,Key Performance Indicators (KPIs)

    HTML Dispatch ReportHTML file format generates an HTML Dispatch Report that can be published directly to the shopfloor.

    XML File ReportsThe standard XML files, which are exported out of Production Scheduling, are: ProductionSchedule.xml

    PurchaseOrderRecommendations.xml WorkOrderSchedule.xmlXML files can be compressed when publishing, which reduces the size of the filescreated.