PROJECTS
Myakka State Park Cabin, Pavilion and Restroom Renovation, Sarasota County, Florida
Refurbishment of Cabins 1 thru 5, Pavilion and Latrine. Accessibility Improvements in Cabin 5 at the Myakka
State Park, Sarasota County, Florida. Florida Department of Environmental Protection Division of Recreation
and Parks Bureau of Recreation and Construction. Elevation of Cabins 18" with structural and building repairs
and reconnect all utilities while preserving the integrity of the historic buildings.
(http://deccontracting.com )
Projects - DEC Contracting
content/uploads/2014/05/0134f2c44d68b3376fdfde51d869cb001951845844.jpg)
(http://deccontracting.com/dev/wp-
content/uploads/2014/05/01454f383bb6cdb98d94a796ccObd4e825baa751c7.jpg)
(http://deccontracting.com/dev/wp-
content/uploads/2014/05/01973ce9991326919d37ed329d0548f07f499f5205.jpg1
Panera Bread Stores #1233, #1741, #1029, #1600 & #1233 - Northeast and Southwest Florida
Renovation of Five Panera Bread Stores located in Northeast and Southwest Florida completed between July
and September, 2014. Renovation work consisted of demolition, interior re-paint, signage, millwork, flooring
replacement, bakery equipment upgrades, electrical and plumbing upgrades and restroom ADA compliance.
All construction activity was completed while maintaining a fully operational and functional store.
(http://deccontracting.com/dey/wp-content/uploads/2014/05/Overall .jpg)
Palmetto Elementary - Naples, Florida
New construction of a two story 122,000 square foot $30
million elementary school. Situated on 34.75 acres with
22.75 acres hping develonPri rid the rPmaining arrpagp wac
-ittp://deccontracting.com/projects/
3/31/2016
Projects - DEC Contracting was the construction of a water and waste water treatment
facility and generator which allowed the school to act as a
hurricane shelter. The school was constructed using tilt-wall
panel construction which allowed construction to be
completed and open for school in under 11 months. Doug Masch was the Project Manager on Palmetto \
Elementary while employed at a previous construction
company, this was not an actual project completed by DEC
Contracting Group, Inc.
M GO- WA 4424 5t4VtikrTA307
Page 3 of 5
Villas Elementary - Fort Myers, Florida
Renovation work consisted of replacement of windows in all
classrooms, new floor finishes, ceilings and lighting, new
classroom millwork. Egress improvements, renovations of
existing group restrooms, expansion of clinic, new entrance
facade, replacement & upgrade of classroom HVAC,
demolition of Amphitheatre and canopy relocation,
replacement of existing P.E. structure with School District
Prototype and roof repair at the Music/Art Building. This
renovation work consisted of 14 different phases all of
which were completed while the facility was occupied.
Doug Masch was the Project Manager on this project while
employed at a previous construction company, this was not
an actual project completed by DEC Contracting Group, Inc.
Wa-ke Hatchee Park - Fort Myers, Florida
Construction of a new Lee County Park totaling 48 acres of
developed ball fields, lakes, walk paths, restroom building,
tennis courts, playground, parking and maintenance
building. The construction was conducted adjacent to tidal
influenced wetlands. This led to many challenges that were
overcome through continuous, effective and concise
communication with multiple governmental authorities
(SFWMD, Lee County Construction & Design, Lee County
Parks Department and Lee County Stormwater).
http ://de c contracting. c om/proj ects/
3/31/2016
Projects - DEC Contracting , employed at a previous construction company, this was not
an actual project completed by DEC Contracting Group, Inc.
Wal-Mart # 8150, 579, 623, 721, 769, 5391, 8173 - Port St. Lucie, St. Augustine, Ft. Myers, Port Charlotte, Venice, Naples & Miromar, Florida
Remodels of seven (7) different Sam's Club and Wal-Mart
Supercenters totaling over $2.5 million and were completed
between the months of April and October. At any given time
there were three (3) projects that were under construction
simultaneously. These remodels consisted of complete
interior and exterior re-paint, joint sealants, signage,
millwork/laminate replacement, complete store flooring
replacement, refrigeration replacement, vision centers,
hearing centers, electrical upgrades, plumbing upgrades,
tire and lube upgrades, restroom ADA compliance, plastic
laminate wainscot, ceramic tile, oven and dishwasher
upgrades and epoxy flooring. All construction activities were
completed while maintaining a fully operational and
functional store. Safety and the ability not to disrupt sales
and the customer experience was paramount to the success
of these projects.
Doug Masch was the Project Manager on this project while
employed at a previous construction company, this was not
an actual project completed by DEC Contracting Group, Inc.
Gulf Elementary Mechanical Renovations - Cape Coral, Florida
Renovations consisted of complete removal and replacement of all HVAC systems (chillers, air handlers,
piping, duct work and insulation), fire protection systems, upgrade to electrical and plumbing systems,
construction of new walls, painting and installation of new acoustical ceiling This work was conducted in three
(3) phases two of which were completed while the school was occupied. Phase II consisted of two (2) chiller
removal and replacement and five (5) air handlers removal and replacement , construction of new walls,
painting and acoustical ceiling which occupied approximately 66% of the school. The phase II work was
completed in seven (7) weeks.
Doug Masch was the Project Manager on this project while employed at a previous
ittp ://deccontracting.com/proj ects/
3/31/2016
Projects - DEC Contracting Page 5 of 5
This site / civil project was a refurbishment to an existing
storm retention system. The existing pond liner and
underdrains were removed in their entirety. The bottom
and slopes were re-graded to meet proposed grades.
Concrete pipe and mitered end sections were removed and
replaced to meet new elevations and match the new
slopes/banks. Modifications to the pond outlet structure
were performed. New rip-rap was installed around the
newly installed mitered end sections. Construction activities
for this project were completed in the months of June and
July. This project was completed on time, within budget and
required effective communication with Wal-mart and the
local / state agencies.
Doug Masch was the Project Manager on this project while
employed at a previous construction company, this was not
an actual project completed by DEC Contracting Group, Inc.
DEC CONTRACTING GROUP, INC 1560 Matthew Drive, Suite B
Fort Myers, Florida 33907
OFFICE: 239.332.4322
EMAIL: infoOdeccontracting.com
(mailto:infoPdeccontracting.com)
GENERAL CONTRACTING
CONSTRUCTION MANAGEMENT
DESIGN BUILD
Connect with us
(https://twittercom/deccontracting)
(http://www.facebook.com/deccontracting
Copyright 0 2014 DEC Contracting Group, Inc. All Rights Reserved. Design Services and Hosting by Web Hosting Hub
ittp://deccontracting.com/projects/ 3/31/2016
C.C.P.S. - ELEMENTARY SCHOOL J
DISTRICT SCHOOL 130.-UtD OF COLLIER COUNTY STANDARD FORM OF CHANGE ORDER
PROJECT: CHANGE ORDER NUMBER 01 (Name, Address)
Elementary School .1 1175 Everglades Blvd. S Napks, Fl 34109
ARCHITECT'S PROJECT NO. 05106
CONTRACT FOR: New Construction
CONTRACT DATE:
To: (Contractor): Lodge Construction. Inc.
You are directed to make the following changes in this Contract: Add five additional 100% outside air moisture removal units for constant volume operation. The units are based on the attached description by Dynathenn Resources. Inc.
The Architect's signature on this constitutes his certification that supporting cost data is accurate and that in his considered professional opinion the prices quoted are both fair and reasonable and in proper ration to the original work contracted for under benefit of competitive bidding.
the Original Contract Sum was $27.534,026.00
Net Change by previous Change Order 5 0.01)
The Contract Suns prior to this Change Order was 527.534.026.09
The Contract Sum will he (increased) (decreasedi(unchunged) by this Change Order 424325.00
The new Contract Sum including this Change Order will he .... 527.958351.00
The new Contract Time will be tincrosed) (decreased) by ( 0 Days
The Date of Comploion as of the date of this Change Order therefore is S July 15. 2007 (Date)
Harvard Jolly
lodge Construction, Inc. District School Board of Collier Co. Architect
Construction Manager
Owner
2161-A McGregor Blvd. 5575 Osceola Trail
Address Address
Foil Myeis. Fl 33901 Naples. Fl 34109
BY kl2 1f P40&4-1- BY
DATE
DATE
1714 ML King.IrSt. N
Address
St. Petersburg. Fl 33704
BY
DATE
STANDARD FORM OF CHANGE ORDER 1)0315-2
ONSTRUCTION, INC.
Meeting Minutes Project [06-913] - Elementary School
Lodge Construction, Inc. 2161 McGregor Blvd Fort Myers, FL 33901 Phone: (239) 332-4371
View Date 8/27/2007 Date 8/21/2007
Meeting No. 06-913- 002
Fax: (239) 332-0218
Meeting Pre-Construction Date 8/21/2007 Type Time 9:30 AM UTC Subject Owner / Architect / CM Pre- Location CCPS Administration Bldg. 4th fl. Rm.
Construction 168 Prepared By Russ Vought
Meeting Attendance
Company - Attendee Attended Company - Attendee Attended
Banks Engineering - David Sheppard F -Lodge Construction, Inc. - Doug Masch
1;7
District School Board of Collier County - Adrian Roman
I— 'Lodge Construction, Inc. - George Riviere
District School Board of Collier County - Fai Chan
17 Lodge Construction, Inc. - Russ Vought
17
District School Board of Collier County - Maria Gomez
17 Lodge Construction, Inc. - Tammy Kaminski
Fi
Harvard Jolly Inc., PA, AIA - Dick Gay F. McCarthy & Associates - Mark Erkkila n Harvard Jolly Inc., PA, AIA - Jeff Cobble 17 Schmidt Dell Associates, Inc. - Gene
Schmidt E.
Harvard Jolly Inc., PA, AIA - John Rhodes 17 Schmidt Dell Associates, Inc. - Heather Callaway
S7
Lodge Construction, Inc. - Cabot Dunn P7 TKW Consulting Engineers - Dan Johnson
r
Ordered By Item No.
06-913-002-001
Type General Originated 8/15/2007 Category Schedule Due 8/21/2007 Summary SCHEDULES Resolved 8/21/2007 Desired Outcome Establish Dates Complete 1%7
Responsible Parties For Information Only
Discussion Details Project Construction Schedule:
A. Review of Construction Schedule
• July 15th, 2008 is Substantial Completion of Elem. "J"
B. Determine Schedule / Guidline of Consultants Inspections
• CCPS requested that the consultants be present for the weekly meetings during the for front of the project
• Consultant visits for observations on an as needed basis • 48 hr notice is prefered for consultant observation / inspections
• Non compliance items are to be noted, forwarded to the Architect for distribution to the Owner & C.M.
06 -913-002-002
Type General
Originated 8/15/2007 Category New Business
Due 8/21/2007
Summary TESTING
Resolved 8/21/2007 Desired Outcome Establish Testing Agency Contacts
Complete 17
Responsible Parties For Information Only
Discussion Details Testing
A. Determine what testing agency is to be utilized on this project
• ASC Geosciences, Inc. will be the testing agency / Contact Person is Frank Murati - 239-693- 6334
06-913 -002-003
Type General Originated 8/15/2007 Category Action Due 8/21/2007 Summary INSPECTIONS Resolved 8/21/2007 Desired Outcome Establish Contacts and Timelines Complete F7
Responsible Parties For Information Only
Discussion Details Project Inspections:
A. Building Inspections performed by PEICO for compliance to project documents
• Confirmed
B. Threshold Inspections to be performed by what identity
• TLC Engineering for Architecture - Mike Head- 239-275-4240
C. MEP / Consultant Inspections / Observations to be determined for contacts and timeline
• Consultant visits for observations on an as needed basis • 48 hr notice is prefered for consultant observation / inspections
Type
General Category
Schedule Summary
PROGRESS MEETINGS Desired Outcome Schedule and Assign Responsibilty Responsible Parties For Information Only
Originated 8/15/2007 Due 8/21/2007 Resolved 8/21/2007 Complete 17/-
Discussion Details Owner / Architect / Consultant Progress Meetings
A. Establish Date & Time
• Weekly: Wednesday's 9:00 a.m. • Location: 4th floor of the CCPS Admin Bldg. untill the construction trailer is in place
B. Establish who will provide agenda and conduct the meetings
• Construction Manager
C. Establish who will be responsible for providing and distribution of meeting minuets
• Construction Manager
06-913-002-004
06-913-002-005
Type General Originated 8/15/2007
Category Schedule Due 8/21/2007
Summary STAGING AREA Resolved
Desired Outcome Staging Area Defined Complete r Responsible Parties For Information Only
Discussion Details Staging Area:
A. Discuss and propose project staging area
• C.M. requested location at the southwest corner of the site along the west side of the Future Access Road.
• C.M. to verify this location with Johns Rhodes on Friday 8-24-07
Type Category Summary Desired Outcome Responsible Parties
Action Item
Schedule REVISED PROJECT DRAWINGS / DOCUMENTS
Reciept of Current Drawings and Documents
Originated 8/15/2007
Due 8/21/2007
Resolved Complete r
Discussion Details Revised Documents:
A. Discuss status of receiving current construction drawings and changes for review and submission to PEICO for revisions to current permitted documents
• ASI No. 1 to be provided by Harvard Jolly 8-24-07 / 8-27-07 • Harvard Jolly to provide to Lodge 8-21-07 HVAC Drawings • Review of HVAC changes to confirm pricing of equipment changes • Provide to owner a Change Order for HVAC related changes
B. Discuss status of receiving the approved SBR drawings and documents
• Signed & Sealed SBR Drawings to be forwarded for distribution to the Architect from TKW • Dan Johnson will forward to Lodge Construction the SWP3 Plan
06-913-002-006
06-913-002-007
Type Action Item Originated 8/15/2007
Category New Business Due 8/21/2007
Summary RESPONSIBLE PERSONNEL Resolved 8/21/2007
Desired Outcome Establish Contacts and Roles Complete 1.7
Responsible Parties For Information Only
Discussion Details Project Principal Contacts:
A. Owners representative
• Fai Chan - CCPS Director of Project Management • Maria Gomez - CCPS Project Manager - 239-377-0269
B. Architects representatives
Harvard Jolly
• John Rhodes - 954-486-7910 / fax 954-486-7825 • Dick Gay - 239-275-774 / fax 239-275-0447 • Jeff Cobble - 727-896-4611
Schmidt Dell Associates
• Heather Callaway - 727-822-6286 / fax 727-822-6280 • Gene Schmidt - 850-438-0050 / fax 850-432-8631
McCarthy & Associates
• Mark Erkkila - 727-536-8772
TKW Consulting Engineers
• Dan Johnson - 239-278-1992
C. CM's representatives
• Cabot Dunn - Senior Project Manager - 239-332-4371 / fax 239-332-0218 • Russ Vought - Project Manager - 239-332-4371 / fax 239- 332-0218 • George Riviere - Project Superintendent - 239-633-9497 • Doug Masch - Project Superintendent - 239-462-1028 • Jossie Pineros - Adimistrative Asst. - 239-332-4371
06-913-002-008
Type Category Summary Desired Outcome Responsible Parties
General New Business OPEN RFI'S Closing of Open RFI's All Team Members
Originated Due Resolved Complete
8/15/2007
I-
Discussion Details Review of Open RFI's ( 13 - 20 )
• John to review these in the next few days
06-913-002-009
Type General Originated 8/15/2007 Category New Business Due 8/21/2007 Summary OPEN DISCUSSION Resolved 8/21/2007 Desired Outcome Complete 17 Responsible Parties
Discussion Details
Meeting Open for Additional Items of Discussion:
A. Boundry Verification for Iron Rod Location
• ABB's 5/8 iron rod and cap are not in place. Request that ABB revisit the site and confirm / re-establish the boundry markers to confirm that the residential fencing is on school property.
B. Moisture Removal Units Change Order Request
• Request current MEP Drawings for Mechanical Contractors review and confirm current pricing. ( Incorporated in ASI No. 1 )
C. Pay Application Review
• Pay Application to be reviewed the last Wednesday of each month • As-Built drawings to be current at time of Pay App. review ( Pencil Copy ) • Schedule: review of past weeks progress, review of 2 week projected work
D. Documentaion
• ASI's provided by Architect • Contingency is for unforseen & Owner requested items • PR's are to be reviewed by Architect for recomendation and frowarded to Owner • CM-PR's are associated with ASI's, Credits & Costs • Visitors sign-in sheet for all Visitors to project site
E. Project Changes / Additions
• ASI No. 1 is forthcomming • Eyebrow changes pending review • Addition of on site Sherrifs Trailer and associated utilities forthcomming • Audio Enhanced System associated with ASI No.1 • Change Order associated with HVAC labor & equipment • Double check valve required at WWTP • Deletion of Pulper associated with the kitchen equipment
F. Required Owner Approval / Review
• Color Selections • Kitchen Equipment • Hardware followed by Keying Schedule Meeting
G. Permits
• PEICO Building Permit expiration / Re-Submit • Fire Permit status
H. Misc.
• Any school personel requested changes send to Maria Gomez • Request to Fai to visit Elem. "M" • Provide to Fai contingency log sample
Distribution
Recipient Company Method Date
Cabot Dunn Lodge Construction, Inc. Email: [email protected] 8/16/2007
Cabot Dunn Lodge Construction, Inc. Message 8/16/2007
Dan Johnson TKW Consulting Engineers Email: [email protected] 8/16/2007
David Sheppard Banks Engineering Email: [email protected] 8/16/2007
Doug Masch Lodge Construction, Inc. Email: [email protected] 8/16/2007
Doug Masch Lodge Construction, Inc. Message 8/16/2007
Fai Chan District School Board of Collier County
Email: [email protected] 8/16/2007
George Riviere Lodge Construction, Inc. Email: [email protected]
8/16/2007
George Riviere Lodge Construction, Inc. Message 8/16/2007
Heather Callaway
Schmidt Dell Associates, Inc. Email: [email protected] 8/16/2007
John Rhodes Harvard Jolly Inc., PA, AIA Email: [email protected] 8/16/2007
Maria Gomez District School Board of Collier County
Email: [email protected] 8/16/2007
Mark Erkkila McCarthy & Associates Email: [email protected] 8/16/2007
Russ Vought Lodge Construction, Inc. Email: [email protected] 8/16/2007
Russ Vought Lodge Construction, Inc. Message 8/16/2007