ProjectWiseOverview
atLaDOTD
David Ringuette
2009 Louisiana Transportation Engineering Conference
Current IT Roles:
PROJECTWISE Manager• Administrator• Implementation – Upgrades & Maintenance• Server & Application Maintenance • Oversee SQL DB• User & System Support• DOTD PW Trainer
CADD• Technical Infrastructure System Support• CADD to ProjectWise Interoperability
ProjectWise WEB
Add: • USER NAME • PASSWORD
DATASOURCE LOGIN
DATASOURCE TREE
WINDOW
DOCUMENTWINDOW
PW WEB – Uploading Documents
Create MULTIPLE DOC’S
• Select the Folder to put the Document.
• From the Document menu, choose New > Multiple Document.
• Click Add Files, navigate to a Windows folder, select one or more files and click Open.
MULTIPLEFILES HERE
ProjectWise Web Explorer Lite is an easy way to View, Download, Search and Compare Plans stored in a ProjectWise Datasource.
Consultants & DOTD Engineers can Collaborate on one platform VIA the INTERNET…
ProjectWise WEBHTTP://www10.dotd.louisiana.gov/WEL/index.html
ProjectWise Explorer
The ProjectWise Explorer Client is the primary application we use at LADOTD for Plans Management.
Stores PROJECT DATA CAD files and related files such as: .DGN’s, .PDF’s and INROADS file-types.
INTERFACE is ideal for Managing DATA CREATION & IN-PROCESS WORKFLOW.
ProjectWise Resolves FILE MGT Issues.
ProjectWiseAPPLICATION INTEGRATION
ProjectWise enables us to accomplish our day-to-day ProjectWise Tasks directly from the applications we typically use
EX: When a User Opens a Design File Starts MicroStation
ProjectWise
DATASOURCE TREE Window
DOCUMENT Window
ATTRIBUTE Window
Typical PROJECT TEMPLATE
LAYOUT
Document Check Out – Check InCHECK OUT or Double click on Document\Design File in the Documents Window. Of course: If you CHECK one OUT, you must CHECK it back IN!
.DGN stays LOCKED
until It Is Checked In!
LOGICAL SET = Master Document & it’s Referenced Documents
Reference FileWindow-Documents
Referenced into the Master Document
DocumentsWindow-
Hierarchical Tree Symbol shows
Master Document of a Logical Set
ProjectWise DESIGN WORKFLOW
1. PLAN DEVELOPMENT: Creating & Editing Plans
2. PLAN CHECKING: Locks Plans To Ensure Security - Verified
3. PLAN CORRECTION: Final Clean-Up & Advanced Status
4. FINAL CHECKING: Plan Validation
5. REVIEW: Management Level Project Controls
6. COMPLETED
• SET FINAL STATUS: Project is Complete
ProjectWiseDOCUMENT PROPERTIES
Right Click on the .DGN
THE PROPERTIES DIALOG BOX OPENS…
Left Click on PROPERTIES
ProjectWiseORIGINAL PROPERTIES
DIALOG BOX
GENERAL: Shows Who has Checked Out the Design File
SECURITY: Shows Security Level
ATTRIBUTES: Individual Fields used for search capabilities
AUDIT TRAIL: Design File History
Before ProjectWise:
• PROJECTS SPREAD OUTProjects were spread out. Road Design, Bridge Design, Survey, etc. all had their own project folder on different servers.
• DIFFICULT ACCESS TO DATAData access between sections was spotty, depending on mapped drives and word of mouth.
Before ProjectWise:
• INCONSISTENT FOLDER STRUCTUREProject folder structure was somewhat standard on the gang level but could vary from gang to gang.
• LIMITED SECURITYSecurity for active projects varied from poor to good at best.
Before ProjectWise:
•NO BUILT IN WORKFLOWWork flow security; if exercised, wasperformed by manually changing windowfolder security.
•LIMITED ELECTRONIC COLLABORATIONThe ability to know who did what andwhen depended on word of mouth.
Project collaboration involved consultantsand DOTD exchanging email, CDs.
After Original ProjectWise Implementation:
• PROJECTS CENTRALIZEDAll project plans reside on one centralizedserver and project folder.
• IMPROVED DATA ACCESSBetween design groups statewidebecause of project centralization
• CONSISTENT FOLDER STRUCTUREProject folder structure is controlled by standard project templates.
After Original ProjectWise Implementation:
• INCREASED PROJECT SECURITYSecurity has been redesigned.
• WORKFLOW SECURITYStandardized workflow security makes it easy to vary security through the various stages of the project.
• AUDIT TRAILThe ability to know who did what andwhen, is facilitated by the Audit Trail.
After Original ProjectWise Implementation:
• EFFICIENT PROJECT CLLABORATIONProject collaboration, involving DOTD andconsultants working and exchanging data ona centralized data management platform, is now exercised as needed.
ProjectWise XM
A Collaborative Environment for Plan Development
Full XM Implementation: Software Upgrade Migrate existing PW Data Create a New General Style Interface Assign Specific Project Level Properties Developing, Testing and Applying our new
Project Template DOTD ProjectWise Access Lists XM Upgrade Training Advancements in Project Collaboration
Software Upgrade from ProjectWise 2004 to ProjectWise XM Edition
XM is more robust and interoperates effectively with the MicroStation XM platform.
Supports Microsoft Office 2007 & Outlook Email Support for Windows Vista Support for 64-bit Windows Server 2003 Support for SharePoint 2007 Project Level Searching MicroStation Raster Referencing Integration Distributed DGN files functionality Management Workspace
Create a New General Style Interface
Assign Specific Project Level Properties
Lead Project Number Associate Project Number District Section Parish Route Funding Category Work Type Plan Status Form [Letter or Full size] Project Manager
New Project Template
Developing: Researching current design processes Creating unique access lists per discipline Internal and External needs… Internal Example: “Bridge Designer” has write
privileges on the Bridge Facilities folder. “Road Designer” has write privileges on the Road-Site folder.
External Example: “External Consultants” Their list and it’s security is only applied to their consultant folder.
New Project Template
Testing: Centered around security schemas and
their effects on the end users associated task.
Ex: Consultants can only see their folders documents and not other consultants’ data…
Ex: Folder Arranged by DOTD disciplines Road Site, Bridge Facilities, Survey
New Project Template
Applying: Everyday Real-Life scenarios continues to
be the most effective way to polish the folder structures’ naming convention and appropriate security access list changes. DOTD has a lot of turnover that also affects the access lists.
New Project Template 000-00-0000 [The Project
Number] PUBLISHED DRAWINGS
• Project Documents• Project Drawings
STANDARD DRAWINGS• Special Details• Standard Plans
AS-BUILT PLANS BRIDGE-FACILITIES
• Architectural• Bridge-Structural• Electrical• Mechanical• Permits
RIGHT-OF-WAY MAP• Documents• Property Survey• Right-of-Way Map
•ROAD SITE•Documents•Existing As-Builts•Images•Permits•Plans
•SURVEY•Documents•Electronic Survey•Field Data•Photographs
•TRAFFIC•Documents•DOCUMENTS•DOCUMENTS•UTILITIES•Design•Operators•Revision 1•SAVED SEARCHES
DOTD ProjectWise Access ListsAdministrator: Manages ProjectWise System including security and permissions.Designer: Creates Documents. Discipline folder viewing is restricted to
working disciplines.Data Manager: Designer who also manages documents and creates new folders
when necessary within Discipline. [This should not abused]DOTD Data Manager: Can copy files into certain folders and view most folders. Includes
most Data Manager Access Lists.DOTD Data Reviewer: DOTD Data Managers, Project Managers, Program Managers,
Administrators and others who can review data in all project folders (read-only)
DOTD Standards Manager: Data Manager who also manages Standard Drawings
DOTD ProjectWise Access Lists
DOTD Plans Manager: Data Manager who creates projects and oversee standards
management
DOTD Everyone: Can review DOTD project subfolders as follows: Published Submittals
and Standard Drawings.
Consultant Firms: Can Review Published Submittals for their Projects only. Can fill in title blocks in project Standard Drawings folders. Cannot view discipline folders unless explicitly granted permission Can exchange data with DOTD in Consultant folder for their firm only Can review Information Purposes Only Standard Drawings in Public
folder
XM Upgrade TrainingDiscussions and Demonstrations
XM TRAINING OBJECTIVES: General Overview of the New Features of ProjectWise XM Open Discussions about how to improve the current system Set some expectations as to what LADOTD would like to
accomplish Identify some of the new features that LADOTD would like to
see implemented Review some of the new features of ProjectWise from an
administrative aspect Demonstration of some of the new features Review of existing LADOTD ProjectWise Environment Open discussion about issues or improvements to the current
system Suggest possible improvements
Advancements in Project CollaborationProjectWise WEBCLIENT Workflow Go to the ProjectWise WEB- Log In
ProjectWise WEBCLIENT Workflow Type in your User Name and Password… Under your Consultant’s Named folder…Will be
your current Project Number
HTTP://www10.dotd.louisiana.gov/WEL/index.html
ProjectWise WEBCLIENT WorkflowThe Consultant’s In/Out Box Folders in ProjectWise Inbox Consultant:
• This the Consultants’ Individual Mail Box-• DOTD can Drop Data into here and the Consultant can Pull the
Data out. Inbox DOTD:
• This is DOTD’s Mail Box for Data Managers-• The Consultant can Drop Data into here and DOTD can Pull the
Data out. Consultants:[ABC] Engineers Individual Consultant
000-00-0000 Project NumberInbox_Consultant Files From DOTDInbox_DOTD Files From Consultant
Temp Temporary Holding
ProjectWise WEBCLIENT Workflow
ProjectWise WEBCLIENT WorkflowExample Consultant Data Upload: Email Consultant requesting the needed data from
them. Consultant Logs In to ProjectWise, locates their
Consultant named folder and uploads data into the “InBox DOTD” folder.
Consultant Emails a confirmation of uploaded data to PW.
DOTD Moves data into the appropriate project folder location.
DOTD Emails a confirmation to the consultant of receipt.
ProjectWise USER ID Request
LADOTD Internet Page-”Doing Business with DOTD”/”Electronic Standards For Plans”:Choose-“ProjectWise Request For ID”
To Be Completed SOON!
ProjectWise Explorer
PLANS MANAGEMENT SOLUTION
ProjectWise simplifies the otherwise complex Data Management Issues associated with Design and Publishing of Project Plans.
ProjectWise XM at LaDOTD