2
2019 TO 2024 IMPLEMENTATION PLAN SUMMARY Seattle Bicycle Master Plan Summer 2019 FACT SHEET Seattle’s Bicycle Master Plan (BMP) 2019 to 2024 Implementation Plan invests $76 million over six years making significant progress toward connecting our bike network, including 50 miles of new bike facilities and 29 miles of new projects funded through design and planning. The plan will transform how people move around Seattle, by completing the Center City Bike Network, delivering protected bike lanes with RapidRide H (Delridge) and RapidRide Roosevelt/Eastlake, increasing connections to future light rail stations, and completing the Missing Link of the Burke Gilman Trail. www.seattle.gov/transportation/BMP Prior to finalizing the Implementation Plan, hundreds of people provided input and called for a southeast Seattle connection to downtown. As a result, Mayor Durkan directed SDOT to advance to construction a project on Martin Luther King, Jr Way S from I-90 to at least Rainier Ave S and to advance planning for a route along Beacon Ave S from the Jose Rizal Bridge to S 39th St. The following map and charts highlight the exciting changes you’ll see over the next six years as we make biking a comfortable, healthy, affordable option for traveling around Seattle. PROJECTS FUNDED THROUGH DESIGN Project Name Type NORTH SECTOR VZ Interurban to Greenwood Connection NGW Lake City/Maple Leaf Connection to Wedgwood NGW SRTS Olympic Hills to Cedar Park NGW CENTRAL SECTOR SRTS Stevens ES Connection NGW Roosevelt Transit Plus Multimodal Corridor PBL Lake Washington Loop NGW SOUTH SECTOR SRTS Orca K-8 Connection NGW Georgetown to South Park PBL / Trail SODO Trail (on-hold) Trail PROJECTS FUNDED THROUGH PLANNING Project Name Type CENTRAL SECTOR Center City - Alaskan Way (Virginia to Elliot Bay Trail) TBD Central District: 12th Ave (King to Yesler) PBL SOUTH SECTOR Beacon Ave S Segment 1 (S 39th St to S Myrtle St) PBL Beacon Ave S Segment 2 (S Myrtle St to S Spokane St) PBL Beacon Ave S Segment 3 (S Spokane St to Jose Rizal Bridge) PBL / NGW Georgetown to Downtown facility TBD Martin Luther King, Jr Blvd (Rainier to Henderson) TBD W Seattle N Admiral Connection NGW SRTS Beacon Hill ES NGW PBL - Protected Bike Lane NGW - Neighborhood Greenway BL - Bike Lane Investing in Biking: A Seattle Progress Report Over the last 18 months, SDOT has: Invested $21M in bike infrastructure Built 13 miles of new facilities Installed 800 parking spaces Seen a 12% increase in bike ridership Launched the nation’s largest free-floating bike share program And Seattle was acknowledged as 2018 “Best Bike City” in Bicycling magazine!

PROJECTS FUNDED THROUGH DESIGN PROJECTS FUNDED …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECTS FUNDED THROUGH DESIGN PROJECTS FUNDED …

2019 TO 2024 IMPLEMENTATION PLAN SUMMARY Seattle Bicycle Master Plan Summer 2019FACT SHEET

Seattle’s Bicycle Master Plan (BMP) 2019 to 2024 Implementation Plan invests $76 million over six years making significant progress toward connecting our bike network, including 50 miles of new bike facilities and 29 miles of new projects funded through design and planning.

The plan will transform how people move around Seattle, by completing the Center City Bike Network, delivering protected bike lanes with RapidRide H (Delridge) and RapidRide Roosevelt/Eastlake, increasing connections to future light rail stations, and completing the Missing Link of the Burke Gilman Trail.

www.seattle.gov/transportation/BMP

Prior to finalizing the Implementation Plan, hundreds of people provided input and called for a southeast Seattle connection to downtown. As a result, Mayor Durkan directed SDOT to advance to construction a project on Martin Luther King, Jr Way S from I-90 to at least Rainier Ave S and to advance planning for a route along Beacon Ave S from the Jose Rizal Bridge to S 39th St.

The following map and charts highlight the exciting changes you’ll see over the next six years as we make biking a comfortable, healthy, affordable option for traveling around Seattle.

PROJECTS FUNDED THROUGH DESIGN Project Name Type

NORTH SECTOR VZ Interurban to Greenwood Connection NGW

Lake City/Maple Leaf Connection to Wedgwood NGW

SRTS Olympic Hills to Cedar Park NGW

CENTRAL SECTOR SRTS Stevens ES Connection NGW

Roosevelt Transit Plus Multimodal Corridor PBL

Lake Washington Loop NGW

SOUTH SECTOR SRTS Orca K-8 Connection NGW

Georgetown to South Park PBL / Trail

SODO Trail (on-hold) Trail

PROJECTS FUNDED THROUGH PLANNING Project Name Type

CENTRAL SECTOR Center City - Alaskan Way (Virginia to Elliot Bay Trail)

TBD

Central District: 12th Ave (King to Yesler) PBL

SOUTH SECTOR Beacon Ave S Segment 1 (S 39th St to S Myrtle St) PBL

Beacon Ave S Segment 2 (S Myrtle St to S Spokane St)

PBL

Beacon Ave S Segment 3 (S Spokane St to Jose Rizal Bridge)

PBL / NGW

Georgetown to Downtown facility TBD

Martin Luther King, Jr Blvd (Rainier to Henderson) TBD

W Seattle N Admiral Connection NGW

SRTS Beacon Hill ES NGWPBL - Protected Bike LaneNGW - Neighborhood GreenwayBL - Bike Lane

Investing in Biking: A Seattle Progress Report

Over the last 18 months, SDOT has:

Invested $21M in bike infrastructure

Built 13 miles of new facilities

Installed 800 parking spaces

Seen a 12% increase in bike ridership

Launched the nation’s largest free-floating bike share program

And Seattle was acknowledged as 2018 “Best Bike City” in Bicycling magazine!

Page 2: PROJECTS FUNDED THROUGH DESIGN PROJECTS FUNDED …

0

9TH

AVE

N

SW ROXBURY ST

BOREN AVE

23R

DAV

EE

FAU

NTL

ER

OY

WAY

SW

RO

OS

EV

ELT

WAY

NE

LEARYWAY

NW

11TH

AV

E N

E

1ST

A VE

S

35TH

A VE

SW

WEST SEATTLE BR WB

2ND

AVE

AIRPORTW

AYS

FAIR

VIE

WAV

EN

N 34TH ST

BROAD ST

MO

NTL

AK

EBL

VD

NE

BA

LLA

RD

BR

1ST

AVE

NE

NNORTH

GATE

WAY

WES

TM

ARG

INAL

WAY

SW

SWIFT

AVES

24TH

AVE

E

1ST

A VE

S

ML

KING

JRW

AYS

WALL

ST

15T H

AVE

NW

N 46TH ST

4TH

AVE

S

N 85TH ST

PINE ST

ROY ST

N 105TH ST

2NDAV

ETS

NE 145TH ST

EA

STL

AK

EAV

EE

15TH

AVE

NE

OLS

ON

PLSWA

LAS

KA

NW

YVI

NB

1ST

AVS

BR

NB

WE

STLAKE

AVE

N

LAK

EC

ITY

WAY

NE

15TH

AVE

W

DE

L RI D

GE

WAY

SW

EAST

MARGINAL WAYS

2ND

AVE

SW

23R

D A

VE

2 5TH

AVE

NE

2 3R

DAV

ES

AU

RO

RA

A VE

N

ALA

SK

AN

WY

VIS

B

31S

TAV

ES

1ST

AVE

NE

59THAV

SWTUR

N

N 65TH ST

17TH

AVE

NE

NE 70TH ST

14TH

AV

E

NW 100TH ST

S ORCAS ST

3RD

AVE

W

NE 115THST

40TH

A VE

NE

32N

DA V

EW

1 0T H

A VE

W

NW 96TH ST

W BERTONAST

SW HOLDEN ST

BEACONAVES

BEACO

NAV

ES

N 125TH ST

NE 41ST ST

SW 106TH ST

3RD

AV

E N

W

48TH

AVE

SW

4 7TH

A VE

NE

LAK

ES

IDE

AVE

S

14TH

AVE

S

NE 55TH ST

43R

DA V

EE

CA

L IFO

RN

I AA V

ES

W

1 7T H

AVE

S

14TH

AVE

NW

NW 65TH ST

20TH

AVE

NW

ME

RID

IAN

A VE

N

6TH

A VE

S8 T

HA V

ES

L AT O

NA

A VE

NE

NW 80TH ST

N 40THST

1ST

A VE

W

34TH

AV

E

N 35TH ST

NE 75TH ST

19TH

A VE

E

NE 110TH ST

19TH

AV

E

SW GENESEE ST

3RD

A VE

NW

UN

IVE

RS

ITY

WAY

NE

3 5TH

AVE

SW

38T H

AVE

S

N 90TH ST

SW TRENTON ST

NW 125THST

20TH

AVE

NE

3 5T H

AVE

SW

W COMMODORE WAY6T

HAV

EW

L IN

DE

NAV

EN

8TH

AVE

NW

62N

DA V

ES

1ST

AVE

NE

DA Y

TON

AVE

N

N 115TH ST

49TH

AVE

SW

SW 100TH ST

1STAVE

S

16T H

A VE

SW

MA

GN

OLIA

BLVD

W

20TH

A VE

NE

2 8T H

AVE

W

20TH

AVE

S

8TH

AVE

S

15TH

AVE

NW

30T H

AVE

NE

6THAVE

S

22N

DAV

EW

0 1 20.5Miles

NPlanned 2024Bike Network

May 20, 2019

2024 Full Build Out of Planned Bike Projects and Existing Bike Facilities (Excluding Sharrows)

Parks

PROJECTS FUNDED THROUGH CONSTRUCTION Project Name Type

NORTH SECTOR Aurora and 83rd signal Spot

NE 70th St Connection to PBL NGW

NE 70th St PBL PBL

North Seattle NGW NGW

VZ - NE 65th St Vision Zero Safety Corridor PBL

AAC - 15th Ave NE - North Segment PBL

AAC - 15th Ave NE - South Segment BL

AAC - Green Lake Park Loop PBL

AAC - N 50th St (Green Lake Park Loop) BL

AAC - N 80th St (Green Lake Park Loop) Spot

Burke Gilman Trail - Missing Link Trail

Green Lake to Interurban Connection NGW

N 34th St Mobility Improvements PBL

NGW Connection to Missing Link 1 NGW

NGW Connection to Missing Link 2 NGW

SRTS Viewlands Connection NGW

VZ -Wedgwood to Roosevelt Connection NGW

Northgate Light Rail to Pinehurst NGW

Northgate Light Rail to Maple Leaf NGW

Northgate Light Rail - Northgate Pedestrian and Bicycle Bridge

Trail

Northgate Light Rail- 1st Ave NE Multi-Use Path (formerly Northgate Light Rail Station (Seg 3)

Trail

Northgate Light Rail - 1st Ave NE PBL (formerly Northgate Light Rail Station Project (Seg 1)

PBL

Northgate Light Rail- 1st Ave NE PBL (formerly Northgate Light Rail Station Project (Seg 2)

PBL

SRTS Ingraham HS Connection Ph 1 NGW

Lake City to Maple Leaf NGW Crossing NGW

SRTS Hazel Wolf K-8 Pinehurst Connection NGW

SRTS Lincoln HS Connection NGW

CENTRAL SECTOR AAC - S Dearborn St PBL

Center City - 8th Ave -Interim PBL

Center City - Bell St PBL (Phase 1 - Denny to 7th) PBL

Center City - Bell St PBL (Phase 2 - 2nd to Denny) PBL

Center City - Pike/Pine Interim (final delivery of 3 blocks between 6th/9th in 2020 due signal equipment availability)

PBL

7th Ave (Bell to Blanchard) PBL

Battery St BL

Center City - 9th Ave N PBL

Center City -4th Ave (segment 1 - Pine to Spring) PBL

Center City - 4th Ave (segment 2 Vine to Pine) PBL

Center City - 4th Ave (segment 3 Spring to Main) PBL

Center City - 8th Ave (permanent) PBL

Center City - Pike/Pine (permanent) PBL

Central Waterfront (Alaskan Way Viaduct Replacement)

PBL

Center City -South End Connection PBL

12th Ave S PBL- Golf Dr to S King St PBL

Central Ridge Phase 1 NGW

Judkins Park Connection NGW

Key Arena - NODO - 1st/Broad St PBL

Key Arena - NODO - Queen Anne/1st PBL

Key Arena - Thomas St (Seattle Center to Waterfront)

NGW

Key Arena-Thomas St (Seattle Center to Eastlake) NGW

King Street Neighborhood Greenway NGW

King Street - 12th & King Spot

King Street - Under I-5 Spot

Melrose Promenade NGW

Melrose Promenade PBL

Union St PBL

SRTS Lowell - Meany Connection NGW

SRTS Washington MS Connection NGW

Central Ridge Phase 2 NGW

Eastlake (Fairview to Stewart) PBL

E Marginal Way PBL

SOUTH SECTOR AAC- S Columbian Way /S Alaska St (2018 AAC Package)

PBL

AAC - Swift/Myrtle/Othello (2018 AAC Package) PBL

AAC - Wilson Ave S (2018 AAC Package) PBL

SRTS High Point Loop NGW

AAC - SW Avalon Way and 35th Ave SW (2019 AAC Package)

PBL

Rainier Valley N-S Phase 2 NGW

S Lander Street Bridge Trail

SRTS Highland Park Connection Ph 2 NGW

SRTS Wing Luke Elementary Connection NGW

West Seattle Phase 2a and 2b NGW

Delridge Transit Plus Multi-modal Corridor PBL / NGW

West Seattle - 35th Ave SW Alternative - Camp Long Connection

NGW

SRTS Emerson ES Connection NGW

Accessible Mt Baker Bicycle Connection TBD

Martin Luther King Jr Blvd (I-90 to Rainier) TBD

West Seattle Phase 1 NGWPBL - Protected Bike LaneNGW - Neighborhood GreenwayBL - Bike Lane